Electricity Supply to Hydrogen Electrolysers

Date of latest update
Type
Change
ID
R0160
Change Category
Priority
Urgent
Yes
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change to the Retail Energy Code is proposing to facilitate efficient and robust procedures between Licensed Suppliers and LCCC as part of the regulatory solution to prove that electricity supplied to the hydrogen producer is LCHS-compliant.
Proposer
Brett Ryan
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

20 Mar 2024

Due:

02 May 2024

Completion:

25 Apr 2024

Consultation Close

Completed

Start:

02 May 2024

Due:

24 May 2024

Completion:

20 May 2024

Final Change Report Issued

Completed

Start:

24 May 2024

Due:

07 Jun 2024

Completion:

23 May 2024

Responsible Committee Decision

Completed

Start:

07 Jun 2024

Due:

18 Jun 2024

Completion:

04 Jun 2024

Authority Determination Requested

Completed

Start:

18 Jun 2024

Due:

19 Jun 2024

Completion:

05 Jun 2024
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. A modification to the Retail Energy Code to facilitate efficient and robust procedures between Licensed Suppliers and LCCC as part of the regulatory solution to prove that electricity supplied to the hydrogen producer is LCHS-compliant.
Proposed Solution Document
Document title
Electricity Supply to Hydrogen Electrolysers Schedule (Draft)
Upload document
REC Mod 140324 - Draft Legal Text (New Schedule).docx
Archive
Off
Document title
R0160 - Draft Schedule - Electricity Supply to Hydrogen Electrolysers (Published for FCR) 23.05.2024)
Upload document
R0160 - Draft Schedule - Electricity Supply to Hydrogen Electrolysers.pdf
Archive
Off
Document title
R0160 - Schedule 1 - Interpretations & Definitions at FCR (23.05.2024)
Upload document
R0160 - Schedule 1 - Interpretations & Definitions at FCR.pdf
Archive
Off
Problem Statement
Primary legislation for hydrogen production does not mention the role of Licensed Suppliers. Consequently, the LCCC does not have the power needed to compel Licensed Suppliers to disclose the information needed by the LCCC to carry out its duties with regards the Hydrogen Production Business Model (HPBM) and Low Carbon Hydrogen Agreement (LCHA) to prove that the electricity is compliant with the Low Carbon Hydrogen Standard (LCHS) .
R0160 - CP Form Electricity Supply to Hydrogen Electrolysers
R0160 - Draft Legal Text (Submitted by proposer)
R0160 - Change Proposal Plan V1.0 (Approved) 18.04.2024
R0160 - Initial Assessment Report v1.0 (Approved) 18.04.2024
R0160 - Preliminary Change Report (Published for Consultation) 25.04.2024
R0160 - Consolidated Consultation Responses (21.05.2024)
R0160 - Final Change Report V2.0 (Post-vote) 04.06.2024
R0160 Authority Decision
Company Name
Hydrogen UK
Review status
Review required

On-site Aggregation as a method to facilitate Third Party Access - BSC P455

Date of latest update
Type
Change
ID
R0150
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Following a modification proposal to the Balancing and Settlement Code (BSC) to allow on-site aggregation as a method for third party access on private networks, the Code Manager is required to amend the REC to place a requirement on the Meter Equipment Managers (MEMs) appointed by the boundary points Electricity Supplier, to rectify any faults found with the submeters used in the on-site aggregation methodology.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

15 Jan 2024

Due:

22 Mar 2024

Completion:

22 Mar 2024

Party Impact Assessment

Completed

Start:

30 Oct 2023

Due:

15 Jan 2024

Completion:

15 Jan 2024

Final Change Report Issued

Completed

Start:

22 Mar 2024

Due:

26 Apr 2024

Completion:

25 Apr 2024

Responsible Committee Decision

Completed

Start:

26 Apr 2024

Due:

08 May 2024

Completion:

08 May 2024
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. The BSC Modification P455 Modification proposes to place a requirement on the SVA MOA (MEMs) appointed by the Boundary Point Supplier to rectify any faults found with the sub meters used in the On-Site Aggregation methodology; and to produce and submit the On-Site Aggregation Form to the HHDC. As MEMs (SVA MOAs) are governed under the Retail Energy Code (REC), R0150 is the REC's subsequent change to propose this.
Proposed Solution Document
Document title
Metering Operations - R0150 Legal Drafting (Published with Consultation 22.03.2024)
Upload document
Metering Operations - R0150 Legal Drafting (1).docx
Archive
Off
Document title
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Extract: R0150 - Schedule 14 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
R0150 - Schedule 14 Legal Drafting (Extract) (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14 Extract)
Upload document
R0150 Legal Drafting (Schedule 14 Extract).docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14).
Upload document
Approved for Implementation - R0150 Schedule 14 Legal Solution.docx
Archive
Off
Document title
Ofgem - BSC Modification P455 Decision
Archive
Off
Problem Statement
Under the proposed solution for BSC Modification P455, Consumers will require a Market Participant to oversee the maintenance of their sub-meter, including installations and rectification of metering faults. To ensure this, the REC will need to place a requirement on the MEMs appointed by the boundary point Electricity Supplier to rectify any faults found with the sub-meters used in the On-Site Aggregation.
R0150 - On-site Aggregation as a method to facilitate Third Party Access - BSC P455
R0150 Change Proposal Plan V1.0 (Approved 19.12.2023)
R0150 - Change Proposal Re-Plan (Approved) 08.02.2024
R0150 Initial Assessment Report V1.0 (Approved) 19.12.2023
R0150 - Preliminary Change Report V1.0 (Published for Consultation 22.03.2024)
R0150 - Consolidated Consultation Responses (17.04.2024)
R0150 - Final Change Report V2.0 (Approved) 08.05.2024
Company Name
Gemserv
Review status
Review required

Updates to the EES API Interface Specification

Date of latest update
Type
Change
ID
R0149
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
The EES Provider has made some alterations to the EES API Interface Specification to incorporate new data items that support MHHS Stage 0 as well as some housekeeping changes and clarifications to the methods within the API.
Proposer
Elise Handy
Change Plan

Preliminary Change Report and Consultation published

Completed

Start:

20 Oct 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023

Consultation close

Completed

Start:

03 Nov 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Final Change Report issued

Completed

Start:

17 Nov 2023

Due:

22 Nov 2023

Completion:

22 Nov 2023

Responsible Committee Decision

Completed

Start:

22 Nov 2023

Due:

29 Nov 2023

Completion:

29 Nov 2023
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an EES API User, I want to ensure that I have the most up to date technical information so that I can use the API in the most effective way.
  2. As the EES Provider, I want to ensure that the most up to date technical information is available to Users.
Proposed Solution Document
Document title
EES API Interface Specification v3.1.5. Redline (30.10.2023)
Upload document
EES API Interface Specification v3.1.5. Redline (1).docx
Archive
Off
Problem Statement
The current version of the EES API Technical Specification (V3.1.4) does not contain the latest updates from the EES Provider. Without these updates, API users will not be able to utlilise the new data items or have further detail on the data items returned within SearchUtilityAddress and GetTechnicalDetailsByMpan.
R0149 - Change Proposal Form.docx
R0149 - Change Proposal Plan (Approved) 07.11.2023
R0149 - Preliminary Change Report (Published for Consultation) 03.11.2023
R0149 Initial Assessment Report (Approved) 07.11.2023
R0149 - Consolidated Consultation Responses (22.11.2023)
R0149 - Final Change Report v2.0 (Approved) 29.11.2023
Company Name
Code Manager
Review status
Review required

Service Termination Issue Reporting (Change to Category 2 document)

Date of latest update
Type
Change
ID
R0145
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
22/02/2024 At the Metering Expert Panel meeting on 14 February 2024, the Panel voted to reject the Code Manager's recommendation to approve R0145 - Service Termination Issue Reporting (Change to Category 2 Document). Under REC Schedule 5 - Change Management, when a Responsible Committee rejects the recommendation of the Code Manager with respect to a Self-Governance Change Proposal, the Change Proposal is automatically referred to Ofgem (as the Authority) for its determination, unless the Code Manager changes its recommendation based on the reasons provided by the relevant sub committee. Following consideration of the decision made by the Metering Expert Panel and the reasons for its rejection, the Code Manager has decided to amend its recommendation, and is now recommending the rejection of R0145. The Code Manager maintains that the business case for R0145 was made, and the solution does address the identified problem statement, and this was reflected in the comments of a majority of group members as the R0145 was progressed and during the vote. However, it is clear that some RECMEP members are supportive of a change to the governance of this document that would remove it from the REC completely. Although this was outside of the scope of the original change, it was a consistent theme throughout the development of R0145. Consequently, R0145 has been rejected for implementation and the decision will not be referred to Ofgem.
Summary
This Change Proposal updates the Categorisation of this REC document to a Category 2 document. It is currently classified as a Category 3 document – which are used for guidance documents that have no material impacts on REC Parties. The REC obligates compliance with this document through Schedule 14 – Meter Operations and the Consolidated Metering Codes of Practice
Proposer
Colette Baldwin
Change Plan

Impact Assessment

Completed

Start:

21 Aug 2023

Due:

25 Aug 2023

Completion:

25 Aug 2023

Preliminary Change Report Issued

Completed

Start:

25 Aug 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

Preliminary Change Report Review by Metering Expert Panel (ex-committee)

Completed

Start:

08 Sep 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Consultation - 15 Working Days

Completed

Start:

15 Sep 2023

Due:

22 Sep 2023

Completion:

13 Oct 2023

Final Change Report Issued

Completed

Start:

08 Dec 2023

Due:

22 Dec 2023

Completion:

06 Feb 2024

Metering Export Panel Decision

Completed

Start:

10 Nov 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Second Preliminary Change Report

Completed

Start:

22 Sep 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Consultation on 2nd Preliminary Change Report

Completed

Start:

24 Nov 2023

Due:

27 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Consultation Closes

Completed

Start:

27 Nov 2023

Due:

08 Dec 2023

Completion:

08 Dec 2023

Final Decision of Metering Expert Panel

Not Started

Start:

22 Dec 2023

Due:

12 Jan 2024

Completion:

Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As a DNO I want to ensure that the MEMs who work on my network have the requisite skills and experience and that they will follow the instructions relating to reporting incidents of danger, damage, or interference with the DNO Equipment, as set out in the Service Termination Issue Reporting document.
  2. As a Supplier I want any MEM I employ to have clear instructions on how to report incidents of danger, damage, or interference with the DNO Equipment.
  3. As a MEM I want information on what actions I need to take where there is danger, damage, or interference with the DNO Equipment at site, so that issues can be safely addressed in the appropriate timescales.
  4. As the Code Manager, I want clarity on the governance and for change processes of the document to be appropriate, for the subject matter and relevant affected parties.
Problem Statement
Compliance with the CoMCoP and the Metering Operations Schedule includes obligations on the MEMs to report incidents of danger, damage, or interference with the DNO Equipment in accordance with the requirements set out in the document. Failure to comply with these requirements will leave the MEM subject to permission to work on the DNO’s equipment being revoked, which will have consequences on their ability to work as a REC MEM more widely.
Stages Selection
R0145 - Downloadable Change Proposal Form
R0145 - Service Termination Issue Reporting CPP v1.0 Approved 05.09.2023
R0145 IAR - Service Termination Issue Reporting Approved by Change Panel 05.09.2023
08.09.2023 - R0145 REC Service Termination Issue Reporting v1.0 Draft Legal Text for PCR
R0145 - Preliminary Change Report (Approved by Panel) 15.09.23
R0145 - Change Proposal Re-Plan v2.0 20/11/2023
R0145 - Consolidated Consultation Responses v1.1 Public
R0145 FCR -STIR Document (Change to Cat 2) (Post-Vote) V1.0 14.02.2024
Company Name
Gemserv
Review status
Review required

Allowing different Metering Equipment Managers (MEMs) to be appointed to Import and Export Metering Points

Date of latest update
Type
Change
ID
R0144
Change Category
Priority
Urgent
No
Latest Update
17/02/2025 - R0144 has been withdrawn by the Proposer, alongside it's joint BSC Change P459, as they cannot be progressed prior to MHHS. The Proposer will look to re-raise both changes in the future. The adoption window for this withdrawal has closed.
Summary
The Export Supplier needs to be able to appoint different MEMs to that of the Import Supplier
Proposer
Kit Dixon
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want a competitive Export market so I can get the best rates for the energy I generate. I want clear metering equipment ownership so I can be confident my meter is functional and safe. I want accurate billing from my Export Supplier.
  2. As an Export Supplier, I want to be able to appoint the MEM that ties in with my commercial strategy.
  3. As a MEM, I want clear guidance on the responsibilities I have for any metering equipment I am appointed to.
Problem Statement
Export Suppliers may become non-compliant with industry regulations if they are unable to appoint the same MEM as the Import Supplier, for example when the Consumer switches Import Supplier or when the Import Supplier changes the appointed MEM.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Change Proposal Form
R0144 Change Proposal Plan Withdrawal v1.0 (Pre Approval)
R0144 Change Proposal Plan v1.0 (16.04.2024) Approved
R0144 Initial Assessment Report v1.0 (16.04.2024) Approved
Company Name
REC Code Manager
Review status
Review required

New value for Site Visit Check Code (J0024)

Date of latest update
Type
Change
ID
R0143
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
12/10/2023 - Change Proposal has been rejected, as the change needs to be raised under the Balancing & Settlement Code - as the impacted Data Item is a BSC owned Data Item, and is not able to be amended by a REC Change.
Summary
The Change introduces a change to the MM00036/(D0139), to introduce a new Site Visit Check Code to reflect site specific capacity charges being levied by the Distribution Network Operators (DNOs) on Suppliers for their Consumers.
Proposer
Peter Waymont
Change Plan

Impact Assessment Report Published

Completed

Start:

14 Aug 2023

Due:

25 Aug 2023

Completion:

25 Aug 2023
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As a Consumer, I need my Supplier to be aware of any charges that will be applied by the DNO for the provision of the connection while the site is De-energised.
  2. As a Supplier I need to know if charges are expected to be levied by the DNO for retained capacity for De-energised Metering Points, so that I can pass the costs on to my Consumer.
Problem Statement
DNOs need to be able to communicate to Suppliers that they will charge site-specific DUoS for de-energised sites where there is an ongoing need for the connection to be maintained.
Stages Selection
R0143 - Change Proposal Form
R0143 - Change Proposal Plan v1.0 2 Approved by Change Panel 05.09.2023
R0143 - IAR - New Site Visit Check Code v1.0 Approved by Change Panel 25.09.2023
Company Name
UK Power Networks
Review status
Review required

Alignment of Market Message D0225 ‘consent to share flag’ to support PSR data sharing

Date of latest update
Type
Change
ID
R0139
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
This change was implemented on the 12th April 2024.
Summary
Ofgem have been in with discussion with Energy Suppliers this year, requesting them to voluntarily change how they use the consent option within the Priority Services Register (PSR) flow. This Change Proposal (CP) has been raised to make sure the Market Message mirrors the process agreed between Ofgem and Energy Suppliers by re-naming the Priority Services Register (PSR) Data Item DI51497 (J2208) as “Lawful basis for sharing” and to amend the relevant clauses in REC Schedule 13 if needed.
Proposer
Katie Stanyard
Change Plan

Party Impact Assessment

Completed

Start:

11 Aug 2023

Due:

05 Jan 2024

Completion:

05 Jan 2024

Preliminary Change Report Issued

Completed

Start:

05 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Consultation

Completed

Start:

26 Jan 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Final Change Report Issued

Completed

Start:

09 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Responsible Committee Decision

Not Started

Start:

16 Feb 2024

Due:

28 Feb 2024

Completion:

Appeal Window Closure

Not Started

Start:

28 Feb 2024

Due:

13 Mar 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Redlining - DI51497 - J2208 - Consent to share data obtained
Upload document
D0139 redlining - DI51497 - J2208 - Consent to share data obtained v0.2 (1).pdf
Archive
Off
Problem Statement
The current PSR Data Item DI51497(J2208) ‘Consent to share data obtained’ does not mirror the legal basis for sharing data that DNOs rely on, or the process that Suppliers have planned to have in place by early 2024.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0139 - Change Proposal Form
Consolidated Impact Assessment Responses
Consolidated Consultation Responses R0139
R0139 Change Proposal Plan v1.0 Approved
R0139 Initial Assessment Report v1.1 Approved
R0139 - Extension to Change Plan v1.0
R0139 Preliminary Change Report v1.0
R0139 Final Change Report v1.0 approved
ICO letter to Ofgem
R0139 redlining - DI51497 - J2208 - Consent to share data obtained
Company Name
Energy Networks Association
Review status
Review required

VLP data access requirements

Date of latest update
Type
Change
ID
R0134
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
Empty
Proposer
Elise Handy
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
ESS data items requirements.xlsx
R0134 - Change Proposal Form
R0054 Draft DAM changes.xlsx
Company Name
Levelise Limited
Review status
Review required

Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation

Date of latest update
Type
Change
ID
R0133
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
A Balancing & Settlement Code (BSC) Modification P441 is looking to introduce additional Complex Site classes which would categorise the types of Complex Site, with each having clearly defined criteria within the BSC, whilst also facilitating a new "type" of Complex Site (referred to as a Class 6 Complex Site) to allow approval of "non-standard" complex sites. It will also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.
Proposer
Elise Handy
Change Plan

Solution Development

Completed

Start:

04 Jul 2023

Due:

14 Aug 2023

Completion:

14 Aug 2023

Party Impact Assessment

Completed

Start:

14 Aug 2023

Due:

14 Aug 2023

Completion:

04 Sep 2023

Preliminary change report

Completed

Start:

14 Aug 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a consumer, I want more choice to take up low-carbon technology and more flexible energy solutions through local energy schemes, such as the Ofgem BEIS Smart System Flexibility Plan and any other future flexibility service provisions that may be developed.
  2. For MEMs, l want to remove ambiguity around the current Complex Site arrangements and will facilitate the advancement of community energy schemes.
  3. For Suppliers, I want to encourage more innovation that will lead to the better use of local energy schemes.
Problem Statement
The introduction of new Complex Site classes is needed into the REC to make the solutions under P441 and DCP 424 work. Meter Equipment Managers (MEMs) will need to understand what their new obligations are in respect of metering requirements, as well as impacts on any of the metering processes associated with a Complex Site.
Stages Selection
Change Proposal Form 04.07.2023
R0133 - Change Proposal Plan v1.0 approved 18/07/2023
R0133 Initial Assessment Report v1.0 Approved 18/07/2023
R0133 - Change Proposal Plan v2.0 (Approved) 13/09/2023
R1033 - Draft Legal Text Schedule 14 - Metering Operations for PCR 22.09.23
R0133 - Consolidated Impact Assessment Responses
R0133 Preliminary Change Report V1.0
Company Name
Code Manager
Review status
Review required

Change the Logical Format of the J0001 (DI50001) ‘Market Participant Role Code’ data item to Char(2)

Date of latest update
Type
Change
ID
R0132
Change Category
Change Path
Urgent
Yes
Latest Update
20/10/2023 - Change Proposal Withdrawn. This change will be progressed through the BSC.
Summary
This Change Proposal looks to implement changes to REC Market Messages impacted by the change in the logical format of the J0001 (DI50001) ‘Market Participant Role Code’ from a character length of one to a character length of two.
Proposer
admin
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a new Market Participant, I want to be able to implement Electricity industry solutions and initiatives utilising industry systems that require me to be assigned a MPRC
  2. As an existing Market Participant, I want to be able to define my interactions with other Market Participants using unique Market Role code identifiers As the BSC, I want to be able to assign new MPRCs so that we can fulfil requests as part of new market solutions
  3. As a new or existing Market Participant, I want to be able to continue sending and receiving Market Messages which include the MPRC within the file
Problem Statement
Under the current logical format there are only 36 possible MPRCs available for the Electricity industry, and they have all been allocated. The BSC are therefore currently unable to allocate new MPRCs and propose to update the logical format of the J0001 (DI50001) ‘Market Participant Role Code’. REC owned Market Messages will need to be updated to accommodate the new logical format.
Stages Selection
REC Change Proposal for J0001 Logical Format_Attachment 1_proposed amendment.docx
R0132 Change Proposal Form
R0132 Change Proposal Plan v1.0 (Approved) 19.09.2023
R0132 Initial Assessment Report v1.0 (Approved) 19.09.2023
Company Name
BSCCo
Review status
Review required