Resolution of invalid CSS data by Data Owners

Date of latest update
Type
Change
ID
R0061
Change Category
Change Path
Priority
Urgent
No
Latest Update
04 March 2024 - Change has been withdrawn following implementation of a solution outside of the REC Change Process. 10WD window to adopt change will close on 18 March 2024.
Summary
Data is sent via the Supplier or MEM to update MPRS, which is then sent to CSS. If the data is considered invalid at CSS, an error is returned to MPRS. MPRS is the conduit of data from the Suppliers & MEMs to CSS, and ERDAs are not responsible for the data, therefore only the supplier/MEM can correct the data. The incidents must be put on hold until the owner of the data corrects the issue, this is to prevent SLA breaches. SLAs does not apply to the Supplier/MEM explicitly, so the incidents remain in the DNOs/IDNOs queue with the need to chase every few days to prevent the incident being closed. The responsibility for the incidents should be on the data owners (Suppliers/MEMs).
Proposer
Elise Handy
Change Plan

Solution Analysis and Development

Completed

Start:

22 Aug 2022

Due:

15 Aug 2023

Completion:

15 Aug 2023

Service Provider Impact Assessment Due

Completed

Start:

15 Aug 2023

Due:

19 Oct 2023

Completion:

19 Oct 2023
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be accurate, so that I can have a consistent and faultless switching experience. As a Consumer, I want any data issues related to my switch to be resolved quickly and by the party responsible, to ensure a fast and efficient switching experience.
  2. As a DNO, I want my service level requirements to be reflective of my data ownership responsibilities, so that data queries can be resolved more efficiently. As the CSS Service Desk provider, I want my tickets to be allocated to the most appropriate party able to resolve them.
Proposed Solution Document
Document title
R0061 Solution - Service Desk Guidance Article
Archive
Off
Problem Statement
DNO/iDNOs are obligated to resolve data mismatches identified by the CSS during the switch process. However, they are unable to do so in cases where the Supplier/MEM owns data required to resolve the mismatch. Tickets assigned to the DNO (via MPRS) are therefore not going to the party best placed to resolve them, resulting in DNOs chasing the incident resolution every few days to prevent them being closed incorrectly.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0061 - Change Proposal Form
R0061 - Initial Assessment Report v1.0 (Approved) - 18.07.2023
R0061 - Change Proposal Plan v1.0 (Approved) - 18.07.2023
R0061 Change Proposal Re-Plan (Approved) v1.0 - 19.10.23
Company Name
St Clements Services
Review status
Review required

ERDS Service Definition timezone correction

Date of latest update
Type
Change
ID
R0060
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change seeks to specify timezones within the ERDS Service Definition. For example: Data received by the ERDA shall be included within the ERDS Total Daily Processing on the basis that all data received prior to 23:00hrs is made available to the SMRA, EES Provider or CSS Provider (as applicable) by 06:00hrs the following Working Day. Data received after 23:00hrs will be made available to the SMRA, EES Provider or CSS Provider (as applicable) by the second Working Day
Proposer
Daniel Tadecicco
Change Plan

Change Proposal Plan and Impact Assessment Report Published

Completed

Start:

22 Aug 2022

Due:

18 Jun 2024

Completion:

18 Jun 2024

Change report and Consultation issued

Completed

Start:

18 Jun 2024

Due:

28 Jun 2024

Completion:

27 Jun 2024

Consultation closed

Completed

Start:

28 Jun 2024

Due:

19 Jul 2024

Completion:

19 Jul 2024

Responsible Committee decision

Completed

Start:

19 Jul 2024

Due:

28 Aug 2024

Completion:

28 Aug 2024

Appeal Window Closure

Not Started

Start:

28 Aug 2024

Due:

12 Sep 2024

Completion:

Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Supplier, I want to have confidence that the data in the systems is aligned and accurate.
  2. As ERDS Provider, I want to be able to provide accurate and appropriately labelled data that can be aligned with data from other systems.
Proposed Solution Document
Document title
R0060 Proposed legal text for decision 15.08.24.zip
Upload document
R0060 Proposed legal text for decision 15.08.24.zip
Archive
Off
Document title
R0060 Proposed legal text 27.06.24
Upload document
R0060 Proposed legal text 27.06.24.zip
Archive
Off
Document title
R0060 Legal Text ERDS Service Definition v1.0 06.06.2024
Upload document
R0060 Legal Text ERDS Service Definition v1.0 06.06.2024.pdf
Archive
Off
Document title
R0060 Approved legal text 28.08.24
Upload document
R0060 Approved legal text 28.08.24.zip
Archive
Off
Problem Statement
The ERDS Service Definition does not specify the time with a specified time zone. This has led to some instances of MPRS close of day running at 22:00GMT instead of 23:00GMT. A confirmation of time zone is required within the ERDS Service Definition to negate any confusion or delays in flow processing and systems becoming misaligned.
SME
SME Role
Lead Assurance Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
R0060 - Change Proposal Form
R0060 Consolidated RFI Responses v1.0 (05.03.2024)
R0060 Change Proposal Plan (Approved) v1.0 18.06.2024
R0060 - Initial Assessment Report v1.0 (Approved) 18.06.2024
R0060 Preliminary Change Report v1.0 (For Consultation) 27.06.2024
R0060 Consolidated Consultation Responses v1.0 (15.08.24)
R0060 Change Report (Final Recommendation - Approved) v2.0
Company Name
St Clements Services
Review status
Review required

Switching Operator Outage Notification Lead time

Date of latest update
Type
Change
ID
R0055
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/11/2022 - The REC Technical Expert Panel voted to approve R0055 for implementation on 24 February 2023.
Summary
Within the Switching Operator Service Definition, the Central Switching Service (CSS) Provider is required to provide 10 Working Days’ (WDs) notice of planned system outages. However, within the CSS Provider’s processes and the Switching Operator Change Management Process Category 3 document, an 8 WD lead time is set out. This change seeks to address this discrepancy.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment

Completed

Start:

06 Jul 2022

Due:

19 Aug 2022

Completion:

19 Sep 2022

Party Impact Assessment

Completed

Start:

19 Aug 2022

Due:

26 Aug 2022

Completion:

13 Sep 2022

Preliminary Change Report Issued

Completed

Start:

26 Aug 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Consultation Issued

Completed

Start:

14 Oct 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Final Change Report Issued

Completed

Start:

14 Oct 2022

Due:

18 Nov 2022

Completion:

18 Nov 2022

Responsible Committee Decision

Not Started

Start:

18 Nov 2022

Due:

30 Nov 2022

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.3.0_Superseded

Documents

Name Version Last updated Actions
203.39 KB
Version 1.0 - 02 Nov 2026 PDF - 203.39 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the CSS Provider, I want the service levels to be consistently defined across relevant REC Products. This will ensure that I am clear on the lead time I need to provide for planned outages and can meet the defined service level.
  2. As a CSS User, I want to understand how much notice I will get for planned outages of the CSS, so I am able to appropriately plan my activity reliant on this service.
  3. As a Switching Data Service Provider, I want to understand how much notice I will get for planned outages of the CSS. This will ensure I am able to appropriately plan my Operational Switching Service Changes and associated activities.
Proposed Solution Document
Document title
R0055 - Proposed Legal Text
Upload document
Proposed legal text changes submitted with the CP (2).pdf
Archive
Off
Problem Statement
Across REC products there is an inconsistency in the defined lead time for the CSS Provider to provide notification of scheduled maintenance and system outages. This may result in uncertainty for Switching Data Service Providers around when they should submit an Operational Switching Service Change. This is to ensure there is sufficient lead time for any change to be included within a planned maintenance release, and for CSS Users planning their operational activity around CSS availability.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0055 - Change Proposal Plan v1.0 (Approved)
R0055 - Initial Assessment Report v1.0 (Approved)
R0055 - Consolidated Consultation Responses
R0055 - Preliminary Change Report (Published for Consultation) v1.0
R0055 - Final Change Report v1.0 (Approved)
Company Name
DCC
Review status
Review required

EES Access for Virtual Lead Parties

Date of latest update
Type
Change
ID
R0054
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/04/2023 - The Data Access Matrix changes went live on 04 November 2022, the technical changes to EES were implemented alongside R0022 on 03 April 2023.
Summary
This Change Proposal seeks to allow Virtual Lead Parties (VLP) access to the Electricity Enquiry Service (EES), to allow them to efficiently register their customers for balancing services under the Balancing and Settlement Code (BSC).
Proposer
Ann Perry
Change Plan

Service Provider Impact Assessment

Completed

Start:

17 Jun 2022

Due:

22 Jul 2022

Completion:

22 Aug 2022

Preliminary Change Report Issued

Completed

Start:

22 Jul 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Consultation Issued

Completed

Start:

02 Sep 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Consultation Complete

Completed

Start:

02 Sep 2022

Due:

16 Sep 2022

Completion:

16 Sep 2022

Final Change Report Issued

Completed

Start:

16 Sep 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Responsible Committee Decision

Completed

Start:

14 Oct 2022

Due:

26 Oct 2022

Completion:

26 Oct 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my VLP to have access to the data needed to correctly register me in a timely manner, so there aren’t delays in the delivery of my service.
  2. As a VLP, I want to have access to all the data I need to register my customers so I can deliver the service they have requested, without delay.
  3. As a VLP, I want to be able to use the EES to find the MPAN of a customer using their address information, to enable me to reliably gather this data to without delay or further engagement with my customer.
Proposed Solution Document
Document title
R0054 - Draft DAM Change
Upload document
R0054 Draft DAM changes.xlsx
Archive
Off
Document title
R0054 - Draft Legal Text
Upload document
R0054 Draft legal text v2.0.pdf
Archive
Off
Problem Statement
VLPs are required to provide their customer’s MPAN as part of the registration process, as per the Balancing and Settlement Code (BSC). VLPs do not currently have access to the EES to enable an MPAN search and they have no reliable means to acquire the MPAN, other than asking their customer to provide it. This could potentially lead to delays in the registration process and may result in an increased risk of inaccurate data, detrimentally impacting the service VLPs are able to provide to their customers.
R0054 - Initial Assessment Report v1.0 (Approved)
R0054 - Change Proposal Plan v1.0 (Approved)
R0054 - Preliminary Change Report v1.0 (Published for Consultation)
R0054 - Non-Confidential Consultation Responses
R0054 - Final Change Report v2.0
Company Name
-
Review status
Review required

GES Service Definition Document

Date of latest update
Type
Change
ID
R0052
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/11/2022 - The REC Technical Expert Panel voted to APPROVE R0052 for implementation on 24 February 2023.
Summary
The frequency of certain reports detailed in the Gas Enquiry Service (GES) Definition document are not consistent with the frequencies set out during the development of REC v3.0 and consulted on with industry stakeholders. This change seeks to align the reporting defined within the Service Definition with the originally intended timetable.
Proposer
Cristina Alvarez
Change Plan

Party Impact Assessment

Completed

Start:

13 Jun 2022

Due:

09 Sep 2022

Completion:

23 Sep 2022

Preliminary Change Report Issued

Completed

Start:

09 Sep 2022

Due:

21 Oct 2022

Completion:

21 Oct 2022

Consultation Issued

Completed

Start:

21 Oct 2022

Due:

21 Oct 2022

Completion:

21 Oct 2022

Final Change Report Issued

In Progress

Start:

21 Oct 2022

Due:

18 Nov 2022

Completion:

Responsible Committee Decision

Not Started

Start:

18 Nov 2022

Due:

30 Nov 2022

Completion:

Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 3.3.0_Superseded

Documents

Name Version Last updated Actions
203.39 KB
Version 1.0 - 02 Nov 2026 PDF - 203.39 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Meter Asset Provider (MAP), I want it to be clear how and when I will receive reports relating to my portfolio, to ensure that I have the data required to operate efficiently.
  2. As a Meter Equipment Manager (MEM), I want it to be clear how and when I will receive reports relating to my portfolio, to ensure that I have the data required to operate efficiently.
  3. As the GES Service Provider, I want to have clearly and correctly defined requirements and responsibilities, to enable me to efficiently carry out my function as a REC Service Provider.
Proposed Solution Document
Document title
R0052 - Redlined Gas Enquiry Service Definition Document
Upload document
R0052 - Proposed legal text v0.3.docx
Archive
Off
Document title
R0052 - EMAR Change Sets
Archive
Off
Problem Statement
The Frequency of reports set out in the Gas Enquiry Service Definition document does not currently reflect the expected frequency for the ‘Supplier Registration report (MEM)’, ‘Portfolio Data (MEM)’ and ‘Portfolio Data (MAP)’ reports. The Gas Enquiry Service Definition needs to be amended to ensure that Meter Equipment Managers (MEMs) and Meter Asset Providers (MAPs) receive reports in the correct timeframe.
R0052 - Proposed legal text submitted with CP
R0052 - Change Proposal Form v1.0
R0052 - Change Proposal Plan v1.0 (Approved)
R0052 - Initial Assessment Report v1.1 (Approved)
R0052 - Preliminary Change Report v1.0 (Published for Consultation)
R0052 - Consolidated Consultation Responses v1.0
R0052 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required

DCC Service Organisation Control 2 (SOC2) Assessments

Date of latest update
Type
Change
ID
R0048
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/06/2024 - The Technical Expert Panel have rejected R0048 in line with the Code Manager's recommendation.
Summary
Currently within the Central Switching Service (CSS) Service Definition document there is a requirement for the CSS Provider to arrange for and undertake system organisation control type 2 (SOC2) assessments on the CSS’s cloud-based infrastructure. This Change Proposal seeks to determine if it is appropriate for the requirement for assurance on the CSS’s cloud-based infrastructure to be changed from ‘SOC2 Type 2’ to ‘independently assessed’.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment

Completed

Start:

20 May 2022

Due:

16 Jan 2023

Completion:

08 Feb 2023

Solution Development

In Progress

Start:

16 Jan 2023

Due:

24 Nov 2023

Completion:

Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the Code Manager, I want REC Service Providers to obtain and maintain appropriate security certification, so I have confidence that the Service Providers security, processing integrity, confidentiality and privacy controls are assessed, and any risks are identified and addressed.
  2. As the CSS Provider, I want to be able to obtain an appropriate security certification, so I can demonstrate security compliance in a proportionate and cost-effective approach.
Proposed Solution Document
Document title
Central Switching Service (CSS) Definition - R0048 Redlined
Upload document
Central Switching Service (CSS) Definition - R48 Redlined .pdf
Archive
Off
Problem Statement
The CSS Provider asserts that SOC2 assessment does not provide a proportionate level of assurance or the best value for money, which based on their experience, they believe they have a better understanding of the CSS’s risk profile. However, the use of SOC2 assessments is currently defined within the CSS Definition document, which means an alternative assurance regime cannot be used.
Stages Selection
R0048 - Change Proposal Form
R0048 - Change Proposal Plan v5.0 (Approved) 11.07.2023
R0048 - Initial Assessment Report v1.0 (Approved)
R0048 Preliminary Change Report v1.0 (Approved)
R0048 Consolidated Consultation Responses v1.0
R0048 Final Change Report Post Vote v1.0
Company Name
DCC
Review status
Review required

Changes to SDEP Messages and Schedule numbering for REC V3.0

Date of latest update
Type
Change
ID
R0045
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Jon Hawkins
Change Plan

Preliminary Change Report issued

Completed

Start:

05 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation Issued

Completed

Start:

27 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation closure

Completed

Start:

27 May 2022

Due:

14 Jun 2022

Completion:

14 Jun 2022

Final Change Report issued

Completed

Start:

14 Jun 2022

Due:

22 Jun 2022

Completion:

22 Jun 2022

Responsible Committee Decision

Completed

Start:

22 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.0.0_Superseded
Included changes Affected REC Items
R0038 Performance Assurance Report Catalogue Changes as a consequence of REC V3.0
R0041 REC V3.0
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 5 - Change Management
  • Schedule 27 - RMP Lifecycle
  • ASPCoP (since removed)
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0042 Performance Assurance Board Terms of Reference
  • Performance Assurance Board - Terms of Reference
R0045 Changes to SDEP Messages and Schedule numbering for REC V3.0
  • Market Message Catalogue

Documents

Name Version Last updated Actions
258.97 KB
Version 1.0 - 02 Nov 2026 PDF - 258.97 KB
1.0 02 Nov 2026
257.76 KB
Version 1.0 - 02 Nov 2026 DOCX - 257.76 KB
1.0 02 Nov 2026
219.4 KB
Version 1.0 - 16 Nov 2026 PDF - 219.4 KB
1.0 16 Nov 2026
1.65 MB
Version 1.0 - 02 Nov 2026 PPTX - 1.65 MB
1.0 02 Nov 2026
6.74 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.74 MB
1.0 02 Nov 2026
9.01 MB
Version 1.0 - 02 Nov 2026 PPTX - 9.01 MB
1.0 02 Nov 2026
3.89 MB
Version 1.0 - 02 Nov 2026 PPTX - 3.89 MB
1.0 02 Nov 2026
1.0 02 Nov 2026
16.78 KB
Version 1.0 - 02 Nov 2026 XLSX - 16.78 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Energy Supplier to resolve any Switching or billing issues in a timely manner without unnecessary delays, so that I can receive accurate and timely bills from my chosen Energy Supplier.
  2. As an SDEP User, I want to understand any changes to SDEP messages I need to send and receive that may impact my business, so I can engage in the process and plan any required changes to my processes.
Proposed Solution Document
Document title
R0045 - Draft Legal Text
Upload document
Changes to SDEP Messages Redline v2.0.docx
Archive
Off
Problem Statement
The Secure Data Exchange Portal (SDEP) will be updated at CSS Go-Live Date to reflect the new processes being introduced as part of REC V3.0. The SDEP messages and Data Items in the Energy Market Architecture Repository (EMAR) do not currently reflect these new processes. SDEP users require the Data Specification to accurately reflect the messages and Data Items to enable them to meet their obligations.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Changes to SDEP Messages.docx
R0045 - CP Form (Downloadable version)
R0045 - Change Proposal Plan v2.0 (Approved)
R0045 - Initial Assessment Report v2.0 (Approved)
R0045 - Preliminary Change Report v1.0
R0045 - Consolidated Consultation Responses v1.0
R0045 - Final Change Report v2.0
Company Name
RECCo
Review status
Review required

EAC information in the EES API

Date of latest update
Type
Change
ID
R0024
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Andrew Long
Change Plan

Solution Development and Party Engagement

Completed

Start:

29 Aug 2022

Due:

07 Sep 2022

Completion:

29 Aug 2022

Change Proposal Withdrawal

Completed

Start:

20 Dec 2021

Due:

29 Aug 2022

Completion:

29 Aug 2022
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As a domestic Electricity Consumer, I want to be quoted accurately for my electricity usage based on my electricity consumption, so that I can make an informed decision to accept/reject the quotation offered.
  2. As an Electricity Supplier, I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
  3. As a Third-Party Intermediary (TPI), I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
Problem Statement
Where an Electricity Supplier provides a quotation, or Third-Party Intermediary (TPI) completes a comparison, for an Electricity Consumer they must rely on the information provided by the Consumer about their electricity usage. In some cases, consumers may not have access to or knowledge of their annual electricity usage. Consequently, this would be estimated leading to potential inaccurate quotations being provided. Having access to the Metering Point level Estimated Annual Consumption (EAC) via the Electricity Enquiry Service (EES) would enable the provision of more accurate electricity quotations, enabling the Consumer to make an informed choice about their Electricity Supplier, tariff and product.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0024 - Change Proposal Plan v2.0 (Approved)
R0024 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Electricity Enquiry Service API Service Status

Date of latest update
Type
Change
ID
R0013
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
admin
Change Plan

Initial Assessment Report published

Completed

Start:

11 Oct 2021

Due:

05 Nov 2021

Completion:

05 Nov 2021

Analysis and Solution development activity

In Progress

Start:

05 Nov 2021

Due:

13 Jan 2022

Completion:

Service Provider Impact Assessment completion

Not Started

Start:

13 Jan 2022

Due:

15 Feb 2022

Completion:

REC Party Impact Assessment completion

Not Started

Start:

15 Feb 2022

Due:

23 Mar 2022

Completion:

Preliminary Change Report issued

Not Started

Start:

23 Mar 2022

Due:

20 Apr 2022

Completion:

Technical Expert Panel review

Not Started

Start:

20 Apr 2022

Due:

27 Apr 2022

Completion:

Consultation starts

Not Started

Start:

27 Apr 2022

Due:

05 May 2022

Completion:

Consultation ends

Not Started

Start:

05 May 2022

Due:

26 May 2022

Completion:

Final Change Report issued

Not Started

Start:

26 May 2022

Due:

21 Jun 2022

Completion:

Technical Expert Panel decision

Not Started

Start:

21 Jun 2022

Due:

29 Jun 2022

Completion:

Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an EES User (organisation), I want a method of integrating the service status of the EES API with my systems, so that in the event of EES API outage or disruption I do not trigger unnecessary internal diagnostic activity of my IT systems and processes, and I can initiate appropriate mitigation activity to reduce impacts to my systems and/or the services I provide.
Problem Statement
EES Users do not have a method of integrating the service status of the EES API with their systems. EES Users could experience disruption in their systems/services, caused by EES API disruption or outage. EES Users are not able to automatically identify the root cause of API outages/disruption and may initiate unnecessary internal diagnostic activity after seeing disruption in their systems/services
Stages Selection
SME
SME Role
Lead Technical Analyst
R0013 - Initial Assessment Report v1.0 (Approved)
R0013 - Change Proposal Plan v1.0 (Approved)
Company Name
Switchcraft
Review status
Review required

Reporting of Additional EMR Backing Data to Suppliers

Date of latest update
Type
Change
ID
R0011
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
The aim of this proposal is to reduce the extra assistance required by Electricity Market Reform (EMR) parties in the invoice validation by updating the backing data within the Market Messages to align to what is being invoiced. The associated Market Messages should be structured and named in line with the actual output of Settlement systems to facilitate validation of Capacity Market (CM) Scheme and the Contracts for Difference (CfD) financial settlement.
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

12 Nov 2021

Completion:

12 Nov 2021

Technical Expert Panel review

Completed

Start:

12 Nov 2021

Due:

24 Nov 2021

Completion:

24 Nov 2021

Consultation starts

Completed

Start:

24 Nov 2021

Due:

30 Nov 2021

Completion:

29 Nov 2021

Consultation ends

Completed

Start:

30 Nov 2021

Due:

21 Dec 2021

Completion:

21 Jan 2022

Final Change Report issued

Completed

Start:

21 Dec 2021

Due:

14 Jan 2022

Completion:

14 Jan 2022

Technical Expert Panel decision

Completed

Start:

14 Jan 2022

Due:

26 Jan 2022

Completion:

26 Jan 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to be able to validate EMRS invoices and credits without having to request additional supporting data.
  2. As EMR Settlement Ltd, I need to have an efficient mechanism in place that enables me to provide Market Participants with all the relevant data that they need to validate their invoices and credit notes, to reduce/remove the need for Market Participants to contact the service desk for additional information.
Proposed Solution Document
Document title
R0011 Tracked Changes 08.03.2023
Upload document
R0011 Tracked Changes 08.03.2023.zip
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
There is no method for Suppliers and Generators to validate their invoices based on the data currently provided within the relevant Market Messages. Parties are able to request all relevant data from EMRS; however, this is time consuming for Parties, EMRS and LCCC/ESC
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0011 - Change Proposal Plan v1.0 (Approved)
R0011 – Initial Assessment Report v1.0 (Approved)
MRA SPF 107 - IA Response Summary
R0011 - Preliminary Change Report v2.0 (Approved)
R0011 - Final Change Report v2.0
Company Name
-
Review status
Review required