CSS End User Obligations

Date of latest update
Type
Change
ID
R0099
Change Category
Change Path
Priority
Urgent
No
Latest Update
07/02/25 - This Change Proposal has been withdrawn at the request of the proposer, as it is being developed as part of I0180
Summary
There are multiple observed instances of CSS incidents that have been raised that cannot be resolved without proactive engagement from the end user. There are currently no direct obligations on CSS Users to engage with the incident resolution process, or to provide up to date contact details, which can result in the CSS System Operator struggling to resolve incidents in a timely manner. This results in CSS incidents remaining unresolved and results in a degradation of the effectiveness of the switching process. This Change Proposal has been raised to address this issue.
Proposer
Ryan Dale
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0099 Draft Legal Text v1.0 (20.03.2024)
Upload document
Main Body_R0099 Draft v1.0.docx
Archive
Off
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0099 - Change Proposal Form 10.03.2023
Company Name
-
Review status
Review required

Consequential Change for CSS Smart Meter Data Retriever Appointments

Date of latest update
Type
Change
ID
R0097
Change Category
Change Path
Urgent
Yes
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
This change looks to make amendments to the Data Specification for the Supplier Arranged Appointments messages exchanged between the Electricity Retail Data Service and Central Switching Service.
Proposer
Michael Taylor
Change Plan

Service Provider Impact Assessment started

Completed

Start:

20 Feb 2023

Due:

22 Mar 2023

Completion:

22 Mar 2023

Service Provider Impact Assessment completed

Completed

Start:

22 Mar 2023

Due:

03 May 2023

Completion:

03 May 2023

Preliminary Change Report and Consultation issued

Completed

Start:

03 May 2023

Due:

19 May 2023

Completion:

19 May 2023

Consultation closed

Completed

Start:

19 May 2023

Due:

05 Jun 2023

Completion:

05 Jun 2023

Final Change Report issued

Completed

Start:

05 Jun 2023

Due:

21 Jun 2023

Completion:

15 Jun 2023

Responsible Committee decision

Completed

Start:

21 Jun 2023

Due:

28 Jun 2023

Completion:

04 Jul 2023

Appeal Window opens

Completed

Start:

28 Jun 2023

Due:

04 Jul 2023

Completion:

04 Jul 2023

Appeal Window closes

Completed

Start:

04 Jul 2023

Due:

18 Jul 2023

Completion:

18 Jul 2023
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.0.0_Superseded
Included changes Affected REC Items
R0044 MHHS Programme Changes required to Central Switching Service
  • Schedule 1 - Interpretations and Definitions
  • Schedule 27 - RMP Lifecycle
R0173 Improvements to the Theft Detection Incentive Scheme (TDIS)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction
R0209 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0222 ESME ID Update Rejections
R0223 Reconciliation of Unallocatable Transactions Review
  • Schedule 11 - Prepayment Arrangements
R0241 MHHS Incremental Changes for go live
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0259 Update to R0173 Implementation Date
R0264 Data Specification Housekeeping
R0083 Changes to Supply Number Format for MHHS
R0097 Consequential Change for CSS Smart Meter Data Retriever Appointments
  • Data Item Catalogue
  • Market Message Catalogue
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the CSS Provider, I want to be able to identify which appointment messages received from ERDS require a response, so that I can confirm whether the appointment was successfully made in SMDSP
  2. As the ERDS Provider, I want to be able to indicate which appointment messages I need to receive a response for, so that I can understand which appointments have been successful in the SMDSP
  3. As an Electricity Supplier, I want Supplier appointments in the ERDS to match those held in SMDSP
Proposed Solution Document
Document title
R0097 Proposed Solution (Initial Assessment) 14.03.23
Upload document
R0097 Proposed Solution (Initial Assessment) 14.03.23.zip
Archive
Off
Document title
R0097 Proposed Solution (Impact Assessment) 22.03.23
Upload document
R0097 Proposed Solution (Impact Assessment) 22.03.23.zip
Archive
Off
Document title
R0097 Proposed Solution (Consultation) 17.05.23
Upload document
R0097 Proposed Solution (Consultation) 17.05.23.zip
Archive
Off
Document title
R0097 Draft Legal Text (Consultation) 17.05.2023
Upload document
Attachment B_R0097 Proposed Data Specification Changes_v1.6.pdf
Archive
Off
Problem Statement
The implementation of Change Proposal R0044, will result in the Central Switching Service (CSS) providing an asynchronous response to the Electricity Retail Data Service (ERDS) upon a successful, or unsuccessful Smart Meter Data Retriever (SMDR) appointment within the SMDSP. This will significantly increase the volume of CSS messages, as there is currently no mechanism for the CSS to recognise when a response is required. The increased volume could have a significant impact on central system performance.
SME
SME Role
Lead Technical Analyst
Workgroup
Workgroup(s)
R0097 - Change Proposal Form downloadable version 20.02.2023
R0097 - Change Proposal Plan v2.0 (Approved) 21.03.2023
R0097 - Initial Assessment Report v2.0 (Approved) 21.03.23
R0097 - Preliminary Change Report v1.0 (For Consultation) 19.05.2023
R0097 Consolidated Consultation Responses v1.0 PUBLIC 15.06.2023
R0097 - Final Change Report v2.0 (Post-Vote) 04.07.2023
Company Name
REC Technical Services
Review status
Review required

CSS Message Regeneration Functionality

Date of latest update
Type
Change
ID
R0096
Change Category
Change Path
Priority
Urgent
No
Latest Update
25/02/2026 On 25 February 2026, the Technical Expert Panel voted in line with the Code Manager recommendation to approve R0096 for implementation in November 2027. The appeal window is now open until 23:59, 11 March 2026.
Summary
An inability by the Central Switching Service (CSS) to re-generate Market Messages that were not sent as intended can result in issues with the Switching process, both for REC Parties, and Consumers. This Change seeks to create a message regeneration functionality that would mitigate this Consumer detriment.
Proposer
Michael Taylor
Change Plan

Update to Plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Oct 2025

Final Recommendation approved at TEP

Completed

Start:

Due:

Completion:

25 Feb 2026
Impacted REC Documents
Impacted REC Parties and Market Participants
Implementation Date
Status Scheduled
EMAR Version 4.7.0_Scheduled
Included changes Affected REC Items
R0096 CSS Message Regeneration Functionality
  • Standards Definition Document

Documents

Name Version Last updated Actions
255.64 KB
Version 1.0 - 02 Nov 2026 PDF - 255.64 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0096 Solution Development Document V1.0
Upload document
R0096 Solution Development Document V1.0.pdf
Archive
Off
Document title
R0096 Detailed Design Document v1.0
Upload document
CSS Message Regeneration Detailed Design (R0096)_Final_Ver.1.01.pdf
Archive
Off
Problem Statement
Failures by the CSS to generate Market Messages can result in a breakdown of the Switching process. As the CSS cannot re-generate Market Messages that should have been sent but were not, this results in message asynchronisation, and breakdown of CSS functions and processes, resulting in substantial impacts for those involved – Difficulties for the REC Parties using the CSS, and difficulties for Consumers, where the Switch process is impacted.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
R0096 - Change Proposal Form downloadable version 17.02.2023
R0096 Change Report (Plan) (Approved) V1.0 21.01.25
R0096 Change Report Re-Plan (Pre-Approval) v1.0
R0096 Change Report (Re-Plan) v1.0 approved 21/10/2025
R0096 Change Report (Impact Assessment) v1.0
R0096 Consolidated Party Impact Assessment Responses v1.0
R0096 Change Report (Consultation) approved 17.12.2025 v1.2
R0096 Consolidated Consultation Responses v2.0
R0096 White Paper - Business Case Assessment v1.5
R0096 Change Report (Final Recommendation) approved 25.02.2026 v1.0
Company Name
REC Technical Services
Review status
Review required

Changes to allow DNOs to reinstate disconnected MPANs

Date of latest update
Type
Change
ID
R0095
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
The Code Manager have taken R0095 off of hold and published an Information Request for R0095 on 22 October 2026, this is open to responses until 13 November 2026.
Summary
When Meter Point Administration Numbers (MPANs) are erroneously disconnected, they cannot be reinstated. As a result, Consumers suffer billing issues and Registered Suppliers cannot settle against the disconnected MPAN. This change seeks to introduce a mechanism to restore erroneously disconnected MPANs.
Proposer
Leanne Yates
Change Plan

Solution Development

Completed

Start:

17 Feb 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024
Impacted Consumers
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I do not want the erroneous disconnection of my MPAN to affect the continuity of my supply contract and billing arrangements.
  2. As a DNO, I want to be able to reverse erroneous disconnections with no lasting effect so that I don’t need to create a new MPAN to resolve the issue, thereby avoiding DUoS payment collection issues. 2 - As a Supplier, I want to be able to reverse erroneous disconnections with no lasting effect so that I can correctly bill my consumers. 3 - As the CSS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate. 4 - As MPRS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate.
Problem Statement
When MPANs are incorrectly identified and targeted for disconnection, the RMP will be erroneously terminated following receipt of Termination Market Messages by the CSS. This process is irreversible once triggered, meaning that there is no mechanism to restore the MPAN as it was previously. This results in a poor Consumer experience, and settlement misbalancing for Registered Suppliers. Currently, there is no mechanism to mitigate the negative impact on Registered Suppliers/DNO and Consumers.
SME
SME Role
Lead Technical Analyst
R0095 - Change Proposal form downloadable version 17.02.2023
R0095 Change Proposal Plan v1.0 (Approved) - 20.09.23
R0095 Initial Assessment Report v1.0 (Approved) - 20.09.2023
R0095 - Change Proposal Re-Plan (Approved) v1.0-13.12.23
Company Name
-
Review status
Review required

ERDS Upload File in the Data Specification and clarification of cancellation code

Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Proposer
admin
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required

CSS Market Message Retry Strategy

Date of latest update
Type
Change
ID
R0081
Priority
Urgent
No
Latest Update
15/11/2023 - Change Proposal has been withdrawn. Market message success data for September 2023 was reviewed to ensure that a stable period was analysed which represented ‘normal’ conditions. Upon completion of the review, it has been concluded that the success of the current retry strategy has significantly improved since this change proposal was raised. The Code Manager will introduce cyclical reviews of performance to ensure this continues at the expected levels.
Summary
The prescriptive nature of the Market Message retry drafting is currently impeding on the CSS Service Provider’s ability to ensure all Market Messages are sent and received successfully between the CSS and the CSS User. This CP proposes a move to a principles-based obligation that allows for flexibility to ensure the CSS and CSS User are able to attempt retries but not have to follow specific timings or have a maximum number of retries.
Proposer
admin
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
R0081 - Change Proposal Form
Proposed legal text submitted with the CP
Company Name
-
Review status
Review required

Improvements to ‘Failed to Deliver’ CSS Messages

Date of latest update
Type
Change
ID
R0080
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
Since CSS Go-Live a large number of messages have not been successfully delivered due to failures of CSS User's gateways, resulting in CSS exhausting the 12-hour retry period. This Change Proposal has been raised to explore and address this issue
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment close

Completed

Start:

09 Nov 2022

Due:

25 Jan 2024

Completion:

25 Jan 2024

Party Impact Assessment trigger

Completed

Start:

25 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Party Impact Assessment close

Completed

Start:

02 Feb 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Preliminary Change Report and Consultation issued

Completed

Start:

23 Feb 2024

Due:

10 May 2024

Completion:

10 May 2024

Consultation close

Completed

Start:

10 May 2024

Due:

03 Jun 2024

Completion:

03 Jun 2024

Responsible Committee Decision

Completed

Start:

24 Jul 2024

Due:

31 Jul 2024

Completion:

31 Jul 2024

Final Change Report Issued

Completed

Start:

03 Jun 2024

Due:

24 Jul 2024

Completion:

19 Jul 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to CSS Users to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
  3. As the CSS User I want to receive CSS messages in a timely manner following any outage of my own gateway or systems, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
Proposed Solution Document
Document title
R0080 - Solution Development Report 11.01.2024
Upload document
R0080 - Solution Development Report 11.01.2024.pdf
Archive
Off
Document title
CSS Interface Design Specification v8.9.0 R0080 - REDLINE
Upload document
CSS Interface Design Specification v8.9.0 R0080 - TRACKED.docx
Archive
Off
Document title
CSS Failed To Deliver Detailed Design (R0080) v1.3 (19.06.2024)
Upload document
CSS Failed To Deliver Detailed Design (R0080) v1.3.docx
Archive
Off
Document title
Business Data Validation Rules v1.5.0 R0080 - REDLINE
Upload document
Copy of Business Data Validation Rules v1.5.0 R0080 - REDLINE.xlsx
Archive
Off
Document title
Schedule 24_Switching Data Management v1.2_R0080 Draft (19.06.2024)
Upload document
Schedule 24_Switching Data Management v1.2_R0080 Draft.doc
Archive
Off
Problem Statement
Following an unexpected or extended period of gateway outage for a CSS User, there is currently no automated process to resend any CSS messages from the CSS Provider that were triggered during the period of outage. This results in the CSS Provider needing to manually correct any issues, which is time consuming and may affect Consumer Switches due to delays in messages being processed.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
R0080 - Change Proposal form
R0080 Onboarding document
R0080 - Change Proposal Plan (Approved) 16.01.2024
R0080 - Rebaselined Change Plan (26.04.2024)
R0080 - Initial Assessment Report (Approved) 16.01.2024
R0080 Consolidated Party IA Responses v1.0 (10.05.2024)
R0080 - Preliminary Change Report v1.0 (Published for Consultation) 10.05.2024
R0080 Consolidated Consultation Responses (19.06.2024)
R0080 - Final Change Report v2.0 (Approved) 31.07.2024
Company Name
-
Review status
Review required

Provision of Enduring Test Environments

Date of latest update
Type
Change
ID
R0070
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Currently the REC does not require the Central Switching Service (CSS) and Switching Operator (SO) to provide the enduring test environments and test data for use by REC Parties when making necessary system changes for REC Change Proposals or internal system updates. This Change Proposal has been raised to introduce these obligations in to the REC.
Proposer
Beth Brown
Change Plan

Solution Analysis and Development

Completed

Start:

09 Sep 2022

Due:

06 Jun 2023

Completion:

06 Jun 2023

Service Provider Impact Assessment Period

Completed

Start:

06 Jun 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Service Provider Impact Assessment

Completed

Start:

24 Nov 2023

Due:

03 Jan 2024

Completion:

03 Jan 2024

Party Impact Assessment Issued

Completed

Start:

06 Oct 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Issued

Completed

Start:

03 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Responsible Committee Review

Completed

Start:

16 Jan 2024

Due:

23 Jan 2024

Completion:

23 Jan 2024

Consultation Issued

Completed

Start:

23 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Final Change Report Issued

Completed

Start:

26 Jan 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Responsible Committee Decision

Completed

Start:

23 Feb 2024

Due:

05 Mar 2024

Completion:

05 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. As a CSS User I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues prior to go-live.
  2. As the SO, I want clarity on the obligations placed on me regarding the provision and maintenance of CSS Test Environments and data, so that I can meet my obligations and provide CSS Users and Service Providers with access to appropriate Test Environments.
  3. As a Switching Data Service Provider (SDSP), I want clarity on the obligations placed on me regarding the provision and maintenance of Test Environments and data, so that I can meet my obligations to test CSS changes. As a Switching Data Service Provider (SDSP), I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues and address prior to go-live.
Proposed Solution Document
Document title
R0070 legal text v1.0 - Published with Impact Assessment
Upload document
R0070 legal text v1.0 - Published with Impact Assessment.docx
Archive
Off
Document title
R0070 Legal Text v2.0 - Published with Preliminary Change Report
Upload document
R0070 legal text v2.0.pdf
Archive
Off
Document title
R0070 - Legal Text v3.0 - Approved for Implementation
Upload document
R0070 legal text v3.0.pdf
Archive
Off
Document title
REC Category 3 - Environment Management Plan
Upload document
REC Cat 3 Environment Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Document title
REC Category 3 Test Data Management Plan
Upload document
REC Cat 3 Test Data Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Problem Statement
For specific types of changes, industry system testing will be required to ensure the end-to-end Switching processes will work as expected following implementation. If Test Environments and Test Data are not available, CSS Users will not be able to complete testing to confirm their systems will operate correctly in the live environment. The REC currently doesn’t define specific obligations on Service Providers regarding enduring test systems and Test Data for Switching processes. The lack of specific obligations may impact the availability of appropriate Test Environments. This could impact the progression of improvements to Switching processes that require a technical change.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0070 Initial Assessment Report v1.0 (Approved)
R0070 - Preliminary Change Report (Approved 23.01.2024)
R0070 - Change Proposal Plan v2.0 (Approved)
R0070 - Change Proposal Form
R0070 - Consolidated Impact Assessment Responses
R0070 - Consolidated Consultation Responses
R0070 - Final Change Report V2.0 (Post-Vote) 05.03.2024
Company Name
-
Review status
Review required

Introduction of CSS refresh functionality

Date of latest update
Type
Change
ID
R0067
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSP) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Change Proposal seeks to introduce a refresh functionality to mitigate these issues.
Proposer
Michael Taylor
Change Plan

Solution Analysis and Development

Completed

Start:

29 Aug 2022

Due:

19 Oct 2022

Completion:

19 Oct 2022

Service Provider Impact Assessment

Completed

Start:

19 Oct 2022

Due:

29 Mar 2023

Completion:

29 Mar 2023

Consultation

Completed

Start:

11 Apr 2023

Due:

09 May 2023

Completion:

28 Apr 2023

Preliminary Change Report Issued

Completed

Start:

29 Mar 2023

Due:

11 Apr 2023

Completion:

05 Apr 2023

Final Change Report Issued

Completed

Start:

Due:

Completion:

21 Jun 2023

Responsible Committee Decision

Completed

Start:

09 May 2023

Due:

28 Jun 2023

Completion:

28 Jul 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to SDSPs to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience. As the CSS Provider, I want the functionality to be available for SDSPs to automatically resolve issues when messages are not received in the correct order or are received after Gate Closure, so that this work does not have to be done manually.
  3. As an SDSP, I want to be able to detect when I have not received the expected CSS messages, so that I am able to request that the missing messages are sent to me to process. As an SDSP I want to be able to request a refresh of CSS messages when they are not received in the correct order or they are received after Gate Closure, so that I am able to maintain an accurate reflection of the current Switch status and minimise impacts on CSS Users and Consumers.
Proposed Solution Document
Document title
R0067 - Legal Text at PCR
Upload document
R0067 - Legal Text at PCR.zip
Archive
Off
Document title
R0067 - Legal Text at FCR
Upload document
R0067 - Legal Text at FCR.zip
Archive
Off
Document title
R0067 - Cost Benefit Analysis and Conclusions v3.0
Upload document
R0067 - Cost Benefit Analysis and Conclusions v3.0.pdf
Archive
Off
Problem Statement
CSS messages not received by the SDSPs in the order they were sent or received, or after Gate Closure, can be difficult to detect and often require significant manual effort to resolve. This issue can directly impact Consumer switching experiences causing disruption and possible delays.
SME
SME Role
Lead Technical Analyst
R0067 - Change Proposal Form
R0067 - Consolidated Consultation Responses
R0067 - Change Proposal Plan v1.0
R0067 - Initial Assessment Report v1.0
R0067 - Change Proposal Plan v2.0 (Approved) 07.03.2023
R0067 - Change Proposal Plan v3.0 04.04.2023
R0067 - Preliminary Change Report v2.0 (Issued for Consultation) 14.04.2023
R0067 - Final Change Report (Post-Vote) 28.06.2023
Company Name
-
Review status
Review required

Resolution of invalid CSS data by Data Owners

Date of latest update
Type
Change
ID
R0061
Change Category
Change Path
Priority
Urgent
No
Latest Update
04 March 2024 - Change has been withdrawn following implementation of a solution outside of the REC Change Process. 10WD window to adopt change will close on 18 March 2024.
Summary
Data is sent via the Supplier or MEM to update MPRS, which is then sent to CSS. If the data is considered invalid at CSS, an error is returned to MPRS. MPRS is the conduit of data from the Suppliers & MEMs to CSS, and ERDAs are not responsible for the data, therefore only the supplier/MEM can correct the data. The incidents must be put on hold until the owner of the data corrects the issue, this is to prevent SLA breaches. SLAs does not apply to the Supplier/MEM explicitly, so the incidents remain in the DNOs/IDNOs queue with the need to chase every few days to prevent the incident being closed. The responsibility for the incidents should be on the data owners (Suppliers/MEMs).
Proposer
Elise Handy
Change Plan

Solution Analysis and Development

Completed

Start:

22 Aug 2022

Due:

15 Aug 2023

Completion:

15 Aug 2023

Service Provider Impact Assessment Due

Completed

Start:

15 Aug 2023

Due:

19 Oct 2023

Completion:

19 Oct 2023
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be accurate, so that I can have a consistent and faultless switching experience. As a Consumer, I want any data issues related to my switch to be resolved quickly and by the party responsible, to ensure a fast and efficient switching experience.
  2. As a DNO, I want my service level requirements to be reflective of my data ownership responsibilities, so that data queries can be resolved more efficiently. As the CSS Service Desk provider, I want my tickets to be allocated to the most appropriate party able to resolve them.
Proposed Solution Document
Document title
R0061 Solution - Service Desk Guidance Article
Archive
Off
Problem Statement
DNO/iDNOs are obligated to resolve data mismatches identified by the CSS during the switch process. However, they are unable to do so in cases where the Supplier/MEM owns data required to resolve the mismatch. Tickets assigned to the DNO (via MPRS) are therefore not going to the party best placed to resolve them, resulting in DNOs chasing the incident resolution every few days to prevent them being closed incorrectly.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0061 - Change Proposal Form
R0061 - Initial Assessment Report v1.0 (Approved) - 18.07.2023
R0061 - Change Proposal Plan v1.0 (Approved) - 18.07.2023
R0061 Change Proposal Re-Plan (Approved) v1.0 - 19.10.23
Company Name
St Clements Services
Review status
Review required