Energy Code Reform - consequential changes to the REC
Date of latest update
Type
Change
ID
R0348
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Final Recommendation has been published for determination by the REC Change Panel on 17 November 2026.
Summary
On 04 September 2026, Ofgem published a Statutory consultation to seek views on proposed amendments to the Retail Energy Code and affected licences required to implement the new governance framework. The proposals address the principal changes required to introduce the new code governance arrangements, including the revised Code Modification process, the Stakeholder Advisory Forum (SAF), changes to existing governance arrangements and transitional provisions. A review of the wider REC baseline has identified that implementation of those changes has consequential impacts on other REC Schedules and subsidiary REC products which are not, or are not fully, addressed by Ofgem’s proposed statutory modifications. Ofgem's statutory Code Reform process will itself introduce amendments to the REC, including amendments to a number of REC Schedules. Those amendments are outside the scope of R0348 and are not being proposed, assessed or approved through this Change Proposal. Where a REC Schedule is being amended both by Ofgem and by R0348, the two sets of amendments will need to be read together and, on implementation, consolidated to form the complete revised Schedule
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
Without corresponding consequential amendments, parts of the REC baseline could retain references, responsibilities, governance arrangements or processes that are inconsistent with reformed REC arrangements. This could create ambiguity over which governance arrangements apply, where responsibilities sit and which process should be followed. It would also mean that different REC products could describe the same arrangements inconsistently.
Stages Selection
Workgroup
Workgroup(s)
Energy Code Reform - consequential changes to the REC submission form
Legal Drafting - consultation
Legal Drafting - Final
R0348 Consolidated consultation responses
Change Report - Final Recommendation
Company Name
-
Review status
Review required
Schedule 15 - Metering Accreditation 3.2
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | N/A |
| Distribution Network Operators | N/A |
| DCC | N/A |
| Approved Meter Installers | Mandatory |
| Electricity Metering Operatives | Mandatory |
| Metering Equipment Managers | Mandatory |
| Automated Meter Reading Service Providers | Voluntary |
Loading...
Introduction of Defined Electricity Metering Work Categories for Metering Accreditation
Date of latest update
Type
Issue
ID
I0335
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/2026 The Information Request has closed and the Consolidated Responses have been published.
Summary
Currently, there are no clearly defined or standardised categories of work for electricity third-party activities within CoMCoP. This lack of categorisation reduces transparency of company capabilities and scope of work, limits the ability to align accreditation with actual operational activity and restricts the ability to apply targeted, risk-based audit assurance.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Stages Selection
Stages Selection
I0335 submission form.pdf
I0335 - Change Report (Proposal Plan) v1.0
I0335 - Change Report (Proposal Plan) v1.0 Approved 15.09.26
I0335 Consolidated IR Responses NON-CONFIDENTIAL v0.1.pdf
Company Name
Wilcock Consultants Ltd
Review status
Review required
CoMCoP 2-year Audit Cycles
Date of latest update
Type
Change
ID
R0311
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Renewal audits under the Consolidated Metering Code of Practice (CoMCoP) are consistently delivered on a 2 year cycle and include both a desktop audit and a site audit. However, Schedule 15 currently does not explicitly define this.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An update to the REC Schedule 15 - Metering Accreditation
Proposed Solution Document
Document title
R0311_Draft legal text (For Final Recommendation)
Upload document
R0311_Draft legal text (4).docx
Archive
Off
Problem Statement
The current lack of explicit wording in the Metering Accreditation Schedule of both a desktop and site audits that need to be completed one year after the initial accreditation, and then every two years for renewals introduces ambiguity for future audit delivery undertaken under CoMCoP as it creates a gap between operational practice and the codified baseline. This could potentially lead to inconsistent approaches by Parties, which in turn could reduce the consistency, predictability, and effectiveness of the industry’s audit and assurance framework.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0311 submission form
Draft legal text (On submission)
R0311 Draft legal text (For Consultation)
R0311_Change Report (Final Recommendation)_v1.1 (13 May 2026)
Company Name
Wilcock Consultants Ltd (WCL)
Review status
Review required
Schedule 15 - Metering Accreditation 3.1
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | N/A |
| Distribution Network Operators | N/A |
| DCC | N/A |
| Metering Equipment Managers | Mandatory |
| Automated Meter Reading Service Providers | Voluntary |
| Approved Meter Installers | Mandatory |
| Electricity Metering Operatives | Mandatory |
| Meter Equipment Managers | Mandatory |
Loading...
Schedule 15 - Metering Accreditation 3.0
– Implemented on
Loading...
Establishing the Safe Isolation Provider (SIP) as a Standalone REC Party
Date of latest update
Type
Issue
ID
I0278
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - An Update to Plan has been approved by the Change Panel on 21 July 2026.
Summary
This proposal recommends the formal recognition of the Safe Isolation Provider (SIP) as a standalone Party under the Retail Energy Code (REC). This aligns with the direction set out in Ofgem’s recently published Strategic Direction Statement (SDS), which explicitly calls for the establishment of SIPs as a standalone Party role. The aim is to address the growing scale of unregulated SIP activity, mitigate associated consumer safety risks, and ensure the metering industry is equipped to support the UK’s Net Zero ambitions. By enabling easier access to certified SIPs, this change will enhance consumer protection, accelerate low-carbon technology deployment, and improve operational efficiency across the energy sector.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The current SIP framework poses several risks: - Consumers, MEMs and unaccredited practitioners’ safety. Unaccredited and unregulated isolation work increases the risk of unsafe installations and potential harm to Consumers. NAPIT highlighted to RECCo and DESNZ that 17 and 13 unregulated practitioners respectively died in 2023 and in 2024 due to unsafe isolation. With the right Party undertaking this work, there would also be less safety issues for the Consumer at their premises; - Inequity. Independent Installers face longer wait times compared to supplier-led installations, creating a two-tier system; - Low competitive market. Currently prospective Parties can be put off from applying to be a SIP as it appears they would need full MEM Accreditation which is often too far outside their current business operating model. Providing SIPs with their own pathway and requirements could result in more Parties becoming SIPs and therefore giving Consumers more choice in their provider; and - Decarbonisation delays. The inability to scale SIP capacity undermines the timely deployment of LZCTs, threatening Net Zero targets.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0278 submission form
I0278 Change Report (Proposal Plan) V1.0 (Pre-Approval) 09.10.2025
I0278_Change Report (Extension to Plan) v1.0 (Pre-Approval) 12.01.2026
I0278_Change Report (Extension to Plan) v2.0 (Pre-Approval) 13.07.2026
I0278_Change Report (Extension to Plan) v2.1 (Approved) 21.07.26
I0278_Consolidated Information Request DNO Responses
I0278_Consolidated Information Request MEM-SIP Responses PUBLIC
I0278_Consolidated Information Request RPA Responses
Company Name
RECCo
Review status
Review required
Clarification of SIP Qualification Requirements
Date of latest update
Type
Change
ID
R0270
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
REC Schedules 1, 14, and 15 all note that in order to Qualify as a Safe Isolation Provider (SIP), the Party needs to be a Qualified Meter Operator Agent (MOA). It has since been determined that Qualified Electricity Metering Operatives (EMOs) should also be able to Qualify as SIPs.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
18 Nov 2025Change Report (For Consultation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
10 Dec 2025Change Report (Final Recommendation) approved by Metering Expert Panel
Completed
Start:
Due:
Completion:
11 Feb 2026Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0270 draft legal text
Upload document
I0270 draft legal text.zip
Archive
Off
Problem Statement
Requiring SIPs to be fully Qualified MOAs may be hindering smaller Parties who wish to be SIPs from Qualifying under the REC. This in turn may be reducing the number of Qualified SIPs in the market for Consumers to choose from or causing Consumers inadvertently to contract with people who are not Qualified SIPs to carry out SIP Works.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0270 Submission Form
I0270 Change Report (Proposal Plan) V1.0 approved 18.11.25
R0270 Change Report (For Consultation) V1.1 approved 10.12.25
R0270 Consolidated Consultation Responses V1.0
R0270 Change Report (Final Recommendation) V1.0 approved 11.02.26
Company Name
REC Code Manager
Review status
Review required
Schedule 15 - Metering Accreditation 2.7
– Implemented on
Loading...
Schedule 15 - Metering Accreditation 2.6
– Implemented on
Market Participant Applicability
| Market participant | All Sections |
|---|---|
| Domestic Suppliers | Mandatory |
| Non-Domestic Suppliers | Mandatory |
| Gas Transporters | N/A |
| Distribution Network Operators | N/A |
| DCC | N/A |
| Electricity Metering Operatives | Mandatory |
| Meter Installers | Mandatory |
| Metering Equipment Managers | Mandatory |
| Automated Meter Reading Service Providers | Voluntary |
Loading...