Import / Export MOA Charging Clarification

Date of latest update
Type
Change
ID
R0207
Change Category
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Proposer
Jon Hawkins
Change Report - Draft Change Report

Comments deadline
Change report - Final Change Report
Change Plan

Final recommendation to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025

Sent to Authority for determination

Completed

Start:

Due:

Completion:

13 Mar 2025
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Schedule 14 - Metering Operations R0207 v0.1
Upload document
Schedule 14 - Metering Operations R0207 draft.docx
Archive
Off
Document title
Schedule 14 - Metering Operations R0207 v0.2
Upload document
Schedule 14 - Metering Operations R0207 v0.2.docx
Archive
Off
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Change Proposal Form
R0207 - Change Report (Proposal Plan - Approved) V2.0 15.10.2024
R0207 Consolidated Impact Assessment Responses PUBLIC V1.0
R0207 Extension to Plan v1.0
R0207 Change Report (For Consultation) v1.0
R0207 Consolidated Consultation Responses PUBLIC V1.0
R0207 Change Report (Final Recommendation) V1.0 Post Vote
Authority Decision Letter - Ofgem Decision to Send Back R0207 (30.05.2025)
R0207 Revised Solution - Legal Text
R0207 Change Report (Impact Assessment) Revised Solution V2.0
Legal Drafting Revised Solution March 2026
Non Confidential consolidated impact assessment responses
R0207 Consolidated Consultation Responses (revised solution)
Authority decision to approve R0207
Company Name
Gemserv
Review status
Review required

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches

Date of latest update
Type
Change
ID
R0205
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
As part of the MHHS REC code change activity, a change has been made to REC Schedule 30 to remove the half hourly meter exemption from the Erroneous Transfer provisions. Whilst this is necessary from an MHHS perspective with all sites becoming half hourly settled, the application of ET obligations in the Advanced Meter segment creates some additional challenges. To be able to accurately bill an Advanced Meter site, following repatriation of that customer to their correct supplier after an ET has been raised / agreed, the supplier needs to have access to half hourly consumption data for the ET period when they were not the registered supplier. With ETs potentially taking up to 2 years to be identified and resolved, the only place that the supplier could reliably source that HH consumption data would be from the other (losing) supplier.
Proposer
Ben Atkinson
Change Report - Draft Change Report
Change report - Final Change Report
Change Plan

Change Proposal Plan to REC Change Panel

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches > Change Plan

Start:

22 Aug 2024

Due:

01 Apr 2025

Completion:

01 Apr 2025

Discussion at REC Change Issues Group

Not Started

Start:

01 Apr 2025

Due:

05 Jun 2025

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. An approval of this Issue/Change Proposal would see an obligation placed upon the Losing Supplier, following a successful Erroneous Switch repatriation, to provide the Gaining Supplier with the Half-Hourly consumption data for the period in which they were erroneously supplying the meter.
  2. Half-Hourly consumption data would be providing to the Gaining Supplier, from the Losing Supplier, via SDEP using an Excel template within 5 Working Days of the Erroneous Switch repatriation switch date. The Gaining Supplier would be required to provide 48 Half-Hourly consumption intervals for each that the the Consumer was supplied by the erroneously Gaining Supplier.
Proposed Solution Document
Document title
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025
Upload document
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025.docx
Archive
Off
Document title
I0205 - Draft Reporting Templates
Upload document
I0205 - Draft Reporting Templates.xlsx
Archive
Off
Document title
I0205 - Impact Assessment
Archive
Off
Document title
R0205 - Schedule 30 Legal Drafting 15.08.2025
Upload document
R0205 - Schedule 30 Legal Drafting (For Consultation) 15.08.2025.docx
Archive
Off
Document title
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template
Upload document
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template.xlsx
Archive
Off
Problem Statement
In the absence of having Half-Hourly consumption data for Erroneously Switched Consumers, Energy Suppliers are currently required to estimate consumption for billing purposes that can lead to inaccurate billing.
I01205 - Change Proposal Form
I0205 - Change Report (Proposal Plan) V1.0 Approved (01.04.2025)
I0205 Consolidated Impact Assessment Responses V1.0 (Non-Confidential) 30.07.2025
R0205 - Consolidated Consultation Responses (09.09.2025)
R0205 Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
Company Name
Centrica
Review status
Review required

CSS Retry Strategy

Date of latest update
Type
Change
ID
R0203
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
There is currently a mismatch within the Central Switching Service (CSS) system functionality and the legal text within the REC Switching Data Management Schedule. Within the schedule the retry strategy is defined as “retry sending the Market Message at intervals of 10 seconds, 20 seconds and 30 seconds from each attempt to send the Market Message. If these retry Market Messages also fail, then the Market Message shall be retried at intervals of one hour up to a maximum of 12 hours; after which delivery of the Market Message shall be abandoned and a Switching Incident raised in accordance with the Switching Service Management Schedule”. However, in response to an incident in 2022, the CSS Provider updated the retry strategy. This change seeks to amend the legal text in Section 2.4 of the Switching Data Management Schedule to reflect the retry strategy which is currently in operation in the CSS system.
Proposer
Caroline Milner
Change Plan

Change Proposal Plan

Completed

Start:

15 Aug 2024

Due:

17 Sep 2024

Completion:

17 Sep 2024

Consultation to be issued

Completed

Start:

17 Sep 2024

Due:

20 Sep 2024

Completion:

20 Sep 2024

Consultation to close

Completed

Start:

20 Sep 2024

Due:

04 Oct 2024

Completion:

04 Oct 2024

Final Recommendation Vote

Completed

Start:

04 Oct 2024

Due:

15 Oct 2024

Completion:

15 Oct 2024
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. The Switching Data Management Schedule Section 2.4 should be updated to reflect the current retry strategy: 1. a short interval retry sequence of 3 attempts at 20 second intervals 2. a long interval retry sequence of 12 attempts at 1 hour intervals. The CSS Provider has confirmed that there is now a process in place that would prevent any future updates to the retry strategy without a change request being raised in the first instance.
Proposed Solution Document
Document title
CSS Retry Strategy Redlining
Upload document
Switching Data Management v1.2 CSS Retry Strategy Redlining.doc
Archive
Off
Problem Statement
The CSS system is currently out of sync with the REC legal drafting for the retry strategy.
Switching Data Management v1.2 CSS Retry Strategy Redlining.doc
R0203 - Change Proposal Form
R0203 - Change Report (Consultation) 17.09.2024
R0203 - Non-Confidential Consolidated Consultation Responses V1.0 (03.10.2024)
R0203 - Change Report (Final Recommendation - Approved) 15.10.2024
Company Name
REC Technical Services
Review status
Review required

Performance Assurance Report Catalogue Updates (MHHS)

Date of latest update
Type
Change
ID
R0202
Change Category
Change Path
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
This change seeks to update the Performance Assurance Reporting Catalogue (PARC) to capture data items required to continue to appropriately monitor Retail Risks under Market-wide Half Hourly Settlement (MHHS) industry arrangements. Some housekeeping changes, for the PARC, have also been included in this change.
Proposer
Andrew Waghorn
Change Plan

Proposal Plan approved

Completed

Start:

08 Aug 2024

Due:

03 Sep 2024

Completion:

03 Sep 2024

Party impact assessment completed

Completed

Start:

03 Sep 2024

Due:

04 Oct 2024

Completion:

04 Oct 2024

Change Report approved for Consultation

Completed

Start:

04 Oct 2024

Due:

25 Mar 2025

Completion:

25 Mar 2025

Consultation completed

Completed

Start:

25 Mar 2025

Due:

15 Apr 2025

Completion:

15 Apr 2025

RECPAB Voting

In Progress

Start:

15 Apr 2025

Due:

29 Apr 2025

Completion:

Status
Implementation Date
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed Solution Document
Document title
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS (27.08.2024)
Upload document
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS.xlsx
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only (18.03.2025)
Upload document
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only 18.03.2025.xlsx
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025
Upload document
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025.xlsx
Archive
Off
Problem Statement
The PARC currently does not capture all the data items required to support the monitoring of Retail Risks following Market-wide Half Hourly Settlement go-live. An update to the PARC is required to include the data items that will ensure the Code Manager can provide the assurance the industry requires during transition and under the new MHHS arrangements.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
RECPAB_23_Performance Assurance Report Catalogue V5.2 - REDLINE.xlsx
R0202 - PARC Updates (MHHS) (CP Form)
R0202 Change Proposal Re-Plan v1.0 31.10.24
R0202 Change Report (Proposal Plan) v2.0 (Approved) 03.09.2024
R0202 Change Proposal Re-Plan V2.0 (Approved) 20.03.2025
R0202 Change Report (Consultation) v1.0 (Approved) 25.03.2025
R0202 Consolidated Consultation Responses V1.1 (22.04.2025)
R0202 Change Report (Final Recommendation) (Post-Vote) v2.0
Company Name
Code Manager
Review status
Review required

Metering Asset Manager (MAM) Communication Method Register

Date of latest update
Type
Change
ID
R0198
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
Studies conducted by the REC Performance Assurance (RPA) function of the REC Code Manager have concluded that gas market data fidelity may be improved by reducing the frequency of missed messages between Metering Asset Managers and other REC Parties. This Issue seeks to explore mechanisms by which a reduction in the number of permissible communication methods used by MAMs could support the data quality improvement objective.
Proposer
Amy Crowe-Lamont
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed Solution Document
Document title
I0198 - Draft Schedule 14 - Metering Operations & Draft Communications Method Register
Upload document
I0198 Proposed Solution V1.0.zip
Archive
Off
Document title
R0198 - Draft Schedule 14 - Metering Operations & Draft Communications Method Register V2.0
Upload document
R0198 Proposed Solution V2.0.zip
Archive
Off
Problem Statement
MAMs communicate with each other, and with other parties, using up to three possible methods as they send Market Messages in line with their obligations in the REC. It has been suggested that moving to a single communication method might help mitigate gas data quality issues. This Issue seeks to explore an interim solution to facilitate this.
SME
SME Role
Lead Assurance Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0198 Change Proposal (pdf)
I0198 Change Report (Plan) (Approved) V2.0 03.04.2
I0198 Change Proposal Re-Plan V1.0 28.03.25
I0198 Change Report (IA) V1.0 03.04.25
R0198 Consolidated IA Responses V1.0 Non-Confidential
R0198 Change Report (Consultation) V1.0 11.06.25
R0198 Change Proposal Re-Plan V2.0 02.07.25
Change Report (Consultation) V2.0 11.07.25
R0198 Consolidated Consultation Responses V1.0 06.08.25
R0198 Change Report (Final Recommendation: Pre-Vote) V1.1 13.08.25
R0198 Change Report (Final Reccomendation - Post-Vote) V1.0 13.08.25
Company Name
-
Review status
Review required

Introduction of SLA for Supplier De-Registration on Disconnected Meters

Date of latest update
Type
Change
ID
R0191
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Issue has been discussed twice at RIG and has been identified via data cleanse activity. Parties identified that there are a number of meters (NG alone have 5k in this state) that are showing as terminated but an active Energy Supplier appointment. Discussion at RIG identified that REC Is potentially lacking detail/obligations/timescales on suppliers/DNOs to report/update/respond to disconnection queries.
Proposer
shelley.rouse
Change Plan

Change Plan approved by Change Panel

Completed

Start:

Due:

Completion:

01 Apr 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Apr 2025

Change Report (For Consultation) approved by Change Panel

Completed

Start:

Due:

Completion:

17 Jun 2025

Approved at Change Panel

Completed

Start:

Due:

Completion:

05 Aug 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0191 draft legal text for IA
Upload document
I0191 draft legal text for IA.pdf
Archive
Off
Document title
R0191 draft legal text for consultation - pre MHHS
Upload document
I0191 draft legal text for consultation - pre MHHS.pdf
Archive
Off
Document title
R0191 draft legal text for consultation - post MHHS
Upload document
I0191 draft legal text for consultation - post MHHS.pdf
Archive
Off
Problem Statement
There is no time scale by which Energy Suppliers need to have submitted the Registration De-Activation Request or for electricity to have raised a query with the Distribution Network Operator (DNO) if they believe the Metering Point should not be Disconnected. This raises difficulties for the REC Performance Assurance team when monitoring and enforcing this obligation.
I0191- De-energisation of disconnected meters
I0191 Change Report (Proposal Plan) V1.1 Approved 01.04.25
I0191 Consolidated Impact Assessment Responses v1.0
R0191 Change Report (For Consultation) V1.1
R0191 Consolidated Consultation Responses V1.0
R0191 Change Report (Final Recommendation) Approved 05.08.25
Company Name
REC Issues Group
Review status
Review required

Related Meter Point RMP status rules

Date of latest update
Type
Change
ID
R0190
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The drafting in Schedule 28 – Related Metering Points has been updated for Market-wide Half Hourly Settlement (MHHS), allowing related Metering Points to be in a Status of Operational or Created in MPRS, as long as all Related Metering Points are in the same Status. This Change Proposal suggests allowing Secondary Metering Points with a Status of Created to be linked to Primary Metering Points with a Status of Operational, for MHHS migrated Metering Points only.
Proposer
andrew.waghorn
Change report - Final Change Report

Comments deadline
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

07 Aug 2025

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

19 Aug 2025

Change Report (For Consultation) approved by Change Panel

Completed

Start:

Due:

Completion:

18 Nov 2025
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0190 - Draft Schedule 28 changes for IA
Upload document
I0190 - Draft Schedule 28 changes V0.2.docx
Archive
Off
Problem Statement
By not allowing Primary Metering Points with a Status of Operational to be linked to Secondary Metering Points with a Status of Created, where the Metering Points have migrated into the MHHS arrangements, full advantage is not being taken of the MHHS functionality of automatically appointing agents to Secondary Metering Points.
SME
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
I0190 - Related Meter Point RMP status rules
I0190 Change Report (Proposal Plan) V1.0
I0190 Consolidated Information Request Responses v1.0
I0190 Consolidated Impact Assessment Responses v1.0
I0190 Extension to Plan V1.0 approved 30.10.25
R0190 Change Report (For Consultation) V1.0 approved 18.11.25
R0190 Consolidated Consultation Responses v1.0
R0190 Change Report (Final Recommendation) V1.0 post vote
Company Name
Code Body/ Administrator
Review status
Review required

Changes to Terms of reference following acceptance of R0167

Date of latest update
Type
Change
ID
R0188
Change Path
Urgent
No
Latest Update
20/08/2024 - Approved for implementation on 06/09/2024.
Summary
This Housekeeping Change Proposal seeks to update the Terms of Reference of the REC Change Panel and the Performance Assurance Board, following the acceptance of R0167, to reflect Issues.
Proposer
Glenn Sheern
Status
Implementation Date
Status Superseded
EMAR Version 3.13.0_Superseded

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
REC Change Panel - Terms of Reference
Upload document
REC Change Panel - Terms of Reference.docx
Archive
Off
Document title
REC Performance Assurance Board (PAB) - Terms of Reference
Upload document
REC Performance Assurance Board (PAB) - Terms of Reference.docx
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to update the Change Panel and Performance Assurance Board, Terms of Reference to reflect that these Committees consider change Issues as well as Change Proposals.
R0188 - Change Proposal Form
R0188 - Housekeeping Change Report (Post Approval)
Company Name
Rec Manager
Review status
Review required

Clarity on use of on hold for switching issues, including the obligations of CSS Users

Date of latest update
Type
Change
ID
R0180
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Many Switching Incidents are on hold waiting for resolution. The Switching Operator puts these tickets on hold, which is an approved business process from the Switching Programme. This is not reflected in the obligations on SDSPs or other REC Service Providers, where there is no on hold concept. Further there are no obligations on CSS Users to respond in a timely basis. This means that the REC obligations do not reflect current practice, and many tickets remain open much longer than necessary.
Proposer
anton.moden
Change Plan

Change Issue Group

Completed

Start:

03 Jun 2024

Due:

01 Aug 2024

Completion:

01 Aug 2024
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Option 1
Upload document
Option 1.zip
Archive
Off
Document title
Solution Development Report
Upload document
Solution Development Report.pdf
Archive
Off
Document title
Option 2
Upload document
Option 2.zip
Archive
Off
Document title
Option 3
Upload document
Option 3.zip
Archive
Off
Problem Statement
A lack of obligations is causing issues with open tickets relating to missing messages. Tickets placed on hold also require significant additional work for the Switching Operator, which could either be released as a cost saving or it could result in time freed up for improvement activities.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Form
Change Report - Proposal Plan V1.0
I0180 Extension to Plan V1.0 approved 09.07.25
I0180 Consolidated Party Impact Assessment Responses v1.0
I0180 Update to Plan V1.0 approved 10.12.25
R0180 Change Report (For Consultation) V1.0
R0180 Consolidated consultation responses V1.0
R0180 Change Report (Final Recommendation) V1.0 approved 25.03.26
Company Name
REC Code Manager
Review status
Review required

Proposal for Limiting Queries in EES API Calls (Single Query per API Call)

Date of latest update
Type
Change
ID
R0179
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
This issue has been raised proposing to establish a limit on the number of queries permitted within a single Application Programming Interface (API) call. As there is potential for performance degradation and system instability that can occur when a large number of queries are made in a single API call to the Electricity Enquiry Services (EES) API. The aim would be to prevent overwhelming the system and ensure consistent response times and reliability. Therefore, this proposes implementing a limit of 1000 queries per single API call.
Proposer
Andres Alvarez
Change report - Final Change Report

Comments deadline
Change Plan

Request for Information

Completed

Start:

03 Jun 2024

Due:

05 Jul 2024

Completion:

05 Jul 2024

Change Issue Group

Completed

Start:

05 Jul 2024

Due:

01 Aug 2024

Completion:

01 Aug 2024
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Request For Information (RFI)
Archive
Off
Problem Statement
The absence of a limit on the number of queries (batch processing) within a single API call could cause performance issues and system instability. As a result, system responsiveness may degrade when a large number of queries are made in a single call, impacting user experience and hindering the ability of the EES API to consistently meet user demands.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Issue Form
EES API Interface Specification REDLINE DRAFT for R0179
R0179 - Change Report - Final Recommendation Approved
R0179 Change Report (Consultation)
R0179 Consolidated consultation responses (non- confidential)
Re-baseline Change Plan 15.07.25
Consolidated IA responses (non-confidential)
I0179 Change Report (Impact Assessment)
Service Provider - Impacts Data
I0179 - Consolidated RFI Responses
Change Report (Proposal Plan)
Consultation on implementation date response
Change Report - Final Recommendation (new implementation date)
Company Name
RECCo
Review status
Review required