Annual Review of the Performance Assurance Report Catalogue (2025-26)
Date of latest update
Type
Change
ID
R0298
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 27 March 2026.
Summary
The Code Manager is required to perform an annual review of a number of PAF items, including the PARC. The PARC has already been updated several times over the course of 2025 through a series of REC Changes (including R0173, R0202, R0254, R0259). We have conducted an end-to-end review and have identified the other changes are required.
Status
Implementation Date
27 March 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0201 | Creation of a Tool to Manually Correct ERDS / CSS Discrepancies |
|
| R0298 | Annual Review of the Performance Assurance Report Catalogue (2025-26) |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Performance Assurance Report Catalogue 5.16 - Redlined
Upload document
Performance Assurance Report Catalogue 5.16 - Redlined.xlsx
Archive
Off
Problem Statement
To ensure REC Parties and Service Providers are aware of reports they must provide for Performance Assurance as well as reports obtained from central data sources (such as, but not limited to, the DIP Manager) used in assuring their performance within the market. It is essential these reports are maintained in line with changes to Code processes as well as changing risk landscape.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0298 Issue Form
R0298 - Change Report (For Consultation) V1.1 (20.01.2026)
R0298 - Consolidated Consultation Responses (Non-Confidential) 12.02.2026.
R0298 - Change Report (Final Recommendation) V1.0 (Approved) 24.02.2026
Company Name
REC Code Manager - Performance Assurance
Review status
Review required
Meter Manufacturers Make and Type not Populated in SMRS
Date of latest update
Type
Issue
ID
I0297
Change Path
Priority
Urgent
No
Latest Update
On 30 September 2026, the REC Technical Expert Panel voted to approve the Update to Plan for I0297, and to place this REC Issue on hold.
Summary
The Meter Manufacturers Make and Type (J0410 / DI-048) was not populated as part of the MHHS Programme's data cleanse. However it is part of the SMRS maintained Meter Technical Details (MTDs) for Smart Meters which replace the DTC MTD Market Messages for Smart Meters in the MHHS environment. It is not currently possible to populate this item in the legacy arrangements.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Following MHHS Migration, the MTDs provided by SMRS do not include the Meter Manufacturers Make and Type, as this replaces the existing D0149/D0150 Market Messages it could lead to the information being lost. This will mean Energy Suppliers and MOAs will not know the make and type of meter installed at a particular Site.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0297 submission form
I0297 Change Report (Proposal Plan) V1.0
I0297 Update to plan
I0297 Legal Drafting
I0297 Update to plan v1.0 Approved 30.09.26
Company Name
RECCo
Review status
Review required
Registration Id Required for MHHS Appointments
Date of latest update
Type
Issue
ID
I0296
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Code Manager have developed a solution which has been live since 05 May 2026. More detail can be found on the REC Portal Wiki. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
The RegistrationId (DI90043 / DI849) is required by SMRS to be included in the IF-031 'Supplier Agent Appointment Request' Market Message to allow the SMRA to process the appointment request. However not all Suppliers hold the RegistrationId for all Meter Points, in particular those that have not undergone a Registration managed by the Central Switching Service (CSS)
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As part of the solution for REC Issue I0296 - Registration Id Required for MHHS Appointments the REC Code Manager have developed a process to provide Energy Suppliers the Registration Id for Metering Points that have not been through a Central Switching Service (CSS) Registration Managed Switch. This is to allow Energy Suppliers that may not hold the Registration Id for these Metering Points to populate the Market-wide Half Hourly Settlement (MHHS) Agent Appointment Messages required to initiate a MHHS Migration.
- More detail of the solution can be found: https://portal.retailenergycode.co.uk/knowledge-centre/rec-wiki/market-wide-half-hourly-settlement/provision-registration-id-required?utm_source=emailoctopus&utm_medium=email&utm_campaign=Weekly%20Bulletin%20-%202026-05-01
Proposed Solution Document
Document title
I0296 Closure Report_v1.0 (12 May 2026)
Upload document
I0296_Closure report_v1.0.pdf
Archive
Off
Problem Statement
Not all Energy Suppliers hold the RegistrationId for all Meter Points, particularly those Meter Points that have not gone through a Switch, i.e. have not undergone a Registration managed by the CSS. The RegistrationId is currently only available where a Metering Point has been through a CSS managed Registration. Without the RegistrationId available to Energy Suppliers, not all Metering Points will be able to migrate putting the MHHS Migration and Milestone M15 at risk.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0296 submission form
Company Name
RECCo
Review status
Review required
Implementation of IF-051 Data Refresh in EES for BSC CP1607
Date of latest update
Type
Change
ID
R0294
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/10/2026 On 28 October 2026, the Technical Expert Panel voted, in line with the Code Manager’s recommendation, to approve the extension to plan for R0294. The Code Manager is working with the BSC on stakeholder workshops on a complete end-to-end solution, including the required market message specification, governance arrangements and operational processes. Stakeholder workshops will be held to run through the new ‘Data Refresh’ message, discuss the proposed change and gather stakeholder views on the full solution. The Code Manager will be attending these workshops to provide input on the new BSC CP, as well as impacts on the REC and REC services (primarily the Electricity Enquiry Services).
Summary
The IF-051 provides a refresh of data from Supplier Meter Registration Service (SMRS) to the Electricity Enquiry Service (EES) (REC) and Market Data Service (BSC). Currently the REC does not hold any detail regarding the DIP Market Messages that the EES is required to receive and process. Due to the nature of the IF-051, the EES Provider obligations need to be clear to ensure the interface can be received and processed appropriately.
Change Plan
Proposal Plan approved at REC Change Panel
Completed
Start:
Due:
16 Dec 2025Completion:
16 Dec 2025Consultation published
Completed
Start:
Due:
12 Feb 2026Completion:
12 Feb 2026Consultation closed
Completed
Start:
Due:
27 Feb 2026Completion:
27 Feb 2026Proposal Plan update approved by Technical Expert Panel
Completed
Start:
Due:
25 Mar 2026Completion:
25 Mar 2026Proposal Plan update approved by Technical Expert Panel
Completed
Start:
Due:
Completion:
28 Oct 2026Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
EES Service Definition v4.1 - redlined for IF-051
Upload document
EES Service Definition v4.1 - redlined for IF-051.pdf
Archive
Off
Document title
366_05B CP1607 IF-0XX_Proposed Data Refresh Flow v0.1
Upload document
366_05B CP1607 IF-0XX_Proposed Data Refresh Flow v0.1.pdf
Archive
Off
Document title
R0294 EES Service Definition REDLINED for Consultation
Upload document
R0294 EES Service Definition REDLINED for Consultation.pdf
Archive
Off
Document title
CP1629 Attachment C IF-051 Refresh Flow v2.0 REDLINED
Upload document
Attachment C IF-051 Refresh Flow v2.0 REDLINED.pdf
Archive
Off
Document title
R0294 Solution Development Report v1.0
Upload document
R0294 Solution Development Report v1.0.pdf
Archive
Off
Problem Statement
BSC CP 1607 will implement a new DIP Market Message, the IF-051 ‘Data Refresh’ on 26 March 2026. EES will be a recipient of that change. If EES is not able to receive and process instances of the IF-051, data in EES will be misaligned with other industry systems (SMRS, DIP and MDS) meaning that it will not maintain its role as the accurate reference point for industry participants. This could lead to potential disruption of industry processes.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0294 Submission Form
R0294 Change Report (Proposal Plan) Approved v1.1 16.12.2025
R0294 Change Report (Consultation) Approved v1.0 04.02.2026
R0294 Consolidated Consultation Responses v1.0
R0294 - Change Proposal Re-Plan v1.0 (Approved) 25.03.2026
R0294 Change Report (Update to Plan) v1.0 Approved 07.07.26
R0294 Change Report (Update to Plan) v2.0 Approved 28.10.26
Company Name
REC Code Manager
Review status
Review required
Housekeeping February 2026
Date of latest update
Type
Change
ID
R0293
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The Code Manager has identified a number of non-material clarifications, typographical errors and changes needed to REC products.
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
This Housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC.
Stages Selection
February 2026 Housekeeping Summary spreadsheet V1.0
February 2026 Housekeeping legal text (zip file) V1.0
R0293 Housekeeping Change Report v1.0 approved 16.12.25
Company Name
REC Code Manager
Review status
Review required
Obligate Energy Suppliers to provide photo evidence of Theft in Conveyance to Network Parties
Date of latest update
Type
Change
ID
R0292
Change Category
Change Path
Priority
Urgent
No
Latest Update
17/11/2026 - the Change Panel voted to approve this Change Proposal for implementation on 26 February 2027. If you wish to raise an appeal against this decision, it must be received by COB 01 December 2026.
Summary
This Issue seeks to introduce an additional clause for Suppliers that have attended Sites with suspected or actual Energy Theft in Conveyance to share and store evidence of the tampering to be made available to Network Parties upon request.
Change Plan
Presented at Change Issues Group
Completed
Start:
06 Aug 2026Due:
06 Aug 2026Completion:
06 Aug 2026Update to Plan approved by Change Panel
Completed
Start:
21 Jul 2026Due:
21 Jul 2026Completion:
21 Jul 2026Change Report (For Consultation) approved by Change Panel
Completed
Start:
18 Aug 2026Due:
18 Aug 2026Completion:
18 Aug 2026Status
Implementation Date
26 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0292 | Obligate Energy Suppliers to provide photo evidence of Theft in Conveyance to Network Parties | |
| R0322 | Erroneous Switch Review: I0237 Clarifications | |
| R0324 | Use of REL Data to Support Key Regulations |
|
| R0339 | REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0292 Schedule 8 draft V0.1
Upload document
I0292 Scheudle 8 draft V0.1 - R0253 baseline.docx
Archive
Off
Document title
I0292 Schedule 8 draft V0.2
Upload document
I0292 Scheudle 8 draft V0.2 - R0253 baseline - for consultation.docx
Archive
Off
Problem Statement
There are cases where Energy Suppliers (or its Revenue Protection Agent) have provided the Network Parties with minimal information and no photos following Site visits for Theft in Conveyance, which results in additional time for Energy Theft Desktop Investigations and additional costs where jobs are raised for attendance that aren’t always needed.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0292 submission form
I0292 Change Report (Proposal Plan) V1.0
I0292 Consolidated Information Request Responses V1.0
I0292 Update to Plan V1.0 approved 21.07.26
I0292 Consolidated Impact Assessment Responses PUBLIC v1.0
R0292 Change Report (For Consultation) V1.0 approved 18.08.26
R0292 Consolidated Consultation Responses v1.0
Company Name
SSEN
Review status
Review required
Review of Schedule 1 Interpretations and Definitions
Date of latest update
Type
Change
ID
R0291
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
During the quality checks of REC Schedules for MHHS, several capitalised terms throughout schedules were identified with no entry in Schedule 1. It has also been identified that there are definitions that link to Schedules (such as 2, 20 and 21) which are no longer live REC Schedules. The Code Manager has reviewed these and determined some changes are required to Schedule 1.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
17 Feb 2026Approved at Change Panel for implementation in June 2026
Completed
Start:
Due:
Completion:
21 Apr 2026Impacted REC Documents
Status
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0291 REC Main Body draft V0.1
Upload document
R0291 REC Main Body draft V0.1.docx
Archive
Off
Document title
R0291 Schedule 1 draft V0.1
Upload document
R0291 Schedule 1 draft V0.1 (1).docx
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Upload document
R0291 Schedule 25 (CSS) draft V0.1.docx
Archive
Off
Document title
R0291 Schedule 1 draft V0.2
Upload document
R0291 Schedule 1 draft V0.2.docx
Archive
Off
Document title
R0291 REC Main Body draft V0.1
Upload document
R0291 REC Main Body draft V0.1 (1).docx
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Upload document
R0291 Schedule 25 (CSS) draft V0.1 (1).docx
Archive
Off
Problem Statement
Without clear definitions of all defined terms within the REC, there may be confusion for REC Parties and other industry participants who use REC documents.
Stages Selection
I0291 submission form
I0291 Change Report (Proposal Plan) V1.0
R0291 Change Report (For Consultation) V1.0
R0291 Consolidated Consultation Responses v1.0
R0291 Change Report (Final Recommendation) V1.1 approved 21.04.26
Company Name
REC Code Manager
Review status
Review required
Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
Date of latest update
Type
Change
ID
R0287
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The current wording of the Annulment definition in REC Schedule 23 – Registration Services does not sufficiently align with the obligations set out in Ofgem’s Electricity Supply Standard Licence Conditions (SLC) 14.2(d),14.4(c) and 14.10. This misalignment has led to inconsistent interpretations of the usage of the Annulment process across the industry compared to the intention of the REC change and the licence obligation. This Issue is seeking further amendments to REC Schedule 23 - Registration Services and clearer guidance. This clarification is essential to prevent retention-based misuse, ensure regulatory compliance, and uphold Consumer trust in the Switching process.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
02 Dec 2025Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
20 Jan 2026Alternative Change Proposals
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0287 Draft Legal Changes - For Consultation
Upload document
I0287 Draft Legal Changes - For Consultation.docx
Archive
Off
Problem Statement
The current wording of the Annulment definition in the REC Schedule 23 – Registration Services is insufficiently aligned with the obligations set out in Ofgem’s Electricity Supply Standard Licence Conditions (SLC). This has led to inconsistent interpretations of the usage of the Annulment process.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
vaishnsharma@deloitte.co.uk
SME Role
Lead Assurance Analyst
I0287 submission form
R0287 and R0287A Change Report (Proposal Plan and Consultation) v1.0 approved 02.12.25
R0287 and R0287A Consolidated Consultation Responses PUBLIC
R0287 and R0287A Change Report (Final Recommendation) Post Vote 20.01.2026 v1.0
Ofgem decision to approve R0287
Company Name
Centrica
Review status
Review required
Clarification on Detailed Impact Assessment Activities
Date of latest update
Type
Change
ID
R0286
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The first complex technical change R0067 (Introduction of CSS Refresh Functionality) encountered a number of challenges within the design and implementation process, the change was scheduled for implementation on the 6th December 2023, however, the change was deployed with defects and was not fully operational until February 2024. Following that session, the Code Manager held discussions, and a formal Lessons Learned session with all Service Providers and identified a number of challenges with the technical change process. Some of these challenges can be attributed to the timing of the detailed design, Detailed Impact Assessments (DIA) and party impact assessments
Impacted Consumers
Impacted REC Documents
Status
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An update to the REC Schedule 5 - Change Management.
Proposed Solution Document
Document title
R0286 Proposed legal text v1.1
Upload document
R0286_Draft legal text_v1.1.docx
Archive
Off
Problem Statement
The technical change process currently creates five challenges which can be attributed to the timing of the detailed design, PIA and DIAs. These are as follows: Lack of Clarity, Limited Feedback, Misalignment, High Contingency Costs and Inaccurate Timelines.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Change Management v3.5 RedLine for IA Clarifications
I0286 submission form
R0286_Consolidated Consultation responses V1.0
Company Name
REC Technical Services
Review status
Review required
Organisations with multiple role types EES and SDEP access
Date of latest update
Type
Issue
ID
I0285
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 22 October 2026, the Code Manager published the I0285 Closure Report. Following a review of the responses to the Party impact assessment, the Code Manager has determined that this REC Issu can be moved to Resolved as there has been a lack of Parties indicating they would use the proposed solution under I0285. The enduring solution of one individual assigned to two company groups to use two separate email addresses for each company group will be sustained. RECCo will consider the requirement for a single login across multiple roles as part of the Enquiry Services Evolution project development.
Summary
It is currently not possible for organisations with multiple role types to have the same person be able to access all assigned role types within the Secure Data Exchange Portal (SDEP) without having a unique email address for each role type.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Discussed at Technical Expert Panel
Completed
Start:
Due:
Completion:
17 Dec 2025Discussed at Technical Expert Panel
Completed
Start:
Due:
Completion:
28 Jan 2026Extension to Plan approved by Technical Expert Panel
Completed
Start:
Due:
Completion:
25 Feb 2026Discussed at Change Issues Group
Completed
Start:
Due:
Completion:
06 Aug 2026Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Zip file with I0285 legal text
Upload document
Legal text for Party IA (2).zip
Archive
Off
Document title
I0285 Solution Development Report V1.0
Upload document
I0285 Solution Development Report V1.0.pdf
Archive
Off
Problem Statement
Organisations with more than one role type are required to have unique email addresses for staff who require access to multiple role types, leading to inefficiencies, unnecessary administrative burdens and a poor user experience.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
I0285 submission form
I0285 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0285 Extension to Plan V1.0 approved 25.02.26
I0285 Extension to Plan V2.0 approved 24.06.26
I0285 Consolidated Impact Assessment Responses v1.0
I0285_Closure Report
Company Name
REC Code Manager
Review status
Review required