Formalising the Submission of PPMIP Unallocated Transaction Report (UTR) Files

Date of latest update
Type
Change
ID
R0082
Change Category
Change Path
Priority
Urgent
No
Latest Update
09/04/2024 - Due to the MHHS impact on Service Providers, the technical code freeze and any MHHS impacts on the proposed solution, the Code Manager has reconsidered the priority of R0082 and believes that should be progressed following MHHS go-live. This Change Proposal has been withdrawn, and the Code Manager will consider raising a new change at the appropriate time following MHHS with consideration of the Codes Roadmap.
Summary
This CP seeks to address the following issues regarding the Unallocated Transaction Report (UTR) files provided by PPMIPs to the Code Manager each month: 1. There is no REC requirement for PPMIPs to submit a monthly file to the Code Manager 2. PPMIPs are currently submitting files in two different file formats 3. C&C is only able to load one of the two file formats The CP has been raised to introduce a requirement in the REC for PPMIPs to provide monthly Unallocated Transaction Report (UTR) files to the Code Manager in a single file format, set out in the REC Data Specification. With this format being one that can be loaded by C&C.
Proposer
Rosalind Timperley
Change Plan

Solution analysis and development

Completed

Start:

28 Nov 2022

Due:

12 Jan 2024

Completion:

11 Jan 2024

Service Provider Impact Assessment start date

Completed

Start:

12 Jan 2024

Due:

15 Jan 2024

Completion:

15 Jan 2024

Service Provider Impact Assessment close

Completed

Start:

15 Jan 2024

Due:

11 Mar 2024

Completion:

11 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a PPMIP, I want to have clear guidance on how and when I should submit my Unallocated Transaction Report files.
  2. As a Supplier, I want to receive accurate Unallocated Transactions in relation to prepayment meters that are not smart meters.
  3. As the Code Manager, I want visibility of the Unallocated Transaction Report.
  4. As the EES Provider, I want to be able to efficiently upload the Unallocated Transaction Reports.
Problem Statement
PPMIPs aren’t submitting UTR files in the same format, and one of these formats cannot be loaded by the EES Provider. There is also no obligation in the REC for these reports to be provided.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0082 - Change Proposal Form
R0082 - Change Proposal Plan (Approved) 17.10.2023
R0082 Initial Assessment Report (Approved) 17.10.2023
Company Name
REC Code Manager
Review status
Review required

Introduction of a Housekeeping Change Proposal Process

Date of latest update
Type
Change
ID
R0073
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented 01 April 2023
Summary
Introduction of a proportionate change process for the implementation of housekeeping changes to the REC. This change will also implemented other non-material housekeeping changes to Schedule 5 - Change Management. These are being progressed alongside the introduction of a housekeeping change process to enable an efficient delivery.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report

Completed

Start:

27 Sep 2022

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Consultation Start (due to end 10/02/23)

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

10 Feb 2023

Final Change Report

Completed

Start:

27 Jan 2023

Due:

28 Feb 2023

Completion:

24 Feb 2023

Responsible Committee Decision

Completed

Start:

28 Feb 2023

Due:

07 Mar 2023

Completion:

07 Mar 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As the Code Manager I want to be able to progress change to the REC in the most efficient way possible. Where minor, non-material changes are needed to correct typographical or consistency errors, or to update out of date reference, I want a simpler and more accelerated change process to manage these housekeeping activities.
  2. As a REC Party, I want the Code Manager to use a more efficient process for housekeeping changes, that reduces the burden of managing industry changes through the standard change process.
  3. As RECCo I want the Code Manager to use the most efficient and simplest process to manage housekeeping changes in order to free up Code Manager resources to progress higher priority changes.
Proposed Solution Document
Document title
R0073 - Final Legal Text v1.0 24.02.23
Upload document
R0073 - Final Legal Text 24.02.23 - v1.0.zip
Archive
Off
Document title
Draft Legal Text Schedules 1 and 5 Changes V1.0
Upload document
R0073 - Draft Legal Text Schedule 5 Change Management- GWLG - v1.0.zip
Archive
Off
Document title
R0073 - Process Flow diagram
Upload document
R0073 - Housekeeping Change Proposal Process v1.0.pdf
Archive
Off
Problem Statement
Typographical errors, formatting, and consistency errors (such as Paragraph numbering), out-of-date references to documents and updating addresses (including email) all have to go through the standard change process. In these cases, the changes are not material and do not need a solution to be developed nor do they need to demonstrate that they meet a business case and could therefore be progressed more quickly.
Housekeeping Change Process Document v1.0
R0073- Housekeeping Change Proposal Process Change Form
R0073 - Change Proposal Plan R0073 v1.0 (Approved)
R0073 Initial Assessment Report v1.0 (Approved)
R0073 - Consolidated Consultation Responses v1.0 24.02.23
R0073 - Preliminary Change Report - v1.0 (Published for consultation) - 27/01/2023
R0073 - Final Change Report V2.0 (Post Vote) - 09/03/2023
Company Name
REC Code Manager
Review status
Review required

DCC access to EES and GES

Date of latest update
Type
Change
ID
R0071
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2023 - R0071 is approved by Change Panel for implementation in February release.
Summary
This Change seeks to create a new User Category in REC Schedule 12 – Data Access, to allow the Switching Service Desk to access the Gas and Electricity Enquiry Services (GES and EES). This would result in more expeditious Service Desk ticket resolution and a positive indirect impact on consumer outcomes.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

25 Sep 2022

Due:

21 Sep 2023

Completion:

Preliminary Change Report Issued

Completed

Start:

21 Sep 2023

Due:

06 Oct 2023

Completion:

Responsible Committee Review

Completed

Start:

06 Oct 2023

Due:

17 Oct 2023

Completion:

17 Oct 2023

Consultation Issued

Completed

Start:

17 Oct 2023

Due:

20 Oct 2023

Completion:

20 Oct 2023

Final Change Report Issued

Completed

Start:

20 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Responsible Committee Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.8.0
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 26 - Switching Service Management
R0156 Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification
R0071 DCC access to EES and GES
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)

Documents

Name Version Last updated Actions
176.62 KB
Version 1.0 - 02 Nov 2026 PDF - 176.62 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be handled appropriately, so that I can have a consistent and faultless switching experience.
  2. As the Switching Service Desk, I want to be able to access market data that lets me resolve tickets first time, so that I can provide a more efficient service to users. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible. As the EES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0071 Proposed Legal Text
Upload document
R0071 Legal Text - Gas Data Access Matrix v3.2.2 - Published with FCR - 10.11.23.zip
Archive
Off
Problem Statement
The Switching Service Desk generates and resolves tickets relating to Switching Incidents and Switching Data queries for Market Participants. GES and EES data is currently unavailable to the Switching Service Desk and access would allow them to resolve tickets more effectively, resulting in a more efficient service and better SLA performance.
SME
SME Role
Lead Technical Analyst
R0071 - Change Proposal Form
R0071 Change Proposal Plan v2.0 (Approved) - 05.09.2023
R0071 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0071 Preliminary Change Report v1.0 (Approved) - 17.10.23
R0071 Consolidated Consultation Responses v1.0 - 10.11.23
R0071 Final Change Report V1.0 (Post-Vote) 21.11.23
Company Name
-
Review status
Review required

Provision of Enduring Test Environments

Date of latest update
Type
Change
ID
R0070
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Currently the REC does not require the Central Switching Service (CSS) and Switching Operator (SO) to provide the enduring test environments and test data for use by REC Parties when making necessary system changes for REC Change Proposals or internal system updates. This Change Proposal has been raised to introduce these obligations in to the REC.
Proposer
Beth Brown
Change Plan

Solution Analysis and Development

Completed

Start:

09 Sep 2022

Due:

06 Jun 2023

Completion:

06 Jun 2023

Service Provider Impact Assessment Period

Completed

Start:

06 Jun 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Service Provider Impact Assessment

Completed

Start:

24 Nov 2023

Due:

03 Jan 2024

Completion:

03 Jan 2024

Party Impact Assessment Issued

Completed

Start:

06 Oct 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Issued

Completed

Start:

03 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Responsible Committee Review

Completed

Start:

16 Jan 2024

Due:

23 Jan 2024

Completion:

23 Jan 2024

Consultation Issued

Completed

Start:

23 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Final Change Report Issued

Completed

Start:

26 Jan 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Responsible Committee Decision

Completed

Start:

23 Feb 2024

Due:

05 Mar 2024

Completion:

05 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. As a CSS User I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues prior to go-live.
  2. As the SO, I want clarity on the obligations placed on me regarding the provision and maintenance of CSS Test Environments and data, so that I can meet my obligations and provide CSS Users and Service Providers with access to appropriate Test Environments.
  3. As a Switching Data Service Provider (SDSP), I want clarity on the obligations placed on me regarding the provision and maintenance of Test Environments and data, so that I can meet my obligations to test CSS changes. As a Switching Data Service Provider (SDSP), I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues and address prior to go-live.
Proposed Solution Document
Document title
R0070 legal text v1.0 - Published with Impact Assessment
Upload document
R0070 legal text v1.0 - Published with Impact Assessment.docx
Archive
Off
Document title
R0070 Legal Text v2.0 - Published with Preliminary Change Report
Upload document
R0070 legal text v2.0.pdf
Archive
Off
Document title
R0070 - Legal Text v3.0 - Approved for Implementation
Upload document
R0070 legal text v3.0.pdf
Archive
Off
Document title
REC Category 3 - Environment Management Plan
Upload document
REC Cat 3 Environment Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Document title
REC Category 3 Test Data Management Plan
Upload document
REC Cat 3 Test Data Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Problem Statement
For specific types of changes, industry system testing will be required to ensure the end-to-end Switching processes will work as expected following implementation. If Test Environments and Test Data are not available, CSS Users will not be able to complete testing to confirm their systems will operate correctly in the live environment. The REC currently doesn’t define specific obligations on Service Providers regarding enduring test systems and Test Data for Switching processes. The lack of specific obligations may impact the availability of appropriate Test Environments. This could impact the progression of improvements to Switching processes that require a technical change.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0070 Initial Assessment Report v1.0 (Approved)
R0070 - Preliminary Change Report (Approved 23.01.2024)
R0070 - Change Proposal Plan v2.0 (Approved)
R0070 - Change Proposal Form
R0070 - Consolidated Impact Assessment Responses
R0070 - Consolidated Consultation Responses
R0070 - Final Change Report V2.0 (Post-Vote) 05.03.2024
Company Name
-
Review status
Review required

REC Data Protection Changes

Date of latest update
Type
Change
ID
R0068
Change Category
Change Path
Priority
Urgent
No
Latest Update
19/03/2024 - Following further analysis and engagement with the REC Change Panel at its meeting on 19 March 2024, the Code Manager has revisited its consideration of this Change Proposal. Despite earlier acceptance of the Change Proposal, the Code Manager, and the Change Panel, believes that the proposal has no reasonable prospect of being approved in its current format, and have determined that the Change Proposal should not progress any further. Consequently, Change Proposal R0068 has been rejected. The Code Manager has offered their assistance to the proposer should they need any support in raising a new Change Proposal to resolve any remaining issues.
Summary
A number of additional data protection related changes were identified during the progression of Change Proposal R0046A ‘Governance of Data under the REC (Alternative)’. The intent of this Proposal is to collate all remaining proposed changes, to assess and progress them independently of R0046A, to allow for more thorough industry consultation and with longer lead-times to implementation.
Proposer
Bradley Baker
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Stages Selection
CP Form.pdf
Company Name
DCC
Review status
Review required

Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)

Date of latest update
Type
Change
ID
R0066
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Change Proposal is a consequential change, to display new Balancing and Settlement Code (BSC) owned Data Items in the Electricity Enquiry Service (EES). These Data Items support the introduction of Registration Service Data Items that will be needed before Market-wide Half Hourly Settlement (MHHS) migration commences.
Proposer
Gemma Dixon
Change Plan

Solution Refinement

Completed

Start:

24 Aug 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Service Provider Impact Assessment

Completed

Start:

23 Sep 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Party Impact Assessment

Completed

Start:

23 Sep 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Preliminary Change Report Issued

Completed

Start:

23 Sep 2022

Due:

04 Nov 2022

Completion:

04 Nov 2022

Consultation Issued

Completed

Start:

04 Nov 2022

Due:

04 Nov 2022

Completion:

04 Nov 2022

Final Change Report Issued

Completed

Start:

04 Nov 2022

Due:

09 Dec 2022

Completion:

09 Dec 2022

Responsible Committee Decision

Completed

Start:

09 Dec 2022

Due:

20 Dec 2022

Completion:

20 Dec 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an impacted Market Participant, I want to ensure good quality underlying data is available to support the transition to HH Settlements to avoid additional time and effort being spent fixing data quality issues during the migration period.
  2. As the MHHS Programme, I want Registration Service Data Items to be available ahead of the MHHS migration to enable data cleanse activity to be completed to address data quality issues.
Proposed Solution Document
Document title
R0066 Solution Documents
Upload document
R0066 - Solution.zip
Archive
Off
Problem Statement
There are Registration Service Data Items that are critical to the MHHS rules and processes. These need to be introduced into the existing Supplier Meter Registration Service (SMRS) system and also displayed in EES prior to the transition to Half Hourly (HH) Settlement, to facilitate MHHS Programme data cleanse activity.
SME
SME Role
Lead Technical Analyst
Change Proposal Form.pdf
R0066 Change Proposal Plan v1.0 (Approved)
R0066 Initial Assessment Report V1.0 (Approved)
R0066 Consolidated Impact Assessment responses
R0066 Preliminary Change Report v1.0
R0066 Consolidated Consultation Responses
R0066 - Final Change Report v2.0 (Post Vote)
Company Name
REC Code Manager
Review status
Review required

Creating a Meter Operator Agent and MOCoP Installer

Date of latest update
Type
Change
ID
R0064
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change Proposal seeks to clarify the obligations of each type of metering provider by reintroducing the distinction between Meter Operator Agents and MOCOPA Meter Installers which was removed by Retail Code Consolidation. At Retail Code Consolidation these organisations were merged into a new category, Metering Equipment Managers, which also included gas metering providers. Whilst both types of organisation can provide metering services, not all MEM obligations in the REC apply to both organisations.
Proposer
Anton Moden
Change Plan

Solution analysis and development

Completed

Start:

22 Aug 2022

Due:

14 Jul 2023

Completion:

13 Jul 2023

Service Impact assessment commenced

Completed

Start:

14 Jul 2023

Due:

14 Jul 2023

Completion:

14 Jul 2023

Impact Assessment Period Ended

Completed

Start:

09 Oct 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023

Preliminary Change Report issued

Completed

Start:

03 Nov 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Consultation issued

Completed

Start:

24 Nov 2023

Due:

07 Dec 2023

Completion:

07 Dec 2023

Final Change report issued

Completed

Start:

07 Dec 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024

REC Change Panel decision

Completed

Start:

26 Jan 2024

Due:

06 Feb 2024

Completion:

06 Feb 2024

Appeal Window closed

Completed

Start:

06 Feb 2024

Due:

20 Feb 2024

Completion:

20 Feb 2024

Draft Legal Text Changes (Including Legal Review)

Completed

Start:

11 Aug 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Service Provider Impact Assessment Completed

Completed

Start:

14 Jul 2023

Due:

11 Aug 2023

Completion:

11 Aug 2023

Impact Assessment Period Started

Completed

Start:

15 Sep 2023

Due:

09 Oct 2023

Completion:

06 Oct 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an electricity MEM, I want to be clear on the obligations I need to meet, based on the type of metering activity I complete. I want to meet my obligations efficiently and effectively and without the need to seek additional input/advice from the Code Manager.
  2. As the Code Manager, I want to be able to differentiate between electricity MEMs based on the type of activity they are responsible for and their interaction with central systems, so that I can engage appropriately. I need to be clear on the obligations that each MEM should be meeting and the performance reporting that should be provided.
Proposed Solution Document
Document title
R0064 - DRAFT legal text 24.11.2023
Upload document
R0064 - Draft Legal Text for Consultation.zip
Archive
Off
Document title
R0064 - Roles Version F for Impact Assessment 4.10.2023
Upload document
R0064 - Roles Version F for Impact Assessment 4.10.2023 (2).pptx
Archive
Off
Problem Statement
The REC currently groups all electricity metering providers within the MEM category. Previously, under the Master Registration Agreement (MRA) they were either classified as Meter Operator Agent or MOCOPA Meter Installers. Not all MEM obligations in the REC are intended to apply to both types of organisations. This can result in ambiguity on the obligations set out in the REC that need to be met by the different types of electricity MEM, not being able to target information to REC Parties appropriately and MEMs not being clear on their new entrant or Maintenance of Qualification obligations.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0064 - Change Proposal Form
R0064 - Change Proposal Plan v1.0 (Approved)
R0064 - Initial Assessment Report v1.0 (Approved)
R0064 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0064 - Change Proposal Plan v3.0 (Approved) 23.6.2023
R0064 - Change Proposal Plan v4.0 (Approved) 14.8.2023
R0064 - Change Proposal Plan v5.0 (Approved) 14.09.2023
R0064 - Change Proposal Plan v6.0 (Approved) 10.11.2023
Consolidated Impact Assessment Responses 29.11.2023
R0064 - Preliminary Change Report - V1.1 (Approved) 05.12.2023
R0064 - Consolidated Consultation Responses
R0064 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required

Removal of ERDA meteringPointEnergyFlow change restriction

Date of latest update
Type
Change
ID
R0062
Change Category
Change Path
Priority
Urgent
No
Latest Update
This change was implemented on 12 April 2024. *This change is expected to have a direct impact on the Market-wide Half Hourly Settlement Design for it to be maintained in the enduring arrangements. The change has been approved as it has value for the interim period.*
Summary
As part of the Faster Switching Programme Enactment Phase change CR-E37, a restriction was applied to Electricity Retail Data Agents (ERDAs) to prevent multiple changes being made to the RMP. Any errors can be rectified once in the lifetime of an RMP, back to the creation of the RMP. This change has been raised to allow ERDAs to make more than one change to Energy Flow to improve data accuracy without requiring a new RMP
Proposer
Daniel Tadecicco
Change Plan

Solution analysis and development completed

Completed

Start:

22 Aug 2022

Due:

16 Aug 2023

Completion:

16 Aug 2023

Service Provider impact assessment started

Completed

Start:

16 Aug 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Service Provider impact assessment completed

Completed

Start:

18 Aug 2023

Due:

25 Sep 2023

Completion:

25 Sep 2023

Party impact assessment issued

Completed

Start:

25 Sep 2023

Due:

19 Oct 2023

Completion:

13 Oct 2023

Party impact assessment closed

Completed

Start:

19 Oct 2023

Due:

09 Nov 2023

Completion:

03 Nov 2023

Preliminary Change Report issued

Completed

Start:

09 Nov 2023

Due:

08 Dec 2023

Completion:

07 Dec 2023

Responsible Committee review

Completed

Start:

08 Dec 2023

Due:

19 Dec 2023

Completion:

19 Dec 2023

Consultation issued

Completed

Start:

19 Dec 2023

Due:

22 Dec 2023

Completion:

22 Dec 2023

Consultation closed

Completed

Start:

22 Dec 2023

Due:

23 Jan 2024

Completion:

23 Jan 2024

Final Change Report issued

Completed

Start:

23 Jan 2024

Due:

09 Feb 2024

Completion:

08 Feb 2024

Responsible Committee decision

Completed

Start:

09 Feb 2024

Due:

20 Feb 2024

Completion:

20 Feb 2024

Appeal window closure

Completed

Start:

20 Feb 2024

Due:

06 Mar 2024

Completion:

06 Mar 2024
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As a Consumer, I want any metering data issues to be resolved without the need for a new MPAN to be created, so that I am able to reference my current MPAN in any discussions with my Energy Supplier or other Market Participants.
  2. As an ERDA, I want to be able to correct the Metering Point Energy Flow Data Item more than once, to remove the need for the termination of RMPs and the creation of new RMPs and to facilitate data accuracy. As an impacted Market Participant, I want to ensure good quality underlying data is available to support the transition to MHHS to avoid additional time and effort being spent fixing data quality issues during the migration period.
  3. As an Energy Supplier, I want data issues associated with the Metering Point Energy Flow to be resolved without the need to create a new RMP, so that my Settlement accuracy and performance is not impacted As an Energy Supplier, I want data issues associated with the Metering Point Energy Flow to be resolved without the need to create a new RMP, so that discussions I have with my customers are not unnecessarily confused by a change in RMP reference.
Proposed Solution Document
Document title
R0062 - Solution Development Report 13.10.2023
Upload document
R0062 - Solution Development Report v2.0 13.10.2023.pdf
Archive
Off
Document title
R0062 - Solution Development Report v3.0 06.12.2023
Upload document
R0062 - Solution Development Report v3.0 06.12.2023 (1).pdf
Archive
Off
Document title
R0062 Draft Legal text 07.12.2023
Upload document
R0062 Draft Legal text 07.12.2023.zip
Archive
Off
Document title
R0062 - Approved Legal Text 20.02.2024
Upload document
R0062 - Approved Legal Text 20.02.2024.zip
Archive
Off
Problem Statement
To maintain accurate values for Settlement, DNOs must make regular changes to the LLFC Indicator in ERDS. Until June 2023, the meteringPointEnergyFlow has been tied to this Data Item, which has sometimes resulted in changes to the energy direction. For example, going from Import to Export. Where errors have been identified, the DNO needs to be able to correct meteringPointEnergyFlow back to the correct value to ensure data accuracy. The current restriction, to only one change of Energy Direction against an RMP, can be overcome through by terminating the existing RMP and creating a new RMP with the correct Metering Point Energy Flow value. This has a detrimental impact on the Consumer and Settlement. It is inconvenient for the Consumer to be assigned a new MPAN and Settlement relies on an accurate history that will be lost when a new MPAN is assigned.
SME
SME Role
Lead Technical Analyst
R0062 - Change Proposal Form
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
R0062 - Change Proposal Plan v1.0 (Approved) 04.07.2023
R0062 - Initial Assessment Report v1.0 (Approved) 04.07.2023
R0062 Consolidated Impact Assessment Responses v1.0 07.12.2023
R0062 Preliminary Change Report v1.0 (Approved) 19.12.2023
R0062 Consolidated Consultation Responses v1.0 PUBLIC
R0062 - Final Change Report (Post-Vote) v2.0 20.02.2024
Company Name
St Clements Services
Review status
Review required

Clarification of Supplier of Last Resort Obligations under the REC

Date of latest update
Type
Change
ID
R0057
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2023 - Change Proposal has been withdrawn as agreed with the Proposer. The Problem Statement was addressed through C3-0047 - Updates to PAB Procedures.
Summary
Within Schedule 19 – Market Exit and Supplier of Last Resort there is currently no consideration of circumstances where the Replacement Supplier is unable to fulfil its REC obligations in respect of Consumers transferred to them, due to them having little or no control over the processes of the failed supplier or it’s administrator. This change seeks to define when the Replacement Supplier is responsible for obligations relating to the Consumers gained through a Supplier of Last Resort (SoLR) Process.
Proposer
admin
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer when my Energy Supplier goes out of business and I am transferred to a Replacement Supplier, I want my supply transfer to be handled quickly and have confidence that my new Supplier has all the necessary data to set up my account and bill me correctly from the transfer date, and if the Replacement Supplier fails to provide the expected level of service they will be appropriately held accountable.
  2. As a Replacement Supplier, I want the limitations affecting my ability to meet my REC obligations to be understood by the REC Code Manager and the Performance Assurance Board, so that any breaches of obligations are considered fairly and any limitations are taken into consideration.
  3. As the Code Manager I want to apply appropriate and proportionate Performance Assurance Techniques, taking in to account the ability of a Replacement Supplier to meet their obligations under the REC.
Proposed Solution Document
Document title
R0057 Draft Legal Text
Upload document
R0057 Draft Legal Text.zip
Archive
Off
Problem Statement
Currently, Replacement Suppliers are responsible for all obligations of the failed supplier from the date and time set out in the Last Resort Supply Direction, this includes a period of time prior to Consumer accounts transferring to the Replacement Supplier’s systems, limiting their ability to fulfil these obligations. This means that a Replacement Supplier may experience issues with the Performance Assurance obligations for which they are responsible, but do not have direct control over. Any breaches of obligations by a Replacement Supplier need to be considered fairly and any limitations the Replacement Supplier may face are taken into consideration.
Stages Selection
R0057 - Change Proposal Form
R0057 - Solution Options
R0057 - Consolidated Impact Assessment Responses
R0057 - Change Proposal Plan v1.0
R0057 - Initial Assessment Report v1.0 (Approved)
R0057 - Preliminary Change Report V1.0 (Approved)
Company Name
EDF
Review status
Review required

24/7 Emergency Metering Service

Date of latest update
Type
Change
ID
R0053
Change Category
Priority
Urgent
No
Latest Update
01/05/25 - Proposal withdrawn at proposers request.
Summary
This change has been raised to address the issue that Suppliers currently are not required to provide a 24/7 emergency metering service that enables a Consumer to speak to an agent and/or receive a visit from a field operative outside normal business hours when faced with power loss situation relating to a metering issue. This Change Proposal has been raised to assess and consider the options to address this issue.
Proposer
Bryan Heap
Change Plan

Solution Analysis and Development

In Progress

Start:

17 Jun 2022

Due:

26 May 2023

Completion:

Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my metering fault to be identified and fixed as soon as possible, so that I am not left in a situation where I have no electricity for an extended period. I want to be able to contact the correct Party to fix my metering fault. I want my personal circumstances to be taken in to account when arranging for a fault to be fixed out of standard working hours.
  2. As a DNO, where there is a meter fault identified I want to be able to contact the Energy Supplier to rectify this, no matter what day or time this is identified, so that Consumers are not left without power for extended periods, during which time they may require ongoing help, support and communication. As an Energy Supplier, I want to provide my Customers with accurate and relevant Emergency contact information. As an Energy Supplier, I want to be able to respond to meter faults in a timely manner and not leave Consumers without power for an extended period.
  3. As a MEM, I want to be notified, in a timely manner, of faults that occur on Metering assets I am responsible for, so that I am able to rectify these without undue detriment being experienced by Consumers
Problem Statement
In situations where an Electricity Consumer experiences a loss of power, the DNOs who attend site to investigate and resolve the issues, are unable to do so when there is a meter issue, which is the responsibility of the Energy Supplier and it’s Appointed agents. When an issue occurs out of hours, or when an Energy Supplier does not have an out of hours metering service in operation, Consumers can be left without power for an extended period, this can create a safety or health concern, particularly for vulnerable Consumers or vulnerable members of their household.
Stages Selection
R0053 - Downloadable Change Proposal Form
R0053 - Change Proposal Plan v1.0 (pre-approval) 27/02/2023
R0053 - Initial Assessment Report v1.1 (Pre-Approval) 06.03.23
R0053 - Initial Assessment Report v2.0 (Approved) 07.03.2023
R0053 - Change Proposal Plan v2.0 (Approved) 07.03.2023
Company Name
Electricity North West Limited
Review status
Review required