Return of Legacy Meters
Date of latest update
Type
Issue
ID
I0282
Change Path
Priority
Urgent
No
Latest Update
08/04/2026 - The Closure Report was presented to the REC Metering Expert Panel at their meeting on 08 April 2026. The Issue has now been classed as resolved.
Summary
The issue identified is that current arrangements require or assume that legacy Meter Asset Providers (MAPs) take back old, non Smart Meters once they are removed from Consumers’ Premises, even though many of these meters are obsolete, cannot be reused, and ultimately require disposal. This has resulted in large volumes of legacy meters being transported across the country between storage providers and legacy MAPs, creating unnecessary cost, administrative burden, and environmental impact. Storage providers are issuing extensive lists of Meter Serial Numbers (MSN) to try to establish meter ownership, and legacy MAPs must manually verify these details. This process has been made more difficult by historical changes in company names and ownership structures. Once ownership is confirmed, the meters are frequently transported to the legacy MAP only for them to arrange disposal, which provides no net value and simply adds further transportation and handling costs.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The process for handling removed legacy non Smart Meters is inefficient and environmentally costly, with unclear ownership, unnecessary transport, and no established recycling route. A consistent, sustainable disposal solution is needed to reduce waste, simplify operations, and clarify the management of any scrap value.
Stages Selection
Stages Selection
I0282 submission form
I0282_Closure Report_v1.0 (26 March 2026)
Company Name
SP Electricity North West
Review status
Review required
Extending R0067 Refresh Functionality
Date of latest update
Type
Issue
ID
I0281
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/09/2026 - The update to plan has been approved by the Technical Expert Panel on 30 September 2026.
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSPs) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Issue originally aimed to extend the Refresh functionality, implemented for the Gas Retail Data Agent (GRDA).to the Electricity Retail Data Agent (ERDA). Following solution development for I0281, it was agreed that the Refresh functionality would be made available for all Market Participants in receipt of the in-scope messages.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0281_Proposed_Legal text_PIA_V1.0.
Upload document
I0281_Proposed_Legal text_PIA_V1.0.zip
Archive
Off
Problem Statement
CSS messages are not received by the SDSPs in the order in which they were originally sent, or after Gate Closure, so it can be difficult to detect and often requires significant manual effort to resolve. This issue can directly impact Consumer switching experiences, causing disruption and possible delays in a switch.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0281_Change Report (Update to Plan) v1.0 (Pre-approval)
I0281_Change Report (Update to Plan) v2.0 Approved
I0281_Change Report (Update to Plan) v2.0 (Pre-approval)
I0281_Change Report (Update to Plan) v1.0 Approved 20.05.2026
I0281_Change Report (Proposal Plan) v1.0_Approved 04.11.2025
Company Name
REC Technical Services
Review status
Review required
Establishing the Safe Isolation Provider (SIP) as a Standalone REC Party
Date of latest update
Type
Issue
ID
I0278
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - An Update to Plan has been approved by the Change Panel on 21 July 2026.
Summary
This proposal recommends the formal recognition of the Safe Isolation Provider (SIP) as a standalone Party under the Retail Energy Code (REC). This aligns with the direction set out in Ofgem’s recently published Strategic Direction Statement (SDS), which explicitly calls for the establishment of SIPs as a standalone Party role. The aim is to address the growing scale of unregulated SIP activity, mitigate associated consumer safety risks, and ensure the metering industry is equipped to support the UK’s Net Zero ambitions. By enabling easier access to certified SIPs, this change will enhance consumer protection, accelerate low-carbon technology deployment, and improve operational efficiency across the energy sector.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The current SIP framework poses several risks: - Consumers, MEMs and unaccredited practitioners’ safety. Unaccredited and unregulated isolation work increases the risk of unsafe installations and potential harm to Consumers. NAPIT highlighted to RECCo and DESNZ that 17 and 13 unregulated practitioners respectively died in 2023 and in 2024 due to unsafe isolation. With the right Party undertaking this work, there would also be less safety issues for the Consumer at their premises; - Inequity. Independent Installers face longer wait times compared to supplier-led installations, creating a two-tier system; - Low competitive market. Currently prospective Parties can be put off from applying to be a SIP as it appears they would need full MEM Accreditation which is often too far outside their current business operating model. Providing SIPs with their own pathway and requirements could result in more Parties becoming SIPs and therefore giving Consumers more choice in their provider; and - Decarbonisation delays. The inability to scale SIP capacity undermines the timely deployment of LZCTs, threatening Net Zero targets.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0278 submission form
I0278 Change Report (Proposal Plan) V1.0 (Pre-Approval) 09.10.2025
I0278_Change Report (Extension to Plan) v1.0 (Pre-Approval) 12.01.2026
I0278_Change Report (Extension to Plan) v2.0 (Pre-Approval) 13.07.2026
I0278_Change Report (Extension to Plan) v2.1 (Approved) 21.07.26
I0278_Consolidated Information Request DNO Responses
I0278_Consolidated Information Request MEM-SIP Responses PUBLIC
I0278_Consolidated Information Request RPA Responses
Company Name
RECCo
Review status
Review required
MHHS Related Metering Points across Market Segments
Date of latest update
Type
Issue
ID
I0275
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
17/09/2026 - The Code Manager has published a guidance document that acts as the solution for this Issue. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
It has been identified by the MHHS Data Cleanse Working Group (DCWG) that around 9,000 existing Metering Point Relationships include Metering Points that would migrate into different Market-wide Half Hourly Settlement (MHHS) Market Segments. The majority of these are where one Metering Point has a Traditional meter installed (Smart Segment) and a Related Metering Point has an Advanced meter (Advanced Segment). This situation is currently valid but in MHHS would cause two problems. - SMRS would not be able to align the agent appointments, leaving secondary MPANs without agents and MHHS Migrations unable to fully complete.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0275 - Related Metering Points Guidance Document_V1.0.pdf
Upload document
I0275 - Related Metering Points Guidance Document_V1.0 (1).pdf
Archive
Off
Document title
I0275 - Closure Report_V1.0
Upload document
I0275_Closure Report_v1.0 (2).pdf
Archive
Off
Problem Statement
Without considering this Issue, there will be a risk to the MHHS migration. Indeed, a Metering Point installed which does not match its Related Metering Point (for example a Relationship between a Traditional meter with an Advanced Meter) will not be able to fully migrate to MHHS arrangements.
Stages Selection
Stages Selection
I0275 submission form
Company Name
RECCo
Review status
Review required
Gas Pressure and Capacity Information Transparency
Date of latest update
Type
Issue
ID
I0274
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - Change Report (Proposal Re-Plan) approved at Change Panel
Summary
As per Section 13.4.18 of CoMCoP, retrieving gas pressure and capacity information from Transporters via the GT1 process can be time consuming for Energy Suppliers/MAMs and/or Consumers. The process of retrieving this information is inconsistent and service timescales are varied between transporters. Gas pressure and capacity information should be readily available through the Gas Enquiry Service to enable timely processing of site work and requests to enable MAM’s and Suppliers to appropriately service their customers.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
For some Energy Suppliers, MAMs and consumers, retrieving pressure and capacity information via the GT1 process can be time consuming. This is due to elements like response timescales and methods (batch responses vs individual responses) being varied among GTs. This ultimately has a negative impact on customers waiting on site work, such as a new connection, for example.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0274 submission form
I0274 Change Report (Proposal Plan) V1.0 approved 18.11.25
IG174 Change Proposal Re-Plan v2.0 approved 21.07.2026
Company Name
OVO Energy
Review status
Review required
Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters
Date of latest update
Type
Issue
ID
I0273
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/10/2026 On 05 October 2026, the MEP voted via an ex-committee vote to approve this extension to plan. The Code Manager is currently engaging with the BSC to raise a consequential change to facilitate the use of the SSC for non-Settlement purposes, for example Billing or quoting tariffs for Smart Metering Assets.
Summary
In the MHHS design the Standard Settlement Configuration (SSC) is a non-mandatory data item for Smart and Advanced metering points, in addition the register level TPR information is not shared in the MTD flows for these meters (IF-006 for Smart and D0268 for Advanced). It was identified through BSC Issue I118 that there is a requirement for the SSC to be set for Domestic / Microbusiness Advanced Metering Points making use of the HH data opt out and there may be other areas where the SSC is required.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0273 - Interim Guidance Document V1.1
Upload document
I0273 - Interim Guidance Document V1.1.pdf
Archive
Off
Problem Statement
The MHHS design does not mandate the use of SSC or support register-level TPR data for Smart and Advanced Meters, creating gaps in data availability for certain Settlement scenarios.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0273 Submission Form
I0273 - Update to Plan V2.0 (Pre-Approval) 06.05.2026
I0273 - Update to Plan V2.0 Approved 05.10.2026
Company Name
RECCo
Review status
Review required
Enabling transparency of the CRS Provider’s REC service level performance
Date of latest update
Type
Change
ID
R0272
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
RECCo regularly reports on the performance of REC Service Providers in relation to their activities under the REC. However, there is currently no formal agreement to permit the publication of CRS performance measures between the CRS Provider and RECCo. Due to the multi-Party agreement, the REC does not specifically address the publication of this performance data. Instead, RECCo are operating under an informal understanding with the CRS Provider, which means there is a possibility that publication may be delayed or not agreed to in a given month. RECCo is dependent on the CRS Provider’s approval for each publication, which can cause delays. This approval could also be withheld at any point.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An update to the REC Schedule 6 – Performance Assurance.
Proposed Solution Document
Document title
R0272 Approved legal text (26.01.2026)
Upload document
I0272 draft legal text_v1.1.docx
Archive
Off
Problem Statement
Unlike REC Service Providers, there is currently no formal agreement in place between the CRS Provider and RECCo to publish details about the CRS Provider’s performance. RECCo is therefore dependent on the CRS Provider’s approval for each publication. Not only could there be delays in RECCo’s reporting, but the approval could also be withheld at any point, preventing RECCo’s reporting.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0272 Change Proposal Form
R0272 Consolidated Consultation responses V1.0
Company Name
Code Manager / RECCo
Review status
Review required
Clarification of SIP Qualification Requirements
Date of latest update
Type
Change
ID
R0270
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
REC Schedules 1, 14, and 15 all note that in order to Qualify as a Safe Isolation Provider (SIP), the Party needs to be a Qualified Meter Operator Agent (MOA). It has since been determined that Qualified Electricity Metering Operatives (EMOs) should also be able to Qualify as SIPs.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Change Report (For Consultation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
10 Dec 2025Change Report (Final Recommendation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
11 Feb 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0270 draft legal text
Upload document
I0270 draft legal text.zip
Archive
Off
Problem Statement
Requiring SIPs to be fully Qualified MOAs may be hindering smaller Parties who wish to be SIPs from Qualifying under the REC. This in turn may be reducing the number of Qualified SIPs in the market for Consumers to choose from or causing Consumers inadvertently to contract with people who are not Qualified SIPs to carry out SIP Works.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0270 Submission Form
I0270 Change Report (Proposal Plan) V1.0 approved 18.11.25
R0270 Change Report (For Consultation) V1.1 approved 10.12.25
R0270 Consolidated Consultation Responses V1.0
R0270 Change Report (Final Recommendation) V1.0 approved 11.02.26
Company Name
REC Code Manager
Review status
Review required
Smart Meter Installation Surveys - Microbusiness requirements
Date of latest update
Type
Change
ID
R0267
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
There is no requirement for energy suppliers planning fewer than 5000 Smart meter installations at domestic premises, within a calendar year, to survey Consumers for REC compliance purposes. Conversely, there is no minimum threshold in place for microbusiness installations, meaning that non-domestic suppliers are required to procure a suitably qualified, independent Smart Meter Installation Survey Organisation, at considerable cost, to survey what might be a very small number of customers.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
19 Aug 2025Change Report (For Consultation) approved by Change Panel
Completed
Start:
Due:
Completion:
17 Feb 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0267 CoMCoP Appendix 20 draft V0.1
Upload document
I0267 CoMCoP Appendix 20 draft V0.1.pdf
Archive
Off
Document title
R0267 CoMCoP Appendix 20 draft V0.2
Upload document
I0267 CoMCoP Appendix 20 draft V0.2 post IA.pdf
Archive
Off
Problem Statement
Non-Domestic Energy Suppliers are having to procure an independent Smart Meter Installation Survey Organisation, at considerable cost, to survey what might be a very small number of Consumers to be compliant with their REC obligations.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0267 Submission form
I0267 Change Report (Proposal Plan) V1.1
I0267 Extension to Plan V1.0
I0267 Consolidated Impact Assessment Responses PUBLIC v1.0
R0267 Change Report (For Consultation) V1.0
R0267 Consolidated Consultation Responses PUBLIC v1.0
R0267 Change Report (Final Recommendation) V1.0 approved 07.04.26
R0267 Decision Document
Company Name
Drax Energy Solutions Ltd
Review status
Review required
REC Data Specification Clarifications
Date of latest update
Type
Change
ID
R0266
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
This issue has been raised to improve the clarity of elements of the Energy Market Data Specification (EMDS) that are ambiguous due to information from the pre-REC Data Transfer Catalogue (DTC) Annex C and gas RGMA Annex B being omitted in the transition to REC.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
19 Aug 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0266 Party IA documents for gas
Upload document
I0266 Party IA documents for gas.zip
Archive
Off
Document title
R0266 consultation documents for gas
Upload document
R0266 consultation documents for gas.zip
Archive
Off
Document title
R0266 final solution documents for gas
Upload document
R0266 gas final solution documents.zip
Archive
Off
Document title
I0266 Party IA documents for electricity
Upload document
I0266 Party IA documents for elec.zip
Archive
Off
Document title
R0266 final solution documents for electricity
Upload document
R0266 final solution - electricity (1).zip
Archive
Off
Problem Statement
There may be a lack of clarity for Parties populating Market Messages / Data Flows as not all of the additional rules, conditions and examples from Annex B and Annex C transitioned into the REC (or to another industry code).
Stages Selection
I0266 REC Data Specification Clarifications Submission Form
I0266 Change Report (Proposal Plan) V1.0
I0266 Consolidated Impact Assessment Responses V1.0
I0266 Extension to Plan V1.0 approved 10.12.25
R0266 Change Report (For Consultation) V1.0
R0266 Consolidated Consultation Responses PUBLIC V1.0
R0266 Change Report (Final Recommendation) V1.0 approved 07.04.26
Company Name
REC Code Manager
Review status
Review required