Optional fuzzy searching in EES
Service Provider Impact Assessment window start
Start:
07 Mar 2023Due:
09 Oct 2023Completion:
09 Oct 2023Service Provider Impact Assessment window close
Start:
09 Oct 2023Due:
27 Dec 2023Completion:
24 Nov 2024Party Impact Assessment start
Start:
27 Dec 2023Due:
12 Jan 2024Completion:
12 Jan 2024Party Impact Assessment close
Start:
12 Jan 2024Due:
02 Feb 2024Completion:
02 Feb 2024Preliminary Change Report and Consultation issued
Start:
02 Feb 2024Due:
16 Feb 2024Completion:
16 Feb 2024Consultation close
Start:
16 Feb 2024Due:
08 Mar 2024Completion:
08 Mar 2024Final Change Report issued
Start:
08 Mar 2024Due:
15 Mar 2024Completion:
15 Mar 2024Responsible Committee decision
Start:
15 Mar 2024Due:
27 Mar 2024Completion:
27 Mar 2024Appeal window closure
Start:
27 Mar 2024Due:
12 Apr 2024Completion:
12 Apr 202408 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Consumer, I want to be able to switch my electricity easily and efficiently.
- As an organisation providing switching services, I want Consumers to be able to search addresses efficiently.
Consequential Change for CSS Smart Meter Data Retriever Appointments
Service Provider Impact Assessment started
Start:
20 Feb 2023Due:
22 Mar 2023Completion:
22 Mar 2023Service Provider Impact Assessment completed
Start:
22 Mar 2023Due:
03 May 2023Completion:
03 May 2023Preliminary Change Report and Consultation issued
Start:
03 May 2023Due:
19 May 2023Completion:
19 May 2023Consultation closed
Start:
19 May 2023Due:
05 Jun 2023Completion:
05 Jun 2023Final Change Report issued
Start:
05 Jun 2023Due:
21 Jun 2023Completion:
15 Jun 2023Responsible Committee decision
Start:
21 Jun 2023Due:
28 Jun 2023Completion:
04 Jul 2023Appeal Window opens
Start:
28 Jun 2023Due:
04 Jul 2023Completion:
04 Jul 2023Appeal Window closes
Start:
04 Jul 2023Due:
18 Jul 2023Completion:
18 Jul 2023MHHS Programme Milestone M8 (Code changes delivered)
| Included changes | Affected REC Items | |
|---|---|---|
| R0044 | MHHS Programme Changes required to Central Switching Service |
|
| R0173 | Improvements to the Theft Detection Incentive Scheme (TDIS) |
|
| R0209 | Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements |
|
| R0222 | ESME ID Update Rejections | |
| R0223 | Reconciliation of Unallocatable Transactions Review |
|
| R0241 | MHHS Incremental Changes for go live |
|
| R0259 | Update to R0173 Implementation Date | |
| R0264 | Data Specification Housekeeping | |
| R0083 | Changes to Supply Number Format for MHHS | |
| R0097 | Consequential Change for CSS Smart Meter Data Retriever Appointments |
|
- As the CSS Provider, I want to be able to identify which appointment messages received from ERDS require a response, so that I can confirm whether the appointment was successfully made in SMDSP
- As the ERDS Provider, I want to be able to indicate which appointment messages I need to receive a response for, so that I can understand which appointments have been successful in the SMDSP
- As an Electricity Supplier, I want Supplier appointments in the ERDS to match those held in SMDSP
Clarify obligations on gas meter exchanges that occur close to CoS
Solution Development & Analysis
Start:
17 Feb 2023Due:
29 Mar 2024Completion:
27 Mar 2024Party Impact Assessment Due
Start:
29 Mar 2024Due:
19 Apr 2024Completion:
19 Apr 2024Preliminary Change Report Issued
Start:
19 Apr 2024Due:
26 Apr 2024Completion:
26 Apr 2024Responsible Committee Review
Start:
26 Apr 2024Due:
08 May 2024Completion:
08 May 2024Consultation Closes
Start:
08 May 2024Due:
31 May 2024Completion:
31 May 2024Final Change Report Issued
Start:
31 May 2024Due:
05 Jun 2024Completion:
05 Jun 2024Responsible Committee Decision
Start:
05 Jun 2024Due:
12 Jun 2024Completion:
12 Jun 2024Appeal Window Closure
Start:
12 Jun 2024Due:
26 Jun 2024Completion:
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Consumer, I want my Supplier to have accurate information about my meter, so that I do not experience billing problems following a Switch.
- As a MEM, I want to clearly understand my obligations relating to data transfer during a Switch, so that records of work I carry out are accurately recorded. 2 - As a Registered Supplier, I want metering data on my portfolio of Registrable Measurement Points to be accurate, so that Consumers do not experience billing problems or have a negative switch experience. 3 - As the CDSP, I want Change of Metering Asset data communicated with me to be timely and accurate, so that I am better able to fulfil my role and support REC Parties.
Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
Solution Analysis and Development completed
Start:
08 Feb 2023Due:
06 Apr 2023Completion:
04 Apr 2023Service Provider Preliminary Impact Assessment period started
Start:
06 Apr 2023Due:
06 Apr 2023Completion:
04 Apr 2023Service Provider impact assessment period completed
Start:
06 Apr 2023Due:
23 Oct 2023Completion:
23 Oct 2023Preliminary Change Report issued
Start:
23 Oct 2023Due:
17 Nov 2023Completion:
17 Nov 2023Responsible Committee review
Start:
17 Nov 2023Due:
29 Nov 2023Completion:
29 Nov 2023Consultation issued
Start:
29 Nov 2023Due:
01 Dec 2023Completion:
01 Dec 2023Consultation closed
Start:
01 Dec 2023Due:
15 Dec 2023Completion:
15 Dec 2023Final Change Report issued
Start:
15 Dec 2023Due:
12 Jan 2024Completion:
12 Jan 2024Responsible Committee decision
Start:
12 Jan 2024Due:
24 Jan 2024Completion:
24 Jan 2024Appeal Window closure
Start:
24 Jan 2024Due:
08 Feb 2024Completion:
08 Feb 202428 March 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0147 | Prepayment Levelisation |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As an Electricity Consumer, I want the migration of my MPAN to the new HH Settlement arrangements to be as smooth as possible, so that the service I receive from my Electricity Supplier or it’s appointed agents is not interrupted As an Electricity Consumer, I want my ability to switch to be impacted as little as possible by MHHS migration activities
- As the Switching Operator, I want to be prepared for the increased volumes expected during the MHHS Migration Period. As the ERDS Provider, I want the CSS to be able to manage the volume of messages being sent so that I can provide the service I am required to during the MHHS Migration Period
- As an Electricity Supplier, I want the MPANs I select to the new HH Settlement arrangements to complete their migration without undue delay, so that the service I provide to Consumers is impacted as little as possible and so that I can meet my migration obligations As a MEM, as part of migration I want my new appointment and my legacy de-appointment to occur within the planned timescales so that the services I provide are impacted as little as possible As a Data Service, as part of migration, I want my new appointment to occur within the planned timescales so that the services I provide can commence in a timely manner As a Data Collector, I want my legacy de-appointment to occur within the planned timescales so that I have a clear understanding and smooth ending to the service I provide
Clarifications to the Theft Detection Incentive Scheme
Initial Assessment Report Issued
Start:
23 Jan 2023Due:
27 Jan 2023Completion:
27 Jan 2023Change Proposal Plan Issued
Start:
27 Jan 2023Due:
27 Jan 2023Completion:
27 Jan 2023Preliminary Change Report Issued
Start:
07 Feb 2023Due:
17 Feb 2023Completion:
17 Feb 2023Consultation Issued
Start:
17 Feb 2023Due:
17 Feb 2023Completion:
17 Feb 2023Responsible Committee Decision
Start:
17 Feb 2023Due:
24 Mar 2023Completion:
24 Mar 2023IAR and CPP Approval
Start:
27 Jan 2023Due:
07 Feb 2023Completion:
07 Feb 202301 April 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0047 | Metering Code of Practice Consolidation Review |
|
| R0025 | Service Provider Performance Charges (DCC) |
|
| R0073 | Introduction of a Housekeeping Change Proposal Process |
|
| R0084 | Housekeeping changes to the approved legal text for R0047 |
|
| R0091 | Clarifications to the Theft Detection Incentive Scheme |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As an Energy Supplier, I need my TDIS obligations to be clear to ensure I can meet the requirements appropriately.
- As the Code Manager, I want all Suppliers to be clear on the required Energy Theft reporting so that the scheme can be effectively administered.
- As RECCo, I want to ensure that all Suppliers have clear obligations to ensure the effective administration of TDIS to support the Theft Reduction Strategy.
Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text
Solution Development
Start:
23 Jan 2023Due:
23 Feb 2023Completion:
23 Feb 2023Party Impact Assessment Issued
Start:
23 Feb 2023Due:
24 Feb 2023Completion:
24 Feb 2023Preliminary Change Report Issued
Start:
24 Feb 2023Due:
27 Mar 2023Completion:
24 Mar 2023Consultation Issued
Start:
27 Mar 2023Due:
27 Mar 2023Completion:
24 Mar 2023Final Change Report Issued
Start:
27 Mar 2023Due:
19 Apr 2023Completion:
19 Apr 2023Responsible Committee Decision
Start:
19 Apr 2023Due:
26 Apr 2023Completion:
30 June 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0101 | Revision of the Implementation Date and approved solution for R0021 |
|
| R0102 | Revision of the approved solution for R0032 |
|
| R0114 | Housekeeping amendments |
|
| R0015 | Remote communication obligations for electricity Advanced Meters |
|
| R0010 | New Meter Types for Auxiliary Proportional Controllers (APCs) |
|
| R0011 | Reporting of Additional EMR Backing Data to Suppliers |
|
| R0021 | Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier |
|
| R0030 | Erroneous Transfer Cancellations |
|
| R0066 | Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change) | |
| R0032 | New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS) |
|
| R0090 | Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Market Participant I want to have clarity on the format of Data Items within the Data Specification, so that my internal systems can be correctly configured to send and receive Data Items within Market Messages.
Make Shipper NExA values available on the GES portal
Initial Assessment and Change Proposal Plan issued
Start:
16 Jan 2023Due:
24 Mar 2023Completion:
24 Mar 2023Initial Assessment Report and Change Plan approved
Start:
24 Mar 2023Due:
04 Apr 2023Completion:
04 Apr 2023Service Provider Impact Assessment
Start:
04 Apr 2023Due:
25 Apr 2023Completion:
24 Apr 2023Party Impact Assessment
Start:
25 Apr 2023Due:
31 May 2023Completion:
31 May 2023Preliminary Change Report published
Start:
31 May 2023Due:
16 Jun 2023Completion:
16 Jun 2023Consultation
Start:
16 Jun 2023Due:
21 Jul 2023Completion:
21 Jul 2023Final Change Report published
Start:
21 Jul 2023Due:
18 Aug 2023Completion:
18 Aug 2023Responsible Committee decision
Start:
18 Aug 2023Due:
30 Aug 2023Completion:
30 Aug 202303 November 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0110 | A review of Supplier access to data on GES | |
| R0138 | Combined progression of Change Proposals R0058, R0104 and R0129 | |
| R0140 | Housekeeping amendments | |
| R0059 | Maintenance of Qualification Schedule Change |
|
| R0088 | Make Shipper NExA values available on the GES portal | |
| R0017 | Invalid Requests for Site Technical Details |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Consumer, where I have entered a bi-lateral NExA with the relevant Transporter, I want my Shipper and Transporter to have access to all the data they need when capacity referrals to the Gas Transporters are required.
- As a Gas Transporter, I want the details of the NExA to be held in GES, to increase visibility of the existence of the NExA and to provide details of the offtake parameters.
- As a Gas Shipper, I need to understand both that a NExA exists, and that I have visibility of the offtake parameters relative to the site, so that I can ensure that I take the necessary actions to ensure the Consumer has the appropriate booked Supply Point Capacity.
Housekeeping changes to the approved legal text for R0047
Preliminary Change Report published and issued for Consultation
Start:
16 Dec 2022Due:
24 Feb 2023Completion:
24 Feb 2023Consultation ends
Start:
24 Feb 2023Due:
10 Mar 2023Completion:
10 Mar 2023Final Change Report published
Start:
10 Mar 2023Due:
21 Mar 2023Completion:
21 Mar 2023Responsible Committee decision (Ex-Committee)
Start:
21 Mar 2023Due:
24 Mar 2023Completion:
24 Mar 2023Appeal window closure
Start:
24 Mar 2023Due:
07 Apr 2023Completion:
01 April 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0047 | Metering Code of Practice Consolidation Review |
|
| R0025 | Service Provider Performance Charges (DCC) |
|
| R0073 | Introduction of a Housekeeping Change Proposal Process |
|
| R0084 | Housekeeping changes to the approved legal text for R0047 |
|
| R0091 | Clarifications to the Theft Detection Incentive Scheme |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
- As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
- As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
- As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Changes to Supply Number Format for MHHS
Solution development completed
Start:
05 Dec 2022Due:
31 Mar 2023Completion:
31 Mar 2023Party Impact Assessment issued
Start:
31 Mar 2023Due:
06 Apr 2023Completion:
06 Apr 2023Party Impact Assessment closed
Start:
06 Apr 2023Due:
02 May 2023Completion:
02 May 2023Preliminary Change Report issued
Start:
02 May 2023Due:
25 May 2023Completion:
26 May 2023REC Change Panel review of PCR
Start:
25 May 2023Due:
06 Jun 2023Completion:
06 Jun 2023Consultation issued
Start:
06 Jun 2023Due:
09 Jun 2023Completion:
09 Jun 2023Consultation closed
Start:
09 Jun 2023Due:
30 Jun 2023Completion:
30 Jun 2023Final Change Report issued
Start:
30 Jun 2023Due:
21 Jul 2023Completion:
20 Jul 2023REC Change Panel decision
Start:
21 Jul 2023Due:
01 Aug 2023Completion:
01 Aug 2023Authority Determination requested
Start:
01 Aug 2023Due:
03 Aug 2023Completion:
02 Aug 2023MHHS Programme Milestone M8 (Code changes delivered)
| Included changes | Affected REC Items | |
|---|---|---|
| R0044 | MHHS Programme Changes required to Central Switching Service |
|
| R0173 | Improvements to the Theft Detection Incentive Scheme (TDIS) |
|
| R0209 | Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements |
|
| R0222 | ESME ID Update Rejections | |
| R0223 | Reconciliation of Unallocatable Transactions Review |
|
| R0241 | MHHS Incremental Changes for go live |
|
| R0259 | Update to R0173 Implementation Date | |
| R0264 | Data Specification Housekeeping | |
| R0083 | Changes to Supply Number Format for MHHS | |
| R0097 | Consequential Change for CSS Smart Meter Data Retriever Appointments |
|
- As an electricity Consumer I want to be able to provide my prospective Energy Supplier with the necessary information for them to provide a suitable tariff. As a Non-Domestic Consumer, I want to have the necessary information that will allow me to access tariff information, specific to my business, to help me manage my energy. As an electricity Consumer, I want to have access to the data that will help me appoint my own Metering Equipment Manager (MEM) where permitted.
- As a Supplier, I want to know how to populate and format the Supply Number, so that I can meet my obligations to include it in Consumer bills or statements. As a Third Party Intermediary (TPI), I want Consumers to be able to provide me with the right information to provide appropriate quotes.
- As an independent Distribution Network Operator, I want to be able to identify and use the DUoS Tariff Id so that I can provide transparency on charging that is being applied to my customers. As the Electricity Enquiry Service (EES) Provider, I want to know how to populate the Supply Number so that I can make it available on the EES
Improvements to ‘Failed to Deliver’ CSS Messages
Service Provider Impact Assessment close
Start:
09 Nov 2022Due:
25 Jan 2024Completion:
25 Jan 2024Party Impact Assessment trigger
Start:
25 Jan 2024Due:
02 Feb 2024Completion:
02 Feb 2024Party Impact Assessment close
Start:
02 Feb 2024Due:
23 Feb 2024Completion:
23 Feb 2024Preliminary Change Report and Consultation issued
Start:
23 Feb 2024Due:
10 May 2024Completion:
10 May 2024Consultation close
Start:
10 May 2024Due:
03 Jun 2024Completion:
03 Jun 2024Responsible Committee Decision
Start:
24 Jul 2024Due:
31 Jul 2024Completion:
31 Jul 2024Final Change Report Issued
Start:
03 Jun 2024Due:
24 Jul 2024Completion:
19 Jul 202428 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
- As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
- As the CSS Provider I want the messages I send to CSS Users to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
- As the CSS User I want to receive CSS messages in a timely manner following any outage of my own gateway or systems, so that there is no interruption to the Switching process or the Consumers’ Switching experience.