Explore use of CHECK as a Meter Type option on J0483 DI-059
Date of latest update
Type
Issue
ID
I0344
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
Change Report (Proposal Plan) has been published for REC Change Panel approval on 17 November 2026.
Summary
It has been suggested that CHECK meters should not be sent within industry messages so the presence of this value within the valid set may not be required. This Issue has been raised to explore whether this assumption is correct, look at the existing/historic use cases industry have used the CHECK option for, if they are no longer valid and if so why not.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
The DI-059 / J0483 Meter Type Data Item is shared between the Balancing and Settlement Code’s Data Integration Platform (DIP) and the REC’s Data Catalogue. The CHECK Meter Type does not have a valid MHHS Market Segment combination and is not a valid enumeration under the DIP version of DI-059 / J0483. Having an enumeration that is valid in one version of the Data Item and not valid in another causes confusion as to what enumerations are valid for this Data Item. As part of this Issue, we will also explore whether use of the LAG_, LEAD_, and MAIN_ meter types are still necessary to be kept within D-Flows, even though they are valid meter types for MHHS arrangements.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0344 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)
Date of latest update
Type
Issue
ID
I0341
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Change Report (Proposal Plan) was approved by the REC Change Panel
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service (Rejection of IF-033 with IF-035 Response R). Basic REC R032 Validation on IF-005/D0312: XX-XX-XX-XX-XX-XX-XX-XX (0-9, A-Z)
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0341 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required
Regulatory Alliance Creation Rejections
Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Update to plan approved by Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
Stages Selection
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required
Addition of value 11 to data item J0418
Date of latest update
Type
Change
ID
R0310
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
To add value 11 to the valid set value for data item J0418 – Meter COP. Unable to update Meter technical details (MTD's), the D0268 flow, as specified under BSCP603/7 via the DTN as the AMVLP. The appointed agent will not be able to automatically process or upload the flows received to their systems due to validation errors.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0310 submission form
R0310 Proposed changes to REC Data Specification
R0310 Change Report (Proposal Plan and Consultation) Approved 17.03.26
R0310 Consolidated Consultation Responses
R0310 Change Report (Final Recommendation) Post-vote
Company Name
EDF Energy
Review status
Review required
Extending R0067 Refresh Functionality
Date of latest update
Type
Issue
ID
I0281
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/09/2026 - The update to plan has been approved by the Technical Expert Panel on 30 September 2026.
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSPs) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Issue originally aimed to extend the Refresh functionality, implemented for the Gas Retail Data Agent (GRDA).to the Electricity Retail Data Agent (ERDA). Following solution development for I0281, it was agreed that the Refresh functionality would be made available for all Market Participants in receipt of the in-scope messages.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0281_Proposed_Legal text_PIA_V1.0.
Upload document
I0281_Proposed_Legal text_PIA_V1.0.zip
Archive
Off
Problem Statement
CSS messages are not received by the SDSPs in the order in which they were originally sent, or after Gate Closure, so it can be difficult to detect and often requires significant manual effort to resolve. This issue can directly impact Consumer switching experiences, causing disruption and possible delays in a switch.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0281_Change Report (Update to Plan) v1.0 (Pre-approval)
I0281_Change Report (Update to Plan) v2.0 Approved
I0281_Change Report (Update to Plan) v2.0 (Pre-approval)
I0281_Change Report (Update to Plan) v1.0 Approved 20.05.2026
I0281_Change Report (Proposal Plan) v1.0_Approved 04.11.2025
Company Name
REC Technical Services
Review status
Review required
Update to R0060 Implementation Date
Date of latest update
Type
Change
ID
R0250
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/05/25 - On 28 May 2025 the Technical Expert Panel approved R0250, resulting in the implementation of R0060 being moved from 27 June 2025 to the ‘First available release after MHHS Milestone 8 – Code changes delivered’.
Summary
Without an update to the implementation of R0060 complexity is created for MHHS code drafting implementation as the MHHS design details in its operational choreography document that all timings are in clock time unless stated as otherwise.
Change Plan
Change Proposal approved by Technical Expert Panel
Completed
Start:
12 May 2025Due:
28 May 2025Completion:
28 May 2025Consultation completed
Completed
Start:
25 Mar 2025Due:
12 May 2025Completion:
12 May 2025Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
28 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Without an update to the implementation date of R0060, the intent of the original proposed implementation date cannot be achieved. If the implementation date remains as 27 June 2025 complexity will be created for the implementation of MHHS code drafting as the MHHS design details in its operational choreography document that all timings are in clock time unless stated as otherwise.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal form
R0250 Change Report (Proposal Plan) v2.0 (Approved) 15.04.2025
R0250 Change Report (Consultation) V1.0 16.04.2025
R0250 Consolidated Consultation Responses v1.0
R0250 Change Report (Final Recommendation) v2.0 (Post-Vote) 28.05.2025
Company Name
-
Review status
Review required
Effective Dates in EES
Date of latest update
Type
Issue
ID
I0247
Urgent
No
Latest Update
12/08/2026 - the Proposer has chosen to withdraw this Issue as MHHS means many of the effective dates are being updated as per the original business case so the change is no longer required.
Summary
On a switch many of the effective dates within EES default to the switch date. This includes energisation status. It means EES users that don't have access to the meter technical details do not know the actual date the status changed.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
Proposal Form
Company Name
Gemserv
Review status
Review required
Sequence order of CSS00200 message
Date of latest update
Type
Issue
ID
I0204
Urgent
No
Latest Update
08/11/2024 - The Proposer has withdrawn this issue as it is being progressed under MHHS CR056. The adoption window has now closed. * This is Issue relates to the Market-wide Half Hourly Settlement design.
Summary
Empty
Status
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
Stages Selection
Company Name
St.Clements
Review status
Review required
Allowing different Metering Equipment Managers (MEMs) to be appointed to Import and Export Metering Points
Date of latest update
Type
Change
ID
R0144
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
17/02/2025 - R0144 has been withdrawn by the Proposer, alongside it's joint BSC Change P459, as they cannot be progressed prior to MHHS. The Proposer will look to re-raise both changes in the future. The adoption window for this withdrawal has closed.
Summary
The Export Supplier needs to be able to appoint different MEMs to that of the Import Supplier
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want a competitive Export market so I can get the best rates for the energy I generate. I want clear metering equipment ownership so I can be confident my meter is functional and safe. I want accurate billing from my Export Supplier.
- As an Export Supplier, I want to be able to appoint the MEM that ties in with my commercial strategy.
- As a MEM, I want clear guidance on the responsibilities I have for any metering equipment I am appointed to.
Problem Statement
Export Suppliers may become non-compliant with industry regulations if they are unable to appoint the same MEM as the Import Supplier, for example when the Consumer switches Import Supplier or when the Import Supplier changes the appointed MEM.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Change Proposal Form
R0144 Change Proposal Plan Withdrawal v1.0 (Pre Approval)
R0144 Change Proposal Plan v1.0 (16.04.2024) Approved
R0144 Initial Assessment Report v1.0 (16.04.2024) Approved
Company Name
REC Code Manager
Review status
Review required
Provision of Grid Supply Point Group ID from a Postcode search in EES
Date of latest update
Type
Change
ID
R0111
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/04/2024 - The Code Manager has rejected the progression of R0111 as Postcode itself does not always have a direct correlation to the GSP Group and believes that a full address should be provided so that accurate quotes are given to a Consumer.
Summary
Empty
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0111 - CP Form (Downloadable version)
Company Name
GB Group plc
Review status
Review required