Provision of Grid Supply Point Group ID from a Postcode search in EES

Date of latest update
Type
Change
ID
R0111
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/04/2024 - The Code Manager has rejected the progression of R0111 as Postcode itself does not always have a direct correlation to the GSP Group and believes that a full address should be provided so that accurate quotes are given to a Consumer.
Summary
Empty
Proposer
Andrew Dawson
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0111 - CP Form (Downloadable version)
Company Name
GB Group plc
Review status
Review required

Enabling Electricity Enquiry Service searches using a Unique Property Reference Number

Date of latest update
Type
Change
ID
R0108
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Consumers that wish to utilise multi-channel switching services for gas, electricity, water, broadband, bank, home insurance etc. cannot make use of generic address-capture services for electricity switching as Unique Property Reference Number (UPRN) search functionality is not available within the Electricity Enquiry Service (EES).
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment window start

Completed

Start:

19 Apr 2023

Due:

02 Oct 2023

Completion:

02 Oct 2023

Service Provider Impact Assessment window close

Completed

Start:

02 Oct 2023

Due:

18 Dec 2023

Completion:

18 Dec 2023

Party Impact Assessment start

Completed

Start:

18 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Preliminary Change Report and Consultation issued

Completed

Start:

02 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Party Impact Assessment close

Completed

Start:

12 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Consultation close

Completed

Start:

16 Feb 2024

Due:

08 Mar 2024

Completion:

08 Mar 2024

Final Change Report issued

Completed

Start:

08 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Responsible Committee decision

Completed

Start:

15 Mar 2024

Due:

27 Mar 2024

Completion:

27 Mar 2024

Appeal window closure

Completed

Start:

27 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to switch my electricity easily and efficiently.
  2. As I Consumer, I want to be able to quote or switch my electricity as part of a packaged search.
  3. As a Supplier, I want Consumers to be able to search for quotes and switch efficiently.
  4. As an organisation providing multi-channel switching services, I want Consumers to be able to use one set of data when requesting quotes.
Proposed Solution Document
Document title
R0108 Requirements Specification v0.1
Upload document
R0108 Requirements Specification v0.1.xlsx
Archive
Off
Document title
Electricity Data Access Matrix_R0108 Draft
Upload document
Electricity Data Access Matrix_R0108 Draft.xlsx
Archive
Off
Document title
EES API Interface Specification v3.1.6 - Redline
Upload document
EES API Interface Specification v3.1.6 - Redline (1).docx
Archive
Off
Problem Statement
Consumers that wish to utilise multi-channel switching services, cannot benefit from the efficiencies of using a UPRN for the electricity Switch as the EES does not provide this functionality.
SME
SME Role
Lead Technical Analyst
Change Proposal Form
R0108 - Change Proposal Plan (Approved) 17.10.2023
R0108 - Initial Assessment Report (Approved) 17.10.2023
R0108 Consolidated Party IA Responses v1.0 Non-confidential (16.02.2024)
R0108 - Preliminary Change Report v1.0 published for consultation (16.02.2024)
R0108 - Consolidated Consultation Responses_Non Confidential (15.03.2024)
R0108 - Final Change Report v2.0 Post-Vote (27.03.2024)
Company Name
GB Group plc
Review status
Review required

Revision of the approved solution for R0032

Date of latest update
Type
Change
ID
R0102
Priority
Urgent
Yes
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
REC Parties have started to prepare for the release and implementation of R0032, during this preparation the REC Code Manager has received questions about the approved solution, specifically regarding the version of the D0312 (MM00256) Market Message (version 002 has been maintained through R0032) and the number of register digits that should be provided for specific meter types. The Code Manager has reviewed these questions and determined changes are required to the approved solution. Therefore, this Change Proposal has been raised to progress changes to the approved solution.
Proposer
Ann Perry
Change Plan

Solution Analysis and Development

Completed

Start:

23 Mar 2023

Due:

31 Mar 2023

Completion:

31 Mar 2023

Service Provider Impact Assessment Complete

Completed

Start:

31 Mar 2023

Due:

11 Apr 2023

Completion:

11 Apr 2023

Party Impact Assessment Completed

Completed

Start:

11 Apr 2023

Due:

11 Apr 2023

Completion:

11 Apr 2023

Preliminary Change Report Published for Consultation

Completed

Start:

11 Apr 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Consultation Start

Completed

Start:

14 Apr 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Consultation End

Completed

Start:

14 Apr 2023

Due:

21 Apr 2023

Completion:

21 Apr 2023

Final Change Report Published

Completed

Start:

21 Apr 2023

Due:

24 Apr 2023

Completion:

24 Apr 2023

Responsible Committee Discussion

Not Started

Start:

24 Apr 2023

Due:

26 Apr 2023

Completion:

Appeal Window Closure

Not Started

Start:

26 Apr 2023

Due:

12 May 2023

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Solution Development
Proposed solution summary
  1. As an impacted Market Participant, I want to have clarity on version of the Market Message and the population of Data Items within the Data Specification, so that my internal systems can be correctly configured to send and receive Data Items within Market Messages.
Proposed Solution Document
Document title
R0102 Proposed Data Specification Changes (Published with Consultation) 29.03.2023
Upload document
Attachment 1 - R0102 Proposed Data Specification Changes 29.03.2023.docx
Archive
Off
Document title
R0102 Proposed Data Specification Changes (Published with Final Change Report) 24.04.2023
Upload document
ATTACH~1 (4).doc
Archive
Off
Document title
R0032 and R0102 Combined Legal Text (Published with Final Change Report) 24.04.2023
Upload document
R0032 and R0102 Combined Legal Text.docx
Archive
Off
Problem Statement
In preparation for the implementation of R0032, Parties have identified areas of ambiguity with the approved solution. Following a review, the Code Manager confirmed that changes are required to the approved solution for R0032, which will ensure Parties have sufficient clarity to implement the required changes to their own systems and processes.
R0102 Change Proposal Form (downloadable version) 23.03.2023
R0102 - Change Proposal Plan v1.0 (Approved) 06.04.2023
R0102 - Initial Assessment Report v1.0 (Approved) 06.04.2023
R0102 - Consolidated Impact Assessment Responses 14.04.2023
R0102 - Preliminary Change Report (Issued for Consultation) 14.04.2023
R0102 - Consolidated Consultation Responses
R0102 - Final Change Report v2.0 (Post-Vote) 26.04.2023
Company Name
-
Review status
Review required

Optional fuzzy searching in EES

Date of latest update
Type
Change
ID
R0098
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change seeks to introduce new configuration settings in to the EES API - to enable a search to be exact or fuzzy.
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment window start

Completed

Start:

07 Mar 2023

Due:

09 Oct 2023

Completion:

09 Oct 2023

Service Provider Impact Assessment window close

Completed

Start:

09 Oct 2023

Due:

27 Dec 2023

Completion:

24 Nov 2024

Party Impact Assessment start

Completed

Start:

27 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Party Impact Assessment close

Completed

Start:

12 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Preliminary Change Report and Consultation issued

Completed

Start:

02 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Consultation close

Completed

Start:

16 Feb 2024

Due:

08 Mar 2024

Completion:

08 Mar 2024

Final Change Report issued

Completed

Start:

08 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Responsible Committee decision

Completed

Start:

15 Mar 2024

Due:

27 Mar 2024

Completion:

27 Mar 2024

Appeal window closure

Completed

Start:

27 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to switch my electricity easily and efficiently.
  2. As an organisation providing switching services, I want Consumers to be able to search addresses efficiently.
Proposed Solution Document
Document title
EES Technical Requirement Specification v0.2
Upload document
R0098 Requirements Specification v0.2.xlsx
Archive
Off
Document title
EES API Interface Specification v3.1.6 - Redline
Upload document
EES API Interface Specification v3.1.6 - Redline.docx
Archive
Off
Problem Statement
Where a Consumer initiates a Switch through a Supplier, PCW or TPI that utilises the EES API address searches can fail as the API only undertakes “fuzzy” matching. Address Search errors will then need to go through an exception handling process creating an inefficiency and producing a loss of confidence in the Switching process.
SME
SME Role
Lead Technical Analyst
R0098 - Change Proposal Form 08.03.2023
R0098 - Change Proposal Plan (Approved) 17.10.2023
R0098 - Initial Assessment Report (Approved) 17.10.2023
R0098 Consolidated Party IA Responses v1.0_Non Confidential (16.02.2024)
R0098 - Preliminary Change Report v1.0 published for consultation (16.02.2024)
R0098 - Consolidated Consultation Responses_Non Confidential (15.03.2024)
R0098 - Final Change Report v2.0 Post-Vote (27.03.2024)
Company Name
GB Group plc
Review status
Review required

ERDS Upload File in the Data Specification and clarification of cancellation code

Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Proposer
admin
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required

Formalising the Submission of PPMIP Unallocated Transaction Report (UTR) Files

Date of latest update
Type
Change
ID
R0082
Change Category
Change Path
Priority
Urgent
No
Latest Update
09/04/2024 - Due to the MHHS impact on Service Providers, the technical code freeze and any MHHS impacts on the proposed solution, the Code Manager has reconsidered the priority of R0082 and believes that should be progressed following MHHS go-live. This Change Proposal has been withdrawn, and the Code Manager will consider raising a new change at the appropriate time following MHHS with consideration of the Codes Roadmap.
Summary
This CP seeks to address the following issues regarding the Unallocated Transaction Report (UTR) files provided by PPMIPs to the Code Manager each month: 1. There is no REC requirement for PPMIPs to submit a monthly file to the Code Manager 2. PPMIPs are currently submitting files in two different file formats 3. C&C is only able to load one of the two file formats The CP has been raised to introduce a requirement in the REC for PPMIPs to provide monthly Unallocated Transaction Report (UTR) files to the Code Manager in a single file format, set out in the REC Data Specification. With this format being one that can be loaded by C&C.
Proposer
Rosalind Timperley
Change Plan

Solution analysis and development

Completed

Start:

28 Nov 2022

Due:

12 Jan 2024

Completion:

11 Jan 2024

Service Provider Impact Assessment start date

Completed

Start:

12 Jan 2024

Due:

15 Jan 2024

Completion:

15 Jan 2024

Service Provider Impact Assessment close

Completed

Start:

15 Jan 2024

Due:

11 Mar 2024

Completion:

11 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a PPMIP, I want to have clear guidance on how and when I should submit my Unallocated Transaction Report files.
  2. As a Supplier, I want to receive accurate Unallocated Transactions in relation to prepayment meters that are not smart meters.
  3. As the Code Manager, I want visibility of the Unallocated Transaction Report.
  4. As the EES Provider, I want to be able to efficiently upload the Unallocated Transaction Reports.
Problem Statement
PPMIPs aren’t submitting UTR files in the same format, and one of these formats cannot be loaded by the EES Provider. There is also no obligation in the REC for these reports to be provided.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0082 - Change Proposal Form
R0082 - Change Proposal Plan (Approved) 17.10.2023
R0082 Initial Assessment Report (Approved) 17.10.2023
Company Name
REC Code Manager
Review status
Review required

DCC access to EES and GES

Date of latest update
Type
Change
ID
R0071
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2023 - R0071 is approved by Change Panel for implementation in February release.
Summary
This Change seeks to create a new User Category in REC Schedule 12 – Data Access, to allow the Switching Service Desk to access the Gas and Electricity Enquiry Services (GES and EES). This would result in more expeditious Service Desk ticket resolution and a positive indirect impact on consumer outcomes.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

25 Sep 2022

Due:

21 Sep 2023

Completion:

Preliminary Change Report Issued

Completed

Start:

21 Sep 2023

Due:

06 Oct 2023

Completion:

Responsible Committee Review

Completed

Start:

06 Oct 2023

Due:

17 Oct 2023

Completion:

17 Oct 2023

Consultation Issued

Completed

Start:

17 Oct 2023

Due:

20 Oct 2023

Completion:

20 Oct 2023

Final Change Report Issued

Completed

Start:

20 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Responsible Committee Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.8.0
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 26 - Switching Service Management
R0156 Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification
R0071 DCC access to EES and GES
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)

Documents

Name Version Last updated Actions
176.62 KB
Version 1.0 - 02 Nov 2026 PDF - 176.62 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be handled appropriately, so that I can have a consistent and faultless switching experience.
  2. As the Switching Service Desk, I want to be able to access market data that lets me resolve tickets first time, so that I can provide a more efficient service to users. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible. As the EES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0071 Proposed Legal Text
Upload document
R0071 Legal Text - Gas Data Access Matrix v3.2.2 - Published with FCR - 10.11.23.zip
Archive
Off
Problem Statement
The Switching Service Desk generates and resolves tickets relating to Switching Incidents and Switching Data queries for Market Participants. GES and EES data is currently unavailable to the Switching Service Desk and access would allow them to resolve tickets more effectively, resulting in a more efficient service and better SLA performance.
SME
SME Role
Lead Technical Analyst
R0071 - Change Proposal Form
R0071 Change Proposal Plan v2.0 (Approved) - 05.09.2023
R0071 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0071 Preliminary Change Report v1.0 (Approved) - 17.10.23
R0071 Consolidated Consultation Responses v1.0 - 10.11.23
R0071 Final Change Report V1.0 (Post-Vote) 21.11.23
Company Name
-
Review status
Review required

Introduction of CSS refresh functionality

Date of latest update
Type
Change
ID
R0067
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSP) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Change Proposal seeks to introduce a refresh functionality to mitigate these issues.
Proposer
Michael Taylor
Change Plan

Solution Analysis and Development

Completed

Start:

29 Aug 2022

Due:

19 Oct 2022

Completion:

19 Oct 2022

Service Provider Impact Assessment

Completed

Start:

19 Oct 2022

Due:

29 Mar 2023

Completion:

29 Mar 2023

Consultation

Completed

Start:

11 Apr 2023

Due:

09 May 2023

Completion:

28 Apr 2023

Preliminary Change Report Issued

Completed

Start:

29 Mar 2023

Due:

11 Apr 2023

Completion:

05 Apr 2023

Final Change Report Issued

Completed

Start:

Due:

Completion:

21 Jun 2023

Responsible Committee Decision

Completed

Start:

09 May 2023

Due:

28 Jun 2023

Completion:

28 Jul 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to SDSPs to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience. As the CSS Provider, I want the functionality to be available for SDSPs to automatically resolve issues when messages are not received in the correct order or are received after Gate Closure, so that this work does not have to be done manually.
  3. As an SDSP, I want to be able to detect when I have not received the expected CSS messages, so that I am able to request that the missing messages are sent to me to process. As an SDSP I want to be able to request a refresh of CSS messages when they are not received in the correct order or they are received after Gate Closure, so that I am able to maintain an accurate reflection of the current Switch status and minimise impacts on CSS Users and Consumers.
Proposed Solution Document
Document title
R0067 - Legal Text at PCR
Upload document
R0067 - Legal Text at PCR.zip
Archive
Off
Document title
R0067 - Legal Text at FCR
Upload document
R0067 - Legal Text at FCR.zip
Archive
Off
Document title
R0067 - Cost Benefit Analysis and Conclusions v3.0
Upload document
R0067 - Cost Benefit Analysis and Conclusions v3.0.pdf
Archive
Off
Problem Statement
CSS messages not received by the SDSPs in the order they were sent or received, or after Gate Closure, can be difficult to detect and often require significant manual effort to resolve. This issue can directly impact Consumer switching experiences causing disruption and possible delays.
SME
SME Role
Lead Technical Analyst
R0067 - Change Proposal Form
R0067 - Consolidated Consultation Responses
R0067 - Change Proposal Plan v1.0
R0067 - Initial Assessment Report v1.0
R0067 - Change Proposal Plan v2.0 (Approved) 07.03.2023
R0067 - Change Proposal Plan v3.0 04.04.2023
R0067 - Preliminary Change Report v2.0 (Issued for Consultation) 14.04.2023
R0067 - Final Change Report (Post-Vote) 28.06.2023
Company Name
-
Review status
Review required

EES Access for Virtual Lead Parties

Date of latest update
Type
Change
ID
R0054
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/04/2023 - The Data Access Matrix changes went live on 04 November 2022, the technical changes to EES were implemented alongside R0022 on 03 April 2023.
Summary
This Change Proposal seeks to allow Virtual Lead Parties (VLP) access to the Electricity Enquiry Service (EES), to allow them to efficiently register their customers for balancing services under the Balancing and Settlement Code (BSC).
Proposer
Ann Perry
Change Plan

Service Provider Impact Assessment

Completed

Start:

17 Jun 2022

Due:

22 Jul 2022

Completion:

22 Aug 2022

Preliminary Change Report Issued

Completed

Start:

22 Jul 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Consultation Issued

Completed

Start:

02 Sep 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Consultation Complete

Completed

Start:

02 Sep 2022

Due:

16 Sep 2022

Completion:

16 Sep 2022

Final Change Report Issued

Completed

Start:

16 Sep 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Responsible Committee Decision

Completed

Start:

14 Oct 2022

Due:

26 Oct 2022

Completion:

26 Oct 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my VLP to have access to the data needed to correctly register me in a timely manner, so there aren’t delays in the delivery of my service.
  2. As a VLP, I want to have access to all the data I need to register my customers so I can deliver the service they have requested, without delay.
  3. As a VLP, I want to be able to use the EES to find the MPAN of a customer using their address information, to enable me to reliably gather this data to without delay or further engagement with my customer.
Proposed Solution Document
Document title
R0054 - Draft DAM Change
Upload document
R0054 Draft DAM changes.xlsx
Archive
Off
Document title
R0054 - Draft Legal Text
Upload document
R0054 Draft legal text v2.0.pdf
Archive
Off
Problem Statement
VLPs are required to provide their customer’s MPAN as part of the registration process, as per the Balancing and Settlement Code (BSC). VLPs do not currently have access to the EES to enable an MPAN search and they have no reliable means to acquire the MPAN, other than asking their customer to provide it. This could potentially lead to delays in the registration process and may result in an increased risk of inaccurate data, detrimentally impacting the service VLPs are able to provide to their customers.
R0054 - Initial Assessment Report v1.0 (Approved)
R0054 - Change Proposal Plan v1.0 (Approved)
R0054 - Preliminary Change Report v1.0 (Published for Consultation)
R0054 - Non-Confidential Consultation Responses
R0054 - Final Change Report v2.0
Company Name
-
Review status
Review required

REC V3.0

Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Alasdair MacMillan
Change Plan

Legal text baselined

Completed

Start:

10 Apr 2022

Due:

13 May 2022

Completion:

13 May 2022

Final Change Report Issued

Completed

Start:

13 May 2022

Due:

20 May 2022

Completion:

20 May 2022

Responsible Committee Decision

Completed

Start:

20 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Authority Determination (Original)

Completed

Start:

07 Jun 2022

Due:

20 Jun 2022

Completion:

17 Jun 2022

Authority Determination (revoked and re-issued)

Completed

Start:

20 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.0.0_Superseded
Included changes Affected REC Items
R0038 Performance Assurance Report Catalogue Changes as a consequence of REC V3.0
R0041 REC V3.0
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 5 - Change Management
  • Schedule 27 - RMP Lifecycle
  • ASPCoP (since removed)
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0042 Performance Assurance Board Terms of Reference
  • Performance Assurance Board - Terms of Reference
R0045 Changes to SDEP Messages and Schedule numbering for REC V3.0
  • Market Message Catalogue

Documents

Name Version Last updated Actions
258.97 KB
Version 1.0 - 02 Nov 2026 PDF - 258.97 KB
1.0 02 Nov 2026
257.76 KB
Version 1.0 - 02 Nov 2026 DOCX - 257.76 KB
1.0 02 Nov 2026
219.4 KB
Version 1.0 - 16 Nov 2026 PDF - 219.4 KB
1.0 16 Nov 2026
1.65 MB
Version 1.0 - 02 Nov 2026 PPTX - 1.65 MB
1.0 02 Nov 2026
6.74 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.74 MB
1.0 02 Nov 2026
9.01 MB
Version 1.0 - 02 Nov 2026 PPTX - 9.01 MB
1.0 02 Nov 2026
3.89 MB
Version 1.0 - 02 Nov 2026 PPTX - 3.89 MB
1.0 02 Nov 2026
1.0 02 Nov 2026
16.78 KB
Version 1.0 - 02 Nov 2026 XLSX - 16.78 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
  2. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
  3. As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
  4. As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Upload document
R0041 Legal Text.zip
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required