Clarifications to the Theft Detection Incentive Scheme

Date of latest update
Type
Change
ID
R0091
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
The Energy Theft Detection Incentive Scheme (TDIS) seeks to encourage Suppliers to undertake theft investigations. Following the completion of the first scheme year operated wholly under the REC, there have been several areas of the Code identified where additional clarity would benefit the administration of the TDIS.
Proposer
andrew.waghorn
Change Plan

Initial Assessment Report Issued

Completed

Start:

23 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Change Proposal Plan Issued

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Issued

Completed

Start:

07 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Consultation Issued

Completed

Start:

17 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Responsible Committee Decision

Completed

Start:

17 Feb 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

IAR and CPP Approval

Completed

Start:

27 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Supplier, I need my TDIS obligations to be clear to ensure I can meet the requirements appropriately.
  2. As the Code Manager, I want all Suppliers to be clear on the required Energy Theft reporting so that the scheme can be effectively administered.
  3. As RECCo, I want to ensure that all Suppliers have clear obligations to ensure the effective administration of TDIS to support the Theft Reduction Strategy.
Proposed Solution Document
Document title
R0091 - Legal Text (as at IAR/CPP)
Upload document
R0091 Legal Text (1).zip
Archive
Off
Document title
R0091 - Legal Text at FCR 21.03.2023
Upload document
R0091 - Legal Text at FCR.zip
Archive
Off
Document title
R0091 - Legal Text FINAL
Upload document
R0091 - Legal Text FINAL.zip
Archive
Off
Document title
EMAR Link
Archive
Off
Problem Statement
To enable REC Parties and their agents to successfully meet the obligations of the TDIS, the REC needs to accurately reflect the intention of the requirements and current processes.
R0091 - Change Proposal Form
R0091 - Change Proposal Plan (Approved) 07.02.2023
R0091 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0091 - Preliminary Change Report v1.0 17.02.2023
R0091 - Consolidated Consultation Responses
R0091 - Final Change Report v1.0 (Pre-Vote) 21.03.2023
R0091 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Housekeeping changes to the approved legal text for R0047

Date of latest update
Type
Change
ID
R0084
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
Change Proposal R0047 - Metering Code of Practice Consolidation Review, has been approved for implementation on 01 April 2023. Since approval of the Change Proposal the Code Manager has identified a number of omissions, clarifications, typographical errors and changes needed to the approved legal text. This CP has been raised to make the changes to the legal text and ensure accurate text is introduced into the REC.
Proposer
Ann Perry
Change Plan

Preliminary Change Report published and issued for Consultation

Completed

Start:

16 Dec 2022

Due:

24 Feb 2023

Completion:

24 Feb 2023

Consultation ends

Completed

Start:

24 Feb 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Final Change Report published

Completed

Start:

10 Mar 2023

Due:

21 Mar 2023

Completion:

21 Mar 2023

Responsible Committee decision (Ex-Committee)

Completed

Start:

21 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Appeal window closure

In Progress

Start:

24 Mar 2023

Due:

07 Apr 2023

Completion:

Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
  2. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
  3. As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
  4. As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Proposed Solution Document
Document title
R0084 Legal text changes - CoMCoP - (For Final Change Report) 21.03.2023
Upload document
R0084 - CoMCoP v2.1 (redlined for Final Change Report) 21.03.2023 (3).docx
Archive
Off
Document title
R0084 Legal text changes - CoMCoP - (For consultation) 24.02.2023
Upload document
R0084 - CoMCoP v2.1 (redined for Consultation) 24.02.2023.docx
Archive
Off
Problem Statement
To enable REC Parties to successfully meet the obligations of the CoMCoP, when it is implemented via Change Proposal R0047 on 01 April 2023, the CoMCoP needs to accurately reflect the intention of R0047 and current processes.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0084 - CP Form (Downloadable version)
R0084 - Legal text changes identified pre IAR/CPP - uploaded 12.02.23
R0084 - Change Proposal Plan v1.0 (Approved) 23.02.2023
R0084 - Initial Assessment Report v1.0 (Approved) 23.02.2023
R0084 - Preliminary Change Report v1.0 (Published for Consultation) 24.02.2023
R0084 - Consolidated consultation responses v1.0 21.03.2023
R0084 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

CSS Market Message Retry Strategy

Date of latest update
Type
Change
ID
R0081
Priority
Urgent
No
Latest Update
15/11/2023 - Change Proposal has been withdrawn. Market message success data for September 2023 was reviewed to ensure that a stable period was analysed which represented ‘normal’ conditions. Upon completion of the review, it has been concluded that the success of the current retry strategy has significantly improved since this change proposal was raised. The Code Manager will introduce cyclical reviews of performance to ensure this continues at the expected levels.
Summary
The prescriptive nature of the Market Message retry drafting is currently impeding on the CSS Service Provider’s ability to ensure all Market Messages are sent and received successfully between the CSS and the CSS User. This CP proposes a move to a principles-based obligation that allows for flexibility to ensure the CSS and CSS User are able to attempt retries but not have to follow specific timings or have a maximum number of retries.
Proposer
admin
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0081 - Change Proposal Form
Proposed legal text submitted with the CP
Company Name
-
Review status
Review required

Improvements to ‘Failed to Deliver’ CSS Messages

Date of latest update
Type
Change
ID
R0080
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
Since CSS Go-Live a large number of messages have not been successfully delivered due to failures of CSS User's gateways, resulting in CSS exhausting the 12-hour retry period. This Change Proposal has been raised to explore and address this issue
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment close

Completed

Start:

09 Nov 2022

Due:

25 Jan 2024

Completion:

25 Jan 2024

Party Impact Assessment trigger

Completed

Start:

25 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Party Impact Assessment close

Completed

Start:

02 Feb 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Preliminary Change Report and Consultation issued

Completed

Start:

23 Feb 2024

Due:

10 May 2024

Completion:

10 May 2024

Consultation close

Completed

Start:

10 May 2024

Due:

03 Jun 2024

Completion:

03 Jun 2024

Responsible Committee Decision

Completed

Start:

24 Jul 2024

Due:

31 Jul 2024

Completion:

31 Jul 2024

Final Change Report Issued

Completed

Start:

03 Jun 2024

Due:

24 Jul 2024

Completion:

19 Jul 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to CSS Users to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
  3. As the CSS User I want to receive CSS messages in a timely manner following any outage of my own gateway or systems, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
Proposed Solution Document
Document title
R0080 - Solution Development Report 11.01.2024
Upload document
R0080 - Solution Development Report 11.01.2024.pdf
Archive
Off
Document title
CSS Interface Design Specification v8.9.0 R0080 - REDLINE
Upload document
CSS Interface Design Specification v8.9.0 R0080 - TRACKED.docx
Archive
Off
Document title
CSS Failed To Deliver Detailed Design (R0080) v1.3 (19.06.2024)
Upload document
CSS Failed To Deliver Detailed Design (R0080) v1.3.docx
Archive
Off
Document title
Business Data Validation Rules v1.5.0 R0080 - REDLINE
Upload document
Copy of Business Data Validation Rules v1.5.0 R0080 - REDLINE.xlsx
Archive
Off
Document title
Schedule 24_Switching Data Management v1.2_R0080 Draft (19.06.2024)
Upload document
Schedule 24_Switching Data Management v1.2_R0080 Draft.doc
Archive
Off
Problem Statement
Following an unexpected or extended period of gateway outage for a CSS User, there is currently no automated process to resend any CSS messages from the CSS Provider that were triggered during the period of outage. This results in the CSS Provider needing to manually correct any issues, which is time consuming and may affect Consumer Switches due to delays in messages being processed.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
R0080 - Change Proposal form
R0080 Onboarding document
R0080 - Change Proposal Plan (Approved) 16.01.2024
R0080 - Rebaselined Change Plan (26.04.2024)
R0080 - Initial Assessment Report (Approved) 16.01.2024
R0080 Consolidated Party IA Responses v1.0 (10.05.2024)
R0080 - Preliminary Change Report v1.0 (Published for Consultation) 10.05.2024
R0080 Consolidated Consultation Responses (19.06.2024)
R0080 - Final Change Report v2.0 (Approved) 31.07.2024
Company Name
-
Review status
Review required

DCC access to EES and GES

Date of latest update
Type
Change
ID
R0071
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2023 - R0071 is approved by Change Panel for implementation in February release.
Summary
This Change seeks to create a new User Category in REC Schedule 12 – Data Access, to allow the Switching Service Desk to access the Gas and Electricity Enquiry Services (GES and EES). This would result in more expeditious Service Desk ticket resolution and a positive indirect impact on consumer outcomes.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

25 Sep 2022

Due:

21 Sep 2023

Completion:

Preliminary Change Report Issued

Completed

Start:

21 Sep 2023

Due:

06 Oct 2023

Completion:

Responsible Committee Review

Completed

Start:

06 Oct 2023

Due:

17 Oct 2023

Completion:

17 Oct 2023

Consultation Issued

Completed

Start:

17 Oct 2023

Due:

20 Oct 2023

Completion:

20 Oct 2023

Final Change Report Issued

Completed

Start:

20 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Responsible Committee Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.8.0
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 26 - Switching Service Management
R0156 Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification
R0071 DCC access to EES and GES
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)

Documents

Name Version Last updated Actions
176.62 KB
Version 1.0 - 02 Nov 2026 PDF - 176.62 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be handled appropriately, so that I can have a consistent and faultless switching experience.
  2. As the Switching Service Desk, I want to be able to access market data that lets me resolve tickets first time, so that I can provide a more efficient service to users. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible. As the EES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0071 Proposed Legal Text
Upload document
R0071 Legal Text - Gas Data Access Matrix v3.2.2 - Published with FCR - 10.11.23.zip
Archive
Off
Problem Statement
The Switching Service Desk generates and resolves tickets relating to Switching Incidents and Switching Data queries for Market Participants. GES and EES data is currently unavailable to the Switching Service Desk and access would allow them to resolve tickets more effectively, resulting in a more efficient service and better SLA performance.
SME
SME Role
Lead Technical Analyst
R0071 - Change Proposal Form
R0071 Change Proposal Plan v2.0 (Approved) - 05.09.2023
R0071 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0071 Preliminary Change Report v1.0 (Approved) - 17.10.23
R0071 Consolidated Consultation Responses v1.0 - 10.11.23
R0071 Final Change Report V1.0 (Post-Vote) 21.11.23
Company Name
-
Review status
Review required

Introduction of CSS refresh functionality

Date of latest update
Type
Change
ID
R0067
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSP) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Change Proposal seeks to introduce a refresh functionality to mitigate these issues.
Proposer
Michael Taylor
Change Plan

Solution Analysis and Development

Completed

Start:

29 Aug 2022

Due:

19 Oct 2022

Completion:

19 Oct 2022

Service Provider Impact Assessment

Completed

Start:

19 Oct 2022

Due:

29 Mar 2023

Completion:

29 Mar 2023

Consultation

Completed

Start:

11 Apr 2023

Due:

09 May 2023

Completion:

28 Apr 2023

Preliminary Change Report Issued

Completed

Start:

29 Mar 2023

Due:

11 Apr 2023

Completion:

05 Apr 2023

Final Change Report Issued

Completed

Start:

Due:

Completion:

21 Jun 2023

Responsible Committee Decision

Completed

Start:

09 May 2023

Due:

28 Jun 2023

Completion:

28 Jul 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to SDSPs to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience. As the CSS Provider, I want the functionality to be available for SDSPs to automatically resolve issues when messages are not received in the correct order or are received after Gate Closure, so that this work does not have to be done manually.
  3. As an SDSP, I want to be able to detect when I have not received the expected CSS messages, so that I am able to request that the missing messages are sent to me to process. As an SDSP I want to be able to request a refresh of CSS messages when they are not received in the correct order or they are received after Gate Closure, so that I am able to maintain an accurate reflection of the current Switch status and minimise impacts on CSS Users and Consumers.
Proposed Solution Document
Document title
R0067 - Legal Text at PCR
Upload document
R0067 - Legal Text at PCR.zip
Archive
Off
Document title
R0067 - Legal Text at FCR
Upload document
R0067 - Legal Text at FCR.zip
Archive
Off
Document title
R0067 - Cost Benefit Analysis and Conclusions v3.0
Upload document
R0067 - Cost Benefit Analysis and Conclusions v3.0.pdf
Archive
Off
Problem Statement
CSS messages not received by the SDSPs in the order they were sent or received, or after Gate Closure, can be difficult to detect and often require significant manual effort to resolve. This issue can directly impact Consumer switching experiences causing disruption and possible delays.
SME
SME Role
Lead Technical Analyst
R0067 - Change Proposal Form
R0067 - Consolidated Consultation Responses
R0067 - Change Proposal Plan v1.0
R0067 - Initial Assessment Report v1.0
R0067 - Change Proposal Plan v2.0 (Approved) 07.03.2023
R0067 - Change Proposal Plan v3.0 04.04.2023
R0067 - Preliminary Change Report v2.0 (Issued for Consultation) 14.04.2023
R0067 - Final Change Report (Post-Vote) 28.06.2023
Company Name
-
Review status
Review required

Addition of key information to all Service Now tickets

Date of latest update
Type
Change
ID
R0063
Change Category
Change Path
Priority
Urgent
No
Latest Update
The code elements of this change were implemented on the 12 April 2024. The technical solution will be delivered as part of the June 2024 REC Release.
Summary
This Change seeks to improve the key business information, required by the DNOs, included in the SNOW tickets produced by CSS Service Desk for CSS Asynchronously rejected messages
Proposer
Chris Price
Change Plan

Solution Analysis and Development

Completed

Start:

22 Aug 2022

Due:

07 Feb 2023

Completion:

07 Feb 2023

Service Provider Impact Assessment - Preliminary

Completed

Start:

07 Feb 2023

Due:

20 Mar 2023

Completion:

20 Mar 2023

Service Provider Detailed Impact Assessments

Completed

Start:

20 Mar 2023

Due:

10 Jul 2023

Completion:

27 Jun 2023

Preliminary Change Report issued

Completed

Start:

10 Jul 2023

Due:

14 Jul 2023

Completion:

14 Jul 2023

Responsible Committee review

Completed

Start:

14 Jul 2023

Due:

26 Jul 2023

Completion:

26 Jul 2023

Consultation trigger

Completed

Start:

26 Jul 2023

Due:

28 Jul 2023

Completion:

28 Jul 2023

Consultation close

Completed

Start:

28 Jul 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Final Change Report issued

Completed

Start:

18 Aug 2023

Due:

15 Sep 2023

Completion:

14 Sep 2023

Responsible Committee decision

Completed

Start:

15 Sep 2023

Due:

27 Sep 2023

Completion:

27 Sep 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer I want the Switch process to work efficiently and effectively, so that I can switch Energy Supplier without unnecessary delay or issues.
  2. As an ERDS and GRDS, I want to receive SNOW tickets that contain all of the relevant data to enable me to triage and resolve issues efficiently, so that Consumers do not experience unnecessary switching delays and I am able to meet my service level obligations.
  3. As the CSS Provider, I want the ERDS related SNOW tickets to contain all of the relevant data to enable the efficient resolution of issues without the need for a manual workaround to be utilised, so that Consumers do not experience unnecessary switching delays.
Proposed Solution Document
Document title
Schedule 26 - Switching Service Management_R0063_FCR 15.09.2023
Upload document
Schedule 26 - Switching Service Management_R0063_FCR 15.09.2023.pdf
Archive
Off
Problem Statement
The SNOW tickets received by ERDS and GRDS for messages that CSS has asynchronously rejected (e.g., for business rule reasons) currently do not contain the relevant data for the SDSPs to triage and take any necessary action to resolve the underlying issue(s).This may delay the resolution of the SNOW tickets, potentially having an impact on aConsumers Switch.
SME
SME Role
Lead Technical Analyst
R0063 - Change Proposal Form
R0063 - Change Proposal Plan v1.0 (Approved)
R0063 - Initial Assessment Report v1.0 (Approved)
R0063 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0063 - Extension to Change Plan 2.0 (Approved) 04.04.2023
R0063 - Preliminary Change Report v1.0 (Approved) 26.07.2023
R0063 - Consolidated Consultation Responses
R0063 - Final Change Report v2.0 (Approved) 27.09.2023
Company Name
St Clements Ltd (on behalf of DNOs)
Review status
Review required

Clarification of Supplier of Last Resort Obligations under the REC

Date of latest update
Type
Change
ID
R0057
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2023 - Change Proposal has been withdrawn as agreed with the Proposer. The Problem Statement was addressed through C3-0047 - Updates to PAB Procedures.
Summary
Within Schedule 19 – Market Exit and Supplier of Last Resort there is currently no consideration of circumstances where the Replacement Supplier is unable to fulfil its REC obligations in respect of Consumers transferred to them, due to them having little or no control over the processes of the failed supplier or it’s administrator. This change seeks to define when the Replacement Supplier is responsible for obligations relating to the Consumers gained through a Supplier of Last Resort (SoLR) Process.
Proposer
admin
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer when my Energy Supplier goes out of business and I am transferred to a Replacement Supplier, I want my supply transfer to be handled quickly and have confidence that my new Supplier has all the necessary data to set up my account and bill me correctly from the transfer date, and if the Replacement Supplier fails to provide the expected level of service they will be appropriately held accountable.
  2. As a Replacement Supplier, I want the limitations affecting my ability to meet my REC obligations to be understood by the REC Code Manager and the Performance Assurance Board, so that any breaches of obligations are considered fairly and any limitations are taken into consideration.
  3. As the Code Manager I want to apply appropriate and proportionate Performance Assurance Techniques, taking in to account the ability of a Replacement Supplier to meet their obligations under the REC.
Proposed Solution Document
Document title
R0057 Draft Legal Text
Upload document
R0057 Draft Legal Text.zip
Archive
Off
Problem Statement
Currently, Replacement Suppliers are responsible for all obligations of the failed supplier from the date and time set out in the Last Resort Supply Direction, this includes a period of time prior to Consumer accounts transferring to the Replacement Supplier’s systems, limiting their ability to fulfil these obligations. This means that a Replacement Supplier may experience issues with the Performance Assurance obligations for which they are responsible, but do not have direct control over. Any breaches of obligations by a Replacement Supplier need to be considered fairly and any limitations the Replacement Supplier may face are taken into consideration.
Stages Selection
R0057 - Change Proposal Form
R0057 - Solution Options
R0057 - Consolidated Impact Assessment Responses
R0057 - Change Proposal Plan v1.0
R0057 - Initial Assessment Report v1.0 (Approved)
R0057 - Preliminary Change Report V1.0 (Approved)
Company Name
EDF
Review status
Review required

EES/GES Additional Service Request for Housing Associations to be added to the Data Access Matrix

Date of latest update
Type
Change
ID
R0056
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/24 - Change Proposal withdrawn.
Summary
Housing Associations need to validate supply point information to ensure that they have the most up to date and accurate data against each property in their portfolio and also to complement their internal safety inspection processes. This change has been raised to enable Housing Associations to have access to data in EES and GES, to understand and confirm which of their properties contain live supply points, the meter locations, asset data and last inspection checks. This will also enable Housing Associations to update the industry where gas safety information is not accurate against their site data.
Proposer
Fay Morris
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
HA REC Requested Data Items.xlsx
Company Name
Correla Limited
Review status
Review required

Switching Operator Outage Notification Lead time

Date of latest update
Type
Change
ID
R0055
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/11/2022 - The REC Technical Expert Panel voted to approve R0055 for implementation on 24 February 2023.
Summary
Within the Switching Operator Service Definition, the Central Switching Service (CSS) Provider is required to provide 10 Working Days’ (WDs) notice of planned system outages. However, within the CSS Provider’s processes and the Switching Operator Change Management Process Category 3 document, an 8 WD lead time is set out. This change seeks to address this discrepancy.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment

Completed

Start:

06 Jul 2022

Due:

19 Aug 2022

Completion:

19 Sep 2022

Party Impact Assessment

Completed

Start:

19 Aug 2022

Due:

26 Aug 2022

Completion:

13 Sep 2022

Preliminary Change Report Issued

Completed

Start:

26 Aug 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Consultation Issued

Completed

Start:

14 Oct 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Final Change Report Issued

Completed

Start:

14 Oct 2022

Due:

18 Nov 2022

Completion:

18 Nov 2022

Responsible Committee Decision

Not Started

Start:

18 Nov 2022

Due:

30 Nov 2022

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.3.0_Superseded

Documents

Name Version Last updated Actions
203.39 KB
Version 1.0 - 02 Nov 2026 PDF - 203.39 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the CSS Provider, I want the service levels to be consistently defined across relevant REC Products. This will ensure that I am clear on the lead time I need to provide for planned outages and can meet the defined service level.
  2. As a CSS User, I want to understand how much notice I will get for planned outages of the CSS, so I am able to appropriately plan my activity reliant on this service.
  3. As a Switching Data Service Provider, I want to understand how much notice I will get for planned outages of the CSS. This will ensure I am able to appropriately plan my Operational Switching Service Changes and associated activities.
Proposed Solution Document
Document title
R0055 - Proposed Legal Text
Upload document
Proposed legal text changes submitted with the CP (2).pdf
Archive
Off
Problem Statement
Across REC products there is an inconsistency in the defined lead time for the CSS Provider to provide notification of scheduled maintenance and system outages. This may result in uncertainty for Switching Data Service Providers around when they should submit an Operational Switching Service Change. This is to ensure there is sufficient lead time for any change to be included within a planned maintenance release, and for CSS Users planning their operational activity around CSS availability.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0055 - Change Proposal Plan v1.0 (Approved)
R0055 - Initial Assessment Report v1.0 (Approved)
R0055 - Consolidated Consultation Responses
R0055 - Preliminary Change Report (Published for Consultation) v1.0
R0055 - Final Change Report v1.0 (Approved)
Company Name
DCC
Review status
Review required