MHHS Programme Changes required to Central Switching Service
Analysis and Requirements Gathering started
Start:
29 Apr 2022Due:
05 May 2022Completion:
05 May 2022Present Updated Change Proposal Plan to REC Change Panel
Start:
05 May 2022Due:
21 Jun 2022Completion:
21 Jun 2022Service Provider Impact Assessment initiated
Start:
21 Jun 2022Due:
11 Jul 2022Completion:
05 Jul 2022Service Provider Impact Assessment completed
Start:
11 Jul 2022Due:
15 Aug 2022Completion:
10 Aug 2022Present extended Change Proposal Plan to Change Panel
Start:
15 Aug 2022Due:
06 Sep 2022Completion:
06 Sep 2022Requirement refinement and validation of Detailed Impact Assessment
Start:
06 Sep 2022Due:
27 Sep 2022Completion:
27 Sep 2022Provide extended Change Proposal Plan to Change Panel
Start:
28 Oct 2022Due:
31 Oct 2022Completion:
25 Oct 2022Preliminary Change Report Issued
Start:
27 Sep 2022Due:
28 Oct 2022Completion:
27 Oct 2022Responsible Committee Review of the Preliminary Change Report
Start:
31 Oct 2022Due:
01 Nov 2022Completion:
01 Nov 2022Consultation started
Start:
01 Nov 2022Due:
04 Nov 2022Completion:
03 Nov 2022Consultation ended
Start:
04 Nov 2022Due:
25 Nov 2022Completion:
25 Nov 2022Final Change Report issued
Start:
25 Nov 2022Due:
09 Dec 2022Completion:
09 Dec 2022Responsible Committee ex-committee decision
Start:
09 Dec 2022Due:
13 Dec 2022Completion:
13 Dec 2022Authority Determination
Start:
13 Dec 2022Due:
02 Feb 2023Completion:
02 Feb 2023MHHS Programme Milestone M8 (Code changes delivered)
| Included changes | Affected REC Items | |
|---|---|---|
| R0044 | MHHS Programme Changes required to Central Switching Service |
|
| R0173 | Improvements to the Theft Detection Incentive Scheme (TDIS) |
|
| R0209 | Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements |
|
| R0222 | ESME ID Update Rejections | |
| R0223 | Reconciliation of Unallocatable Transactions Review |
|
| R0241 | MHHS Incremental Changes for go live |
|
| R0259 | Update to R0173 Implementation Date | |
| R0264 | Data Specification Housekeeping | |
| R0083 | Changes to Supply Number Format for MHHS | |
| R0097 | Consequential Change for CSS Smart Meter Data Retriever Appointments |
|
- As the SMDSP, I want to be able to validate that an SMDR is registered so that I can provide them with access to the Metering Points to which they are registered.
- As a SMDR, I want to be able to access the Metering Points I am registered to so that I can collect settlement data from those meters
- As the CSS Provider, I want the CSS to be able to receive notifications from the Registration Service on the appointment/de-appointment of an SMDR so that I can send the appointment data to the SMDSP. As the CSS Provider, I want the CSS to be able to provide SMDR appointment data to the SMDSP.
REC V3.0
Legal text baselined
Start:
10 Apr 2022Due:
13 May 2022Completion:
13 May 2022Final Change Report Issued
Start:
13 May 2022Due:
20 May 2022Completion:
20 May 2022Responsible Committee Decision
Start:
20 May 2022Due:
07 Jun 2022Completion:
07 Jun 2022Authority Determination (Original)
Start:
07 Jun 2022Due:
20 Jun 2022Completion:
17 Jun 2022Authority Determination (revoked and re-issued)
Start:
20 Jun 2022Due:
29 Jun 2022Completion:
29 Jun 202218 July 2022
| Included changes | Affected REC Items | |
|---|---|---|
| R0038 | Performance Assurance Report Catalogue Changes as a consequence of REC V3.0 | |
| R0041 | REC V3.0 |
|
| R0042 | Performance Assurance Board Terms of Reference |
|
| R0045 | Changes to SDEP Messages and Schedule numbering for REC V3.0 |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
- As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
- As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
- As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Erroneous Transfer Cancellations
Solution Development
Start:
13 Jan 2022Due:
22 Apr 2022Completion:
22 Apr 2022Party Impact Assessment Issued
Start:
22 Apr 2022Due:
06 May 2022Completion:
06 May 2022Preliminary Change Report Issued
Start:
06 May 2022Due:
08 Jul 2022Completion:
08 Jul 2022Responsible Committee Review
Start:
08 Jul 2022Due:
19 Jul 2022Completion:
19 Jul 2022Consultation Issued
Start:
19 Jul 2022Due:
05 Aug 2022Completion:
05 Aug 202230 June 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0101 | Revision of the Implementation Date and approved solution for R0021 |
|
| R0102 | Revision of the approved solution for R0032 |
|
| R0114 | Housekeeping amendments |
|
| R0015 | Remote communication obligations for electricity Advanced Meters |
|
| R0010 | New Meter Types for Auxiliary Proportional Controllers (APCs) |
|
| R0011 | Reporting of Additional EMR Backing Data to Suppliers |
|
| R0021 | Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier |
|
| R0030 | Erroneous Transfer Cancellations |
|
| R0066 | Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change) | |
| R0032 | New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS) |
|
| R0090 | Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Consumer I want to receive my bills when expected, from the Supplier of my choice without delays caused by being switched incorrectly and not being resolved in a timely manner. As a Consumer, in the event that my Supplier has exited the market and my supply cannot be returned to my original Supplier, I want the Gaining ET Supplier to have the ability to terminate any ET process that has already been initiated so that I am able to choose my preferred Supplier and switch without delay or penalty.
- As a Consumer, if Energy Suppliers need to share my data to resolve a switching issue, I want Suppliers to share my personal data securely so that my data is protected.
- As an Energy Supplier, where appropriate, I need to be able to cancel an ET effectively and efficiently, so that I can bill my Consumers accurately and timely. As an Energy Supplier, where appropriate, I need to be able to cancel an ET so that I supply Consumers with whom I have a valid contract.
- As The Code Manager I need to be able to identify when an ET has been cancelled so that I have a clear audit trail and can monitor performance effectively.
Minimum identification requirements in the Meter Operation Code of Practice
- As an electricity Consumer I want to be able to verify the attending agent’s identity so I can feel safe at my Premises whilst work is completed and trust the Energy industry to care about my safety.
- As an electricity Consumer I want to be able to verify the attending agent’s identity so that work can be completed efficiently, without delay or confusion.
- As an Electricity Supplier I want my Appointed Metering Equipment Manager to be identifiable when attending Consumer Sites to retain Consumer confidence, trust and for works to be completed without delay.
- As a Metering Equipment Manager, I want clarity around the requirements regarding identity cards to be clear so that I can assure compliance and easily identify myself to consumers at site.
- As a Metering Scheme Auditor, I want clarity on appropriate identity requirements so I can confidently validate a Metering Equipment Manager’s identity during a site audit.
Whole current (WC)/Current Transformer (CT) certificates
Solution Analysis and Development Start
Start:
07 Jan 2022Due:
31 Oct 2022Completion:
Impact Assessment Period start
Start:
Due:
Completion:
Solution Development completed
Start:
Due:
Completion:
Impact Assessment period ends
Start:
Due:
Completion:
- As an Electricity Consumer I want to be confident that the Meter Operative that completes work on my Metering Equipment is competent to ensure my supply is safe, secure and uninterrupted.
- As a MEM, I want to be confident that my processes and Meter Operatives are compliant with the MOCoP, to ensure minimal disruption to my clients and the safety of my employees.
- As an Electricity Supplier, I want to be confident that my Appointed agents are compliant with the MOCoP to ensure my consumers safety.
Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
Solution Development
Start:
09 Dec 2021Due:
03 Feb 2022Completion:
19 Apr 2022Party Impact Assessment Issued
Start:
03 Feb 2022Due:
22 Apr 2022Completion:
22 Apr 2022Deadline for Alternative Change Proposal Submission
Start:
22 Apr 2022Due:
27 May 2022Completion:
27 May 2022Preliminary Change Report Issued Interim
Start:
27 May 2022Due:
27 May 2022Completion:
27 May 2022Consultation Issued
Start:
27 May 2022Due:
12 Jul 2022Completion:
12 Jul 2022Final Change Report Issued
Start:
16 Aug 2022Due:
26 Aug 2022Completion:
26 Aug 2022Responsible Committee Decision
Start:
26 Aug 2022Due:
14 Sep 2022Completion:
14 Sep 2022Preliminary Change Report (Updated) Issued
Start:
12 Jul 2022Due:
12 Jul 2022Completion:
12 Jul 2022Consultation closure (extended deadline)
Start:
12 Jul 2022Due:
16 Aug 2022Completion:
16 Aug 202230 June 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0101 | Revision of the Implementation Date and approved solution for R0021 |
|
| R0102 | Revision of the approved solution for R0032 |
|
| R0114 | Housekeeping amendments |
|
| R0015 | Remote communication obligations for electricity Advanced Meters |
|
| R0010 | New Meter Types for Auxiliary Proportional Controllers (APCs) |
|
| R0011 | Reporting of Additional EMR Backing Data to Suppliers |
|
| R0021 | Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier |
|
| R0030 | Erroneous Transfer Cancellations |
|
| R0066 | Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change) | |
| R0032 | New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS) |
|
| R0090 | Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a property owner or occupier I want to be to arrange for the installation of equipment for the use of the occupier, such as fitting an isolator, installing on-site generation equipment or electric vehicle charging points. I want the installer to use a Safe Isolator Provider (SIP) who is authorised to undertake the work at my instruction rather than arrange for this work to be completed through the premises’ Registered Suppliers.
- As a REC Accredited Metering Equipment Manager, I want to be able to work as a SIP and de-energise and re-energise a site on the instruction of the homeowner/landlord, so that equipment – such as an isolator, on-site generation or electric vehicle charging points can be fitted without the need to co-ordinate the work with the Registered Suppliers’ MEMs. As a Distribution Network Operator, I want to be assured that the work is only completed by a SIP that has the necessary skills and REC accreditation and has the appropriate permissions to de-energise and re-energise the supply and doesn’t introduce any additional risk to the Distribution Network.
- As the Registered Supplier, I want to know what steps the SIP who attends the site and finds the site in an unsafe situation to re-energise, will take so that my customer is not left off-supply unnecessarily. As the Registered Supplier, I want to be alerted if the SIP finds any evidence of meter tampering at the premises.
Invalid Requests for Site Technical Details
ANALYSIS AND ENGAGEMENT WITH BSC
Start:
01 Nov 2022Due:
30 Nov 2022Completion:
30 Nov 2022PRESENT UPDATED CHANGE PROPOSAL PLAN TO CHANGE PANEL
Start:
22 Nov 2021Due:
01 Nov 2022Completion:
01 Nov 2022Part Impact Assessment Issued
Start:
30 Nov 2022Due:
13 Jan 2023Completion:
13 Jan 2023Party Impact Assessment Closes
Start:
13 Jan 2023Due:
03 Feb 2023Completion:
03 Feb 2023Present Updated Plan to Change Panel
Start:
03 Feb 2023Due:
07 Feb 2023Completion:
07 Feb 2023Preliminary Change Report issued
Start:
07 Feb 2023Due:
31 Mar 2023Completion:
31 Mar 2023Metering Expert Panel approval of PCR
Start:
31 Mar 2023Due:
12 Apr 2023Completion:
12 Apr 2023Consultation start date (aligned with BSC)
Start:
12 Apr 2023Due:
14 Apr 2023Completion:
14 Apr 2023Consultation end date (aligned with BSC)
Start:
14 Apr 2023Due:
08 May 2023Completion:
08 May 2023Final Change Report issued
Start:
08 May 2023Due:
26 May 2023Completion:
26 May 2023Metering Expert Panel decision
Start:
26 May 2023Due:
07 Jun 2023Completion:
07 Jun 202303 November 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0110 | A review of Supplier access to data on GES | |
| R0138 | Combined progression of Change Proposals R0058, R0104 and R0129 | |
| R0140 | Housekeeping amendments | |
| R0059 | Maintenance of Qualification Schedule Change |
|
| R0088 | Make Shipper NExA values available on the GES portal | |
| R0017 | Invalid Requests for Site Technical Details |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As a Consumer I want my existing or new meter to be read regularly to ensure I receive accurate bills.
- As a Distribution Network Operator I want to receive appropriate Requests for Site Technical Details. As a Distribution Network Operator I want the difference between my obligations and best practice to be clear in relation to provision of Site Technical Details for sites with and without Measurement Transformers.
- As a Metering Equipment Manager I want to be provided with Site Technical Details for all relevant sites so I can correctly install, commission and maintain the Metering Equipment.
Resolution of Bilateral Erroneous Transfers
Solution Analysis
Start:
18 Nov 2021Due:
21 Mar 2023Completion:
Proposed Approach Presented To Change Panel
Start:
21 Mar 2023Due:
18 Apr 2023Completion:
- As a Consumer, I want issues affecting me or my energy account to be resolved at the earliest opportunity, to minimise impacts to my energy switch or accurate and timely billing.
- As a Consumer, I want industry parties to share my personal data securely so that my data is protected.
- As an Energy Supplier, I want to be able to resolve Bilateral Erroneous Transfers effectively and efficiently, so that I can bill my Consumers accurately and timely.
- As an Energy Supplier, I want to be able to resolve Bilateral Erroneous Transfers effectively and efficiently, so that I supply Consumers with whom I have a valid contract.
Remote communication obligations for electricity Advanced Meters
Initial Assessment Report published
Start:
17 Nov 2021Due:
21 Dec 2021Completion:
21 Dec 2021Analysis and Solution development activity
Start:
21 Dec 2021Due:
27 Feb 2022Completion:
25 Feb 2022Party Impact Assessment completion
Start:
27 Feb 2022Due:
21 Mar 2022Completion:
21 Mar 2022Preliminary Change Report issued
Start:
07 Apr 2022Due:
27 May 2022Completion:
27 May 2022Consultation starts
Start:
27 May 2022Due:
10 Jun 2022Completion:
10 Jun 2022Consultation ends
Start:
10 Jun 2022Due:
01 Jul 2022Completion:
01 Jul 2022Final Change Report issued
Start:
01 Jul 2022Due:
29 Jul 2022Completion:
28 Jul 2022Metering Expert Panel decision
Start:
29 Jul 2022Due:
10 Aug 2022Completion:
10 Aug 2022Service Provider Impact Assessment issued
Start:
21 Mar 2022Due:
07 Apr 2022Completion:
07 Apr 2022Send back solution refinement completed
Start:
10 Aug 2022Due:
13 Jan 2023Completion:
13 Jan 2023Consultation issued
Start:
13 Jan 2023Due:
20 Jan 2023Completion:
20 Jan 2023Update provided to Change Panel
Start:
20 Jan 2023Due:
07 Feb 2023Completion:
07 Feb 2023Final Change Report issued
Start:
07 Feb 2023Due:
14 Feb 2023Completion:
14 Feb 2023Responsible Committee decision
Start:
14 Feb 2023Due:
21 Feb 2023Completion:
21 Feb 2023Authority Determination requested
Start:
21 Feb 2023Due:
28 Feb 2023Completion:
24 Mar 202330 June 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0101 | Revision of the Implementation Date and approved solution for R0021 |
|
| R0102 | Revision of the approved solution for R0032 |
|
| R0114 | Housekeeping amendments |
|
| R0015 | Remote communication obligations for electricity Advanced Meters |
|
| R0010 | New Meter Types for Auxiliary Proportional Controllers (APCs) |
|
| R0011 | Reporting of Additional EMR Backing Data to Suppliers |
|
| R0021 | Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier |
|
| R0030 | Erroneous Transfer Cancellations |
|
| R0066 | Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change) | |
| R0032 | New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS) |
|
| R0090 | Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As an electricity consumer with an Advanced Meter, I want my usage data to be accessed remotely from my meter, to reduce the need for on-site visits and ensure that I receive timely and accurate bills.
- As the Market-wide Half Hourly Settlement (MHHS) Programme I want to see an effective, early migration of NHH settled Advanced Meters to HH settled, to reduce the risk of missed migration deadlines and ensuring sufficient time to resolve ‘problem’ sites ahead of the MHHS migration deadline.
- As an Energy Supplier I want to obtain usage remotely, reducing the need for on-site metering reading activity, enabling me to settle and bill accurately. As a Metering Equipment Manager (MEM), I need to understand any changes to obligations that may impact my business, so I can engage in the change process and plan any required changes to my systems, processes and organisation.
Housekeeping amendments to REC V2
Initial Assessment Report published
Start:
04 Oct 2021Due:
12 Oct 2021Completion:
12 Oct 2021Change Panel review
Start:
12 Oct 2021Due:
19 Oct 2021Completion:
19 Oct 2021Preliminary Change Report issued
Start:
19 Oct 2021Due:
22 Oct 2021Completion:
22 Oct 2021Change Panel review
Start:
22 Oct 2021Due:
16 Nov 2021Completion:
16 Nov 2021Consultation starts
Start:
16 Nov 2021Due:
17 Nov 2021Completion:
17 Nov 2021Consultation ends
Start:
17 Nov 2021Due:
08 Dec 2021Completion:
08 Dec 2021Final Change Report issued
Start:
08 Dec 2021Due:
10 Dec 2021Completion:
10 Dec 2021Change Panel decision
Start:
10 Dec 2021Due:
21 Dec 2021Completion:
21 Dec 202131 January 2022
| Included changes | Affected REC Items | |
|---|---|---|
| R0020 | ETTOS Report Dissemination |
|
| R0012 | Housekeeping amendments to REC V2 |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
- As an Energy Consumer, I need Energy Companies to operate consistent processes, to ensure my energy supply is managed efficiently and to retain my trust in the functioning of the energy market.
- As a REC Party, I need the REC to provide a consistent baseline, so I can operate in an interoperable way with other Market Participants.