Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters
Date of latest update
Type
Issue
ID
I0273
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/10/2026 On 05 October 2026, the MEP voted via an ex-committee vote to approve this extension to plan. The Code Manager is currently engaging with the BSC to raise a consequential change to facilitate the use of the SSC for non-Settlement purposes, for example Billing or quoting tariffs for Smart Metering Assets.
Summary
In the MHHS design the Standard Settlement Configuration (SSC) is a non-mandatory data item for Smart and Advanced metering points, in addition the register level TPR information is not shared in the MTD flows for these meters (IF-006 for Smart and D0268 for Advanced). It was identified through BSC Issue I118 that there is a requirement for the SSC to be set for Domestic / Microbusiness Advanced Metering Points making use of the HH data opt out and there may be other areas where the SSC is required.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0273 - Interim Guidance Document V1.1
Upload document
I0273 - Interim Guidance Document V1.1.pdf
Archive
Off
Problem Statement
The MHHS design does not mandate the use of SSC or support register-level TPR data for Smart and Advanced Meters, creating gaps in data availability for certain Settlement scenarios.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0273 Submission Form
I0273 - Update to Plan V2.0 (Pre-Approval) 06.05.2026
I0273 - Update to Plan V2.0 Approved 05.10.2026
Company Name
RECCo
Review status
Review required
Clarification of ASP, AMI, and EMO Accession Requirements
Date of latest update
Type
Change
ID
R0271
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
Schedule 15 - Metering Accreditation is explicit that Meter Operator Agents (MOAs) and Meter Asset Managers (MAMs) need to accede to the Retail Energy Code (REC), but is not explicit on whether Automated Meter Reading (AMR) Service Providers (ASPs), Approved Meter Installers (AMIs), and Electricity Metering Operatives (EMOs) need to accede to the Code.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
16 Sep 2025Final Recommendation approved at MEP
Completed
Start:
Due:
Completion:
12 Nov 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0271 Legal Text For Consultation
Upload document
R0271 Legal Text For Consultation.zip
Archive
Off
Problem Statement
There is a lack of clarity in the Code as to whether ASPs, AMIs, and EMOs need to accede to the REC, meaning these companies may not sure be of their REC obligations.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0271 Submission form
I0271 Change Report (Proposal Plan) v1.0 approved 16/09/2025
R0271 Change Report (For Consultation) v1.0
R0271 Change Report (For Consultation) Pre-Approval
R0271 Change Report (Final Recommendation) Approved 12.11.2025 v1.0
Company Name
REC Code Manager
Review status
Review required
Clarification of SIP Qualification Requirements
Date of latest update
Type
Change
ID
R0270
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
REC Schedules 1, 14, and 15 all note that in order to Qualify as a Safe Isolation Provider (SIP), the Party needs to be a Qualified Meter Operator Agent (MOA). It has since been determined that Qualified Electricity Metering Operatives (EMOs) should also be able to Qualify as SIPs.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Change Report (For Consultation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
10 Dec 2025Change Report (Final Recommendation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
11 Feb 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0270 draft legal text
Upload document
I0270 draft legal text.zip
Archive
Off
Problem Statement
Requiring SIPs to be fully Qualified MOAs may be hindering smaller Parties who wish to be SIPs from Qualifying under the REC. This in turn may be reducing the number of Qualified SIPs in the market for Consumers to choose from or causing Consumers inadvertently to contract with people who are not Qualified SIPs to carry out SIP Works.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0270 Submission Form
I0270 Change Report (Proposal Plan) V1.0 approved 18.11.25
R0270 Change Report (For Consultation) V1.1 approved 10.12.25
R0270 Consolidated Consultation Responses V1.0
R0270 Change Report (Final Recommendation) V1.0 approved 11.02.26
Company Name
REC Code Manager
Review status
Review required
Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation
Date of latest update
Type
Change
ID
R0268
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
15/10/2026 On 14 October 2026, REC Metering Expert Panel voted to recommend that the Authority approve this Change Proposal, in line with the Code Manager recommendation. The Change Report (Final Recommendation) V2.0 has been issued to the Authority.
Summary
The Balancing and Settlement Code (BSC) modification P441 is looking to introduce Complex Site classes which would categorise the types of Complex Site with each having clearly defined criteria within the BSC whilst also facilitating a new "type" of Complex Site (referred to as a Class 6 Complex Site) to allow approval of "non-standard" Complex Sites. It will also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
21 Oct 2025Extension to Plan approved by MEP
Completed
Start:
Due:
Completion:
14 Jan 2026Final Recommendation approved at MEP
Completed
Start:
Due:
Completion:
11 Mar 2026Final Recommendation V2.0 approved at MEP
Completed
Start:
Due:
Completion:
14 Oct 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0268 Metering Operations v0.1 draft
Upload document
R0268 Metering Operations v0.1 draft.zip
Archive
Off
Problem Statement
The introduction of new Complex Site classes is needed into the REC to facilitate the solutions under BSC P441 and DCP 424.
Stages Selection
I0268 Submission Form
I0268 Change Report (Proposal Plan) V1.1 approved 21.10.25
R0268 Change Report (For Consultation) V1.0
R0268 Consolidated Consultation responses V1.0
R0268 Extension to Plan V1.0
R0268 Change Report Final Recommendation V1.0 post vote
R0268 Authority send back letter on implementation date
R0268 Implementation Date Consultation - Consolidated Consultation Responses V1.0
R0268 Change Report (Final Recommendation) V2.0 Approved 15.10.26
Company Name
REC Code Manager
Review status
Review required
C21 to be introduced into STIRG Document
Date of latest update
Type
Change
ID
R0244
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
This change proposes to add a new category 3 asset condition code to the Guidance for Service Termination Issue Reporting (STIRG) document, to allow Meter Operator Agents (MOAs) to report to the Distribution Network Operator (DNO) where the meter supply neutral is fed via a shared additional N/E block without having to abort the meter work.
Change Plan
Proposal Plan approved by Change Panel
Completed
Start:
Due:
Completion:
01 Apr 2025Approved at Metering Expert Panel
Completed
Start:
Due:
Completion:
09 Jul 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
C21 proposed legal text
Upload document
RECMEP_24_0212_09 - Non-standard PME Arrangement.pdf
Archive
Off
Document title
Non-standard PME arrangement - for consultation
Upload document
Non-standard PME arrangement - for consultation.pdf
Archive
Off
Document title
R0244 STIR Fully Red Lined post consultation
Upload document
R0244 STIR Fully Red Lined (1).docx
Archive
Off
Problem Statement
Parties are having to unnecessarily abort installs where there is a non-standard PME connection arrangement as there is no category 3 asset issue reporting option within the STIRG document.
Stages Selection
Proposal form
I0244 Change Report (Proposal Plan) v1.0 Approved 01.04.25
I0244 Consolidated Impact Assessment Responses PUBLIC v1.0
R0244 Change Report (For Consultation) V1.0
R0244 Consolidated Consultation Responses v1.0
R0244 Change Report (Final Recommendation) V1.0 post vote
Company Name
OVO
Review status
Review required
Amending contractual obligations for SIPs at Non-Domestic Premises
Date of latest update
Type
Change
ID
R0217
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 1 April Extraordinary REC Release.
Summary
The contractual obligations in section 21 of Schedule 14 are too restrictive or not relevant to Non-Domestic Premises making delivering isolators to Non-Domestic Premises more complex than it needs to be.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
21 Jan 2025Change approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
12 Mar 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
01 April 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0217 | Amending contractual obligations for SIPs at Non-Domestic Premises |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Non-Domestic Consumers who occupy (but do not own) a Premises with relevant permissions allowing metering work to occur are unable to contract with SIPs due to the restrictions in section 21 of Schedule 14 Metering Operations.
Stages Selection
SIP Non-Domestic contracting red lining.docx
R0217 Change Proposal form
R0217 Change Report (Proposal Plan) V1.0 Approved 21.01.25
R0217 Change Report (For Consultation) V1.0
R0217 Consolidated Consultation Responses PUBLIC V1.0
R0217 Change Report (Final Recommendation) V1.0 Post Vote
Company Name
-
Review status
Review required
REC Changes to tie in with DCP419
Date of latest update
Type
Change
ID
R0216
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
19/01/2026 - on 19 January 2026, the Authority published their decision to reject R0216, in line with the recommendation from both the Metering Expert Panel and the Code Manager.
Summary
DCP419 is looking to place obligations on any Party or agent to update the DNO before any planned de-energisation or comms interruptions on sites with a smart meter. This is to allow DNOs to be able to manage any off supply notifications (via AD1 alerts).
Change Plan
Discussed at Change Issues Group
Completed
Start:
Due:
Completion:
07 Nov 2024Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
18 Feb 2025Change Report (For Consultation) approved by MEP
Completed
Start:
Due:
Completion:
09 Jul 2025Change Report (Final Recommendation) presented at Metering Expert Panel
Completed
Start:
Due:
Completion:
10 Sep 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0216 - Schedule 14 - Metering Operations (MHHS) - v0.2 (02.07.2025)
Upload document
R0216 - Schedule 14 - Metering Operations (MHHS) - v0.2 (1).docx
Archive
Off
Problem Statement
DNOs may be unnecessarily contacting Consumers where an AD1 notification is generated but the Consumer is having planned works involving their Electricity Smart Meter or Communications Hub replacements for their Electricity Smart Meter. This may create a poor Consumer experience.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
DCP 419 Market Message Specification.docx
Issue Form
I0216 Change Report (Proposal Plan) v1.0 Approved 18.02.25
I0216 Solution Development Report V1.0
I0216 Consolidated Impact Assessment Responses PUBLIC v1.0
I0216 Extension to Plan V1.0 Approved 06.05.25
R0216 Extension to Plan V2.0 Approved 27.06.25
R0216 Change Report (For Consultation) V1.0 approved 09.07.25
R0216 Consolidated Consultation Responses PUBLIC V1.0
R0216 Change Report (Final Recommendation) V1.1 post vote
Ofgem decision to reject R0216
Company Name
-
Review status
Review required
Import / Export MOA Charging Clarification
Date of latest update
Type
Change
ID
R0207
Change Category
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Change Plan
Final recommendation to Metering Expert Panel
Completed
Start:
Due:
Completion:
12 Mar 2025Sent to Authority for determination
Completed
Start:
Due:
Completion:
13 Mar 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Schedule 14 - Metering Operations R0207 v0.1
Upload document
Schedule 14 - Metering Operations R0207 draft.docx
Archive
Off
Document title
Schedule 14 - Metering Operations R0207 v0.2
Upload document
Schedule 14 - Metering Operations R0207 v0.2.docx
Archive
Off
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Stages Selection
Change Proposal Form
R0207 - Change Report (Proposal Plan - Approved) V2.0 15.10.2024
R0207 Consolidated Impact Assessment Responses PUBLIC V1.0
R0207 Extension to Plan v1.0
R0207 Change Report (For Consultation) v1.0
R0207 Consolidated Consultation Responses PUBLIC V1.0
R0207 Change Report (Final Recommendation) V1.0 Post Vote
Authority Decision Letter - Ofgem Decision to Send Back R0207 (30.05.2025)
R0207 Revised Solution - Legal Text
R0207 Change Report (Impact Assessment) Revised Solution V2.0
Legal Drafting Revised Solution March 2026
Non Confidential consolidated impact assessment responses
R0207 Consolidated Consultation Responses (revised solution)
Authority decision to approve R0207
Company Name
Gemserv
Review status
Review required
Review of Metering Asset data transferred from MAMs to the CDSP
Date of latest update
Type
Issue
ID
I0196
Change Path
Priority
Urgent
No
Latest Update
10/09/2026 - The Metering Expert Panel approved the extension to plan for I0196. This REC Issue is now placed on hold.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
I0196 Change Re-Plan V2.1 (Approved) 09.09.26
Company Name
-
Review status
Review required
Introducing a Process to Provide Updates During Fault Resolutions
Date of latest update
Type
Issue
ID
I0197
Change Category
Priority
Urgent
No
Latest Update
10/06/2026 - The Code Manager, following an approval to an Update to Plan by the REC Metering Expert Panel, has placed I0197 on hold.
Summary
Some customers have had faulty meters for a prolonged period, which impacts billing and settlement, and can prevent customers accessing specific tariffs. Currently the REC only has obligations relating to electricity meter faults, and these do not actually require work to be done to address faults. This issues proposes the introduction a maximum timeframe Fault Resolution deadline to resolve issues around faulty meters.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Consumers have had faulty meters for a prolonged period, which impacts billing and settlement, and can prevent customers accessing specific tariffs.
Stages Selection
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0197 - Change Proposal Form
I0197 - Change Report (Proposal Plan) V1.0 (Approved) 03.06.2025
I0197 - Update to Plan V3.0 (On Hold) 03.06.2026
Company Name
-
Review status
Review required