Amendments to D0312 to align with BSC CP1622

Date of latest update
Type
Change
ID
R0300
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Elexon have raised CP1622 to amend the Validation rules within the Supplier Meter Registration Service (SMRS) for the Number of Register Digits Data Item within the IF-005 Market Message, to allow digit values from 1–9, ensuring accurate data and reducing exceptions. There are no Validation rules related to the D0312 Market Message which need to be amended under the Balancing and Settlement Code (BSC), but the D0312 itself contains a Data Item Rule regarding the Number of Displayed Register Digits which needs to be amended in line with CP1622.
Proposer
Caroline Freimuller
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 4.3.0
Included changes Affected REC Items
R0267 Smart Meter Installation Surveys - Microbusiness requirements
  • Smart Meter Installation Schedule (since removed)
R0276 SFIC to CMRM - missing Scenario Variant in D0126 / MM00016
  • Market Message Catalogue
R0286 Clarification on Detailed Impact Assessment Activities
  • Schedule 5 - Change Management
R0291 Review of Schedule 1 Interpretations and Definitions
  • Schedule 1 - Interpretations and Definitions
R0299 Data Latency Targets for the GES Service Definition
R0300 Amendments to D0312 to align with BSC CP1622
  • Data Item Catalogue
R0307 Release and Licensing of the CoMCoP Logo for Accredited Parties
R0308 Update CCSG ToRs to include cross-code prioritisation as per Code Reform
R0310 Addition of value 11 to data item J0418
  • Data Item Catalogue
R0311 CoMCoP 2-year Audit Cycles
  • Schedule 15 - Metering Accreditation
R0316 Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification
R0319 Clarification of in-year amendments to the CRS budget
R0320 Housekeeping June 2026
  • Schedule 1 - Interpretations and Definitions
  • Schedule 11 - Prepayment Arrangements
  • Schedule 7 - Energy Theft Reduction
  • Schedule 17 - Secure Data Exchange
  • Schedule 12 - Data Access
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Amendments to D0312 red-lined data spec V0.1
Upload document
Amendments to D0312 red-lined data spec.docx
Archive
Off
Document title
Amendments to D0312 red-lined data spec V0.2
Upload document
Amendments to D0312 red-lined data spec V0.2.docx
Archive
Off
Document title
20260205 CP1622 R0300 industry workshop slides
Upload document
20260205 CP1622 R0300 industry workshop slides (1).pdf
Archive
Off
Problem Statement
BSC CP1622 is looking to address that SMRS cannot accurately update the Number of Displayed Register Digits for a SMETS2 Smart Electricity Meter due to Validation rules currently in place. The Validation rules proposed to be amended are those on the IF-005, which has direct impacts to the D0312.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0300 submission form
R0300 Change Report (Proposal Plan) V1.0
R0300 Consolidated Impact Assessment Responses PUBLIC v1.0
R0300 Update to Plan V1.0 approved 19.03.26
R0300 Change Report (For Consultation) V1.1
R0300 Consolidated Consultation Responses V1.0
R0300 Change Report (Final Recommendation) V1.0 approved 29.04.26
Company Name
Code Manager/CCSG
Review status
Review required

Meter Manufacturers Make and Type not Populated in SMRS

Date of latest update
Type
Issue
ID
I0297
Change Path
Priority
Urgent
No
Latest Update
On 30 September 2026, the REC Technical Expert Panel voted to approve the Update to Plan for I0297, and to place this REC Issue on hold.
Summary
The Meter Manufacturers Make and Type (J0410 / DI-048) was not populated as part of the MHHS Programme's data cleanse. However it is part of the SMRS maintained Meter Technical Details (MTDs) for Smart Meters which replace the DTC MTD Market Messages for Smart Meters in the MHHS environment. It is not currently possible to populate this item in the legacy arrangements.
Proposer
jonny.moore_42
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Problem Statement
Following MHHS Migration, the MTDs provided by SMRS do not include the Meter Manufacturers Make and Type, as this replaces the existing D0149/D0150 Market Messages it could lead to the information being lost. This will mean Energy Suppliers and MOAs will not know the make and type of meter installed at a particular Site.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0297 submission form
I0297 Change Report (Proposal Plan) V1.0
I0297 Update to plan
I0297 Legal Drafting
I0297 Update to plan v1.0 Approved 30.09.26
Company Name
RECCo
Review status
Review required

Registration Id Required for MHHS Appointments

Date of latest update
Type
Issue
ID
I0296
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Code Manager have developed a solution which has been live since 05 May 2026. More detail can be found on the REC Portal Wiki. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
The RegistrationId (DI90043 / DI849) is required by SMRS to be included in the IF-031 'Supplier Agent Appointment Request' Market Message to allow the SMRA to process the appointment request. However not all Suppliers hold the RegistrationId for all Meter Points, in particular those that have not undergone a Registration managed by the Central Switching Service (CSS)
Proposer
jonny.moore_42
Change Report - Initial Assessment and Change Plan Report
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As part of the solution for REC Issue I0296 - Registration Id Required for MHHS Appointments the REC Code Manager have developed a process to provide Energy Suppliers the Registration Id for Metering Points that have not been through a Central Switching Service (CSS) Registration Managed Switch. This is to allow Energy Suppliers that may not hold the Registration Id for these Metering Points to populate the Market-wide Half Hourly Settlement (MHHS) Agent Appointment Messages required to initiate a MHHS Migration.
  2. More detail of the solution can be found: https://portal.retailenergycode.co.uk/knowledge-centre/rec-wiki/market-wide-half-hourly-settlement/provision-registration-id-required?utm_source=emailoctopus&utm_medium=email&utm_campaign=Weekly%20Bulletin%20-%202026-05-01
Proposed Solution Document
Document title
I0296 Closure Report_v1.0 (12 May 2026)
Upload document
I0296_Closure report_v1.0.pdf
Archive
Off
Problem Statement
Not all Energy Suppliers hold the RegistrationId for all Meter Points, particularly those Meter Points that have not gone through a Switch, i.e. have not undergone a Registration managed by the CSS. The RegistrationId is currently only available where a Metering Point has been through a CSS managed Registration. Without the RegistrationId available to Energy Suppliers, not all Metering Points will be able to migrate putting the MHHS Migration and Milestone M15 at risk.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0296 submission form
Company Name
RECCo
Review status
Review required

Implementation of IF-051 Data Refresh in EES for BSC CP1607

Date of latest update
Type
Change
ID
R0294
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/10/2026 On 28 October 2026, the Technical Expert Panel voted, in line with the Code Manager’s recommendation, to approve the extension to plan for R0294. The Code Manager is working with the BSC on stakeholder workshops on a complete end-to-end solution, including the required market message specification, governance arrangements and operational processes. Stakeholder workshops will be held to run through the new ‘Data Refresh’ message, discuss the proposed change and gather stakeholder views on the full solution. The Code Manager will be attending these workshops to provide input on the new BSC CP, as well as impacts on the REC and REC services (primarily the Electricity Enquiry Services).
Summary
The IF-051 provides a refresh of data from Supplier Meter Registration Service (SMRS) to the Electricity Enquiry Service (EES) (REC) and Market Data Service (BSC). Currently the REC does not hold any detail regarding the DIP Market Messages that the EES is required to receive and process. Due to the nature of the IF-051, the EES Provider obligations need to be clear to ensure the interface can be received and processed appropriately.
Proposer
Harriet Truss
Change Plan

Proposal Plan approved at REC Change Panel

Completed

Start:

Due:

16 Dec 2025

Completion:

16 Dec 2025

Consultation published

Completed

Start:

Due:

12 Feb 2026

Completion:

12 Feb 2026

Consultation closed

Completed

Start:

Due:

27 Feb 2026

Completion:

27 Feb 2026

Proposal Plan update approved by Technical Expert Panel

Completed

Start:

Due:

25 Mar 2026

Completion:

25 Mar 2026

Proposal Plan update approved by Technical Expert Panel

Completed

Start:

Due:

Completion:

28 Oct 2026
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
EES Service Definition v4.1 - redlined for IF-051
Upload document
EES Service Definition v4.1 - redlined for IF-051.pdf
Archive
Off
Document title
366_05B CP1607 IF-0XX_Proposed Data Refresh Flow v0.1
Upload document
366_05B CP1607 IF-0XX_Proposed Data Refresh Flow v0.1.pdf
Archive
Off
Document title
R0294 EES Service Definition REDLINED for Consultation
Upload document
R0294 EES Service Definition REDLINED for Consultation.pdf
Archive
Off
Document title
CP1629 Attachment C IF-051 Refresh Flow v2.0 REDLINED
Upload document
Attachment C IF-051 Refresh Flow v2.0 REDLINED.pdf
Archive
Off
Document title
R0294 Solution Development Report v1.0
Upload document
R0294 Solution Development Report v1.0.pdf
Archive
Off
Problem Statement
BSC CP 1607 will implement a new DIP Market Message, the IF-051 ‘Data Refresh’ on 26 March 2026. EES will be a recipient of that change. If EES is not able to receive and process instances of the IF-051, data in EES will be misaligned with other industry systems (SMRS, DIP and MDS) meaning that it will not maintain its role as the accurate reference point for industry participants. This could lead to potential disruption of industry processes.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0294 Submission Form
R0294 Change Report (Proposal Plan) Approved v1.1 16.12.2025
R0294 Change Report (Consultation) Approved v1.0 04.02.2026
R0294 Consolidated Consultation Responses v1.0
R0294 - Change Proposal Re-Plan v1.0 (Approved) 25.03.2026
R0294 Change Report (Update to Plan) v1.0 Approved 07.07.26
R0294 Change Report (Update to Plan) v2.0 Approved 28.10.26
Company Name
REC Code Manager
Review status
Review required

Organisations with multiple role types EES and SDEP access

Date of latest update
Type
Issue
ID
I0285
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 22 October 2026, the Code Manager published the I0285 Closure Report. Following a review of the responses to the Party impact assessment, the Code Manager has determined that this REC Issu can be moved to Resolved as there has been a lack of Parties indicating they would use the proposed solution under I0285. The enduring solution of one individual assigned to two company groups to use two separate email addresses for each company group will be sustained. RECCo will consider the requirement for a single login across multiple roles as part of the Enquiry Services Evolution project development.
Summary
It is currently not possible for organisations with multiple role types to have the same person be able to access all assigned role types within the Secure Data Exchange Portal (SDEP) without having a unique email address for each role type.
Proposer
Caroline Freimuller
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

04 Nov 2025

Discussed at Technical Expert Panel

Completed

Start:

Due:

Completion:

17 Dec 2025

Discussed at Technical Expert Panel

Completed

Start:

Due:

Completion:

28 Jan 2026

Extension to Plan approved by Technical Expert Panel

Completed

Start:

Due:

Completion:

25 Feb 2026

Discussed at Change Issues Group

Completed

Start:

Due:

Completion:

06 Aug 2026
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Zip file with I0285 legal text
Upload document
Legal text for Party IA (2).zip
Archive
Off
Document title
I0285 Solution Development Report V1.0
Upload document
I0285 Solution Development Report V1.0.pdf
Archive
Off
Problem Statement
Organisations with more than one role type are required to have unique email addresses for staff who require access to multiple role types, leading to inefficiencies, unnecessary administrative burdens and a poor user experience.
SME
SME Role
Lead Technical Analyst
I0285 submission form
I0285 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0285 Extension to Plan V1.0 approved 25.02.26
I0285 Extension to Plan V2.0 approved 24.06.26
I0285 Consolidated Impact Assessment Responses v1.0
I0285_Closure Report
Company Name
REC Code Manager
Review status
Review required

Updates to Schedule 14 Measurement Transformers Commissioning Timescales

Date of latest update
Type
Change
ID
R0284
Change Category
Change Path
Priority
Urgent
No
Latest Update
12/08/2026 - the Metering Expert Panel approved the Change Report (Final Recommendation) V1.2. This Change Proposal will be implemented on 26 June 2027. If you wish to appeal this decision, this must be received by COB 28 August 2026.
Summary
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
Proposer
Caroline Freimuller
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

03 Feb 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

05 Feb 2026

Change Report (For Consultation) approved by Metering Expert Panel

Completed

Start:

Due:

Completion:

08 Apr 2026
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Scheduled
EMAR Version 4.6.0_Scheduled

Documents

Name Version Last updated Actions
244.73 KB
Version 1.0 - 02 Nov 2026 PDF - 244.73 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0284 Schedule 14 Metering Operations draft V0.2
Upload document
I0284 Schedule 14 Metering Operations draft V0.2.pdf
Archive
Off
Document title
R0284 Schedule 14 Metering Operations draft V0.3
Upload document
I0284 Schedule 14 Metering Operations draft V0.3.pdf
Archive
Off
Document title
R0284 Schedule 14 Metering Operations final version
Upload document
I0284 Schedule 14 Metering Operations final version.pdf
Archive
Off
Problem Statement
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
I0284 submission form
I0284 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0284 Change Issue Group paper v1.0
I0284 Consolidated Impact Assessment Responses PUBLIC v1.0
R0284 Change Report (For Consultation) V1.0 approved 08.04.26
R0284 Consolidated Consultation Responses PUBLIC v1.0
R0284 Change Report (Final Recommendation) V1.2 approved 12.08.26
Company Name
REC Code Manager
Review status
Review required

MHHS Related Metering Points across Market Segments

Date of latest update
Type
Issue
ID
I0275
Change Category
Change Path
Priority
Urgent
No
Latest Update
17/09/2026 - The Code Manager has published a guidance document that acts as the solution for this Issue. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
It has been identified by the MHHS Data Cleanse Working Group (DCWG) that around 9,000 existing Metering Point Relationships include Metering Points that would migrate into different Market-wide Half Hourly Settlement (MHHS) Market Segments. The majority of these are where one Metering Point has a Traditional meter installed (Smart Segment) and a Related Metering Point has an Advanced meter (Advanced Segment). This situation is currently valid but in MHHS would cause two problems. - SMRS would not be able to align the agent appointments, leaving secondary MPANs without agents and MHHS Migrations unable to fully complete.
Proposer
jonny.moore_42
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0275 - Related Metering Points Guidance Document_V1.0.pdf
Upload document
I0275 - Related Metering Points Guidance Document_V1.0 (1).pdf
Archive
Off
Document title
I0275 - Closure Report_V1.0
Upload document
I0275_Closure Report_v1.0 (2).pdf
Archive
Off
Problem Statement
Without considering this Issue, there will be a risk to the MHHS migration. Indeed, a Metering Point installed which does not match its Related Metering Point (for example a Relationship between a Traditional meter with an Advanced Meter) will not be able to fully migrate to MHHS arrangements.
I0275 submission form
Company Name
RECCo
Review status
Review required

Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters

Date of latest update
Type
Issue
ID
I0273
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/10/2026 On 05 October 2026, the MEP voted via an ex-committee vote to approve this extension to plan. The Code Manager is currently engaging with the BSC to raise a consequential change to facilitate the use of the SSC for non-Settlement purposes, for example Billing or quoting tariffs for Smart Metering Assets.
Summary
In the MHHS design the Standard Settlement Configuration (SSC) is a non-mandatory data item for Smart and Advanced metering points, in addition the register level TPR information is not shared in the MTD flows for these meters (IF-006 for Smart and D0268 for Advanced). It was identified through BSC Issue I118 that there is a requirement for the SSC to be set for Domestic / Microbusiness Advanced Metering Points making use of the HH data opt out and there may be other areas where the SSC is required.
Proposer
jonny.moore_42
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed Solution Document
Document title
I0273 - Interim Guidance Document V1.1
Upload document
I0273 - Interim Guidance Document V1.1.pdf
Archive
Off
Problem Statement
The MHHS design does not mandate the use of SSC or support register-level TPR data for Smart and Advanced Meters, creating gaps in data availability for certain Settlement scenarios.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0273 Submission Form
I0273 - Update to Plan V2.0 (Pre-Approval) 06.05.2026
I0273 - Update to Plan V2.0 Approved 05.10.2026
Company Name
RECCo
Review status
Review required

Sharing Confirmed Energy Theft Data with the BSCCo

Date of latest update
Type
Change
ID
R0263
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This Change Proposal provides a legal text amendment to Schedule 7 – Energy Theft Reduction, Annex 3 clause 6.4, to include the BSCCo in the list of organisations and Parties who should be shared the data relating to Confirmed Energy Thefts.
Proposer
Alex Leyland
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed Solution Document
Document title
R0263 - Legal Drafting - Schedule 7 Energy Theft Reduction (14.08.2025)
Upload document
R0263 - Legal Drafting - Schedule 7 Energy Theft Reduction (14.08.2025) - For Consultation.docx
Archive
Off
Document title
R0263 - Legal Drafting - Schedule 7 Energy Theft Reduction (Extract) (14.08.2025)
Upload document
R0263 - Legal Drafting - Schedule 7 Energy Theft Reduction (Extract) (14.08.2025) - For Consultation.docx
Archive
Off
Problem Statement
There is a gap in the provision of the REC that means that Energy Theft data is not able to be shared with the BSCCo for the purposes of use within Settlement. Without the ability to have this data shared with them, the BSCCo are unable to confirm that all Energy Theft data has been correctly entered into Settlement.
Issue Proposal Form
R0263 - Change Report (Proposal Plan) 08.07.2025 (Approved)
R0263 - Change Report (For Consultation) V1.0 (14.08.2025)
R0263 - Consolidated Consultation Responses (09.09.2025)
R0263 - Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
Company Name
Elexon
Review status
Review required

MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101

Date of latest update
Type
Change
ID
R0256
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
REC Changes R0021 and R0101 introduced Scenario Variant SV00493 (Safe Isolation Provider (SIP) to Supply Fault Information Centre (SFIC)) to the Asset Condition Report Market Message (MM00023/D0135) which sets group 60H range to 0-*. It has been queried with the Code Manager if this was in error, as SIPs and Meter Operator Agents (MOAs) should act in the same manner when sending D0135 flows.
Proposer
April Harbour
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

01 Jul 2025
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Red lined Data Specification for I0256
Upload document
I0256 solution for IA (1).docx
Archive
Off
Problem Statement
The differences between the Scenario Variants of the MOA, SIP, CMRM, Advanced Meter Service and Smart Meter Services in the D0135 flow could lead to confusion, as these Parties are meant to operate in the same manner in respect of sending the D0135 flow.
Issue Form
I0256 Change Report (Proposal Plan) V1.0 approved 01.07.25
I0256 Consolidated Impact Assessment Responses PUBLIC V1.0
R0256 Change Report (For Consultation) V1.0
R0256 Consolidated Consultation Responses v1.0
R0256 Change Report (Final Recommendation) V1.0 approved 24.09.25
Company Name
RTS Code Manager
Review status
Review required