MAP GES data access

Date of latest update
Type
Change
ID
R0087
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/01/25 - Change Proposal withdrawn at proposers request.
Summary
As a MAP I want to be able to track my daily position of my portfolio. As a MAP I want to be able to track changes in my portfolio over time. As a MAP I want to understand who are using my assets and identify where assets are not being used
Proposer
David Newman
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
holly.law
Solution Development
Stages Selection
Company Name
Correla
Review status
Review required

ERDS Upload File in the Data Specification and clarification of cancellation code

Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Proposer
admin
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required

Release of Community View Data Items to MEMs in GES

Date of latest update
Type
Change
ID
R0074
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/06/2023 The system changes associated with this change were successfully implemented as planned on Friday 02 June 2023.
Summary
This Change Proposal will enable MEMs to ‘Community View’ access to a limited set of data in the GES, for sites where they are not the appointed MEM.
Proposer
David Addison
Change Plan

Service Provider Impact Assessment

Completed

Start:

05 Oct 2022

Due:

21 Nov 2022

Completion:

16 Dec 2022

Party Impact Assessment

Completed

Start:

21 Nov 2022

Due:

21 Nov 2022

Completion:

18 Dec 2022

Preliminary Change Report Issued

Completed

Start:

21 Nov 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation closure

Completed

Start:

13 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Responsible Committee Decision

Completed

Start:

27 Jan 2023

Due:

22 Feb 2023

Completion:

22 Feb 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.3.0_Superseded

Documents

Name Version Last updated Actions
203.39 KB
Version 1.0 - 02 Nov 2026 PDF - 203.39 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want a Metering Equipment Manager to be able to access and validate my site details, ahead of their arrival on site for planned or emergency metering work, so that I do not experience any delays in work being completed and can have continuity of supply.
  2. As a MEM, I want access to sufficient data for sites where I am not the Appointed MEM, to enable me to complete pre-metering works validations of the site details, so I can undertake these works correctly and safely.
  3. As a MEM, I want access to data for sites where I am not the Appointed MEM, so I can confirm de-appointments and answer invoice validation queries.
Proposed Solution Document
Document title
GES Data Access Matrix for R0074
Upload document
R0074 - REC V3.0 GES Data Access Matrix v1.0.xlsx
Archive
Off
Problem Statement
At go-live for REC v3.0 the ‘Community View’ access to data in the GES, previously available via the DES under the UNC, was inadvertently removed. MEMs used this data in a number of processes, including validation of site details prior to metering works – particularly for emergency work, and the resolution of invoice queries from Suppliers. Without access to this Enquiry Service Data, MEMs are unable to complete activities that are central to their operations, including checking site details prior to attending emergency metering works. This has the potential to have a direct negative impact on the experience of metering works for Consumers, and in in some cases, continuity of supply and safety could be at risk.
Change Proposal Form
R0074 - Change Proposal Plan v1.0
R0074 - Initial Assessment Report v1.0 (Approved)
R0074 - Consultation Responses_NON CONFIDENTIAL
R0074 - Preliminary Change Report v1.0 (Published for Consultation)
R0074 - Final Change Report v2.0 (Post-Vote) 22.02.2023
Company Name
Xoserve
Review status
Review required

Provision of Enduring Test Environments

Date of latest update
Type
Change
ID
R0070
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Currently the REC does not require the Central Switching Service (CSS) and Switching Operator (SO) to provide the enduring test environments and test data for use by REC Parties when making necessary system changes for REC Change Proposals or internal system updates. This Change Proposal has been raised to introduce these obligations in to the REC.
Proposer
Beth Brown
Change Plan

Solution Analysis and Development

Completed

Start:

09 Sep 2022

Due:

06 Jun 2023

Completion:

06 Jun 2023

Service Provider Impact Assessment Period

Completed

Start:

06 Jun 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Service Provider Impact Assessment

Completed

Start:

24 Nov 2023

Due:

03 Jan 2024

Completion:

03 Jan 2024

Party Impact Assessment Issued

Completed

Start:

06 Oct 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Issued

Completed

Start:

03 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Responsible Committee Review

Completed

Start:

16 Jan 2024

Due:

23 Jan 2024

Completion:

23 Jan 2024

Consultation Issued

Completed

Start:

23 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Final Change Report Issued

Completed

Start:

26 Jan 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Responsible Committee Decision

Completed

Start:

23 Feb 2024

Due:

05 Mar 2024

Completion:

05 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. As a CSS User I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues prior to go-live.
  2. As the SO, I want clarity on the obligations placed on me regarding the provision and maintenance of CSS Test Environments and data, so that I can meet my obligations and provide CSS Users and Service Providers with access to appropriate Test Environments.
  3. As a Switching Data Service Provider (SDSP), I want clarity on the obligations placed on me regarding the provision and maintenance of Test Environments and data, so that I can meet my obligations to test CSS changes. As a Switching Data Service Provider (SDSP), I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues and address prior to go-live.
Proposed Solution Document
Document title
R0070 legal text v1.0 - Published with Impact Assessment
Upload document
R0070 legal text v1.0 - Published with Impact Assessment.docx
Archive
Off
Document title
R0070 Legal Text v2.0 - Published with Preliminary Change Report
Upload document
R0070 legal text v2.0.pdf
Archive
Off
Document title
R0070 - Legal Text v3.0 - Approved for Implementation
Upload document
R0070 legal text v3.0.pdf
Archive
Off
Document title
REC Category 3 - Environment Management Plan
Upload document
REC Cat 3 Environment Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Document title
REC Category 3 Test Data Management Plan
Upload document
REC Cat 3 Test Data Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Problem Statement
For specific types of changes, industry system testing will be required to ensure the end-to-end Switching processes will work as expected following implementation. If Test Environments and Test Data are not available, CSS Users will not be able to complete testing to confirm their systems will operate correctly in the live environment. The REC currently doesn’t define specific obligations on Service Providers regarding enduring test systems and Test Data for Switching processes. The lack of specific obligations may impact the availability of appropriate Test Environments. This could impact the progression of improvements to Switching processes that require a technical change.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0070 Initial Assessment Report v1.0 (Approved)
R0070 - Preliminary Change Report (Approved 23.01.2024)
R0070 - Change Proposal Plan v2.0 (Approved)
R0070 - Change Proposal Form
R0070 - Consolidated Impact Assessment Responses
R0070 - Consolidated Consultation Responses
R0070 - Final Change Report V2.0 (Post-Vote) 05.03.2024
Company Name
-
Review status
Review required

Clarification of Supplier of Last Resort Obligations under the REC

Date of latest update
Type
Change
ID
R0057
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2023 - Change Proposal has been withdrawn as agreed with the Proposer. The Problem Statement was addressed through C3-0047 - Updates to PAB Procedures.
Summary
Within Schedule 19 – Market Exit and Supplier of Last Resort there is currently no consideration of circumstances where the Replacement Supplier is unable to fulfil its REC obligations in respect of Consumers transferred to them, due to them having little or no control over the processes of the failed supplier or it’s administrator. This change seeks to define when the Replacement Supplier is responsible for obligations relating to the Consumers gained through a Supplier of Last Resort (SoLR) Process.
Proposer
admin
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer when my Energy Supplier goes out of business and I am transferred to a Replacement Supplier, I want my supply transfer to be handled quickly and have confidence that my new Supplier has all the necessary data to set up my account and bill me correctly from the transfer date, and if the Replacement Supplier fails to provide the expected level of service they will be appropriately held accountable.
  2. As a Replacement Supplier, I want the limitations affecting my ability to meet my REC obligations to be understood by the REC Code Manager and the Performance Assurance Board, so that any breaches of obligations are considered fairly and any limitations are taken into consideration.
  3. As the Code Manager I want to apply appropriate and proportionate Performance Assurance Techniques, taking in to account the ability of a Replacement Supplier to meet their obligations under the REC.
Proposed Solution Document
Document title
R0057 Draft Legal Text
Upload document
R0057 Draft Legal Text.zip
Archive
Off
Problem Statement
Currently, Replacement Suppliers are responsible for all obligations of the failed supplier from the date and time set out in the Last Resort Supply Direction, this includes a period of time prior to Consumer accounts transferring to the Replacement Supplier’s systems, limiting their ability to fulfil these obligations. This means that a Replacement Supplier may experience issues with the Performance Assurance obligations for which they are responsible, but do not have direct control over. Any breaches of obligations by a Replacement Supplier need to be considered fairly and any limitations the Replacement Supplier may face are taken into consideration.
Stages Selection
R0057 - Change Proposal Form
R0057 - Solution Options
R0057 - Consolidated Impact Assessment Responses
R0057 - Change Proposal Plan v1.0
R0057 - Initial Assessment Report v1.0 (Approved)
R0057 - Preliminary Change Report V1.0 (Approved)
Company Name
EDF
Review status
Review required

24/7 Emergency Metering Service

Date of latest update
Type
Change
ID
R0053
Change Category
Priority
Urgent
No
Latest Update
01/05/25 - Proposal withdrawn at proposers request.
Summary
This change has been raised to address the issue that Suppliers currently are not required to provide a 24/7 emergency metering service that enables a Consumer to speak to an agent and/or receive a visit from a field operative outside normal business hours when faced with power loss situation relating to a metering issue. This Change Proposal has been raised to assess and consider the options to address this issue.
Proposer
Bryan Heap
Change Plan

Solution Analysis and Development

In Progress

Start:

17 Jun 2022

Due:

26 May 2023

Completion:

Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my metering fault to be identified and fixed as soon as possible, so that I am not left in a situation where I have no electricity for an extended period. I want to be able to contact the correct Party to fix my metering fault. I want my personal circumstances to be taken in to account when arranging for a fault to be fixed out of standard working hours.
  2. As a DNO, where there is a meter fault identified I want to be able to contact the Energy Supplier to rectify this, no matter what day or time this is identified, so that Consumers are not left without power for extended periods, during which time they may require ongoing help, support and communication. As an Energy Supplier, I want to provide my Customers with accurate and relevant Emergency contact information. As an Energy Supplier, I want to be able to respond to meter faults in a timely manner and not leave Consumers without power for an extended period.
  3. As a MEM, I want to be notified, in a timely manner, of faults that occur on Metering assets I am responsible for, so that I am able to rectify these without undue detriment being experienced by Consumers
Problem Statement
In situations where an Electricity Consumer experiences a loss of power, the DNOs who attend site to investigate and resolve the issues, are unable to do so when there is a meter issue, which is the responsibility of the Energy Supplier and it’s Appointed agents. When an issue occurs out of hours, or when an Energy Supplier does not have an out of hours metering service in operation, Consumers can be left without power for an extended period, this can create a safety or health concern, particularly for vulnerable Consumers or vulnerable members of their household.
Stages Selection
R0053 - Downloadable Change Proposal Form
R0053 - Change Proposal Plan v1.0 (pre-approval) 27/02/2023
R0053 - Initial Assessment Report v1.1 (Pre-Approval) 06.03.23
R0053 - Initial Assessment Report v2.0 (Approved) 07.03.2023
R0053 - Change Proposal Plan v2.0 (Approved) 07.03.2023
Company Name
Electricity North West Limited
Review status
Review required

Switch Request Objections (Change of Occupier)

Date of latest update
Type
Change
ID
R0051
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/01/2024 - Withdrawn following adoption window closure.
Summary
This Change Proposal looks to clarity obligations regarding the losing suppliers' rights to object and the circumstances surrounding registrations by gaining suppliers, following the migration from the MRA to the REC.
Proposer
admin
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
R0051 - Downloadable CP form
Company Name
Business Energy Direct
Review status
Review required

Clarification of REC Maintenance of Qualification Schedule

Date of latest update
Type
Change
ID
R0050
Urgent
No
Latest Update
Change withdrawn following agreement to combine with R0059
Summary
-
Proposer
Bryan Heap
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0050 - Downloadable Change Proposal form
Company Name
-
Review status
Review required

MHHS Programme Changes required to Central Switching Service

Date of latest update
Type
Change
ID
R0044
Change Category
Other Industry Codes impacted
Urgent
Yes
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
This change has been raised by the Market-wide Half-Hourly Settlement (MHHS) Programme to implement the necessary Retail Energy Code (REC) changes in relation to a new Data Communications Company User Role for the Meter Data Retrieval service (MDR). The new role required by the MHHS Target Operating Model will be established by the Smart Energy Code Modification Proposal, SEC MP162. This REC change will provide the new system interfaces required for sharing the MDR’s Registration Data.
Proposer
Jason Brogden
Change Plan

Analysis and Requirements Gathering started

Completed

Start:

29 Apr 2022

Due:

05 May 2022

Completion:

05 May 2022

Present Updated Change Proposal Plan to REC Change Panel

Completed

Start:

05 May 2022

Due:

21 Jun 2022

Completion:

21 Jun 2022

Service Provider Impact Assessment initiated

Completed

Start:

21 Jun 2022

Due:

11 Jul 2022

Completion:

05 Jul 2022

Service Provider Impact Assessment completed

Completed

Start:

11 Jul 2022

Due:

15 Aug 2022

Completion:

10 Aug 2022

Present extended Change Proposal Plan to Change Panel

Completed

Start:

15 Aug 2022

Due:

06 Sep 2022

Completion:

06 Sep 2022

Requirement refinement and validation of Detailed Impact Assessment

Completed

Start:

06 Sep 2022

Due:

27 Sep 2022

Completion:

27 Sep 2022

Provide extended Change Proposal Plan to Change Panel

Completed

Start:

28 Oct 2022

Due:

31 Oct 2022

Completion:

25 Oct 2022

Preliminary Change Report Issued

Completed

Start:

27 Sep 2022

Due:

28 Oct 2022

Completion:

27 Oct 2022

Responsible Committee Review of the Preliminary Change Report

Completed

Start:

31 Oct 2022

Due:

01 Nov 2022

Completion:

01 Nov 2022

Consultation started

Completed

Start:

01 Nov 2022

Due:

04 Nov 2022

Completion:

03 Nov 2022

Consultation ended

Completed

Start:

04 Nov 2022

Due:

25 Nov 2022

Completion:

25 Nov 2022

Final Change Report issued

Completed

Start:

25 Nov 2022

Due:

09 Dec 2022

Completion:

09 Dec 2022

Responsible Committee ex-committee decision

Completed

Start:

09 Dec 2022

Due:

13 Dec 2022

Completion:

13 Dec 2022

Authority Determination

Completed

Start:

13 Dec 2022

Due:

02 Feb 2023

Completion:

02 Feb 2023
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.0.0_Superseded
Included changes Affected REC Items
R0044 MHHS Programme Changes required to Central Switching Service
  • Schedule 1 - Interpretations and Definitions
  • Schedule 27 - RMP Lifecycle
R0173 Improvements to the Theft Detection Incentive Scheme (TDIS)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction
R0209 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0222 ESME ID Update Rejections
R0223 Reconciliation of Unallocatable Transactions Review
  • Schedule 11 - Prepayment Arrangements
R0241 MHHS Incremental Changes for go live
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0259 Update to R0173 Implementation Date
R0264 Data Specification Housekeeping
R0083 Changes to Supply Number Format for MHHS
R0097 Consequential Change for CSS Smart Meter Data Retriever Appointments
  • Data Item Catalogue
  • Market Message Catalogue
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the SMDSP, I want to be able to validate that an SMDR is registered so that I can provide them with access to the Metering Points to which they are registered.
  2. As a SMDR, I want to be able to access the Metering Points I am registered to so that I can collect settlement data from those meters
  3. As the CSS Provider, I want the CSS to be able to receive notifications from the Registration Service on the appointment/de-appointment of an SMDR so that I can send the appointment data to the SMDSP. As the CSS Provider, I want the CSS to be able to provide SMDR appointment data to the SMDSP.
Proposed Solution Document
Document title
R0044 - Draft Legal Text
Upload document
R0044 Draft Legal Text.zip
Archive
Off
Document title
R0044 Final Legal Text (Post Consultation)
Upload document
R0044 Final Legal Text.zip
Archive
Off
Document title
Consultation page
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The MHHS Target Operating Model requires that the appointment data of the Smart Meter Data Retriever (SMDR) is available to the Smart Meter Data Service Provider (SMDSP), so that the SMDSP can provide SMDRs with access to the Smart Meters at Metering Points they are registered to. Currently the new SMDR role and appointment data do not exist in, nor can they be made available from, CSS as this is a new industry operating model.
SME
SME Role
Lead Technical Analyst
Workgroup
Workgroup(s)
R0044 - Change Proposal form v1.0
MHHSP-BP003A-CSSandDCC Update - v3.0
R0044 Change Proposal Plan v5.0 (Approved)
R0044 Initial Assessment Report v1.0 (Approved)
R0044 - Preliminary Change Report v1.0 (Approved)
R0044 - Consolidated Consultation Responses v1.0
R0044 - Final Change Report v2.0 (Post-Vote)
R0044 - Ofgem Decision
Company Name
MHHS Programme
Review status
Review required

REC V3.0

Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Alasdair MacMillan
Change Plan

Legal text baselined

Completed

Start:

10 Apr 2022

Due:

13 May 2022

Completion:

13 May 2022

Final Change Report Issued

Completed

Start:

13 May 2022

Due:

20 May 2022

Completion:

20 May 2022

Responsible Committee Decision

Completed

Start:

20 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Authority Determination (Original)

Completed

Start:

07 Jun 2022

Due:

20 Jun 2022

Completion:

17 Jun 2022

Authority Determination (revoked and re-issued)

Completed

Start:

20 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.0.0_Superseded
Included changes Affected REC Items
R0038 Performance Assurance Report Catalogue Changes as a consequence of REC V3.0
R0041 REC V3.0
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 5 - Change Management
  • Schedule 27 - RMP Lifecycle
  • ASPCoP (since removed)
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0042 Performance Assurance Board Terms of Reference
  • Performance Assurance Board - Terms of Reference
R0045 Changes to SDEP Messages and Schedule numbering for REC V3.0
  • Market Message Catalogue

Documents

Name Version Last updated Actions
258.97 KB
Version 1.0 - 02 Nov 2026 PDF - 258.97 KB
1.0 02 Nov 2026
257.76 KB
Version 1.0 - 02 Nov 2026 DOCX - 257.76 KB
1.0 02 Nov 2026
219.4 KB
Version 1.0 - 16 Nov 2026 PDF - 219.4 KB
1.0 16 Nov 2026
1.65 MB
Version 1.0 - 02 Nov 2026 PPTX - 1.65 MB
1.0 02 Nov 2026
6.74 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.74 MB
1.0 02 Nov 2026
9.01 MB
Version 1.0 - 02 Nov 2026 PPTX - 9.01 MB
1.0 02 Nov 2026
3.89 MB
Version 1.0 - 02 Nov 2026 PPTX - 3.89 MB
1.0 02 Nov 2026
1.0 02 Nov 2026
16.78 KB
Version 1.0 - 02 Nov 2026 XLSX - 16.78 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
  2. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
  3. As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
  4. As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Upload document
R0041 Legal Text.zip
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required