Cable Colour Identification

Date of latest update
Type
Change
ID
R0014
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
colette.baldwin
Change Plan

Initial Assessment Report published

Completed

Start:

01 Nov 2021

Due:

26 Nov 2021

Completion:

26 Nov 2021

Change Panel review

Completed

Start:

26 Nov 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

04 Jan 2022

Completion:

31 Dec 2021

Metering Expert Panel review

Completed

Start:

04 Jan 2022

Due:

12 Jan 2022

Completion:

12 Jan 2022

Consultation starts

Completed

Start:

12 Jan 2022

Due:

17 Jan 2022

Completion:

25 Jan 2022

Consultation ends

Completed

Start:

17 Jan 2022

Due:

15 Feb 2022

Completion:

15 Feb 2022

Final Change Report issued

Completed

Start:

15 Feb 2022

Due:

25 Feb 2022

Completion:

25 Feb 2022

Metering Expert Panel decision

Completed

Start:

25 Feb 2022

Due:

09 Mar 2022

Completion:

09 Mar 2022
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As an electricity Consumer, I want requested meter work to take place safely and efficiently at the time and date agreed, so that I have a safe and working meter.
  2. As a MEM or a DNO I want clarity on how to deal with cable labelling during periods of coloured cable supply chain shortages, so that I can continue to install or maintain consumer metering.
  3. As a Metering Scheme Auditor, I want there to be clarity on the permitted labelling of non-standard colour coded cables used when connecting meters, so that audits can be appropriately completed.
Proposed Solution Document
Document title
R0014 legal text (tracked changes)
Upload document
R0014 MOCoP Tracked Change Legal Text v2.0.pdf
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
During times of sustained supply chain shortages, some colour coded cables may not generally be available. Where this is the case, Metering Equipment Managers (MEMs) and Distribution Network Operators (DNOs) need to be able to source a suitable alternative cable so that they can continue to install and maintain meters. Although the labelling of cables with different out sheath colours from the inner insulation is covered by the IET Wiring Regulations, this is not set out within the REC Electricity MOCoP.
IET Wiring Regulation BS7671 - 2018 - Table 51 Identification of Conductors
R0014 - Change Proposal Plan v1.0 (Approved)
R0014 - Initial Assessment Report v1.0 (Approved)
R0014 - Preliminary Change Report v2.0 (Approved)
R0014 - Final Change Report V2.0 (Post-Vote)
Company Name
-
Review status
Review required

Housekeeping amendments to REC V2

Date of latest update
Type
Change
ID
R0012
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

04 Oct 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

22 Oct 2021

Completion:

22 Oct 2021

Change Panel review

Completed

Start:

22 Oct 2021

Due:

16 Nov 2021

Completion:

16 Nov 2021

Consultation starts

Completed

Start:

16 Nov 2021

Due:

17 Nov 2021

Completion:

17 Nov 2021

Consultation ends

Completed

Start:

17 Nov 2021

Due:

08 Dec 2021

Completion:

08 Dec 2021

Final Change Report issued

Completed

Start:

08 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Change Panel decision

Completed

Start:

10 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version REC V2.2.0_SUPERSEDED
Included changes Affected REC Items
R0020 ETTOS Report Dissemination
  • Schedule 7 - Energy Theft Reduction
R0012 Housekeeping amendments to REC V2
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 11 - Prepayment Arrangements
  • Schedule 6 - Performance Assurance
  • Schedule 8 - Unbilled Energy Code of Practice
  • ASPCoP (since removed)
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
198.05 KB
Version 1.0 - 02 Nov 2026 PDF - 198.05 KB
1.0 02 Nov 2026
255.31 KB
Version 1.0 - 02 Nov 2026 DOCX - 255.31 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I need Energy Companies to operate consistent processes, to ensure my energy supply is managed efficiently and to retain my trust in the functioning of the energy market.
  2. As a REC Party, I need the REC to provide a consistent baseline, so I can operate in an interoperable way with other Market Participants.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Upload document
Legal Drafting (3).zip
Archive
Off
Document title
Link to Change Set (Clean)
Archive
Off
Problem Statement
The implementation of REC V2, as part of the Retail Code Consolidation SCR, was due to consolidate the existing provisions in other codes into the REC on a like-for-like basis. The Code Manager has identified that there were changes made to previous codes that weren’t reflected in the REC V2 drafting that was implemented. This means that the current processes being operated by industry parties are not reflected in the REC. REC Party's and Service Providers rely on the REC to provide a consistent baseline to ensure the industry operate in an effective and interoperable way. There are currently inconsistencies between the drafting of the REC, and the processes operated by REC Party's and Service Providers, which could cause issues in the effective operation and assurance of the retail energy market.
R0012 - Change Proposal Plan v1.0 (Approved)
R0012 - Initial Assessment Report v1.0 (Approved)
R0012 - Preliminary Change Report v1.0
R0012 - Preliminary Change Report v2.0 (Approved)
R0012 - Final Change Report v1.0 (Pre-Vote)
R0012 - Final Change Report v2.0 (Post-Vote)
Company Name
REC Code Manager
Review status
Review required

Reporting of Additional EMR Backing Data to Suppliers

Date of latest update
Type
Change
ID
R0011
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
The aim of this proposal is to reduce the extra assistance required by Electricity Market Reform (EMR) parties in the invoice validation by updating the backing data within the Market Messages to align to what is being invoiced. The associated Market Messages should be structured and named in line with the actual output of Settlement systems to facilitate validation of Capacity Market (CM) Scheme and the Contracts for Difference (CfD) financial settlement.
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

12 Nov 2021

Completion:

12 Nov 2021

Technical Expert Panel review

Completed

Start:

12 Nov 2021

Due:

24 Nov 2021

Completion:

24 Nov 2021

Consultation starts

Completed

Start:

24 Nov 2021

Due:

30 Nov 2021

Completion:

29 Nov 2021

Consultation ends

Completed

Start:

30 Nov 2021

Due:

21 Dec 2021

Completion:

21 Jan 2022

Final Change Report issued

Completed

Start:

21 Dec 2021

Due:

14 Jan 2022

Completion:

14 Jan 2022

Technical Expert Panel decision

Completed

Start:

14 Jan 2022

Due:

26 Jan 2022

Completion:

26 Jan 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to be able to validate EMRS invoices and credits without having to request additional supporting data.
  2. As EMR Settlement Ltd, I need to have an efficient mechanism in place that enables me to provide Market Participants with all the relevant data that they need to validate their invoices and credit notes, to reduce/remove the need for Market Participants to contact the service desk for additional information.
Proposed Solution Document
Document title
R0011 Tracked Changes 08.03.2023
Upload document
R0011 Tracked Changes 08.03.2023.zip
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
There is no method for Suppliers and Generators to validate their invoices based on the data currently provided within the relevant Market Messages. Parties are able to request all relevant data from EMRS; however, this is time consuming for Parties, EMRS and LCCC/ESC
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0011 - Change Proposal Plan v1.0 (Approved)
R0011 – Initial Assessment Report v1.0 (Approved)
MRA SPF 107 - IA Response Summary
R0011 - Preliminary Change Report v2.0 (Approved)
R0011 - Final Change Report v2.0
Company Name
-
Review status
Review required

New Meter Types for Auxiliary Proportional Controllers (APCs)

Date of latest update
Type
Change
ID
R0010
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This change seeks to introduce a method for industry parties to identify new SMETS2 variant meter types with Auxiliary Proportional Controllers (APCs).
Proposer
David Morton
Change Plan

Change Panel review

Completed

Start:

08 Sep 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Analysis and Solution development activity

Completed

Start:

19 Oct 2021

Due:

30 Dec 2021

Completion:

30 Dec 2021

Alternative Change Proposal decision point

Completed

Start:

30 Dec 2021

Due:

31 Dec 2021

Completion:

31 Dec 2021

Service Provider Impact Assessment completion

Completed

Start:

31 Dec 2021

Due:

21 Apr 2022

Completion:

21 Apr 2022

REC Party Impact Assessment completion

Completed

Start:

21 Apr 2022

Due:

23 May 2022

Completion:

28 Mar 2022

Preliminary Change Report issued

Completed

Start:

23 May 2022

Due:

27 Jun 2022

Completion:

27 Jun 2022

Technical Expert Panel review

Completed

Start:

27 Jun 2022

Due:

05 Jul 2022

Completion:

30 Jun 2022

Consultation starts

Completed

Start:

05 Jul 2022

Due:

12 Jul 2022

Completion:

01 Jul 2022

Consultation ends

Completed

Start:

12 Jul 2022

Due:

26 Jul 2022

Completion:

22 Jul 2022

Final Change Report issued

Completed

Start:

26 Jul 2022

Due:

22 Aug 2022

Completion:

19 Aug 2022

Technical Expert Panel decision

Completed

Start:

22 Aug 2022

Due:

31 Aug 2022

Completion:

31 Aug 2022
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want to be quoted the correct rates as part of my contract conversation when switching supplier. I want my meter set-up correctly to be able to utilise secondary electricity loads at specific times for specific purposes. (e.g., overnight Electric Vehicle (EV) charging, Heat/Hot Water, Boost, etc.). I want to be assured that I will have access to electricity when I need it. I want to switch to my chosen Supplier without any delays or issues.
  2. As an Energy Supplier, I need to identify meter types with Auxiliary Proportional Controllers (APCs) at a property, so that I can offer my customer the correct tariff and configure their meter correctly.
  3. As a Meter Equipment Manager (MEM), I need to identify meter types that incorporate Auxiliary Proportional Controllers (APCs) are present at a property, so that any necessary maintenance/repair work can be carried out appropriately.
Proposed Solution Document
Document title
R0010 - Final approved legal text
Upload document
R0010 - Final approved legal text.docx
Archive
Off
Document title
R0010 - Draft Legal Text v1.0
Upload document
R0010 - Draft Legal Text v1.0.docx
Archive
Off
Document title
R0010 - Appendix 1 - Solution Analysis v1.0
Upload document
R0010 - PCR Appendix 1 - Solution Analysis v1.0.docx
Archive
Off
Problem Statement
Currently there is no way to identify new meter types that incorporate Auxiliary Proportional Controllers (APCs) outside of the DCC Smart Metering Inventory. Failure to correctly identify these could result in an incorrect meter type being assigned to a supply point. Failure to accurately record where meter types that incorporate Auxiliary Proportional Controllers (APCs) are at a property could result in the meter not being configured correctly by the Supplier. This may impact switching, timely and accurately billing, and industry settlements. Options need to be considered to accurately record what meter types that incorporate Auxiliary Proportional Controllers (APCs) are installed at a property.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
DTC CP 3580 - New Meter Types for Auxiliary Proportional Controllers.pdf
R0010 - Change Proposal Plan v1.0 (Approved)
R0010 – Initial Assessment Report v1.0 (Approved)
R0010 - Consolidated Impact Assessment Responses v1.0
R0010 - Preliminary Change Report v1.0 (Approved)
R0010 - Consolidated Consultation Responses v1.0
R0010 - Final Change Report v2.0 (Post-Vote - Approved)
Company Name
-
Review status
Review required

Consequential New and Amended Market Messages for BSC Modification P375

Date of latest update
Type
Change
ID
R0008
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

01 Nov 2021

Completion:

29 Oct 2021

Technical Expert Panel review

Completed

Start:

01 Nov 2021

Due:

08 Nov 2021

Completion:

08 Nov 2021

Consultation starts

Completed

Start:

08 Nov 2021

Due:

15 Nov 2021

Completion:

12 Nov 2021

Consultation ends

Completed

Start:

15 Nov 2021

Due:

06 Dec 2021

Completion:

06 Dec 2021

Final Change Report issued

Completed

Start:

06 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Technical Expert Panel decision

Completed

Start:

10 Dec 2021

Due:

22 Dec 2021

Completion:

22 Dec 2021
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer I want to be able to access aggregation services so that I can take full advantage of commercial opportunities for my onsite generation or demand reduction.
  2. As Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Asset Metering Virtual Lead Party, I need to be recognised as a valid Market Data Service, so that I can appoint BSC Qualified Agents and fulfil relevant metering operations and data collection activities for Asset Metering.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Upload document
R0008 Legal Text Changes.zip
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
BSC Modification P375 will be implemented on 30th June 2022 and introduces a new role of Asset Metering Virtual Lead Party (AMVLP), to allow settlement of meters ‘behind the boundary point’. To enable this, the AMVLP will need to exchange Market Messages with other Market Participants that underpin the new process being introduced by the BSC. Some of these Market Messages are governed by the REC and require a consequential REC Change Proposal to deliver the full solution.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Attachment B- New and amended Market Messages and Data Items for REC.docx
BSC P375 Final Modification Report
R0008 – Initial Assessment Report v1.0 (Approved)
R0008 – Change Proposal Plan v1.0 (Approved)
R0008 - Preliminary Change Report v1.0 (Approved)
R0008 - Final Change Report v2.0 (Post Vote)
Company Name
-
Review status
Review required

Market-wide Half-Hourly Settlement Implementation

Date of latest update
Type
Change
ID
R0003
Change Category
Other Industry Codes impacted
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Abid Sheikh
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

03 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version REC V2.1.0_SUPERSEDED
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item
  • Data Item Catalogue
  • Market Message Catalogue
R0002 Review of Data Specification Category in REC Baseline Statement
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0003 Market-wide Half-Hourly Settlement Implementation
  • REC Main Body

Documents

Name Version Last updated Actions
208.12 KB
Version 1.0 - 02 Nov 2026 PDF - 208.12 KB
1.0 02 Nov 2026
222.97 KB
Version 1.0 - 02 Nov 2026 DOCX - 222.97 KB
1.0 02 Nov 2026
101.69 KB
Version 1.0 - 02 Nov 2026 PDF - 101.69 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the Senior Responsible Owner for the Market-wide Half-Hourly Settlement programme, I need assurance that all programme participants will deliver the required changes in accordance with programme plan, so Market-wide Half-Hourly settlement can be introduced and implemented successfully.
Proposed Solution Document
Document title
R0003 - Red-lined amendments to Main Body
Upload document
R0003 - Red-lined amendments to Main Body.doc
Archive
Off
Document title
Link to EMAR - Change Set (Clean)
Archive
Off
Problem Statement
The successfully introduction of Market-wide Half-Hourly Settlement (MHHS) requires changes to made to the systems and processes governed by other codes outside of the BSC, including the REC. Elexon as the Senior Responsible Owner (SRO) and Ofgem as the Programme Sponsor for the MHHS programme need assurance that all programme participants will support the implementation of the programme and deliver against the approved timetable. While there is a general ‘duty to cooperate’ with Significant Code Reviews that exists for licenced parties, there is no explicit legal requirement for RECCo (as a non-BSC Party) to support this and no contractual recourse if its duties are not met.
Letter from the Authority to the REC Code Manager - Authority Led Modification Proposal
Initial Assessment Report v1.0 (Approved)
Change Proposal Plan v1.0 (Approved)
R0003 - Preliminary Change Report v1.0 (Approved)
R0003 - Final Change Report v1.0 (Pre-Vote)
R0003 - Final Change Report v2.0 (Post-Vote)
R0003 - Authority Decision
Company Name
Ofgem
Review status
Review required

Review of Data Specification Category in REC Baseline Statement

Date of latest update
Type
Change
ID
R0002
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

02 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version REC V2.1.0_SUPERSEDED
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item
  • Data Item Catalogue
  • Market Message Catalogue
R0002 Review of Data Specification Category in REC Baseline Statement
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0003 Market-wide Half-Hourly Settlement Implementation
  • REC Main Body

Documents

Name Version Last updated Actions
208.12 KB
Version 1.0 - 02 Nov 2026 PDF - 208.12 KB
1.0 02 Nov 2026
222.97 KB
Version 1.0 - 02 Nov 2026 DOCX - 222.97 KB
1.0 02 Nov 2026
101.69 KB
Version 1.0 - 02 Nov 2026 PDF - 101.69 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a market participant, I need to understand any changes to market messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  2. As the REC Code Manager, I need to ensure that proposals to amend the Data Specification are subject to appropriate scrutiny and impact assessment, so that impacted stakeholders can appropriately engage with the proposal and understand the impacts to their business.
Proposed Solution Document
Document title
Changes to REC Baseline Statement
Upload document
Changes to REC Baseline Statement.docx
Archive
Off
Document title
https://www.google.com
Archive
Off
Problem Statement
The Data Specification was not included in the Switching Programme Change Requests that gave effect to REC V2.0. Therefore, the Data Specification was not formally designated as part of REC V2.0 and has temporarily been added to the REC Baseline Statement as a Category 3 product. This means that changes to the Data Specification, including changes to Market Messages and Data Items used by market participants to interface with other businesses and service providers, are not subject to the process set out in the REC Change Management Schedule. Changes to these artefacts can have significant impacts to the systems and processes of market participants and service providers. These changes should follow a robust and thorough assessment to ensure these impacts are identified and considered, and the most appropriate solution is considered. The Category 3 change process is not appropriate for this, as changes to Category 3 products should not cause a material impact to parties and stakeholders.
Initial Assessment Report V1.0 (Approved)
Change Proposal Plan V1.0 (Approved)
R0002 - Preliminary Change Report v1.0 (Approved)
R0002 - Final Change Report v1.0 (Pre-Vote)
R0002 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Amendment to DCC Service Flag (DI51130) Data Item

Date of latest update
Type
Change
ID
R0001
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

02 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version REC V2.1.0_SUPERSEDED
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item
  • Data Item Catalogue
  • Market Message Catalogue
R0002 Review of Data Specification Category in REC Baseline Statement
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0003 Market-wide Half-Hourly Settlement Implementation
  • REC Main Body

Documents

Name Version Last updated Actions
208.12 KB
Version 1.0 - 02 Nov 2026 PDF - 208.12 KB
1.0 02 Nov 2026
222.97 KB
Version 1.0 - 02 Nov 2026 DOCX - 222.97 KB
1.0 02 Nov 2026
101.69 KB
Version 1.0 - 02 Nov 2026 PDF - 101.69 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my Energy Supplier to know the status of my smart meter, so they can bill me accurately using remote smart data.
  2. As an Energy Supplier, I need to establish whether there is a smart meter I can communicate with in the DCC network, so I can complete the correct process for customers switching supplier.
  3. As a Distribution Network Operator, I need to establish whether there is a smart meter I can communicate with in the DCC network, so I know whether to respond to smart meter alerts.
Proposed Solution Document
Document title
Amendments to DCC Service Flag Data Item - Legal Text
Upload document
Amendments to DCC Service Flag Data Item - Legal Text.docx
Archive
Off
Document title
Link to EMAR - Change Set (Clean)
Archive
Off
Problem Statement
SEC Modification Proposal 077 proposes to update the values, and business rules, of the DCC Service Flag Data Item. This will allow users to use the Data Item as originally intended, to establish whether there is an active smart meter in the DCC network that they can communicate with at a premises. This modification has been approved for implementation on 4th November 2021 by the SEC, and a consequential change is required to the Data Specification to reflect this.
SEC MP077 - Modification Report v1.0.pdf
SEC MP077 Legal Text v1.0 (1).pdf
Initial Assessment Report V1.0 (Approved)
Change Proposal Plan V1.0 (Approved)