Review of Schedule 12 and processes to manage access to data

Date of latest update
Type
Change
ID
R0118
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
Since REC go-live in September 2021, Enquiry Service Providers have operated the Enquiry Services processes as effectively as possible, however, overtime gaps have emerged and opportunities to improve have been identified. There have been an increasing number of access requests for market roles that are not reflected in Schedule 12 or the Data Access Matrix (DAM). As a result, it has become apparent there are restrictions on the access to data, and the granting of access to such users can be slow and time consuming. Given the market roles are too narrow at present, this will become increasingly problematic as they do not reflect market roles that could exist in 10 year’s time for example. There is a need to therefore limit ambiguity and reduce number of use cases where judgement is required. This CP will take forward the review of Schedule 12 and any identified changes.
Proposer
Katie Taaffe
Change Plan

Preliminary Change Report issued

Completed

Start:

12 May 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

Consultation triggered

Completed

Start:

08 Sep 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

Consultation close

Completed

Start:

08 Sep 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Final Change Report issued

Completed

Start:

22 Sep 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Responsible Committee decision

Completed

Start:

06 Oct 2023

Due:

17 Oct 2023

Completion:

17 Oct 2023
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want Market Participants to have the appropriate data access so any issues affecting my energy account can be addressed easily.
  2. As a Consumer, I want Market Participants to have appropriate data access so that I can benefit from improved product and service offerings.
  3. As a Market Participant, I want the processes that grant data access to be simplified and adaptable so that valid data use cases are addressed quickly.
Proposed Solution Document
Document title
R0118 - Draft Legal Text at PCR 08.09.2023
Upload document
R0118 - Draft Legal Text at PCR.zip
Archive
Off
Document title
R0118 - Draft Legal Text at FCR 06.10.2023
Upload document
R0118 - Draft Legal Text at FCR 06.10.2023.zip
Archive
Off
Problem Statement
Organisations with valid use cases for REC data access must raise a Change Proposal as they are not listed within Schedule 12 or the Data Access Matrix. This is a time-consuming process which delays the implementation of the required access and does not promote innovation, competition, and positive Consumer outcomes.
R0118 - Change Proposal Form 12.05.2023
R0118 - Change Proposal Plan (Approved) 05.09.2023
R0118 - Initial Assessment Report (Approved) 05.09.2023
R0118 - Consolidated Consultation Responses_NON-CONFIDENTIAL 06.10.2023
R0118 - Preliminary Change Report v1.0 (Published for Consultation) 08.09.2023
R0118 - Final Change Report (Approved) 17.10.2023
Company Name
-
Review status
Review required

Retrospective Implementation of Distribution Connection Use of System Agreement (DCUSA) DCP 383

Date of latest update
Type
Change
ID
R0117
Change Category
Change Path
Priority
Urgent
No
Latest Update
01/12/2023 - this change has been withdrawn and the adoption window is closed.
Summary
This change seeks to retrospectively deliver the consequential REC changes for the DCUSA Change Proposal DCP383 – Provision for Distributors to move meters for service alterations. DCP383 created a mechanism for licensed Distributors to move Whole Current (WC) meters as part of customer requested works to alter the service position.
Proposer
admin
Change Plan

Appeal window closure

Not Started

Start:

10 Jan 2024

Due:

24 Jan 2024

Completion:

Responsible Committee decision

Not Started

Start:

29 Dec 2023

Due:

10 Jan 2024

Completion:

Final Change Report issued

Not Started

Start:

08 Dec 2023

Due:

29 Dec 2023

Completion:

Consultation close

Not Started

Start:

17 Nov 2023

Due:

08 Dec 2023

Completion:

Preliminary Change Report published and Consultation triggered

Not Started

Start:

06 Nov 2023

Due:

17 Nov 2023

Completion:

Party Impact Assessment trigger

Completed

Start:

12 May 2023

Due:

13 Oct 2023

Completion:

13 Oct 2023

Party Impact Assessment close

Not Started

Start:

13 Oct 2023

Due:

06 Nov 2023

Completion:

Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want industry systems to contain accurate information on my service so that future works or billing are not impacted.
  2. As a Metering Equipment Manager, I want to ensure my obligations are clear as to which Market Messages I am required to action and how this should be completed.
Problem Statement
Following the implementation of DCP383, MEMs are receiving Market Messages from the DNO however, there is no process defined within the REC on how to action them and their systems have not been configured to accept and process them. This has led to a backlog within the MEMs gateways and the Data Collector is not being updated on the meter’s new location.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0117 - Change Proposal Form 12.05.2023
R0117 - Change Proposal Plan v1.0 (Approved) 01.08.2023
R0117 - Initial Assessment Report v1.0 (Approved) 01.08.2023
R0117 - Change Plan Re-baseline (Approved) 29.09.2023
R0117 Change Report (For Consultation) v1.0
Company Name
REC Code Manager
Review status
Review required

TPI access to the Meter Asset Manager data via the GES

Date of latest update
Type
Change
ID
R0116
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/06/2024 - Adoption window closed. Withdrawn.
Summary
Empty
Proposer
chris felgate
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0116 - Change Proposal Form (Downloadable version) 05.05.2023
Company Name
Ginger Energy Limited
Review status
Review required

Housekeeping amendments

Date of latest update
Type
Change
ID
R0114
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Housekeeping Change Proposal seeks to make typographical and grammatical corrections that have been identified and clarifications and improve consistency across the REC
Proposer
Ann Perry
Change Plan

Publish Housekeeping Change Report

Completed

Start:

20 Apr 2023

Due:

09 May 2023

Completion:

09 May 2023

Responsible Committee Decision

Completed

Start:

09 May 2023

Due:

16 May 2023

Completion:

16 May 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a REC Party, I need the REC drafting to be accurate, so I can rely on it to ensure my processes and procedures correctly reflect my obligations. If there are mistakes or omissions, then it could cause issues with the effective operation and assurance of the retail energy market.
Proposed Solution Document
Document title
R0114 - Approved legal text 16.05.2023
Upload document
R0114 - Approved legal text 16.05.2023.zip
Archive
Off
Document title
R0114 - Draft legal text 09.05.2023
Upload document
R0114 - Draft legal text 09.05.2023.zip
Archive
Off
Problem Statement
This housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC. The Data Access Matrices need to accurately reflect the intention of Change Proposal R0074, and the current access of Enquiry Services Users.
SME
SME Role
Lead Technical Analyst
R0114 - CP Form (Downloadable version)
R0114 - Housekeeping Change Report v2.0 (Post Vote) 16.05.2023
Company Name
-
Review status
Review required

Data Specification updates and clarifications

Date of latest update
Type
Change
ID
R0113
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
It has been identified that gaps or misaligned references were transferred into the REC Data Specification at REC go-live. This Change Proposal seeks to fill these gaps and provide clarification for Parties. This will enable Parties to self-serve and reduce the risk of ambiguities in the current Data Specification resulting in incorrectly defined Market Messages. This change will update relevant legal text in the REC Data Specification to provide clarification and alignment from previous legacy documents to Parties. This will ensure existing Parties have a consistent understanding and new entrants are able to set up their systems appropriately.
Proposer
April Harbour
Change Plan

PRELIMINARY CHANGE REPORT AND CONSULTATION ISSUED

Completed

Start:

20 Apr 2023

Due:

24 May 2024

Completion:

24 May 2024

FINAL CHANGE REPORT ISSUED

Completed

Start:

24 May 2024

Due:

24 Jul 2024

Completion:

19 Jul 2024

RESPONSIBLE COMMITTEE DECISION

Completed

Start:

24 Jul 2024

Due:

31 Jul 2024

Completion:

31 Jul 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need the Data Specification to be clear and correct to ensure my systems are set-up appropriately and Market Messages are correctly defined.
  2. As a Market Participant, I need to understand any changes to the Data Specification that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
Proposed Solution Document
Document title
R0113 Legal Text at FCR (19.07.2024)
Upload document
R0113 Legal Text (1) (1).zip
Archive
Off
Document title
R0113 - Legal Text Guide (17.05.2024)
Upload document
R0113 - Legal Text Guide.xlsx
Archive
Off
Document title
R0113 Webinar Recording
Archive
Off
Problem Statement
There is a risk that the current ambiguities in the Data Specification could make it challenging for Parties to follow the Data Specification and result in Market Messages being sent that do not correctly reflect the rules of the Data Specification. This may result in Market Message rejections, which may have impacts for Consumers and other Market Participants.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0113 - Change Proposal Plan V1.0 (Approved)
R0113 - Initial Assessment Report v1.0 (Approved)
R0113 - Preliminary Change Report v1.0 (Published for Consultation) 24.05.2024
R0113 - Consolidated Consultation Responses_NON-CONFIDENTIAL (19.07.2024)
R0113 - Final Change Report (Approved) 31.07.2024
Company Name
-
Review status
Review required

Provision of Grid Supply Point Group ID from a Postcode search in EES

Date of latest update
Type
Change
ID
R0111
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/04/2024 - The Code Manager has rejected the progression of R0111 as Postcode itself does not always have a direct correlation to the GSP Group and believes that a full address should be provided so that accurate quotes are given to a Consumer.
Summary
Empty
Proposer
Andrew Dawson
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0111 - CP Form (Downloadable version)
Company Name
GB Group plc
Review status
Review required

A review of Supplier access to data on GES

Date of latest update
Type
Change
ID
R0110
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
When Registered Gas Suppliers and Registered Shippers access the Gas Enquiry Service (GES) they currently have access to their own unique set of Data Items. This Change would give Registered Gas Suppliers access to some additional Data Items which form part of the Registered Gas Shipper Data Items, to enable them to solve Consumer facing switching and billing issues.
Proposer
Lorna Mallon
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

19 Apr 2023

Due:

07 Sep 2023

Completion:

07 Sep 2023

Preliminary Change Report Issued

Completed

Start:

07 Sep 2023

Due:

20 Sep 2023

Completion:

20 Sep 2023

Responsible Committee Review

Completed

Start:

20 Sep 2023

Due:

27 Sep 2023

Completion:

27 Sep 2023

Consultation Issued

Completed

Start:

27 Sep 2023

Due:

27 Sep 2023

Completion:

11 Oct 2023

Final Change Report Issued

Completed

Start:

27 Sep 2023

Due:

18 Oct 2023

Completion:

18 Oct 2023

Responsible Committee Decision

Completed

Start:

18 Oct 2023

Due:

25 Oct 2023

Completion:

25 Oct 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Supplier to be able to access essential information about my energy account, so that billing issues and switching problems can be addressed easily.
  2. As a Registered Gas Supplier, I want to be able to readily access appropriate information relating to my RMP portfolio, so that I can resolve consumer facing billing issues more easily. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives (in line with REC Data Access principles), so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0110 - Draft Legal Text - Gas Data Access Matrix - 20.09.2023
Upload document
R0110 - GAS DAM - RTS_LegalText - 18-09-23.xlsx
Archive
Off
Problem Statement
When Registered Gas Suppliers need to resolve queries relating to meter reading history, they may need to access information that is currently only available to the Registered Shipper in GES. As a result, Registered Gas Suppliers may be unable to resolve these consumer facing issues on their own, as they do not have direct access to the required Registered Shipper only information.
SME
SME Role
Lead Technical Analyst
R0110 - CP Form (Downloadable Version)
R0110 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0110 Change Proposal Plan v1.0 (Approved) - 01.08.2023
R0110 Preliminary Change Report v1.0 (Approved) - 27.09.23
R0110 Consolidated Consultation Responses - Non-Confidential v1.0
R0110 Final Change Report v2.0 (Post-Vote) 25.10.23
Company Name
ScottishPower Energy Retail Ltd
Review status
Review required

Aligning electricity and gas timescale requirements for sharing Meter Technical Detail information

Date of latest update
Type
Change
ID
R0109
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
Empty
Proposer
Elise Handy
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0109 - Change Proposal Form
Company Name
Utility Warehouse
Review status
Review required

Enabling Electricity Enquiry Service searches using a Unique Property Reference Number

Date of latest update
Type
Change
ID
R0108
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Consumers that wish to utilise multi-channel switching services for gas, electricity, water, broadband, bank, home insurance etc. cannot make use of generic address-capture services for electricity switching as Unique Property Reference Number (UPRN) search functionality is not available within the Electricity Enquiry Service (EES).
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment window start

Completed

Start:

19 Apr 2023

Due:

02 Oct 2023

Completion:

02 Oct 2023

Service Provider Impact Assessment window close

Completed

Start:

02 Oct 2023

Due:

18 Dec 2023

Completion:

18 Dec 2023

Party Impact Assessment start

Completed

Start:

18 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Preliminary Change Report and Consultation issued

Completed

Start:

02 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Party Impact Assessment close

Completed

Start:

12 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Consultation close

Completed

Start:

16 Feb 2024

Due:

08 Mar 2024

Completion:

08 Mar 2024

Final Change Report issued

Completed

Start:

08 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Responsible Committee decision

Completed

Start:

15 Mar 2024

Due:

27 Mar 2024

Completion:

27 Mar 2024

Appeal window closure

Completed

Start:

27 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to switch my electricity easily and efficiently.
  2. As I Consumer, I want to be able to quote or switch my electricity as part of a packaged search.
  3. As a Supplier, I want Consumers to be able to search for quotes and switch efficiently.
  4. As an organisation providing multi-channel switching services, I want Consumers to be able to use one set of data when requesting quotes.
Proposed Solution Document
Document title
R0108 Requirements Specification v0.1
Upload document
R0108 Requirements Specification v0.1.xlsx
Archive
Off
Document title
Electricity Data Access Matrix_R0108 Draft
Upload document
Electricity Data Access Matrix_R0108 Draft.xlsx
Archive
Off
Document title
EES API Interface Specification v3.1.6 - Redline
Upload document
EES API Interface Specification v3.1.6 - Redline (1).docx
Archive
Off
Problem Statement
Consumers that wish to utilise multi-channel switching services, cannot benefit from the efficiencies of using a UPRN for the electricity Switch as the EES does not provide this functionality.
SME
SME Role
Lead Technical Analyst
Change Proposal Form
R0108 - Change Proposal Plan (Approved) 17.10.2023
R0108 - Initial Assessment Report (Approved) 17.10.2023
R0108 Consolidated Party IA Responses v1.0 Non-confidential (16.02.2024)
R0108 - Preliminary Change Report v1.0 published for consultation (16.02.2024)
R0108 - Consolidated Consultation Responses_Non Confidential (15.03.2024)
R0108 - Final Change Report v2.0 Post-Vote (27.03.2024)
Company Name
GB Group plc
Review status
Review required

Review of ONAGE SLAs

Date of latest update
Type
Change
ID
R0105
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/09/24 - Change Report REJECTED by REC Metering Expert Panel
Summary
In light of the changes introduced as part of the Faster Switching Programme, this Change Proposal has been raised to review the SLAs and lead times around the sending and receiving/processing of the ONAGE and associated Market Messages.
Proposer
Natalie Hitchman
Change Plan

Solution Development Closes

Completed

Start:

06 Apr 2023

Due:

31 May 2024

Completion:

31 May 2024

Party Impact Assessment Published

Completed

Start:

31 May 2024

Due:

04 Jul 2024

Completion:

04 Jul 2024

Preliminary Change Report & Consultation Published

Completed

Start:

04 Jul 2024

Due:

08 Aug 2024

Completion:

08 Aug 2024

Final Change Report Published

Not Started

Start:

08 Aug 2024

Due:

04 Sep 2024

Completion:

Responsible Committee Decision

Not Started

Start:

04 Sep 2024

Due:

11 Sep 2024

Completion:

Appeal Window Closure

Not Started

Start:

11 Sep 2024

Due:

25 Sep 2024

Completion:

Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want to have continual Meter Equipment Manager coverage, so that I am confident that work on my Metering Asset can be conducted even during a Switch.
  2. As a MEM, I want my obligations relating to appointment and de-appointment to be considered and practicable, so that my operational processes are not unduly onerous. 2 - As a Gas Supplier, I want to be able to reliably and predictably appoint and de-appoint MEMs during a Switch, so that I am confident that my Consumers are not left without a MEM at any stage. 3 - As the Code Manager, I want REC processes to operate within SLAs that are reflective of both the realistic operational capacities of REC Parties, and also of the needs of the broader market, so that the end Consumer has the best possible Switching experience.
Problem Statement
Current ONAGE SLAs may no longer be proportionate to the length of the Switching process as a result of the Faster Switching programme. Lengthy ONAGE SLAs relative to the timescale of the switching process may result in Consumers being left without a MEM during the switch process. The proposer has asked the Code Manager to conduct a review of the ONAGE SLAs to explore whether these SLAs are still appropriate, and therefore ensure that Consumers are subject to any detriment.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0105 - Change Proposal Form (downloadable version) 06.04.2023
R0105 Change Proposal Plan (Approved) V2.0 31.05.24
R0105 Initial Assessment Report (Approved) V1.0 16.04.24
R0105 Change Proposal Re-Plan (Approved) V1.0 31.05.24
R0105 Consolidated IA Responses V1.0 08.08.24
R0105 Change Report (Published for Consultation) v1.0 08.08.24
R0105 Consolidated Consultation Responses V1.0 02.09.2024
R0105 Change Report (Rejected) V2.0 11.09.24
Company Name
-
Review status