Erroneous Switch Review: I0237 Clarifications
Date of latest update
Type
Change
ID
R0322
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 03 November 2026, the Change Panel, in line with Code Manager recommendation, voted to approve this Change Proposal. The appeal window is now open until 23:59 on 18 November.
Summary
The I0237 working group has carried out an end-to-end review of the Erroneous Switch process. The working group highlighted housekeeping changes and clarifications within Schedule 30 and the Market Messages.
Status
Implementation Date
26 February 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0292 | Obligate Energy Suppliers to provide photo evidence of Theft in Conveyance to Network Parties | |
| R0322 | Erroneous Switch Review: I0237 Clarifications | |
| R0324 | Use of REL Data to Support Key Regulations |
|
| R0339 | REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0
Upload document
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0.zip
Archive
Off
Document title
R0322 Legal Drafting V1.2
Upload document
R0322 - Legal Drafting.zip
Archive
Off
Problem Statement
The current Erroneous Switch drafting contains inconsistencies that can cause confusion and misunderstanding between Energy Suppliers regarding the applicable governance and process requirements, creating ambiguity around the correct contractual and operational framework. In addition, the I0237 Working Group has identified further required amendments to Schedule 30, highlighting that the existing drafting does not fully or accurately reflect intended process arrangements or correct terminology.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0322 submission form
R0322 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0322 Consolidated IA Responses
R0322 Change Report (For Consultation)
R0322 Consolidated Consultation Responses
R0322 Change Report (Final Recommendation) Approved
Company Name
REC Code Manager
Review status
Review required
DNOs Create Export MPANs after approving G98/99 commissioning documents
Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/11/2026 On 20 October 2026, the REC Change Panel voted, in line with the Code Manager's recommendation, to approve this Change Proposal. The appeal window is now closed. R0321 will be implemented on 25 June 2027.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
05 May 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
07 May 2026Change Report (For Consultation) and Update to Plan approved at Change Panel
Completed
Start:
Due:
Completion:
17 Aug 2026Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Sep 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
20 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
25 June 2027
| Included changes | Affected REC Items | |
|---|---|---|
| R0122 | SDEP Review Improvements (2) - Usability | |
| R0178 | Improvements to CSS Business Process Logic | |
| R0284 | Updates to Schedule 14 Measurement Transformers Commissioning Timescales |
|
| R0321 | DNOs Create Export MPANs after approving G98/99 commissioning documents |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Upload document
RMP Lifecycle draft for export MPANs - 21 November 2025(118301312) (1).docx
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Upload document
RMP Lifecycle draft for export MPANs - for consultation.docx
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
R0321 Consolidated consultation responses - NON CONFIDENTIAL
R0321 Change Report (Final Recommendation) V1.0 Approved 20.10.26
Company Name
British Gas
Review status
Review required
Housekeeping June 2026
Date of latest update
Type
Change
ID
R0320
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The Code Manager has identified a number of non-material clarifications, typographical errors and changes needed to REC products.
Impacted REC Documents
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
June 2026 Housekeeping Summary V1.0
Upload document
June 2026 Housekeeping Summary.xlsx
Archive
Off
Document title
June 2026 Housekeeping legal text (zip file)
Upload document
June 2026 Housekeeping legal text v2.0.zip
Archive
Off
Document title
June 2026 Housekeeping Summary V2.0
Upload document
June 2026 Housekeeping Summary (1).xlsx
Archive
Off
Document title
June 2026 Housekeeping legal text v3.0
Upload document
June 2026 Housekeeping legal text v3.0.zip
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC.
Stages Selection
R0320 Housekeeping Change Report v1.1
Company Name
REC Code Manager
Review status
Review required
Clarification of in-year amendments to the CRS budget
Date of latest update
Type
Change
ID
R0319
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Clause 9 of the REC currently sets out that any amendments to the approved CRS budget for each Financial Year may only be amended through a REC Change Proposal. The intention of this Clause was to ensure that any additional funding required by the CRS Provider, outside of the approved budget cycle, was subject to appropriate scrutiny, consultation and approval under REC governance. This was not intended to apply to a scenario where the CRS Provider expects to significantly underspend against the approved budget.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
07 Apr 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
19 May 2026Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0319 Legal Text For Consultation
Upload document
R0319 - Draft - REC Main Body_For Consultation.docx
Archive
Off
Document title
R0319 Legal Text For Final Recommendation
Upload document
R0319 Legal Text for Final Recommendation v1.1 (1).docx
Archive
Off
Problem Statement
This Change Proposal seeks to amend clause 9 of the REC Main Body to not require a Change Proposal to be raised to facilitate an in-year reduction to the CRS budget.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0319 submission form
R0316 Change Report (Proposal Plan and Consultation) v1.1 Approved 07.04.26
R0319 - Consolidated Consultation Responses v1.0
R0319 Change Report (Final Recommendation) v1.1 Pre-Approval
R0319 Change Report (Final Recommendation) v1.0 Approved 190526
Company Name
RECCo
Review status
Review required
Introduction of Consumer Consent Service
Date of latest update
Type
Change
ID
R0318
Date of next activity
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
18/11/2026 - The Issue was progressed to Change Proposal on 17 November 2026. Following industry consultation on the REC drafting a number of refinements to the CCS design and drafting are being made. On progression to Change Proposal and Modification, the title has been updated to Introduction of Consumer Consent Service (not Solution) to reflect the new service that will be introduced.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Change Plan
Proposal Plan (Approved)
Completed
Start:
02 Apr 2026Due:
02 Apr 2026Completion:
02 Apr 2026Update to Plan (Approved)
Completed
Start:
30 Sep 2026Due:
30 Sep 2026Completion:
30 Sep 2026Definition
Completed
Start:
02 Apr 2026Due:
17 Nov 2026Completion:
17 Nov 2026Business Case Assessment
In Progress
Start:
18 Nov 2026Due:
18 Dec 2026Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Proposal Re-Plan v2.0 APPROVED 30.09.2026.
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
Retail Energy Code Company Ltd
Review status
Review required
Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification
Date of latest update
Type
Change
ID
R0316
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The definition of certain data items within the PML schedule is currently ambiguous and open to misinterpretation by Suppliers, which may result in inconsistent data submissions and a consequential variation in the allocation of scheme debits and credits.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
03 Mar 2026Final Recommendation approved at Change Panel
Completed
Start:
Due:
Completion:
06 Apr 2026Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0316 Legal Text For Consultation
Upload document
REC Schedule 1 - For Consultation v1.1.zip
Archive
Off
Document title
CODE_YYYYMM[_x]
Upload document
Submission template.csv
Archive
Off
Problem Statement
There is a lack of clarity in REC Schedule 31 – Payment Method Levelisation Reconciliation around the definition of Primary Meter Points, which has led to inconsistent data submission and consequential variation in the allocation of PML scheme debits and credits.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0316 submission form
R0316 Guidance for Suppliers
R0316 Change Report (Proposal Plan and Consultation)
R0316 Consolidated Consultation Responses V1.0 (26.03.2026)
R0316 Change Report (Final Recommendation) v1.0 Approved 07.04.2026
R0316 Authority Decision
Company Name
RECCo
Review status
Review required
Crossed Meters Process: Clarifications and Support
Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel approved an Extension to Plan for I0314 via ex-committee.
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
I0314 Extension to Plan V1.0 (Approved) 30.10.26
Company Name
REC Code Manager
Review status
Review required
Erroneous Switch Review: Amendments to Clause 4.5
Date of latest update
Type
Change
ID
R0313
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/10/2026 REC Change Panel voted to approve the Extension to Plan for R0313 via an ex-committee decision.
Summary
Schedule 30, Section B, Clause 4.5 currently permits Energy Suppliers to raise an Erroneous Switch (ES) within 24 months of the suspected ES taking place. However, analysis from the I0237 Erroneous Switch Review shows that 98% of ESs are raised within the first 12 months.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- Amend Schedule 30 – Resolution of Consumer Facing Switching and Billing Issues, Section B, Clause 4.5 to reduce the timeframe to 12 months and ensure Consumer contact is made in a reasonable timescales.
Problem Statement
The existing 24‑month allowance no longer reflects operational practice and maintains an unnecessarily long resolution period that adds complexity and increases the potential for data quality issues, Consumer confusion, and prolonged operational uncertainty. When the original 24‑month time limit was introduced (prior to REC Go‑Live), it was expected that this would later be reduced to 12 months soon after implementation. However, this subsequent reduction did not take place.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
R0313 submission form
R0313 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0313 - Change Report (Extension to Plan) V1.0 Approved 27.08.2026
R0313 - Change Report (Update to Plan) V1.0 (Approved)
Company Name
REC Code Manager
Review status
Review required
In-year CRS budget amendment
Date of latest update
Type
Change
ID
R0309
Change Path
Urgent
No
Latest Update
17/02/2026 - Change Panel approved this Change Proposal for implementation with immediate effect.
Summary
DCC has identified that the CRS budget for the current Financial Year (2025-2026) can be reduced, and as per the Code, a REC Change Proposal must be raised for the agreed budget to be amended.
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
R0309 submission form
R0309 Change Report (Final Recommendation) approved 17.02.26
Company Name
Smart DCC
Review status
Review required
Update CCSG ToRs to include cross-code prioritisation as per Code Reform
Date of latest update
Type
Change
ID
R0308
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
As part of the Ofgem Code Reform which looks to standardise how changes and modifications are prioritised across all Codes, there is confirmation that for cross-code changes the prioritisation will be set by the Lead Code with all non-lead Codes using the same prioritisation.
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
CCSG - Terms of Reference - Legal Text R0308
Upload document
CCSG - Terms of Reference updated formating.pdf
Archive
Off
Problem Statement
Failing to update the CCSG Terms of Reference could result in unintentional ambiguity and leave no place within any Code to record the requirement for all codes to align with the prioritisation of the lead code.
Stages Selection
I0308 submission form
Consolidated Consultation Responses
Company Name
REC Code Manager
Review status
Review required