Market Role Code
GT
Harmonised context
GNP

Clarify & Strengthen CRS Providers Requirements

Date of latest update
Type
Change
ID
R0168
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
The RECCo MSI review focused on the analysis and assessment of; Code compliance, performance, impacts and insights from lessons learned feedback from impacted stakeholders. These assessments thematically articulated changes and improvements identified to assure industry market participants that clear and appropriate action is, and will be, taken to prevent, detect and mitigate the risks and impacts of another event, and prepare for the right response to any future incidents. This Issue has been raised to address learnings from the P1 switching incident in July 2023.
Proposer
glenn.sheern
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.16.0_Superseded

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. Root Cause Communication: That the DCC, in its role as Switching Operator, delivers, clear, accurate, timely information on the incident root cause, as soon as possible, once it has obtained a reasonable understanding. Both to offset the risks of uncertainty and limited information introduce, ensuring Switching parties (like Supplier, TPIs and Networks) have the right information to enable meaningful engagement, assist their end-consumers, and all impacted Market Participants can more proactively manage the incident impacts, including making appropriate plans in response to the incident and its resolution. Switching Operator's End-Consumer Communication: Introduce a requirement for the DCC, in its role as the Switching Operator, to provide end-consumer appropriate information for REC Parties and Non-REC Parties use to determine communication and action for their Consumers.
  2. Switching Operator, Switching Incident Impact Assessment: This change should clarify the existing Switching Operator’s broader obligation to assess an incidents impact on the wider Switching Arrangements (set out in REC Schedule 26, Switching Service Management Schedule (SSMS), section 1.7, or Major Switching Incidents starting at section 2.9), to ensure the Switching Operator facilitates the most effective, efficient (time, cost, resource) overall Switching industry solution is promoted and implemented. Incident Wider Switching Impact Assessment: Clarify that if a Major Switching Incident is not going to be resolved within defined Service levels (4 hours), then the DCC in its role as Switching Operator should determine the impact on compliance with the REC end-to-end Switching Arrangements, and work with Ofgem, and the Code Administrators for BSC, UNC and DCUSA, and RECCo, to identify the cross code impacts/impacts on other Codes when managing an incident and developing an appropriate solution for industry, with least negative impact to end-consumers.
  3. Refresh and testing of Switching Operator’s (SO) incident related policies, processes, and procedures, to ensure they remain fit for purpose.
  4. Refresh and testing of Switching Operator’s (SO) incident related policies, processes, and procedures, to ensure they remain fit for purpose.
Proposed Solution Document
Document title
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (02.08.2024)
Upload document
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (2).docx
Archive
Off
Document title
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 05.12.2024
Upload document
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
Switching Operator (SO) Service Definition (R0168 - Red-lining) 05.12.2024
Upload document
Switching Operator (SO) Service Definition (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 05.12.2024
Upload document
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024 (Word Version)
Upload document
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024.docx
Archive
Off
Document title
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024 (PDF Version)
Upload document
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024.pdf
Archive
Off
Document title
R0168 - Change Report (for Consultation) 12.12.2024
Upload document
R0168 - Change Report (for Consultation) 12.12.2024.pdf
Archive
Off
Document title
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 28.01.2025
Upload document
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 28.01.2025
Upload document
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Switching Operator (SO) Service Definition (R0168 - Red-lining) 28.01.2025
Upload document
Switching Operator (SO) Service Definition (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Major Switching Incident: Switching Operator Best Practice Evaluation Form V1.0
Upload document
Major Switching Incident - Switching Operator Best Practice Evaluation Form V1.0.pdf
Archive
Off
Document title
Major Switching Incident: Switching Operator Best Practice Evaluation Form V1.0
Upload document
Major Switching Incident - Switching Operator Best Practice Evaluation Form V1.0.pdf
Archive
Off
Problem Statement
On 6th July 2023, a Major Switching Incident occurred with the Central Switching Service ((CSS) operated by the Switching Operator and CSS Service Provider, the Smart Data Communication Company (DCC)). It prevented the successful completion of that day’s planned electricity and gas, supply switches and new registrations. The CSS was stabilised post-incident and any new requests submitted after 9 a.m., 6th July were processed successfully. Through the collective action of the Switching Operator and industry parties, the CSS sent the missing industry messages to give effect to the intended switches and new registrations during the period of the 2nd to the 8th of August 2023. Priority 1 (P1) Major Switching Incidents of this nature are required to be resolved within 4 hours; however, DCC reported it took 1,605.6 hours in this instance. This incident had significant impacts on multiple industry parties and end consumers, demonstrating a clear need for improvement in the arrangements managing switching services and response to major incidents. The Retail Energy Code Company ((RECCo) with the assistance of its Code Manager) completed an end-to-end incident review; to identify the root cause, consider the efficiency and effectiveness of the incident management response, assess the improvements required, and identify appropriate actions for risk mitigation. With the overarching objective that by delivering the identified review recommendations, these actions should limit the possibility, or minimise the impact of, any future major switch incidents.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0168 - Issue Form
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (02.08.2024)
I0168 - Change Report (Change Plan) (Approved) 17.09.2024
I0168 - Update to Proposal Plan (Approved 30.10.2024)
R0168 - Consolidated Consultation Responses (Non-Confidential) 20.01.2025
R0168 - Change Report (Final Reccomendation) 04.02.2025 (Approved) V2.0
Company Name
-
Review status
Review required

Alignment of Market Message D0225 ‘consent to share flag’ to support PSR data sharing

Date of latest update
Type
Change
ID
R0139
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
This change was implemented on the 12th April 2024.
Summary
Ofgem have been in with discussion with Energy Suppliers this year, requesting them to voluntarily change how they use the consent option within the Priority Services Register (PSR) flow. This Change Proposal (CP) has been raised to make sure the Market Message mirrors the process agreed between Ofgem and Energy Suppliers by re-naming the Priority Services Register (PSR) Data Item DI51497 (J2208) as “Lawful basis for sharing” and to amend the relevant clauses in REC Schedule 13 if needed.
Proposer
Katie Stanyard
Change Plan

Party Impact Assessment

Completed

Start:

11 Aug 2023

Due:

05 Jan 2024

Completion:

05 Jan 2024

Preliminary Change Report Issued

Completed

Start:

05 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Consultation

Completed

Start:

26 Jan 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Final Change Report Issued

Completed

Start:

09 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Responsible Committee Decision

Not Started

Start:

16 Feb 2024

Due:

28 Feb 2024

Completion:

Appeal Window Closure

Not Started

Start:

28 Feb 2024

Due:

13 Mar 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Redlining - DI51497 - J2208 - Consent to share data obtained
Upload document
D0139 redlining - DI51497 - J2208 - Consent to share data obtained v0.2 (1).pdf
Archive
Off
Problem Statement
The current PSR Data Item DI51497(J2208) ‘Consent to share data obtained’ does not mirror the legal basis for sharing data that DNOs rely on, or the process that Suppliers have planned to have in place by early 2024.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0139 - Change Proposal Form
Consolidated Impact Assessment Responses
Consolidated Consultation Responses R0139
R0139 Change Proposal Plan v1.0 Approved
R0139 Initial Assessment Report v1.1 Approved
R0139 - Extension to Change Plan v1.0
R0139 Preliminary Change Report v1.0
R0139 Final Change Report v1.0 approved
ICO letter to Ofgem
R0139 redlining - DI51497 - J2208 - Consent to share data obtained
Company Name
Energy Networks Association
Review status
Review required

Updates to the Data Access Matrix

Date of latest update
Type
Change
ID
R0130
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/05/2024 - This change proposal has been withdrawn and the adoption window is closed. There is no longer the requirement for the requester to have Enquiry Services Data.
Summary
There are organisations that are named in Schedule 12 - Data Access that are not recorded in the gas and/or electricity Data Access Matrix (DAM). This means it is not possible for the Code Manager to provision them access. All organisations listed in Schedule 12 to access data in the REC should have an entry in the Data Access Matrices. This Change Proposal has been raised to review the Schedule and DAMs and take forward the necessary changes.
Proposer
Anton Moden
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0130 - Change Proposal form (downloadable version) 16.06.2023
Company Name
REC Code Manager
Review status
Review required

Clarifying Event of Default requirements

Date of latest update
Type
Change
ID
R0129
Priority
Urgent
No
Latest Update
04/10/2023 - Following the approval of R0138, this change has been withdrawn.
Summary
Following several recent events of non-payment for services and REC defaults it is clear that the event of default provisions in the Code are unclear. This change seeks to introduce clarity to the REC Main Body.
Proposer
admin
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0129 - Change Proposal form (downloadable version) 16.06.2023
Company Name
REC Code Manager
Review status
Review required

Supplier compensation for Network Party driven MPXN or GSP Group changes

Date of latest update
Type
Change
ID
R0112
Priority
Urgent
No
Latest Update
28/07/2023 - The Proposer has withdrawn R0112. This Change Proposal is open for adoption for 10 Working Days, after which time it will be fully withdrawn on the REC Portal. If you wish to adopt the Change Proposal, you can do this via the ‘Adopt Proposal’ button by 23:59 on 12 August 2023.
Summary
Empty
Proposer
admin
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0112 - CP Form (Downloadable Version)
Company Name
ScottishPower Energy Retail Ltd
Review status
Review required

CSS Message Time Stamping

Date of latest update
Type
Change
ID
R0107
Urgent
No
Latest Update
11/08/2023 - This Change Proposal has been withdrawn. During the progression of the Preliminary Impact Assessment work, it was found that an existing data item ‘EventDate’ could be leveraged to address the issue stated in the Change Proposal. R107 will be open for adoption until 25/08/2023.
Summary
Empty
Proposer
admin
Change Plan

Test

In Progress

Start:

14 Apr 2023

Due:

19 Mar 2026

Completion:

19 Mar 2026
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0107 - Change Proposal Form
Company Name
DCC
Review status
Review required

Clarifications to the Theft Detection Incentive Scheme

Date of latest update
Type
Change
ID
R0091
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
The Energy Theft Detection Incentive Scheme (TDIS) seeks to encourage Suppliers to undertake theft investigations. Following the completion of the first scheme year operated wholly under the REC, there have been several areas of the Code identified where additional clarity would benefit the administration of the TDIS.
Proposer
andrew.waghorn
Change Plan

Initial Assessment Report Issued

Completed

Start:

23 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Change Proposal Plan Issued

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Issued

Completed

Start:

07 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Consultation Issued

Completed

Start:

17 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Responsible Committee Decision

Completed

Start:

17 Feb 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

IAR and CPP Approval

Completed

Start:

27 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Supplier, I need my TDIS obligations to be clear to ensure I can meet the requirements appropriately.
  2. As the Code Manager, I want all Suppliers to be clear on the required Energy Theft reporting so that the scheme can be effectively administered.
  3. As RECCo, I want to ensure that all Suppliers have clear obligations to ensure the effective administration of TDIS to support the Theft Reduction Strategy.
Proposed Solution Document
Document title
R0091 - Legal Text (as at IAR/CPP)
Upload document
R0091 Legal Text (1).zip
Archive
Off
Document title
R0091 - Legal Text at FCR 21.03.2023
Upload document
R0091 - Legal Text at FCR.zip
Archive
Off
Document title
R0091 - Legal Text FINAL
Upload document
R0091 - Legal Text FINAL.zip
Archive
Off
Document title
EMAR Link
Archive
Off
Problem Statement
To enable REC Parties and their agents to successfully meet the obligations of the TDIS, the REC needs to accurately reflect the intention of the requirements and current processes.
R0091 - Change Proposal Form
R0091 - Change Proposal Plan (Approved) 07.02.2023
R0091 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0091 - Preliminary Change Report v1.0 17.02.2023
R0091 - Consolidated Consultation Responses
R0091 - Final Change Report v1.0 (Pre-Vote) 21.03.2023
R0091 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Make Shipper NExA values available on the GES portal

Date of latest update
Type
Change
ID
R0088
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This Change Proposal seeks to deliver the consequential REC changes for Uniform Network Code (UNC) Modification 0701 Aligning Capacity Booking under the UNC and arrangements set out in relevant NExAs. Modification (MOD) 0701 will ensure that the daily capacity allowed by the Network Exit Agreement (NExA) and that permitted by the UNC are aligned.
Proposer
Sharon Dudley
Change Plan

Initial Assessment and Change Proposal Plan issued

Completed

Start:

16 Jan 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Initial Assessment Report and Change Plan approved

Completed

Start:

24 Mar 2023

Due:

04 Apr 2023

Completion:

04 Apr 2023

Service Provider Impact Assessment

Completed

Start:

04 Apr 2023

Due:

25 Apr 2023

Completion:

24 Apr 2023

Party Impact Assessment

Completed

Start:

25 Apr 2023

Due:

31 May 2023

Completion:

31 May 2023

Preliminary Change Report published

Completed

Start:

31 May 2023

Due:

16 Jun 2023

Completion:

16 Jun 2023

Consultation

Completed

Start:

16 Jun 2023

Due:

21 Jul 2023

Completion:

21 Jul 2023

Final Change Report published

Completed

Start:

21 Jul 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Responsible Committee decision

Completed

Start:

18 Aug 2023

Due:

30 Aug 2023

Completion:

30 Aug 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, where I have entered a bi-lateral NExA with the relevant Transporter, I want my Shipper and Transporter to have access to all the data they need when capacity referrals to the Gas Transporters are required.
  2. As a Gas Transporter, I want the details of the NExA to be held in GES, to increase visibility of the existence of the NExA and to provide details of the offtake parameters.
  3. As a Gas Shipper, I need to understand both that a NExA exists, and that I have visibility of the offtake parameters relative to the site, so that I can ensure that I take the necessary actions to ensure the Consumer has the appropriate booked Supply Point Capacity.
Proposed Solution Document
Document title
R0088 Gas DAM v3.1 at FCR (18.08.2023)
Upload document
R0088 Draft V3.1 GES Data Access Matrix at FCR.xlsx
Archive
Off
Problem Statement
XRN 5186 will make updates to the GES to implement the solution for UNC MOD 701. Following Ofgem’s decision to approve MOD 701, a REC Change Proposal is required to make changes to the REC DAM to enable the delivery of the full cross code solution.
SME
SME Role
Lead Technical Analyst
R0088 - Initial Assessment Report v1.0 (Approved) 04.04.2023
R0088 - Preliminary Change Report (Post-Vote) 28.06.2023
R0088 - Change Proposal Plan v1.0 (Approved) 04.04.2023
R0088 - Final Change Report v2.0 (Approved) 30.08.2023
R0088 - Final Change Report v1.0 (Pre-Vote) 18.08.2023
Company Name
Xoserve
Review status
Review required

Housekeeping changes to the approved legal text for R0047

Date of latest update
Type
Change
ID
R0084
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
Change Proposal R0047 - Metering Code of Practice Consolidation Review, has been approved for implementation on 01 April 2023. Since approval of the Change Proposal the Code Manager has identified a number of omissions, clarifications, typographical errors and changes needed to the approved legal text. This CP has been raised to make the changes to the legal text and ensure accurate text is introduced into the REC.
Proposer
Ann Perry
Change Plan

Preliminary Change Report published and issued for Consultation

Completed

Start:

16 Dec 2022

Due:

24 Feb 2023

Completion:

24 Feb 2023

Consultation ends

Completed

Start:

24 Feb 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Final Change Report published

Completed

Start:

10 Mar 2023

Due:

21 Mar 2023

Completion:

21 Mar 2023

Responsible Committee decision (Ex-Committee)

Completed

Start:

21 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Appeal window closure

In Progress

Start:

24 Mar 2023

Due:

07 Apr 2023

Completion:

Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
  2. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
  3. As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
  4. As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Proposed Solution Document
Document title
R0084 Legal text changes - CoMCoP - (For Final Change Report) 21.03.2023
Upload document
R0084 - CoMCoP v2.1 (redlined for Final Change Report) 21.03.2023 (3).docx
Archive
Off
Document title
R0084 Legal text changes - CoMCoP - (For consultation) 24.02.2023
Upload document
R0084 - CoMCoP v2.1 (redined for Consultation) 24.02.2023.docx
Archive
Off
Problem Statement
To enable REC Parties to successfully meet the obligations of the CoMCoP, when it is implemented via Change Proposal R0047 on 01 April 2023, the CoMCoP needs to accurately reflect the intention of R0047 and current processes.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0084 - CP Form (Downloadable version)
R0084 - Legal text changes identified pre IAR/CPP - uploaded 12.02.23
R0084 - Change Proposal Plan v1.0 (Approved) 23.02.2023
R0084 - Initial Assessment Report v1.0 (Approved) 23.02.2023
R0084 - Preliminary Change Report v1.0 (Published for Consultation) 24.02.2023
R0084 - Consolidated consultation responses v1.0 21.03.2023
R0084 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Maintenance of Qualification Schedule Change

Date of latest update
Type
Change
ID
R0059
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This change seeks to clarify, strengthen and simplify a number of requirements within REC Schedule 9 – Qualification and Maintenance.
Proposer
Georgina Scott-Picton
Change Plan

Solution Development

Completed

Start:

05 Aug 2022

Due:

01 Mar 2023

Completion:

01 Mar 2023

Impact Assessment Start

Completed

Start:

01 Mar 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Impact Assessment End

Completed

Start:

10 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Preliminary Change Report Issued

Completed

Start:

24 Mar 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Responsible Committee Review

Completed

Start:

14 Apr 2023

Due:

25 Apr 2023

Completion:

25 Apr 2023

Consultation Start

Completed

Start:

25 Apr 2023

Due:

28 Apr 2023

Completion:

28 Apr 2023

Consultation End

Completed

Start:

28 Apr 2023

Due:

22 May 2023

Completion:

22 May 2023

Final Change Report Issued

Completed

Start:

22 May 2023

Due:

16 Jun 2023

Completion:

15 Jun 2023

Responsible Committee Decision

Completed

Start:

16 Jun 2023

Due:

27 Jun 2023

Completion:

27 Jun 2023

Appeal Window Closure

Not Started

Start:

27 Jun 2023

Due:

11 Jul 2023

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As an Energy Supplier, DNO, GT, MEM and REC Service User, I want to understand precisely what obligations apply to me under the Schedule 9 – Qualification and Maintenance, so that I can provide the required information to the Code Manager in a timely manner and be compliant.
  2. As the REC Code Manager, I want REC Parties and REC Service Users to have a clear understanding of the information they need to submit relating to the maintenance of their qualification, so that necessary information can be submitted for review and consideration in the most efficient way.
Proposed Solution Document
Document title
R0059 - Draft legal text for IA v1.0 10.03.2023
Upload document
R0059 - Draft legal text for IA v1.0 10.03.2023.zip
Archive
Off
Document title
R0059 - Draft legal text for Consultation v1.0 14.04.2023
Upload document
R0059 - Draft legal text for Consultation v1.0 14.04.2023 (1).zip
Archive
Off
Document title
R0059 - Draft legal text for FCR v1.0 01.06.2023
Upload document
R0059 - Draft legal text for FCR v1.0 01.06.2023.zip
Archive
Off
Document title
R0059 - Final approved draft legal text v1.0 27.06.2023
Upload document
R0059 - Final approved draft legal text v1.0 27.06.2023.zip
Archive
Off
Document title
EMAR Link - R0059 - Draft legal text for FCR v1.0 01.06.2023
Archive
Off
Problem Statement
REC Service Users are required to submit Maintenance of Qualification Annual Statements to the Code Manager, the requirements differ depending on the User category. The lack of clear obligations for REC Service Users surrounding the Maintenance of Qualification reporting, set out in Schedule 9 – Qualification and Maintenance results in missing or partially completed submissions. Considerable time is spent by the Code Manager requesting and following up on individual submissions.
R0059 - Change Proposal Form
R0059 - Change Proposal Plan v1.0 (Approved) 07.02.2023
R0059 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0059 - Impact Assessment Responses V1.0 14.04.2023
R0059 - Preliminary Change Report v1.0 (approved) 25.04.2023
R0059 - Consolidated Consultation Responses v1.0 23.05.2023
R0059 - Final Change Report v2.0 (post-vote) 27.06.23
Company Name
-
Review status
Review required