Explore use of CHECK as a Meter Type option on J0483 DI-059

Date of latest update
Type
Issue
ID
I0344
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
Change Report (Proposal Plan) has been published for REC Change Panel approval on 17 November 2026.
Summary
It has been suggested that CHECK meters should not be sent within industry messages so the presence of this value within the valid set may not be required. This Issue has been raised to explore whether this assumption is correct, look at the existing/historic use cases industry have used the CHECK option for, if they are no longer valid and if so why not.
Proposer
Holly Law
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Lead Analyst
Ian Chalfon
Solution Development
Problem Statement
The DI-059 / J0483 Meter Type Data Item is shared between the Balancing and Settlement Code’s Data Integration Platform (DIP) and the REC’s Data Catalogue. The CHECK Meter Type does not have a valid MHHS Market Segment combination and is not a valid enumeration under the DIP version of DI-059 / J0483. Having an enumeration that is valid in one version of the Data Item and not valid in another causes confusion as to what enumerations are valid for this Data Item. As part of this Issue, we will also explore whether use of the LAG_, LEAD_, and MAIN_ meter types are still necessary to be kept within D-Flows, even though they are valid meter types for MHHS arrangements.
Workgroup
Workgroup(s)
I0344 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required

Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types

Date of latest update
Type
Change
ID
R0342
Change Path
Priority
Urgent
No
Latest Update
26/10/2026 - The Consultation has closed. The Code Manager is assessing the responses.
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Proposer
Lee Stone
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
Proposed Solution Document
Document title
R0342 Legal Drafting
Upload document
R0342 Legal Drafting V1.0 (1).docx
Archive
Off
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0342 submission form
R0342 Change Report (Proposal Plan and Consultation) v1.1 Approved
R0342 Consolidated Non-Confidential Consultation Responses
Company Name
Npower Commercial Gas Limited
Review status
Review required

Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)

Date of latest update
Type
Issue
ID
I0341
Priority
Urgent
No
Latest Update
18/11/2026 - The Change Report (Proposal Plan) was approved by the REC Change Panel
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Proposer
Daniel Tadecicco
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Lead Analyst
Harry Firth
Solution Development
Problem Statement
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service (Rejection of IF-033 with IF-035 Response R). Basic REC R032 Validation on IF-005/D0312: XX-XX-XX-XX-XX-XX-XX-XX (0-9, A-Z)
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0341 submission form
Change Report - Proposal Plan
Company Name
-
Review status
Review required

REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled

Date of latest update
Type
Change
ID
R0339
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
On 11 November 2026, the REC Metering Expert Panel voted, in line with the Code Manager’s recommendation, to approve this Change Proposal. The appeal window is now open until 25 November 2026. Subject to no appeal raised, R0339 will be implemented on 26 February 2027.
Summary
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
Proposer
Caroline Freimuller
Change report - Final Change Report

Comments deadline
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

15 Sep 2026

Due:

15 Sep 2026

Completion:

15 Sep 2026
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Scheduled
EMAR Version 4.5.0_Scheduled
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Annabel Ashworth
Solution Development
Proposed Solution Document
Document title
R0339_Draft Schedule 14 v1.0
Upload document
R0339_Draft Schedule 14 v1.0.docx
Archive
Off
Problem Statement
BSC CP1646 has been raised to address ambiguity around Supplier obligations following receipt of IF-002 messages for cancelled registration Switch Requests. The same obligation exists within the REC, so a REC change is needed to align with the clarifications introduced by BSC CP1646, ensuring consistent interpretation and behaviour across industry.
Workgroup
Workgroup(s)
R0339 submission form
R0339 Change Report (Proposal Plan and Consultation) v1.0 Pre-Approval
R0339 Change Report (Proposal Plan and Consultation) v1.0 Approved 15.09.2026
R0339 Consolidated Consultation Responses v1.0
R0339 Change Report (Final Recommendation) v1.0 Pre Approval
R0339 Change Report (Final Recommendation) v1.0 Approved 11.11.26
Company Name
REC Code Manager / CCSG Representative
Review status
Review required

REC Change to align with CP1633 Capture Modem Module Details Under BSCP601

Date of latest update
Type
Issue
ID
I0338
Change Category
Priority
Urgent
No
Latest Update
06/08/2026 - Issue accepted in by the Code Manager
Summary
BSC CP1633 “Capture Modem Module Details Under BSCP601” makes amendments to BSCP601 Metering Protocol Approval and Compliance Testing. One of the amendments places obligations on MOAs where they are introducing and amending Communications Equipment. Equivalent and potentially expanded obligations need to be placed within REC Schedule 14 Metering Operations to support this.
Proposer
Lee Walker
Status
Implementation Status
Date Raised
Solution Development
I0338 submission form
Company Name
REC Code Manager / CCSG representative
Review status
Review required

Change to Location (A0059) data item within the ONAGE APPT file to MAMs, from ‘Optional’ to ‘Mandatory’

Date of latest update
Type
Change
ID
R0337
Priority
Urgent
No
Latest Update
17/11/2026 - Change Report (Proposal Plan) approved by the REC Change Panel.
Summary
Currently, the location (A0059) data item within the ONAGE APPT file from Suppliers to MAMs is Optional, this allows a Supplier to leave this field blank. Currently SGNCS system functionality is designed to reject the file if this field is blank. This is due to SGNCS requiring to hold the location of the meter installation in order to allow us to deliver on our safety obligations as a MAM in maintaining of an asset.
Proposer
Marc Gasson
Issue Report - Issue Closure Report
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
Ian Chalfon
Solution Development
Proposed Solution Document
Document title
I0337 legal text changes
Upload document
I0337 proposed solution.pdf
Archive
Off
Problem Statement
ONAGE files are Market Messages sent from Gas Suppliers to Gas Metering Asset Managers (MAMs) to appoint or de-appoint the MAM following a change of Energy Supplier or a change of MAM. The 'Location Code' (A0059) Data Item within ONAGE tells MAMs where a meter is located within the property (“01 = cellar”, “02 = under stairs”, etc). A0059 is currently an 'Optional' data item, which means that ONAGE entries are valid even where A0059 is blank. Although most Energy Suppliers send ONAGE files that always have A0059 populated, including when it is "00 = unknown", it is possible for ONAGE files to be sent with a blank ‘Location Code’. This Issue was raised by a MAM who has identified that this leads to rejections of the ONAGE appointment (APPT) files where the A0059 is left blank as this is a mandatory field in their internal systems. The location of the meter installation is also required for MAMs to deliver their safety and asset maintenance obligations.
Workgroup
Workgroup(s)
I0337 submission form
Company Name
-
Review status
Review required

Removal of D0383 & D0384 requirements from Sharing MTDs process

Date of latest update
Type
Change
ID
R0328
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Proposer
Harriet Truss
Change report - Final Change Report

Comments deadline
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jul 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Aug 2026

Change Report (For Consultation) presented to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Aug 2026

Final Recommendation approved at MEP

Completed

Start:

Due:

Completion:

14 Oct 2026
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Upload document
R0328 legal text V0.1.zip
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
R0328 Consolidated Consultation Responses v1.0
R0328 Change Report (Final Recommendation) V1.0 Approved 14.10.26
Company Name
REC Code Manager
Review status
Review required
Schedule 14 - Metering Operations 7.3 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC N/A
Metering Equipment Managers Mandatory
Approved Meter Installers Mandatory
Electricity Metering Operatives Mandatory
Non-REC Service Users N/A
Loading...

Crossed Meters Process: Clarifications and Support

Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
On 30 October 2026, the REC Change Panel approved an Extension to Plan for I0314 via ex-committee.
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Proposer
James Hardy
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Solution Development
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
I0314 Extension to Plan V1.0 (Approved) 30.10.26
Company Name
REC Code Manager
Review status
Review required

Review of export meter work arrangements

Date of latest update
Type
Change
ID
R0312
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/11/2026 The Party impact assessment has now opened until 23:59 on 04/12/2026
Summary
The REC Metering Operations Schedule has limited distinction between the activities for import and export metering. These provisions were not specifically developed to support a market with high volumes of small-scale microgeneration with shared metering assets for import and export.
Proposer
Jon Hawkins
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
There is a lack of distinction within REC Schedule 14 – Metering Operations between activities for Import and Export Metering, and how to manage work arrangements where is a shared Metering Asset between Import and Export Suppliers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Workgroup
Workgroup(s)
I0312 submission form
I0312 Change Report (Proposal Plan) v1.0 Approved 21.04.26
Change Report (Update to Plan) V1.0 Pre-Approval 10.11.26
R0312 Process Maps and Proposed Solution Requirements
Company Name
-
Review status