REC change to align with BSC IF-045 notification for Import/Export MPAN meter type misalignment

Date of latest update
Type
Change
ID
R0347
Change Category
Change Path
Urgent
No
Latest Update
05/11/2026 The Party impact assessment was published on 05 November 2026 and will remain open to responses until 27 November 2026. The Issue progressed to a Change Proposal on 05 November 2026.
Summary
Elexon are raising a CP that would introduce additional SMRS validation controls and a new IF-045 notification scenario to identify and manage metering misalignment across associated Import and Export MPANs. As this places obligations on MOAs, an impact to REC Schedule 14 has been identified.
Proposer
Caroline Freimuller
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
R0347 Legal Text Draft for Party impact assessment
Upload document
R0347 - Legal Text for Party IA.zip
Archive
Off
Problem Statement
The BSC CP CP1652 – Introduction of IF-045 notification from Registration Service for meter type misalignment was raised at the Supplier Volume Allocation Group on 06 October 2026. Following MHHS migration activity, Distribution Network Operators (DNOs) have identified and removed a population of Import and Export MPAN associations that contained inconsistent metering characteristics, including instances where one MPAN was configured with Smart Metering and the other with Advanced Metering. BSC CP1652 is seeking to create a new IF-045 notification scenario for the Supplier and the MOA to identify and manage misalignment issues. As BSC CP1652 relies on a new obligation on MOAs to agree on an approach to resolve the issue with the Electricity Supplier, a REC Issue is required to update Schedule 14 – Metering Operations.
I0347 Change Report (Proposal Plan) Approved
Company Name
Code Manager
Review status
Review required

Explore use of CHECK as a Meter Type option on J0483 DI-059

Date of latest update
Type
Issue
ID
I0344
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
Change Report (Proposal Plan) has been published for REC Change Panel approval on 17 November 2026.
Summary
It has been suggested that CHECK meters should not be sent within industry messages so the presence of this value within the valid set may not be required. This Issue has been raised to explore whether this assumption is correct, look at the existing/historic use cases industry have used the CHECK option for, if they are no longer valid and if so why not.
Proposer
Holly Law
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Lead Analyst
Ian Chalfon
Solution Development
Problem Statement
The DI-059 / J0483 Meter Type Data Item is shared between the Balancing and Settlement Code’s Data Integration Platform (DIP) and the REC’s Data Catalogue. The CHECK Meter Type does not have a valid MHHS Market Segment combination and is not a valid enumeration under the DIP version of DI-059 / J0483. Having an enumeration that is valid in one version of the Data Item and not valid in another causes confusion as to what enumerations are valid for this Data Item. As part of this Issue, we will also explore whether use of the LAG_, LEAD_, and MAIN_ meter types are still necessary to be kept within D-Flows, even though they are valid meter types for MHHS arrangements.
Workgroup
Workgroup(s)
I0344 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required

Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types

Date of latest update
Type
Change
ID
R0342
Change Path
Priority
Urgent
No
Latest Update
26/10/2026 - The Consultation has closed. The Code Manager is assessing the responses.
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Proposer
Lee Stone
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
R0342 Legal Drafting
Upload document
R0342 Legal Drafting V1.0 (1).docx
Archive
Off
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0342 submission form
R0342 Change Report (Proposal Plan and Consultation) v1.1 Approved
R0342 Consolidated Non-Confidential Consultation Responses
Company Name
Npower Commercial Gas Limited
Review status
Review required

Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)

Date of latest update
Type
Issue
ID
I0341
Priority
Urgent
No
Latest Update
18/11/2026 - The Change Report (Proposal Plan) was approved by the REC Change Panel
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Proposer
Daniel Tadecicco
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Lead Analyst
Harry Firth
Solution Development
Problem Statement
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service (Rejection of IF-033 with IF-035 Response R). Basic REC R032 Validation on IF-005/D0312: XX-XX-XX-XX-XX-XX-XX-XX (0-9, A-Z)
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0341 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required

REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled

Date of latest update
Type
Change
ID
R0339
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
On 11 November 2026, the REC Metering Expert Panel voted, in line with the Code Manager’s recommendation, to approve this Change Proposal. The appeal window is now open until 25 November 2026. Subject to no appeal raised, R0339 will be implemented on 26 February 2027.
Summary
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
Proposer
Caroline Freimuller
Change report - Final Change Report

Comments deadline
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

15 Sep 2026

Due:

15 Sep 2026

Completion:

15 Sep 2026
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Annabel Ashworth
Solution Development
Proposed Solution Document
Document title
R0339_Draft Schedule 14 v1.0
Upload document
R0339_Draft Schedule 14 v1.0.docx
Archive
Off
Problem Statement
BSC CP1646 has been raised to address ambiguity around Supplier obligations following receipt of IF-002 messages for cancelled registration Switch Requests. The same obligation exists within the REC, so a REC change is needed to align with the clarifications introduced by BSC CP1646, ensuring consistent interpretation and behaviour across industry.
Workgroup
Workgroup(s)
R0339 submission form
R0339 Change Report (Proposal Plan and Consultation) v1.0 Pre-Approval
R0339 Change Report (Proposal Plan and Consultation) v1.0 Approved 15.09.2026
R0339 Consolidated Consultation Responses v1.0
R0339 Change Report (Final Recommendation) v1.0 Pre Approval
R0339 Change Report (Final Recommendation) v1.0 Approved 11.11.26
Company Name
REC Code Manager / CCSG Representative
Review status
Review required

REC Change to align with CP1633 Capture Modem Module Details Under BSCP601

Date of latest update
Type
Issue
ID
I0338
Change Category
Priority
Urgent
No
Latest Update
06/08/2026 - Issue accepted in by the Code Manager
Summary
BSC CP1633 “Capture Modem Module Details Under BSCP601” makes amendments to BSCP601 Metering Protocol Approval and Compliance Testing. One of the amendments places obligations on MOAs where they are introducing and amending Communications Equipment. Equivalent and potentially expanded obligations need to be placed within REC Schedule 14 Metering Operations to support this.
Proposer
Lee Walker
Status
Implementation Status
Date Raised
Solution Development
I0338 submission form
Company Name
REC Code Manager / CCSG representative
Review status
Review required

Use of REL Data by The Authority

Date of latest update
Type
Change
ID
R0330
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the July 2026 REC Release.
Summary
This Change Proposal allows The Authority to utilise REL data and its elements to match a UPRN to an MPAN. This is an electricity only Change Proposal.
Proposer
Joel Fernandes
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

10 Jun 2026

Final Recommendation approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jul 2026
Status
Implementation Date
Status Superseded
EMAR Version 4.3.1
Included changes Affected REC Items
R0330 Use of REL Data by The Authority
  • Schedule 29 - Address Management
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0330 Proposed legal text changes v2.0
Upload document
R0330 - Legal Text for Consultation v2.0.zip
Archive
Off
Document title
R0330 Legal Text for Final Recommendation
Upload document
R0330 Legal Text for Final Recommendation.zip
Archive
Off
Problem Statement
The REC currently limits the use of Retail Energy Location (REL) data to Switching purposes only. This limits the Authority’s ability to match a UPRN to an MPAN in support of the government’s Bill Discount Scheme.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0330 submission form
R0330 Change Report (Proposal Plan and Consultation) v1.0 Approved
R0330 Consolidated Consultation Responses v1.0
R0330 Change Report (Final Recommendation) v1.0 Approved 21.07.26
Company Name
RECCo
Review status
Review required

Removal of D0383 & D0384 requirements from Sharing MTDs process

Date of latest update
Type
Change
ID
R0328
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Proposer
Harriet Truss
Change report - Final Change Report

Comments deadline
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jul 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Aug 2026

Change Report (For Consultation) presented to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Aug 2026

Final Recommendation approved at MEP

Completed

Start:

Due:

Completion:

14 Oct 2026
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Upload document
R0328 legal text V0.1.zip
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
R0328 Consolidated Consultation Responses v1.0
R0328 Change Report (Final Recommendation) V1.0 Approved 14.10.26
Company Name
REC Code Manager
Review status
Review required

Post-MHHS Full Transition Complete (M15) REC updates

Date of latest update
Type
Change
ID
R0325
Change Category
Change Path
Priority
Urgent
No
Latest Update
29/09/2026 - A Change Report (Update to Plan) has been published for review at the Change Panel on 06 October 2026, any comments on this plan must be received by 23:59 05 October 2026.
Summary
The REC was updated, primarily through R0209 and R0241, to add requirements that support the transition to, and enduring operation of the MHHS arrangements. As part of the transition, each impacted Metering Point will be migrated using processes defined in Codes, including the REC. Once this migration activity is complete, the legacy and transitional arrangements will become redundant and should be removed from the REC to support its efficient operation
Proposer
Jonny Moore
Change Report - Initial Assessment and Change Plan Report
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Francine Peyroux-Sissoko
Solution Development
Problem Statement
Retention of redundant obligations within the REC would make it more complex to navigate for Market Participants and could cause confusion on the obligations that are in effect to support the efficient operation of the Great British Energy retail market. It is also worth noting that until Ofgem formally closes the MHHS Significant Code Review (SCR), this REC Issue could potentially impact that SCR.
Workgroup
Workgroup(s)
I0325 submission form
I0325 Scope list
I0325 Schedules CHIG 03092026.zip
I0325 Schedules CHIG 01102026.zip
I0325 Schedule1 CHIG 05112026.pdf
I0325_Change Report (Update to Plan) v1.0
R0325 Legal drafting
Company Name
RECCO
Review status
Reviewed - Accepted

DNOs Create Export MPANs after approving G98/99 commissioning documents

Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/11/2026 On 20 October 2026, the REC Change Panel voted, in line with the Code Manager's recommendation, to approve this Change Proposal. The appeal window is now closed. R0321 will be implemented on 25 June 2027.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Proposer
Ben Atkinson
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

05 May 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

07 May 2026

Change Report (For Consultation) and Update to Plan approved at Change Panel

Completed

Start:

Due:

Completion:

17 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Final Recommendation approved at Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Implementation Date
Status Scheduled
EMAR Version 4.6.0_Scheduled

Documents

Name Version Last updated Actions
244.73 KB
Version 1.0 - 02 Nov 2026 PDF - 244.73 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Upload document
RMP Lifecycle draft for export MPANs - 21 November 2025(118301312) (1).docx
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Upload document
RMP Lifecycle draft for export MPANs - for consultation.docx
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
R0321 Consolidated consultation responses - NON CONFIDENTIAL
R0321 Change Report (Final Recommendation) V1.0 Approved 20.10.26
Company Name
British Gas
Review status