Revision to the Consolidated Metering Code of Practice (CoMCoP)

Date of latest update
Type
Change
ID
R0152
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Following the implementation of the Consolidated Metering Code of Practice (CoMCoP) a number of issues have been identified by RECCo, The Code Manager and REC Parties, stating that REC Parties are unable to meet their obligations as currently presented in the CoMCoP. The Code Manager has reviewed these and determined changes are required.
Proposer
Tina Pearce
Change Plan

Extension to Plan V2.0 approved at Change Panel

Completed

Start:

Due:

Completion:

04 Feb 2025
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I trust my Energy Supplier and their associated agents to have a robust metering framework to ensure the safety and accuracy of my meter.
  2. As an Energy Supplier, MEM or DNO, I need clear and correct documentation so I can identify the obligations I need to meet within my role and satisfy my audit criteria.
  3. As an Energy Supplier, I need to know that any MEM or DNO I work with is compliant to ensure the best practice for my customers.
  4. As the Metering Scheme Auditor, I need clear and correct documentation to ensure I can fulfil my role and provide confidence that REC Parties are meeting their obligations.
Proposed Solution Document
Document title
Draft legal text for Party Impact Assessment
Upload document
Legal text for Party IA (1).zip
Archive
Off
Document title
R0152 Solution Documents Guidance v1.0
Upload document
R0152 Solution Documents Guidance v1.0.pdf
Archive
Off
Document title
R0152 Party IA Solution Documents Guidance Video
Archive
Off
Document title
R0152 Legal text for Consultation
Upload document
R0152 Legal text for Consultation.zip
Archive
Off
Document title
R0152 legal text for final recommendation
Upload document
R0152 legal text for final recommendation.zip
Archive
Off
Problem Statement
MEMs are struggling to successfully pass their CoMCoP audits and be compliant, due to inconsistencies and lack of clarity in the document. There has been concern expressed by MEMs, that when contracting with Energy Suppliers, they are proclaiming themselves compliant with the CoMCoP when this may or may not be true.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
SME User
daniel.rodgers@retailenergycode.co.uk
REC Analysis CoMCoP.xlsx
R0152 - Change Proposal Form (downloadable version) 16.11.2023
R0152 Change Proposal Plan v1.0 (Approved) 19.12.23
R0152 Initial Assessment Report v1.0 (Approved) 19.12.23
R0152 Extension to Plan v1.0 (Approved) 31.10.2024
R0152 Extension to Plan v2.0 (Approved) 04.02.2025
R0152 Consolidated Party Impact Assessment Responses PUBLIC V1.0
R0152 Change Report (For Consultation) V1.0
R0152 - Consolidated Consultation Responses (Public) v1.0
R0152 Change Report (Final Recommendation) V1.1 approved
R0152 Change Report (Final Recommendation) V1.1 approved
Company Name
REC
Review status
Review required

On-site Aggregation as a method to facilitate Third Party Access - BSC P455

Date of latest update
Type
Change
ID
R0150
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Following a modification proposal to the Balancing and Settlement Code (BSC) to allow on-site aggregation as a method for third party access on private networks, the Code Manager is required to amend the REC to place a requirement on the Meter Equipment Managers (MEMs) appointed by the boundary points Electricity Supplier, to rectify any faults found with the submeters used in the on-site aggregation methodology.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

15 Jan 2024

Due:

22 Mar 2024

Completion:

22 Mar 2024

Party Impact Assessment

Completed

Start:

30 Oct 2023

Due:

15 Jan 2024

Completion:

15 Jan 2024

Final Change Report Issued

Completed

Start:

22 Mar 2024

Due:

26 Apr 2024

Completion:

25 Apr 2024

Responsible Committee Decision

Completed

Start:

26 Apr 2024

Due:

08 May 2024

Completion:

08 May 2024
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. The BSC Modification P455 Modification proposes to place a requirement on the SVA MOA (MEMs) appointed by the Boundary Point Supplier to rectify any faults found with the sub meters used in the On-Site Aggregation methodology; and to produce and submit the On-Site Aggregation Form to the HHDC. As MEMs (SVA MOAs) are governed under the Retail Energy Code (REC), R0150 is the REC's subsequent change to propose this.
Proposed Solution Document
Document title
Metering Operations - R0150 Legal Drafting (Published with Consultation 22.03.2024)
Upload document
Metering Operations - R0150 Legal Drafting (1).docx
Archive
Off
Document title
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Extract: R0150 - Schedule 14 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
R0150 - Schedule 14 Legal Drafting (Extract) (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14 Extract)
Upload document
R0150 Legal Drafting (Schedule 14 Extract).docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14).
Upload document
Approved for Implementation - R0150 Schedule 14 Legal Solution.docx
Archive
Off
Document title
Ofgem - BSC Modification P455 Decision
Archive
Off
Problem Statement
Under the proposed solution for BSC Modification P455, Consumers will require a Market Participant to oversee the maintenance of their sub-meter, including installations and rectification of metering faults. To ensure this, the REC will need to place a requirement on the MEMs appointed by the boundary point Electricity Supplier to rectify any faults found with the sub-meters used in the On-Site Aggregation.
R0150 - On-site Aggregation as a method to facilitate Third Party Access - BSC P455
R0150 Change Proposal Plan V1.0 (Approved 19.12.2023)
R0150 - Change Proposal Re-Plan (Approved) 08.02.2024
R0150 Initial Assessment Report V1.0 (Approved) 19.12.2023
R0150 - Preliminary Change Report V1.0 (Published for Consultation 22.03.2024)
R0150 - Consolidated Consultation Responses (17.04.2024)
R0150 - Final Change Report V2.0 (Approved) 08.05.2024
Company Name
Gemserv
Review status
Review required

Updates to the EES API Interface Specification

Date of latest update
Type
Change
ID
R0149
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
The EES Provider has made some alterations to the EES API Interface Specification to incorporate new data items that support MHHS Stage 0 as well as some housekeeping changes and clarifications to the methods within the API.
Proposer
Elise Handy
Change Plan

Preliminary Change Report and Consultation published

Completed

Start:

20 Oct 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023

Consultation close

Completed

Start:

03 Nov 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Final Change Report issued

Completed

Start:

17 Nov 2023

Due:

22 Nov 2023

Completion:

22 Nov 2023

Responsible Committee Decision

Completed

Start:

22 Nov 2023

Due:

29 Nov 2023

Completion:

29 Nov 2023
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an EES API User, I want to ensure that I have the most up to date technical information so that I can use the API in the most effective way.
  2. As the EES Provider, I want to ensure that the most up to date technical information is available to Users.
Proposed Solution Document
Document title
EES API Interface Specification v3.1.5. Redline (30.10.2023)
Upload document
EES API Interface Specification v3.1.5. Redline (1).docx
Archive
Off
Problem Statement
The current version of the EES API Technical Specification (V3.1.4) does not contain the latest updates from the EES Provider. Without these updates, API users will not be able to utlilise the new data items or have further detail on the data items returned within SearchUtilityAddress and GetTechnicalDetailsByMpan.
R0149 - Change Proposal Form.docx
R0149 - Change Proposal Plan (Approved) 07.11.2023
R0149 - Preliminary Change Report (Published for Consultation) 03.11.2023
R0149 Initial Assessment Report (Approved) 07.11.2023
R0149 - Consolidated Consultation Responses (22.11.2023)
R0149 - Final Change Report v2.0 (Approved) 29.11.2023
Company Name
Code Manager
Review status
Review required

Prepayment Levelisation

Date of latest update
Type
Change
ID
R0147
Change Category
Urgent
Yes
Latest Update
This change was implemented as part of the the Extraordinary release on 28 March 2024. *This Change Proposal has no impacts on Market-wide Half Hourly Settlement
Summary
This Change Proposal seeks to introduce the necessary governance and charging arrangements into the Retail Energy Code, to reconcile the impact on Domestic Energy Suppliers of levelling the cost of standing charges to Domestic Consumers paying by means of a Prepayment Meter with those paying by Direct Debit. This proposal is being raised on a contingent basis pending the decision of the Authority on whether to modify the standard conditions of the Gas and Electricity Supply Licences to levelise standing charges. That decision is expected in January 2024. This Change Proposal is being progressed in anticipation of the reconciliation of levelisation costs being administered by the Retail Energy Code Company.
Proposer
Jon Dixon
Change Plan

Solution development completed

Completed

Start:

22 Sep 2023

Due:

12 Oct 2023

Completion:

12 Oct 2023

Impact assessment period started

Completed

Start:

12 Oct 2023

Due:

13 Oct 2023

Completion:

13 Oct 2023

Impact assessment completed

Completed

Start:

13 Oct 2023

Due:

08 Nov 2023

Completion:

08 Nov 2023

Preliminary Change Report issued

Completed

Start:

08 Nov 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Responsible Committee review of Preliminary Change Report

Completed

Start:

17 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023

Consultation started

Completed

Start:

21 Nov 2023

Due:

22 Nov 2023

Completion:

22 Nov 2023

Consultation closed

Completed

Start:

22 Nov 2023

Due:

13 Dec 2023

Completion:

13 Dec 2023

Final Change Report issued

Completed

Start:

13 Dec 2023

Due:

12 Jan 2024

Completion:

11 Jan 2024

Responsible Committee decision

Completed

Start:

12 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Authority Determination requested

Completed

Start:

16 Jan 2024

Due:

17 Jan 2024

Completion:

17 Jan 2024
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.9.0
Included changes Affected REC Items
R0147 Prepayment Levelisation
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
184.95 KB
Version 1.0 - 16 Nov 2026 PDF - 184.95 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As a Domestic Consumer, I want to be charged the same standing charges regardless of whether I pay by DD or have a Prepayment Meter.
  2. As an Energy Supplier, I want my obligations regarding data provision to be clear so that I can provide accurate data. As an Energy Supplier, I want there to be a fair reconciliation mechanism calculates, reports, invoices and credits my organisation with the outcome of applying the payment levelisation methodology. As an Energy Supplier, I want the arrangements for the payment mechanism and terms, charging arrangements and invoicing to be clearly set out in the REC, so I can meet my obligations and have confidence in how the scheme operates.
  3. As RECCo, I want my responsibilities in relation to the development and administration of the levelisation scheme to be clearly set out in the REC so that I can successfully deliver the scheme for the industry. As the REC Code Manager, I want the levelisation scheme arrangements to be clearly set out in the REC, so that I can fulfil my role in administering and assuring the scheme.
Proposed Solution Document
Document title
Prepayment Levelisation - High level Solution Overview 05.10.2023
Upload document
PPM Levelisation - High level Solution Overview v1.2 05.10.2023.pdf
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v2.0 13.10.2023
Upload document
PPM Levelisation - High level Solution Overview v2.0 13.10.2023.pdf
Archive
Off
Document title
R0147 Draft Legal Text 05.10.2023
Upload document
R0147 Draft Legal Text 05.10.2023.zip
Archive
Off
Document title
R0147 Legal Text for PCR 17.11.2023
Upload document
R0147 Legal Text for PCR 17.11.2023.zip
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v3.0 (17.11.2023)
Upload document
PPM Levelisation - High level Solution Overview v3.0.pdf
Archive
Off
Document title
Payment Method Levelisation Solution Requirements (17.11.2023)
Upload document
Payment Method Levelisation Solution Requirements_13112023.xlsx
Archive
Off
Document title
Schedule XX Appendix - Supplier Data Reporting Specification v1.0
Upload document
Schedule XX Appendix - Supplier Data Reporting Specification v1.0.pdf
Archive
Off
Document title
R0147 Legal Text For Consultation 22.11.23
Upload document
R0147 Legal Text For Consultation 22.11.23.zip
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023
Upload document
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023.pdf
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v5.0 11.01.2024
Upload document
PPM Levelisation - High level Solution Overview v5.0 11.01.2024.pdf
Archive
Off
Document title
Payment Method Levelisation Solution Requirements_11.01.2024
Upload document
Payment Method Levelisation Solution Requirements_11.01.2024.xlsx
Archive
Off
Document title
R0147 Legal Text for FCR 11.01.2024
Upload document
R0147 Legal Text for FCR 11.01.2024.zip
Archive
Off
Document title
Ofgem Letter Levelisation - Alignment of legal text and license conditions 20.12.2023
Upload document
20231220 Ofgem Letter Levelisation - Alignment of legal text and license conditions (2).pdf
Archive
Off
Document title
R0147 Legal text - Consultation to FCR comparison
Upload document
R0147 Legal text - Consultation to FCR comparison.zip
Archive
Off
Document title
Levelisation - Alignment of legal text and licence modifications REC Response 17.01.2024
Upload document
20240117 Levelisation - Alignment of legal text and licence modifications REC Response.pdf
Archive
Off
Document title
R0147 Additional data specification guidance 23.02.2024
Upload document
R0147 Additional data specification guidance 23.02.2024.pdf
Archive
Off
Problem Statement
Ofgem are working towards and consulting on the design and implementation of a levelisation scheme to align the standing charges of Domestic Consumers who pay through a Prepayment Meter with those who pay via DD. RECCo will be the delivery partner for this scheme, however, the requirements and arrangements for the scheme need to be established in the REC.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0147 - Change Proposal Form.docx
R0147 Change Proposal Plan v2.0 (Approved) 14.11.2023
R0147 - Change Proposal Re-Plan (Approved) 19.12.2023
R0147 Initial Assessment Report v2.0 (Approved) 03.10.2023
R0147 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0147 Preliminary Change Report v2.0 (Approved) 22.11.2023
R0147 Consolidated Consultation Responses v1.0 PUBLIC
R0147 Final Change Report v2.0 (Post-Vote) 16.01.2024
Authority decision on REC modification proposal R0147 - Prepayment Levelisation 23.02.24
Company Name
RECCo
Review status
Review required

Data Specification Update for Refresh Functionality

Date of latest update
Type
Change
ID
R0146
Change Category
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
This change has been raised to update the Data Specification and to align it with the changes made during implementation of change proposal ‘R0067 – Introduction of CSS Refresh Functionality’.
Proposer
Michael Taylor
Change Plan

Preliminary Change Report Published

Completed

Start:

21 Aug 2023

Due:

16 May 2024

Completion:

16 May 2024

Consultation Issued

Completed

Start:

16 May 2024

Due:

16 May 2024

Completion:

16 May 2024

Final Change Report Issued

Data Specification Update for Refresh Functionality > Change Plan

Start:

16 May 2024

Due:

19 Jun 2024

Completion:

Responsible Committee Decision

Data Specification Update for Refresh Functionality > Change Plan

Start:

19 Jun 2024

Due:

26 Jun 2024

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.12.0_Superseded

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 02 Nov 2026 PDF - 159.49 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
Proposed Solution Document
Document title
R0146 Solution Development Report
Upload document
R0146 Solution Development Report v1.0.docx
Archive
Off
Document title
R0146 Attachment A - Proposed Data Specification Changes
Upload document
Attachment A R0146 Proposed Data Specification Changes v1.0.docx
Archive
Off
Problem Statement
Following implementation of R0067, a small number of Market Messages and Data Items need to be appropriately reflected within the Data Specification.
R0146 - Change Proposal Form
R0146 - Change Proposal Plan v1.0 (Approved)
R0146 - Initial Assessment Report v1.0 (Approved)
R0146 - Preliminary Change Report v1.0
R0146 Final Change Report (Post-Vote) v1.0 26.06.2024
Company Name
Code Manager
Review status
Review required

Amendment to Multiplication Factor Enumerations to Support Hydrogen Trials

Date of latest update
Type
Change
ID
R0142
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
The H100 hydrogen gas trial involves the supply of hydrogen gas to households in place of natural gas. The quantity of gas supplies needs to be billed in a way that is comparable to standard gas supply. To facilitate the trial, a multiplication factor enumeration value must be established within the Data Specification that can replicate hydrogen’s calorific value, therefore allowing accurate billing.
Proposer
David Addison
Change Plan

SERVICE PROVIDER IMPACT ASSESSMENT ISSUED

Completed

Start:

11 Aug 2023

Due:

27 Nov 2023

Completion:

27 Nov 2023

PARTY IMPACT ASSESSMENT ISSUED

Completed

Start:

27 Nov 2023

Due:

01 Dec 2023

Completion:

01 Dec 2023

PRELIMINARY CHANGE REPORT PUBLISHED

Completed

Start:

01 Dec 2023

Due:

19 Jan 2024

Completion:

19 Jan 2024

CONSULTATION ISSUED

Completed

Start:

19 Jan 2024

Due:

19 Jan 2024

Completion:

19 Jan 2024

FINAL CHANGE REPORT PUBLISHED

Completed

Start:

19 Jan 2024

Due:

20 Feb 2024

Completion:

16 Feb 2024

RESPONSIBLE COMMITTEE DECISION

Completed

Start:

20 Feb 2024

Due:

28 Feb 2024

Completion:

28 Feb 2024
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer taking part in the H100 trial, I want to be charged based on the amount of gas I consume, such that I am not charged more than I would have been, had I consumed the equivalent energy from natural gas.
  2. As a Gas Supplier, I want to ensure H100 trial Consumers, are not charged more than they would have been, had they consumed the equivalent energy from natural gas. 2- As a Gas Transporter, I want to accurately know how much hydrogen gas is being offtaken, so that I can support Suppliers. 3- As the Central Data Service Provider (CDSP), I want Market Messages relating to meter asset information to be accurate, so that I am better able to support dependant REC Parties. 4- As a Meter Equipment Manager (MEM), I want my metering assets compatible with the H100 trial to be underpinned by accurate Market Messages, so that I able to manage these meters correctly.
Proposed Solution Document
Document title
R0142 Solution - DI40145 - A0120 - Multiplication Factor Change v2.0
Upload document
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.0.pdf
Archive
Off
Document title
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.1
Upload document
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.1.pdf
Archive
Off
Problem Statement
In order for the H100 gas trial to be successful, a billable value for hydrogen gas needs to be accurately calculated from supplied physical volumes. To do this, relevant Data Items (relating to the calculation of billable gas volumes) within the Data Specification need to be updated to allow a new value for the multiplication factor. This change seeks to introduce a new enumeration value for the multiplication factor needed to facilitate the addition of this new value.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
DI40145 Multiplication Factor - 23.06.2023
R0142 - Change Proposal Form.pdf
R0142 - Change Proposal Form
R0142 Change Proposal Plan v1.0 (Approved) - 05.12.2023
R0142 Initial Assessment Report v1.0 (Approved) - 05.12.23
R0142 Consolidated Impact Assessment Responses V1.0 16.01.24
R0142 Preliminary Change Report (Published for Consultation) V1.0 19.01.24
R0142 Consolidated Consultation Responses v1.0 16.02.24
R0142 Final Change Report (Post-Vote) v1.0 - 28.02.24
Company Name
Xoserve
Review status
Review required

Housekeeping amendments

Date of latest update
Type
Change
ID
R0140
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal. Schedule 27 – RMP Lifecycle Schedule 1 – Interpretations and Definitions Schedule 5 – Change Management Schedule 9 – Qualification and Maintenance
Proposer
Holly Law
Change Plan

Publish House Keeping Change Report

Completed

Start:

11 Aug 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

Responsible Committee decision

Completed

Start:

08 Sep 2023

Due:

19 Sep 2023

Completion:

19 Sep 2023

Implemented

Completed

Start:

19 Sep 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
R0140 Final Draft Legal text
Upload document
R0140 Final Draft Legal text.zip
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
R0140 - Housekeeping Change Report v1.0 (Approved) 19.09.23
Company Name
Gemserv
Review status
Review required

Alignment of Market Message D0225 ‘consent to share flag’ to support PSR data sharing

Date of latest update
Type
Change
ID
R0139
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
This change was implemented on the 12th April 2024.
Summary
Ofgem have been in with discussion with Energy Suppliers this year, requesting them to voluntarily change how they use the consent option within the Priority Services Register (PSR) flow. This Change Proposal (CP) has been raised to make sure the Market Message mirrors the process agreed between Ofgem and Energy Suppliers by re-naming the Priority Services Register (PSR) Data Item DI51497 (J2208) as “Lawful basis for sharing” and to amend the relevant clauses in REC Schedule 13 if needed.
Proposer
Katie Stanyard
Change Plan

Party Impact Assessment

Completed

Start:

11 Aug 2023

Due:

05 Jan 2024

Completion:

05 Jan 2024

Preliminary Change Report Issued

Completed

Start:

05 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Consultation

Completed

Start:

26 Jan 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Final Change Report Issued

Completed

Start:

09 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Responsible Committee Decision

Not Started

Start:

16 Feb 2024

Due:

28 Feb 2024

Completion:

Appeal Window Closure

Not Started

Start:

28 Feb 2024

Due:

13 Mar 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Redlining - DI51497 - J2208 - Consent to share data obtained
Upload document
D0139 redlining - DI51497 - J2208 - Consent to share data obtained v0.2 (1).pdf
Archive
Off
Problem Statement
The current PSR Data Item DI51497(J2208) ‘Consent to share data obtained’ does not mirror the legal basis for sharing data that DNOs rely on, or the process that Suppliers have planned to have in place by early 2024.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0139 - Change Proposal Form
Consolidated Impact Assessment Responses
Consolidated Consultation Responses R0139
R0139 Change Proposal Plan v1.0 Approved
R0139 Initial Assessment Report v1.1 Approved
R0139 - Extension to Change Plan v1.0
R0139 Preliminary Change Report v1.0
R0139 Final Change Report v1.0 approved
ICO letter to Ofgem
R0139 redlining - DI51497 - J2208 - Consent to share data obtained
Company Name
Energy Networks Association
Review status
Review required

Combined progression of Change Proposals R0058, R0104 and R0129

Date of latest update
Type
Change
ID
R0138
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This change seeks to efficiently address the issues raised under the following Change Proposals. R0058 – REC Services Procurement Clarification R0104 – Clarifying Requirement for Continuous Billing Following an Erroneous Switch R0129 – Clarifying Event of Default Requirements These Change Proposals have been identified by the Code Manager as requiring non-contentious, clarificatory and non-material alterations to the REC Legal Text only.
Proposer
Elise Handy
Change Plan

Preliminary Change Report published

Completed

Start:

04 Aug 2023

Due:

01 Sep 2023

Completion:

01 Sep 2023

Consultation close

Completed

Start:

01 Sep 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Final Change Report published

Completed

Start:

15 Sep 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Responsible Committee decision

Not Started

Start:

22 Sep 2023

Due:

03 Oct 2023

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need the REC drafting to be accurate, so I can rely on it to ensure my processes and procedures correctly reflect my obligations. If there are mistakes or omissions, then it could cause issues with the effective operation and assurance of the retail energy market.
Proposed Solution Document
Document title
R0138 - Draft Legal Text
Upload document
R0138 - Draft Legal Text.zip
Archive
Off
Problem Statement
Three Change Proposals have been placed on hold due to having a low priority status. These proposals have been identified as having fully formed solutions, which are non-contentious and can be quickly implemented. This change seeks to address these Change Proposals so that they can be addressed, and their benefits realised.
DRAFT Change Proposal Form - Umbrella 2 CP.docx
R0138 - Initial Assessment Report (Approved) 15.08.2023
R0138 - Change Proposal Plan (Approved) 15.08.2023
R0138 - Consolidated Consultation Responses
R0138 - Preliminary Change Report v1.0 (01.09.2023) published for Consultation
R0138 - Final Change Report (Post-Vote) 03.10.2023
Company Name
REC Code Manager
Review status
Review required

Change to REC Schedule 22 Market Stabilisation Charge (MSC)

Date of latest update
Type
Change
ID
R0136
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
This Change Proposal seeks to deliver two changes to REC Schedule 22 – Market Stabilisation Charge. The first change will update the statement timescales in Schedule 22 to ensure that this is appropriately aligned with the statement Schedule. The second change seeks to update the disputes Section (section 7) of Schedule 22 to include reference to Credit Advice Notes.
Proposer
Lynne Fallon
Change Plan

Impact Assessment and Change Proposal Plan Published

Completed

Start:

17 Jul 2023

Due:

25 Aug 2023

Completion:

25 Aug 2023

Preliminary Change Report Issued

Completed

Start:

25 Aug 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Review of PCR by Change Panel

Completed

Start:

22 Sep 2023

Due:

03 Oct 2023

Completion:

03 Oct 2023

Consultation Started

Completed

Start:

03 Oct 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Consultation Closes

Completed

Start:

06 Oct 2023

Due:

26 Oct 2023

Completion:

26 Oct 2023

Final Change Report Issued

Completed

Start:

26 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Change Panel Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Samantha Briggs
Solution Development
Proposed solution summary
  1. As RECCo, I want the Retail Energy Code to specify my obligations, governance and charging mechanisms, so that I can effectively discharge obligations imposed by the Authority through the Licence Condition modification.
  2. As a Domestic Supplier, I want to understand how RECCo will calculate my credits and liabilities and when they will send statements, so that I can plan to review my invoices/credit notes prior to the receipt of monies owed or payments I need to make to RECCo or at an appropriate time for my organisation.
  3. As a Domestic Supplier, I want to understand how I can dispute a Credit Advice which I do not believe is accurate, so that I am able to raise a dispute/challenge compliantly.
Proposed Solution Document
Document title
R0136 - Draft Legal Text (10.11.2023)
Upload document
R0136 - Draft Legal Text v1.0 (1).doc
Archive
Off
Problem Statement
Schedule 22 says that within 10 Working Days after the end of each MSC-4-Week Cycle, RECCo shall send each Energy Supplier a statement in respect of that MSC-4-Week Cycle. This contradicts the 15 days set out in the Process Maps shared with Parties during the development of the administration arrangements of the Market Stabilisation Charge. Additionally, suppliers are querying how they may raise a dispute when they believe they are not entitled to the monies stated on Credit Advice Notices as this process is not set out in the Schedule.
R0136 - Change Proposal Form
R0136 - Changes to Sche 22 - CPP v1.0 (Approved) 05.09.2023
R0136 - Changes to Sch 22 MSC IAR (Approved) v1.0 05.09.2023
R0136 - Preliminary Change Report - (Approved) 03.10.23
R0136 - Consolidated Consultation Response 10/11/2023
R0136 - Final Change Report v2.0 (Post-Vote) 21.11.2023
Company Name
RECCo
Review status
Review required