Prepayment Credit Balance Transfer Process

Date of latest update
Type
Change
ID
R0037
Change Category
Priority
Urgent
No
Latest Update
04/08/2026 - On 04 August 2026, the REC Change Panel approved this Proposal Plan.
Summary
This Change Proposal seeks to develop an agile, efficient, Consumer-centric solution for the transfer of credit balance as part of a smart prepayment Switch.
Proposer
Simon Bevis
Change Plan

Initial Analysis

Completed

Start:

10 Mar 2022

Due:

30 Jun 2022

Completion:

Present updated Change Proposal Plan to Change Panel

Completed

Start:

30 Jun 2022

Due:

19 Jul 2022

Completion:

Solution Development Complete

Completed

Start:

30 Jan 2023

Due:

29 Feb 2024

Completion:

29 Feb 2024

Present Updated Change Proposal Plan to Change Panel

Completed

Start:

19 Jul 2022

Due:

08 Nov 2022

Completion:

Present Updated Plan to Change Panel

Completed

Start:

08 Nov 2022

Due:

17 Jan 2023

Completion:

17 Jan 2023

Service Provider Impact Assessment

Completed

Start:

17 Jan 2023

Due:

30 Jan 2023

Completion:

30 Jan 2023
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
R0037 - Draft Legal Text v1.0
Upload document
R0037 Party IA Legal Drafts.zip
Archive
Off
Document title
R0037 - Solution Document v2.0
Upload document
R0037 - Solution Document v2.0.pdf
Archive
Off
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
R0037 - CP Form (Downloadable version)
R0037 Consolidated Party IA Responses PUBLIC v1.0
R0037 - Change Proposal Plan V6.0 (Approved) 05.03.24
R0037 - Initial Assessment Report v1.0 (Approved) 06.04.22
R0037 Consolidated RFI Responses PUBLIC v1.0
R0037 Change Report (Proposal Plan) Approved
Company Name
Utilita Energy Limited
Review status
Review required

Market Stabilisation Charge – Administration

Date of latest update
Type
Change
ID
R0035
Change Category
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Jon Dixon
Change Plan

Party Impact Assessment initiated

Completed

Start:

22 Feb 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022

Party Impact Assessment completed

Completed

Start:

08 Apr 2022

Due:

29 Apr 2022

Completion:

29 Apr 2022

Preliminary Change Report issued

Completed

Start:

29 Apr 2022

Due:

06 May 2022

Completion:

06 May 2022

Issued to Responsible Committee for review (ex-Committee)

Completed

Start:

06 May 2022

Due:

10 May 2022

Completion:

10 May 2022

Consultation initiated

Completed

Start:

10 May 2022

Due:

13 May 2022

Completion:

13 May 2022

Consultation completed

Completed

Start:

13 May 2022

Due:

01 Jun 2022

Completion:

01 Jun 2022

Final Change Report issued

Completed

Start:

01 Jun 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Responsible Committee Decision (ex-Committee)

Completed

Start:

10 Jun 2022

Due:

14 Jun 2022

Completion:

14 Jun 2022

Authority Determination

Completed

Start:

14 Jun 2022

Due:

24 Jun 2022

Completion:

27 Jun 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Domestic Consumer, I want to be able to choose my Energy Supplier and a tariff from a range of competitive options, so that I can take advantage of cheaper deals as they become available.
  2. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the MSC obligations, so that the new MSC licence obligations on Energy Suppliers can be effectively discharged by RECCo.
  3. As RECCo, I want the Retail Energy Code to specify my obligations, governance and charging mechanisms, so that I can effectively discharge obligations imposed by the Authority through the Licence Condition modification.
  4. As a Domestic Supplier, I want to understand how RECCo will calculate my credits and liabilities and when they will send my invoices/credit notes, so that I can plan to review my invoices/credit notes prior to the receipt of monies owed or payments I make to RECCo or at an appropriate time for my organisation. As a Domestic Supplier, I want to understand how I could dispute an invoice which I do not believe is accurate, so that I am able to raise a dispute/challenge compliantly
Proposed Solution Document
Document title
Legal Text (tracked changes)
Upload document
R0035 Legal Text - Post Consultation.zip
Archive
Off
Document title
EMAR Change Set
Archive
Off
Problem Statement
Following the publication of Ofgem’s decision on potential short-term interventions to address risks to consumers from market volatility, the Market Stabilisation Charge will be introduced via the modified Standard Licence Condition 24A and introduced into the REC by Change Proposal R0034. A change is needed to the REC to set out the charging and payment mechanism, and to introduce the necessary governance arrangements to allow these MSC payments to be administered by RECCo.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0035 - CP Form (Downloadable version)
Ofgem Decision document - Short Term Interventions
MSC calculation guidance
Gas SLC Modified Decision Notice
Elec SLC Modified Decision Notice
R0035 - High level Solution Overview v1.0
R0035 - Change Proposal Plan v2.0 (Approved)
R0035 - Initial Assessment Report v2.0 (Approved)
R0035 - Consolidated IA responses v1.0
R0035 - Proposed Solution v2.0
R0035 - Preliminary Change Report v2.0 (Approved)
R0035 - Consolidated consultation responses v1.0
R0035 - Final Change Report v2.0 (Post-Vote)
Authority Decision for R0035
Company Name
RECCo
Review status
Review required

Market Stabilisation Charge

Date of latest update
Type
Change
ID
R0034
Change Category
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Henry Kemp
Change Plan

Preliminary Change Report issued

Completed

Start:

21 Feb 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Consultation issued (5 WD)

Completed

Start:

04 Mar 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Final Change Report issued

Completed

Start:

04 Mar 2022

Due:

18 Mar 2022

Completion:

18 Mar 2022

Responsible Committee decision (ex-Committee)

Completed

Start:

18 Mar 2022

Due:

23 Mar 2022

Completion:

23 Mar 2022

Authority determination

Completed

Start:

23 Mar 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version REC V2.2.2_SUPERSEDED
Included changes Affected REC Items
R0028 Review of Category 3 documents in the REC Baseline Statement
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Standards Definition Document
R0034 Market Stabilisation Charge
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
170.51 KB
Version 1.0 - 02 Nov 2026 PDF - 170.51 KB
1.0 02 Nov 2026
4.09 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.09 MB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the MSC obligations, so that the new MSC licence obligations on Energy Suppliers can be effectively discharged by RECCo.
Proposed Solution Document
Document title
Legal Text
Upload document
R0034 legal text - Market Stabilisation Charge v2.0 Post Consultation.zip
Archive
Off
Document title
EMAR Change Set
Archive
Off
Problem Statement
Following the publication of Ofgem’s decision on potential short-term interventions to address risks to consumers from market volatility, the Market Stabilisation Charge will be introduced via the modified Standard Licence Condition 24A. A change is needed to the REC to give effect to the Market Stabilisation Charge from 14 April 2022.
Ofgem Decision Document - Short Term Interventions
R0034 - CP Form (Downloadable version)
R0034 - Change Proposal Plan v1.0 (Approved)
R0034 - Initial Assessment Report v1.0 (Approved)
R0034 - Preliminary Change Report v1.0 (Published for Consultation)
R0034 - Consolidated consultation responses v1.0
R0034 - Final Change Report v2.0 (Post-Vote)
Authority Decision for R0034 - Market Stabilisation Charge
Company Name
-
Review status
Review required

Erroneous Transfer Cancellations

Date of latest update
Type
Change
ID
R0030
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Erroneous Switches (ESs) are currently being cancelled without a defined process or full audit trail. This Change Proposal seeks to introduce a defined process for Energy Suppliers to be able to cancel an ES in specific scenarios.
Proposer
Lorna Mallon
Change Plan

Solution Development

Completed

Start:

13 Jan 2022

Due:

22 Apr 2022

Completion:

22 Apr 2022

Party Impact Assessment Issued

Completed

Start:

22 Apr 2022

Due:

06 May 2022

Completion:

06 May 2022

Preliminary Change Report Issued

Completed

Start:

06 May 2022

Due:

08 Jul 2022

Completion:

08 Jul 2022

Responsible Committee Review

Completed

Start:

08 Jul 2022

Due:

19 Jul 2022

Completion:

19 Jul 2022

Consultation Issued

Completed

Start:

19 Jul 2022

Due:

05 Aug 2022

Completion:

05 Aug 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer I want to receive my bills when expected, from the Supplier of my choice without delays caused by being switched incorrectly and not being resolved in a timely manner. As a Consumer, in the event that my Supplier has exited the market and my supply cannot be returned to my original Supplier, I want the Gaining ET Supplier to have the ability to terminate any ET process that has already been initiated so that I am able to choose my preferred Supplier and switch without delay or penalty.
  2. As a Consumer, if Energy Suppliers need to share my data to resolve a switching issue, I want Suppliers to share my personal data securely so that my data is protected.
  3. As an Energy Supplier, where appropriate, I need to be able to cancel an ET effectively and efficiently, so that I can bill my Consumers accurately and timely. As an Energy Supplier, where appropriate, I need to be able to cancel an ET so that I supply Consumers with whom I have a valid contract.
  4. As The Code Manager I need to be able to identify when an ET has been cancelled so that I have a clear audit trail and can monitor performance effectively.
Proposed Solution Document
Document title
R0030 Pre Consultation Solution Documents
Upload document
R0030 - Consultation Solution Documents (1).zip
Archive
Off
Document title
R0030 - Final Solution Documents
Upload document
Final Solution (1).zip
Archive
Off
Document title
R0030 - EMAR Change Set (Final)
Archive
Off
Problem Statement
Erroneous Transfers are being cancelled by Suppliers, which is currently not permitted under the REC. There is no consistent defined process or audit trail. In the event of a Supplier of Last Resort (SoLR) being appointed, or on a Change of Occupier at a premise, the Gaining Supplier currently has no way to formally cancel an ET after it has been initiated. This can cause Switching and/or Billing delays for Consumers whilst Energy Suppliers attempt to resolve an outstanding or open ET. For Energy Suppliers this can mean they are supplying Consumers with whom they have no Valid Contract, resulting in additional Guaranteed Standards of Performance (GSOP) Payments and increased Consumer dissatisfaction. The Performance Assurance Board (PAB) has no way to identify the difference between the process legitimately closing without resolution, and an Energy Supplier not meeting their obligations in the code to properly resolve an ET. As a result, the PAB are unable to differentiate the performance of Energy Suppliers between those that are closed down legitimately or those being closed inappropriately.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Erroneous Transfer Cancellations - Change Proposal Form
R0030 - Consolidated Impact Assessment Responses
R0030 Change Proposal Plan v1.0 (Approved)
R0030 - Initial Assessment Report v1.0 (Approved)
R0030 - Preliminary Change Report v2.0 (Approved)
Non Confidential Consultation Responses
R0030 Final Change Report v2.0 (Post-Vote)
Company Name
Scottish Power
Review status
Review required

Minimum identification requirements in the Meter Operation Code of Practice

Date of latest update
Type
Change
ID
R0027
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
courtney.campbellwood
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want to be able to verify the attending agent’s identity so I can feel safe at my Premises whilst work is completed and trust the Energy industry to care about my safety.
  2. As an electricity Consumer I want to be able to verify the attending agent’s identity so that work can be completed efficiently, without delay or confusion.
  3. As an Electricity Supplier I want my Appointed Metering Equipment Manager to be identifiable when attending Consumer Sites to retain Consumer confidence, trust and for works to be completed without delay.
  4. As a Metering Equipment Manager, I want clarity around the requirements regarding identity cards to be clear so that I can assure compliance and easily identify myself to consumers at site.
  5. As a Metering Scheme Auditor, I want clarity on appropriate identity requirements so I can confidently validate a Metering Equipment Manager’s identity during a site audit.
Problem Statement
Identify card inconsistencies can result in Metering Scheme Auditors and Consumers not being able to reliably verify a Meter Operative’s identity. If Consumers and Metering Scheme Auditors are unable to verify the Competent Person’s identity there could be delays to audits being completed, on-site work being carried out, safety risks or a reduction in consumer trust and confidence.
Stages Selection
R0027 - Change Proposal Plan V1.0 (Approved)
R0027 Initial Assessment Report
Company Name
-
Review status
Review required

Whole current (WC)/Current Transformer (CT) certificates

Date of latest update
Type
Change
ID
R0026
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/01/2024 - Change Proposal has been withdrawn.
Summary
Metering Equipment Managers (MEMs) can currently work on Whole Current (WC) or Current Transformer (CT) meters without having been previously assessed on that metering category. This Change Proposal seeks to develop and implement a solution to address this area of risk.
Proposer
Elise Handy
Change Plan

Solution Analysis and Development Start

Completed

Start:

07 Jan 2022

Due:

31 Oct 2022

Completion:

Impact Assessment Period start

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Solution Development completed

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Impact Assessment period ends

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Electricity Consumer I want to be confident that the Meter Operative that completes work on my Metering Equipment is competent to ensure my supply is safe, secure and uninterrupted.
  2. As a MEM, I want to be confident that my processes and Meter Operatives are compliant with the MOCoP, to ensure minimal disruption to my clients and the safety of my employees.
  3. As an Electricity Supplier, I want to be confident that my Appointed agents are compliant with the MOCoP to ensure my consumers safety.
Problem Statement
Current metering accreditation arrangements allow MEMs to work on whole current or Current Transformer (CT) meters regardless of whether they have previously or recently been assessed on that metering category. This poses potential risks for the safety of Consumers and Meter Operatives as the MEMs may not have appropriate processes or training in place to ensure compliance with the MOCoP.
Stages Selection
R0026 - Initial Assessment Report v1.0 (Approved)
R0026 - Change Proposal Plan - V3.0 (Approved)
Company Name
-
Review status
Review required

EAC information in the EES API

Date of latest update
Type
Change
ID
R0024
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Andrew Long
Change Plan

Solution Development and Party Engagement

Completed

Start:

29 Aug 2022

Due:

07 Sep 2022

Completion:

29 Aug 2022

Change Proposal Withdrawal

Completed

Start:

20 Dec 2021

Due:

29 Aug 2022

Completion:

29 Aug 2022
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As a domestic Electricity Consumer, I want to be quoted accurately for my electricity usage based on my electricity consumption, so that I can make an informed decision to accept/reject the quotation offered.
  2. As an Electricity Supplier, I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
  3. As a Third-Party Intermediary (TPI), I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
Problem Statement
Where an Electricity Supplier provides a quotation, or Third-Party Intermediary (TPI) completes a comparison, for an Electricity Consumer they must rely on the information provided by the Consumer about their electricity usage. In some cases, consumers may not have access to or knowledge of their annual electricity usage. Consequently, this would be estimated leading to potential inaccurate quotations being provided. Having access to the Metering Point level Estimated Annual Consumption (EAC) via the Electricity Enquiry Service (EES) would enable the provision of more accurate electricity quotations, enabling the Consumer to make an informed choice about their Electricity Supplier, tariff and product.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0024 - Change Proposal Plan v2.0 (Approved)
R0024 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Prepayment Unallocatable Transactions

Date of latest update
Type
Change
ID
R0023
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Jonathan Holland
Change Plan

Preliminary Change Report Issued

Completed

Start:

15 Dec 2021

Due:

04 Mar 2022

Completion:

04 Mar 2022

Responsible Committee Decision

Completed

Start:

08 Apr 2022

Due:

19 Apr 2022

Completion:

19 Apr 2022

Consultation Period Start

Completed

Start:

19 Apr 2022

Due:

22 Apr 2022

Completion:

22 Apr 2022

Consultation Period End

Completed

Start:

22 Apr 2022

Due:

16 May 2022

Completion:

16 May 2022

Final Change Report Issued

Completed

Start:

16 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Responsible Committee Decision

Completed

Start:

27 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Appeal Window Closure

Completed

Start:

07 Jun 2022

Due:

22 Jun 2022

Completion:

22 Jun 2022

Legal Review / Preliminary Change Report Revision

Completed

Start:

04 Mar 2022

Due:

15 Mar 2022

Completion:

15 Mar 2022

Revised Preliminary Change Report Issued

Completed

Start:

15 Mar 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As a PPMIP, I want to receive accurate market share data to allow me to complete the Unallocatable Prepayment Allocation Run in a timely manner.
  2. As an Energy Supplier, I want the calculation of Unallocatable Transactions to be carried out accurately and efficiently so that I receive payments allocated to my organisation.
Proposed Solution Document
Document title
R0023 Legal Text changes (tracked changes)
Upload document
R0023 Legal Text changes (tracked changes) v1.0 (1).docx
Archive
Off
Document title
EMAR Change Set
Archive
Off
Problem Statement
The process for the allocation and payment of Unallocatable Transactions, set out in the Prepayment Arrangements Schedule, does not currently take into account Energy Suppliers that have exited the market or that do not have a contract with the PPMIP. This prevents the PPMIP from being able to release payments to Energy Suppliers, as the process doesn’t allow for all funds to be accounted for in the calculation.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
Change Proposal Plan v1.0 (Approved)
R0023 - Preliminary Change Report v3.0 (Approved)
R0023 - Initial Assessment Report v1.0 (Approved)
R0023 - Final Change Report v1.0
Company Name
-
Review status
Review required

Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier

Date of latest update
Type
Change
ID
R0021
Change Category
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Currently only the Registered Supplier can instruct a Metering Equipment Manager (MEM) to work on their metering asset. There is no ability to request that a single MEM completes work on multiple properties that may have different Electricity Suppliers. This creates barriers to developing solutions for local authorities, private and social housing landlords who are refurbishing premises or to help any premise owner (whether domestic or non-domestic) install new equipment to facilitate Low & Zero Carbon Technology (LZCT) installation such as the retro-fit of Electric Vehicle Charging (EVC) Points to homes and business premises. This Change Proposal will introduce a new role for existing accredited MEMs that will enable them to accept instructions to undertake a limited set of activities at the request of the premise owners without the need to use the Registered Suppliers’ MEMs.
Proposer
Colette Baldwin
Change Plan

Solution Development

Completed

Start:

09 Dec 2021

Due:

03 Feb 2022

Completion:

19 Apr 2022

Party Impact Assessment Issued

Completed

Start:

03 Feb 2022

Due:

22 Apr 2022

Completion:

22 Apr 2022

Deadline for Alternative Change Proposal Submission

Completed

Start:

22 Apr 2022

Due:

27 May 2022

Completion:

27 May 2022

Preliminary Change Report Issued Interim

Completed

Start:

27 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation Issued

Completed

Start:

27 May 2022

Due:

12 Jul 2022

Completion:

12 Jul 2022

Final Change Report Issued

Completed

Start:

16 Aug 2022

Due:

26 Aug 2022

Completion:

26 Aug 2022

Responsible Committee Decision

Completed

Start:

26 Aug 2022

Due:

14 Sep 2022

Completion:

14 Sep 2022

Preliminary Change Report (Updated) Issued

Completed

Start:

12 Jul 2022

Due:

12 Jul 2022

Completion:

12 Jul 2022

Consultation closure (extended deadline)

Completed

Start:

12 Jul 2022

Due:

16 Aug 2022

Completion:

16 Aug 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As a property owner or occupier I want to be to arrange for the installation of equipment for the use of the occupier, such as fitting an isolator, installing on-site generation equipment or electric vehicle charging points. I want the installer to use a Safe Isolator Provider (SIP) who is authorised to undertake the work at my instruction rather than arrange for this work to be completed through the premises’ Registered Suppliers.
  2. As a REC Accredited Metering Equipment Manager, I want to be able to work as a SIP and de-energise and re-energise a site on the instruction of the homeowner/landlord, so that equipment – such as an isolator, on-site generation or electric vehicle charging points can be fitted without the need to co-ordinate the work with the Registered Suppliers’ MEMs. As a Distribution Network Operator, I want to be assured that the work is only completed by a SIP that has the necessary skills and REC accreditation and has the appropriate permissions to de-energise and re-energise the supply and doesn’t introduce any additional risk to the Distribution Network.
  3. As the Registered Supplier, I want to know what steps the SIP who attends the site and finds the site in an unsafe situation to re-energise, will take so that my customer is not left off-supply unnecessarily. As the Registered Supplier, I want to be alerted if the SIP finds any evidence of meter tampering at the premises.
Proposed Solution Document
Document title
R0021 - Final Approved legal text
Upload document
R0021 - Approved legal text.zip
Archive
Off
Document title
R0021 - Proposed new Market Message v1.0
Upload document
R0021 - Proposed new market message v1.0.docx (2).pdf
Archive
Off
Document title
R0021 - Draft Legal Text
Upload document
R0021 - Draft Legal Text.zip
Archive
Off
Document title
R0021 - Webinar 2 March 2023 - Draft Q & A Responses v0.3
Upload document
R0021 Implementation Webinar Q & A 2 March 2023.docx
Archive
Off
Problem Statement
It is difficult for landlords of local authority, social housing developments or private landlords of homes and businesses to co-ordinate the refurbishment of properties where they need the electricity supply to be de-energised to allow work being completed and the supply re-energised. Currently the landlord needs to liaise with the Electricity Supplier of each premise independently to arrange for the appointed MEM to attend and de-energise each supply point and then re-energise the site when the work is completed, as currently only the Registered Supplier’s appointed MEM or the DNO is permitted to undertake the work.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0021 - Change Proposal Plan v2.0 (Approved)
R0021 - Party IA Consolidated Responses
R0021 - Initial Assessment Report v1.0 (Approved)
R0021 - FAQs following Impact Assessment
R0021 - Preliminary Change Report v2.0 (Approved)
NAPIT Survey Results
R0021 - Consultation Non-confidential Consolidated Responses
R0021 - Final Change Report (Post-Vote)
R0021 Authority Decision
Company Name
-
Review status
Review required

Resolution of Bilateral Erroneous Transfers

Date of latest update
Type
Change
ID
R0016
Change Category
Change Path
Priority
Urgent
No
Latest Update
16/05/2023 - At the Change Panel meeting on 02 May 2023, the recommendations set out in the SDEP Review Report were approved. This included the initiation of 6 Change Proposal groups, including a group that captures Multilateral Erroneous Switches and the functionality changes required within R0016. As a consequence Change Proposal R0016 - Resolution of Bilateral Erroneous Transfers has been withdrawn. The requirements identified under R0016 will be taken forward under a new SDEP review related Change Proposal.
Summary
This Change Proposal is to introduce a more consistent and efficient mechanism for Suppliers to use when investigating and resolving Bilateral Erroneous Transfers.
Proposer
admin
Change Plan

Solution Analysis

In Progress

Start:

18 Nov 2021

Due:

21 Mar 2023

Completion:

Proposed Approach Presented To Change Panel

Not Started

Start:

21 Mar 2023

Due:

18 Apr 2023

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want issues affecting me or my energy account to be resolved at the earliest opportunity, to minimise impacts to my energy switch or accurate and timely billing.
  2. As a Consumer, I want industry parties to share my personal data securely so that my data is protected.
  3. As an Energy Supplier, I want to be able to resolve Bilateral Erroneous Transfers effectively and efficiently, so that I can bill my Consumers accurately and timely.
  4. As an Energy Supplier, I want to be able to resolve Bilateral Erroneous Transfers effectively and efficiently, so that I supply Consumers with whom I have a valid contract.
Problem Statement
The SDEP currently only supports direct messaging between two SDEP Users and doesn’t allow for communications to be shared with multiple users (three or more). In circumstances where agreement is required between multiple parties, this needs to be managed outside of the SDEP by telephone and email. This has reportedly resulted in inconsistencies between parties and delays in the resolution process.
Stages Selection
R0016 Initial Assessment Report v1.0 (Approved)
R0016 Change Proposal Plan v6.0 (Approved)
Company Name
-
Review status
Review required