Provision of data to the GES Provider
Date of latest update
Type
Issue
ID
I0302
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/08/2026 On 26 August 2026, in line with the Code Manager's recommendation, TEP approved the extension to plan for I0302.
Summary
RECCo has commenced work on developing a dual-fuel Enquiry Service which will involve the migration of data from its legacy services.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Ahead of the introduction of a dual-fuel Enquiry Service and in the case that the GES Provider is not the same entity as the CDSP and GRDA, this Issue seeks to enable the migration of gas data from legacy services into a new physical interface.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0302 submission form
I0302 Change Report (Proposal Plan) v1.0
I0302 Change Report (Update to Plan) v1.0 Approved 15.04.26
I0302 Change Report (Extension to Plan) v1.0 Approved 26.08.2026
Company Name
REC Code Manager
Review status
Review required
Updates to Enquiry Service API endpoints to support migration to RECCo’s API Gateway
Date of latest update
Type
Issue
ID
I0301
Change Path
Urgent
No
Latest Update
06/11/2026 - Following further analysis, it was determined that I0301 is no longer required. While the Issue was originally raised to support a dual-fuel approach to RECCo’s Enquiry Service evolution, the initial focus on GES means that no changes to the REC are currently required to update the relevant API endpoints.
Summary
As part of RECCo’s plan to procure a dual-fuel Enquiry Service, there will be a single point of entry to API services. A migration plan has been developed with two independent stages. For stage one, all current Enquiry Service API users will need to connect through RECCo’s API Gateway rather than connecting directly to the existing EES and GES APIs. This will require users to amend the URLs they call when accessing the services.
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
I0301 submission form
Company Name
REC Code Manager
Review status
Review required
Meter Manufacturers Make and Type not Populated in SMRS
Date of latest update
Type
Issue
ID
I0297
Change Path
Priority
Urgent
No
Latest Update
On 30 September 2026, the REC Technical Expert Panel voted to approve the Update to Plan for I0297, and to place this REC Issue on hold.
Summary
The Meter Manufacturers Make and Type (J0410 / DI-048) was not populated as part of the MHHS Programme's data cleanse. However it is part of the SMRS maintained Meter Technical Details (MTDs) for Smart Meters which replace the DTC MTD Market Messages for Smart Meters in the MHHS environment. It is not currently possible to populate this item in the legacy arrangements.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Following MHHS Migration, the MTDs provided by SMRS do not include the Meter Manufacturers Make and Type, as this replaces the existing D0149/D0150 Market Messages it could lead to the information being lost. This will mean Energy Suppliers and MOAs will not know the make and type of meter installed at a particular Site.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0297 submission form
I0297 Change Report (Proposal Plan) V1.0
I0297 Update to plan
I0297 Legal Drafting
I0297 Update to plan v1.0 Approved 30.09.26
Company Name
RECCo
Review status
Review required
Registration Id Required for MHHS Appointments
Date of latest update
Type
Issue
ID
I0296
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Code Manager have developed a solution which has been live since 05 May 2026. More detail can be found on the REC Portal Wiki. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
The RegistrationId (DI90043 / DI849) is required by SMRS to be included in the IF-031 'Supplier Agent Appointment Request' Market Message to allow the SMRA to process the appointment request. However not all Suppliers hold the RegistrationId for all Meter Points, in particular those that have not undergone a Registration managed by the Central Switching Service (CSS)
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As part of the solution for REC Issue I0296 - Registration Id Required for MHHS Appointments the REC Code Manager have developed a process to provide Energy Suppliers the Registration Id for Metering Points that have not been through a Central Switching Service (CSS) Registration Managed Switch. This is to allow Energy Suppliers that may not hold the Registration Id for these Metering Points to populate the Market-wide Half Hourly Settlement (MHHS) Agent Appointment Messages required to initiate a MHHS Migration.
- More detail of the solution can be found: https://portal.retailenergycode.co.uk/knowledge-centre/rec-wiki/market-wide-half-hourly-settlement/provision-registration-id-required?utm_source=emailoctopus&utm_medium=email&utm_campaign=Weekly%20Bulletin%20-%202026-05-01
Proposed Solution Document
Document title
I0296 Closure Report_v1.0 (12 May 2026)
Upload document
I0296_Closure report_v1.0.pdf
Archive
Off
Problem Statement
Not all Energy Suppliers hold the RegistrationId for all Meter Points, particularly those Meter Points that have not gone through a Switch, i.e. have not undergone a Registration managed by the CSS. The RegistrationId is currently only available where a Metering Point has been through a CSS managed Registration. Without the RegistrationId available to Energy Suppliers, not all Metering Points will be able to migrate putting the MHHS Migration and Milestone M15 at risk.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0296 submission form
Company Name
RECCo
Review status
Review required
Review of Schedule 1 Interpretations and Definitions
Date of latest update
Type
Change
ID
R0291
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
During the quality checks of REC Schedules for MHHS, several capitalised terms throughout schedules were identified with no entry in Schedule 1. It has also been identified that there are definitions that link to Schedules (such as 2, 20 and 21) which are no longer live REC Schedules. The Code Manager has reviewed these and determined some changes are required to Schedule 1.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
17 Feb 2026Approved at Change Panel for implementation in June 2026
Completed
Start:
Due:
Completion:
21 Apr 2026Impacted REC Documents
Status
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0291 REC Main Body draft V0.1
Upload document
R0291 REC Main Body draft V0.1.docx
Archive
Off
Document title
R0291 Schedule 1 draft V0.1
Upload document
R0291 Schedule 1 draft V0.1 (1).docx
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Upload document
R0291 Schedule 25 (CSS) draft V0.1.docx
Archive
Off
Document title
R0291 Schedule 1 draft V0.2
Upload document
R0291 Schedule 1 draft V0.2.docx
Archive
Off
Document title
R0291 REC Main Body draft V0.1
Upload document
R0291 REC Main Body draft V0.1 (1).docx
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Upload document
R0291 Schedule 25 (CSS) draft V0.1 (1).docx
Archive
Off
Problem Statement
Without clear definitions of all defined terms within the REC, there may be confusion for REC Parties and other industry participants who use REC documents.
Stages Selection
I0291 submission form
I0291 Change Report (Proposal Plan) V1.0
R0291 Change Report (For Consultation) V1.0
R0291 Consolidated Consultation Responses v1.0
R0291 Change Report (Final Recommendation) V1.1 approved 21.04.26
Company Name
REC Code Manager
Review status
Review required
Legacy Data Item API Service
Date of latest update
Type
Change
ID
R0290
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/06/2026 - the REC Change Panel voted to reject the implementation of this Change Proposal, in line with the Code Manager recommendation. The appeal window closed on 17 June 2026.
Summary
MHHS removes certain Data Items (e.g. Profile Class, Measurement Class, Standard Settlement Configuration, Time Pattern Regime etc.) that are important to wider processes and products offered to consumers. This proposal is seeking a mechanism for electricity Market Participants to look up the previous entries for these legacy Data Items held before MHHS Migration begins.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0290 New Schedule Legacy Data Item API V0.4
Upload document
I0290 Legacy Data Item API V0.4.docx
Archive
Off
Document title
R0290 Schedule 1 Defined Terms V0.2
Upload document
I0290 Schedule 1 Defined Terms V0.2.docx
Archive
Off
Document title
R0290 Schedule 9 Qualification and Maintenance v0.1
Upload document
I0290 Scheudle 9 Qualification and Maintenance v0.1.docx
Archive
Off
Problem Statement
The risk of loss of certain Data Items for MHHS Migrated Metering Points may impact Parties in their ability to carry out and support industry processes, or in what products they are able to offer Consumers, in both the MHHS Market and following a Reverse Migration.
Stages Selection
SME
SME Role
Lead Technical Analyst
I0290 submission form
I0290 Change Report (Proposal Plan) V1.0
I0290 Extension to Plan V1.0 approved 27.03.26
I0290 Extension to Plan V2.0 approved 27.04.26
R0290 Change Report (For Consultation) v1.0
R0290 Consolidated Consultation Responses V1.0
Energy Consultants Association - letter on Change Report (Final Recommendation)
R0290 Change Report (Final Recommendation) v1.1 post vote 02.06.2026
Company Name
Stark
Review status
Review required
Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
Date of latest update
Type
Change
ID
R0287
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The current wording of the Annulment definition in REC Schedule 23 – Registration Services does not sufficiently align with the obligations set out in Ofgem’s Electricity Supply Standard Licence Conditions (SLC) 14.2(d),14.4(c) and 14.10. This misalignment has led to inconsistent interpretations of the usage of the Annulment process across the industry compared to the intention of the REC change and the licence obligation. This Issue is seeking further amendments to REC Schedule 23 - Registration Services and clearer guidance. This clarification is essential to prevent retention-based misuse, ensure regulatory compliance, and uphold Consumer trust in the Switching process.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
02 Dec 2025Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
20 Jan 2026Alternative Change Proposals
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0287 Draft Legal Changes - For Consultation
Upload document
I0287 Draft Legal Changes - For Consultation.docx
Archive
Off
Problem Statement
The current wording of the Annulment definition in the REC Schedule 23 – Registration Services is insufficiently aligned with the obligations set out in Ofgem’s Electricity Supply Standard Licence Conditions (SLC). This has led to inconsistent interpretations of the usage of the Annulment process.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
vaishnsharma@deloitte.co.uk
SME Role
Lead Assurance Analyst
I0287 submission form
R0287 and R0287A Change Report (Proposal Plan and Consultation) v1.0 approved 02.12.25
R0287 and R0287A Consolidated Consultation Responses PUBLIC
R0287 and R0287A Change Report (Final Recommendation) Post Vote 20.01.2026 v1.0
Ofgem decision to approve R0287
Company Name
Centrica
Review status
Review required
Clarification on Detailed Impact Assessment Activities
Date of latest update
Type
Change
ID
R0286
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The first complex technical change R0067 (Introduction of CSS Refresh Functionality) encountered a number of challenges within the design and implementation process, the change was scheduled for implementation on the 6th December 2023, however, the change was deployed with defects and was not fully operational until February 2024. Following that session, the Code Manager held discussions, and a formal Lessons Learned session with all Service Providers and identified a number of challenges with the technical change process. Some of these challenges can be attributed to the timing of the detailed design, Detailed Impact Assessments (DIA) and party impact assessments
Impacted Consumers
Impacted REC Documents
Status
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An update to the REC Schedule 5 - Change Management.
Proposed Solution Document
Document title
R0286 Proposed legal text v1.1
Upload document
R0286_Draft legal text_v1.1.docx
Archive
Off
Problem Statement
The technical change process currently creates five challenges which can be attributed to the timing of the detailed design, PIA and DIAs. These are as follows: Lack of Clarity, Limited Feedback, Misalignment, High Contingency Costs and Inaccurate Timelines.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Change Management v3.5 RedLine for IA Clarifications
I0286 submission form
R0286_Consolidated Consultation responses V1.0
Company Name
REC Technical Services
Review status
Review required
Organisations with multiple role types EES and SDEP access
Date of latest update
Type
Issue
ID
I0285
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 22 October 2026, the Code Manager published the I0285 Closure Report. Following a review of the responses to the Party impact assessment, the Code Manager has determined that this REC Issu can be moved to Resolved as there has been a lack of Parties indicating they would use the proposed solution under I0285. The enduring solution of one individual assigned to two company groups to use two separate email addresses for each company group will be sustained. RECCo will consider the requirement for a single login across multiple roles as part of the Enquiry Services Evolution project development.
Summary
It is currently not possible for organisations with multiple role types to have the same person be able to access all assigned role types within the Secure Data Exchange Portal (SDEP) without having a unique email address for each role type.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Discussed at Technical Expert Panel
Completed
Start:
Due:
Completion:
17 Dec 2025Discussed at Technical Expert Panel
Completed
Start:
Due:
Completion:
28 Jan 2026Extension to Plan approved by Technical Expert Panel
Completed
Start:
Due:
Completion:
25 Feb 2026Discussed at Change Issues Group
Completed
Start:
Due:
Completion:
06 Aug 2026Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Zip file with I0285 legal text
Upload document
Legal text for Party IA (2).zip
Archive
Off
Document title
I0285 Solution Development Report V1.0
Upload document
I0285 Solution Development Report V1.0.pdf
Archive
Off
Problem Statement
Organisations with more than one role type are required to have unique email addresses for staff who require access to multiple role types, leading to inefficiencies, unnecessary administrative burdens and a poor user experience.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
I0285 submission form
I0285 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0285 Extension to Plan V1.0 approved 25.02.26
I0285 Extension to Plan V2.0 approved 24.06.26
I0285 Consolidated Impact Assessment Responses v1.0
I0285_Closure Report
Company Name
REC Code Manager
Review status
Review required
Updates to Schedule 14 Measurement Transformers Commissioning Timescales
Date of latest update
Type
Change
ID
R0284
Change Category
Change Path
Priority
Urgent
No
Latest Update
12/08/2026 - the Metering Expert Panel approved the Change Report (Final Recommendation) V1.2. This Change Proposal will be implemented on 26 June 2027. If you wish to appeal this decision, this must be received by COB 28 August 2026.
Summary
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
03 Feb 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
05 Feb 2026Change Report (For Consultation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
08 Apr 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
25 June 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0122 | SDEP Review Improvements (2) - Usability | |
| R0178 | Improvements to CSS Business Process Logic | |
| R0284 | Updates to Schedule 14 Measurement Transformers Commissioning Timescales |
|
| R0321 | DNOs Create Export MPANs after approving G98/99 commissioning documents |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0284 Schedule 14 Metering Operations draft V0.2
Upload document
I0284 Schedule 14 Metering Operations draft V0.2.pdf
Archive
Off
Document title
R0284 Schedule 14 Metering Operations draft V0.3
Upload document
I0284 Schedule 14 Metering Operations draft V0.3.pdf
Archive
Off
Document title
R0284 Schedule 14 Metering Operations final version
Upload document
I0284 Schedule 14 Metering Operations final version.pdf
Archive
Off
Problem Statement
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
Stages Selection
I0284 submission form
I0284 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0284 Change Issue Group paper v1.0
I0284 Consolidated Impact Assessment Responses PUBLIC v1.0
R0284 Change Report (For Consultation) V1.0 approved 08.04.26
R0284 Consolidated Consultation Responses PUBLIC v1.0
R0284 Change Report (Final Recommendation) V1.2 approved 12.08.26