Update CCSG ToRs to include cross-code prioritisation as per Code Reform
Date of latest update
Type
Change
ID
R0308
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
As part of the Ofgem Code Reform which looks to standardise how changes and modifications are prioritised across all Codes, there is confirmation that for cross-code changes the prioritisation will be set by the Lead Code with all non-lead Codes using the same prioritisation.
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
CCSG - Terms of Reference - Legal Text R0308
Upload document
CCSG - Terms of Reference updated formating.pdf
Archive
Off
Problem Statement
Failing to update the CCSG Terms of Reference could result in unintentional ambiguity and leave no place within any Code to record the requirement for all codes to align with the prioritisation of the lead code.
Stages Selection
I0308 submission form
Consolidated Consultation Responses
Company Name
REC Code Manager
Review status
Review required
Release and Licensing of the CoMCoP Logo for Accredited Parties
Date of latest update
Type
Change
ID
R0307
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Although a CoMCoP logo was trademarked prior to the launch of the CoMCoP in April 2023, the logos have not yet been made available for use.
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0307 Proposed Legal Drafting
Upload document
R0307 Proposed Legal Drafting.docx
Archive
Off
Document title
R0307 Proposed Legal Drafting Extract
Upload document
R0307 Proposed Legal Drafting (1).docx
Archive
Off
Document title
R0307 Schedule 1 Proposed legal drafting
Upload document
R0307 Schedule 1 Proposed legal drafting.docx
Archive
Off
Document title
R0307 Schedule 15 Proposed legal drafting
Upload document
R0307 Schedule 15 Proposed legal drafting.docx
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0307 submission form
R0307 Change Report (Proposal Plan and Consultation)
R0307 Change Report (Final Recommendation) V1.1
Company Name
Retail Energy Code Company
Review status
Review required
REC Change to Align with DCP467 Asset Condition Reporting
Date of latest update
Type
Change
ID
R0306
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
11/11/2026 - the Metering Expert Panel voted to approve placing this Change Proposal on hold until the solution of DCP467 has been finalised.
Summary
DCUSA change DCP467 has been raised to propose that Category A and B defects reported currently using the Asset Condition Report (D0135) or phone call to the DNO, should instead be reported via an online reporting tool where the DNO has one available. This is expected to have impacts to the REC.
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0306 STIRG Guidance Document draft V0.1
Upload document
I0306 STIRG Guidance Document draft V0.1.docx
Archive
Off
Document title
I0306 Data Spec changes v0.1
Upload document
I0306 Data Spec changes.docx
Archive
Off
Document title
R0306 STIRG Guidance Document draft V0.2
Upload document
I0306 STIRG Guidance Document draft V0.2.docx
Archive
Off
Document title
R0306 Data Spec changes V0.2
Upload document
I0306 Data Spec changes V0.2.docx
Archive
Off
Problem Statement
Where DNOs have enhanced reporting tools for Category A or Category B situations, it is not mandatory for Parties to submit reports using this method. This may lead to a detrimental Consumer experience, as it is limited what information can be provided over the telephone or via Market Message (e.g. it is not possible to provide photographs of the situation).
Stages Selection
Workgroup
Workgroup(s)
I0306 submission form
I0306 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0306 Consolidated Impact Assessment Responses V1.0
R0306 Change Report (For Consultation) V1.1
R0306 Consolidated Consultation Responses v1.1 PUBLIC
R0306 Change Proposal Re-Plan v1.0 approved 08.07.26
R0306 Change Proposal Re-Plan v2.0 approved 11.11.26
Company Name
-
Review status
Review required
Categorisation of Gas Address Amendment SDEP Cases
Date of latest update
Type
Issue
ID
I0305
Priority
Urgent
No
Latest Update
20/01/2026 - Issue accepted in by Code Manager
Summary
The Market Message PT0055 is specifically used for SDEP cases related to Gas Crossed Meter queries. We have identified a large number of cases requesting resolutions relating to Gas Address Amendments that are being raised in PT0055.
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
I0305 submission form
Company Name
OVO Energy
Review status
Review required
Implementation of Ofgem-led code modification prioritisation within the REC
Date of latest update
Type
Change
ID
R0304
Change Category
Change Path
Urgent
No
Latest Update
This Change Proposal was implemented on 29 May 2026.
Summary
Ofgem has consulted on, and is progressing towards a decision on, the introduction of a harmonised code modification prioritisation framework across all industry codes, under its transitional powers in Schedule 12 to the Energy Act 2023. This Issue is being raised to provide the formal REC change vehicle through which Ofgem’s prioritisation reforms can be tracked, developed and implemented in the REC, once the Authority has published its decision and statutory modification notice.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
In the absence of REC changes, the REC would not align with Ofgem’s harmonised approach to code modification prioritisation, creating inconsistency with other industry codes and undermining the objectives of Energy code reform.
Stages Selection
I0304 submission form
I0304 Change Report (Proposal Plan) V1.0
New Priority Status
Company Name
RECCo
Review status
Review required
Potential Consumer detriment for Smart Economy 7
Date of latest update
Type
Issue
ID
I0303
Urgent
No
Latest Update
09/04/2026 Following a review of responses to the joint information request on REC Issues I0273 - Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters and I0303 - Potential Consumer detriment for Smart Economy 7, the Code Manager has determined that the scope of REC Issue I0303 can be considered as part of the solution development for REC Issue I0273. I0303 has now been classed as resolved and will not be progressed further as a separate Issue. For further engagement with this issue, please refer to I0273 directly.
Summary
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating.
Status
Implementation Status
Date Raised
Solution Development
Problem Statement
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating. A solution is required that enables a Supplier to identify a Smart E7 Consumer during the Switch process to ensure they can offer the correct tariff and prevent consumer detriment.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0303 submission form
Company Name
Centrica
Review status
Review required
Provision of data to the GES Provider
Date of latest update
Type
Issue
ID
I0302
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/08/2026 On 26 August 2026, in line with the Code Manager's recommendation, TEP approved the extension to plan for I0302.
Summary
RECCo has commenced work on developing a dual-fuel Enquiry Service which will involve the migration of data from its legacy services.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Ahead of the introduction of a dual-fuel Enquiry Service and in the case that the GES Provider is not the same entity as the CDSP and GRDA, this Issue seeks to enable the migration of gas data from legacy services into a new physical interface.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0302 submission form
I0302 Change Report (Proposal Plan) v1.0
I0302 Change Report (Update to Plan) v1.0 Approved 15.04.26
I0302 Change Report (Extension to Plan) v1.0 Approved 26.08.2026
Company Name
REC Code Manager
Review status
Review required
Updates to Enquiry Service API endpoints to support migration to RECCo’s API Gateway
Date of latest update
Type
Issue
ID
I0301
Change Path
Urgent
No
Latest Update
06/11/2026 - Following further analysis, it was determined that I0301 is no longer required. While the Issue was originally raised to support a dual-fuel approach to RECCo’s Enquiry Service evolution, the initial focus on GES means that no changes to the REC are currently required to update the relevant API endpoints.
Summary
As part of RECCo’s plan to procure a dual-fuel Enquiry Service, there will be a single point of entry to API services. A migration plan has been developed with two independent stages. For stage one, all current Enquiry Service API users will need to connect through RECCo’s API Gateway rather than connecting directly to the existing EES and GES APIs. This will require users to amend the URLs they call when accessing the services.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
I0301 submission form
Company Name
REC Code Manager
Review status
Review required
Amendments to D0312 to align with BSC CP1622
Date of latest update
Type
Change
ID
R0300
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Elexon have raised CP1622 to amend the Validation rules within the Supplier Meter Registration Service (SMRS) for the Number of Register Digits Data Item within the IF-005 Market Message, to allow digit values from 1–9, ensuring accurate data and reducing exceptions. There are no Validation rules related to the D0312 Market Message which need to be amended under the Balancing and Settlement Code (BSC), but the D0312 itself contains a Data Item Rule regarding the Number of Displayed Register Digits which needs to be amended in line with CP1622.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Amendments to D0312 red-lined data spec V0.1
Upload document
Amendments to D0312 red-lined data spec.docx
Archive
Off
Document title
Amendments to D0312 red-lined data spec V0.2
Upload document
Amendments to D0312 red-lined data spec V0.2.docx
Archive
Off
Document title
20260205 CP1622 R0300 industry workshop slides
Upload document
20260205 CP1622 R0300 industry workshop slides (1).pdf
Archive
Off
Problem Statement
BSC CP1622 is looking to address that SMRS cannot accurately update the Number of Displayed Register Digits for a SMETS2 Smart Electricity Meter due to Validation rules currently in place. The Validation rules proposed to be amended are those on the IF-005, which has direct impacts to the D0312.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0300 submission form
R0300 Change Report (Proposal Plan) V1.0
R0300 Consolidated Impact Assessment Responses PUBLIC v1.0
R0300 Update to Plan V1.0 approved 19.03.26
R0300 Change Report (For Consultation) V1.1
R0300 Consolidated Consultation Responses V1.0
R0300 Change Report (Final Recommendation) V1.0 approved 29.04.26
Company Name
Code Manager/CCSG
Review status
Review required
Data Latency Targets for the GES Service Definition
Date of latest update
Type
Change
ID
R0299
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
R0277 – Data Latency SLA alignment for Gas Enquiry Service amended two performance levels within the Gas Enquiry Service (GES) Service Definition. However, these changes only addressed ambiguity on when the performance level applied from and to and increased the number of hours in which data will be available to Authorised Persons within the Supply Point Switching API. This change will seek to support the changes made under R0277 whilst also providing a suitable percentage SLA target for the Gas Enquiry Service Provider to meet these measures.
Change Plan
Proposal Plan approved
Completed
Start:
Due:
17 Feb 2026Completion:
17 Feb 2026Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0299 Legal Text for Consultation
Upload document
R0299 Legal Text for Consultation.zip
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0299 submission form
R0299 Change Report v1.0 (Consultation) APPROVED
R0299 Change Report (Final Recommendation) v1.0 APPROVED
Company Name
REC Code Manager
Review status
Review required