Clarify obligations on gas meter exchanges that occur close to CoS

Date of latest update
Type
Change
ID
R0094
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change has been raised to address an issue with the 'Switch with a Concurrent Change of MEM process.'. MEMs are obliged to issue ONJOBs to the CDSP as part of a meter exchange. However, this would not be issued if the MEM has received a de-Appointment flow as part of the Switch. This change proposes to obligate MEMs to issue ONJOBs for any completed meter exchanges, even after receiving a de-Appointment flow. This will ensure accurate Meter Technical Details are available to the gaining Supplier and MEM.
Proposer
David Morley
Change Plan

Solution Development & Analysis

Completed

Start:

17 Feb 2023

Due:

29 Mar 2024

Completion:

27 Mar 2024

Party Impact Assessment Due

Completed

Start:

29 Mar 2024

Due:

19 Apr 2024

Completion:

19 Apr 2024

Preliminary Change Report Issued

Completed

Start:

19 Apr 2024

Due:

26 Apr 2024

Completion:

26 Apr 2024

Responsible Committee Review

Completed

Start:

26 Apr 2024

Due:

08 May 2024

Completion:

08 May 2024

Consultation Closes

Completed

Start:

08 May 2024

Due:

31 May 2024

Completion:

31 May 2024

Final Change Report Issued

Completed

Start:

31 May 2024

Due:

05 Jun 2024

Completion:

05 Jun 2024

Responsible Committee Decision

Completed

Start:

05 Jun 2024

Due:

12 Jun 2024

Completion:

12 Jun 2024

Appeal Window Closure

Not Started

Start:

12 Jun 2024

Due:

26 Jun 2024

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Supplier to have accurate information about my meter, so that I do not experience billing problems following a Switch.
  2. As a MEM, I want to clearly understand my obligations relating to data transfer during a Switch, so that records of work I carry out are accurately recorded. 2 - As a Registered Supplier, I want metering data on my portfolio of Registrable Measurement Points to be accurate, so that Consumers do not experience billing problems or have a negative switch experience. 3 - As the CDSP, I want Change of Metering Asset data communicated with me to be timely and accurate, so that I am better able to fulfil my role and support REC Parties.
Proposed Solution Document
Document title
R0094 Draft Legal Text
Upload document
R0094 Draft Legal Text V1.0 25.04.24.pdf
Archive
Off
Document title
R0094 Solution - Draft Legal Text V1.1 05.06.24
Upload document
R0094 Solution - Draft Legal Text V1.1 05.06.24.pdf
Archive
Off
Problem Statement
When Metering Asset work is carried out concurrently with a Switch, details of the work undertaken may not be sent to industry by the MEM, resulting in inaccurate and out of date Metering Asset data being passed to the gaining Registered Gas Supplier.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
R0094 - Change Proposal Form downloadable version 17.02.2023
R0094 Change Proposal Plan v1.0 (Approved) 04-10-2023
R0094 Change Proposal Plan v2.0 (Approved) 01-03-2024
R0094 Initial Assessment Report v1.0 (Approved) 04-10-2023
R0094 Change Proposal Re-Plan (Approved) V1.0 01.03.24
R0094 Consolidated Impact Assessment Responses
R0094 Preliminary Change Report (Approved) V1.0 08.05.24
R0094 Consolidated Consultation Responses V1.0 05.06.24
R0094 Final Change Report (Post-Vote) V1.0 12.06.24
Company Name
OVO Energy
Review status
Review required

Altering the Trigger Points for CT Commissioning

Date of latest update
Type
Change
ID
R0031
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
colette.baldwin
Change Plan

Preliminary Change Report Published

Completed

Start:

01 Feb 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022

Consultation Issued

Completed

Start:

08 Apr 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022

Consultation Period End

Completed

Start:

08 Apr 2022

Due:

04 May 2022

Completion:

04 May 2022

Final Change Report Published

Completed

Start:

04 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Responsible Committee Decision

Completed

Start:

27 May 2022

Due:

10 Aug 2022

Completion:

10 Aug 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.2.0_Superseded
Included changes Affected REC Items
R0018 Complex Sites process improvements
  • Schedule 14 - Metering Operations
R0022 Amendment to REC Data Access Matrix
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
R0054 EES Access for Virtual Lead Parties
  • Schedule 1 - Interpretations and Definitions
R0031 Altering the Trigger Points for CT Commissioning
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue
R0033 Micro-business Smart Meter Installation Reports
  • Smart Meter Installation Schedule (since removed)
R0036 Extensive Housekeeping Amendments
  • MOCoPA (since removed)
  • Schedule 15 - Metering Accreditation
  • REC Main Body
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 11 - Prepayment Arrangements
  • Schedule 6 - Performance Assurance
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 7 - Energy Theft Reduction
  • Schedule 5 - Change Management
  • Schedule 8 - Unbilled Energy Code of Practice
  • Schedule 4 - Company Governance
  • Schedule 17 - Secure Data Exchange
  • Schedule 28 - Related Metering Points
  • Schedule 3 - Accession Agreement
  • Schedule 18 - Green Deal Arrangements
  • Schedule 29 - Address Management
  • Schedule 13 - Transfer of Consumer Data
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As the DNO, I only want to send the commissioning information using the D0383 (MM00370) when I am made aware that the site has now been energised by the Registered Supplier’s MEM for a CT Pre-commissioned meter, so that I can meet my regulatory obligations under the BSC
  2. As a MEM I want to receive the information from the DNO in a timely manner to ensure my records are accurate and up to date, and that I can provide the Registered Supplier with information to ensure the metering point is accurately settled.
Proposed Solution Document
Document title
R0031 Proposed Draft Legal Text
Upload document
R0031 - Legal Text Altering the Trigger Point for CT Commisioning v1.0.docx
Archive
Off
Problem Statement
The Balancing & Settlement Code Procedure (BSCP) 515 and the Retail Energy Code (REC) Metering Operations Schedule set out the obligations and timescales imposed on the DNO to send commissioning information to the MEM (using the D0383 (MM00370) data flow), where the DNO has installed metering equipment, with Measurement Transformers. When the DNO installs Low Voltage Current Transformer (LV CT) metering units, that have been pre-commissioned off-site, the commissioning of the units is done before installation and separately to the Energisation of the Supply. When the Energisation status change is the responsibility of the Registered Supplier and is requested of the MEM using the D0134 data flow, notification of the change in energisation status is then sent to the Registered Supplier and the DNO by the MEM, using the D0139 (MM00036) For an LV fused supply, the DNO may not be aware of who the MEM is to send the commissioning information to via a D0383 (MM00370) until a D0139 (MM00036) is received. This is often the point at which the DNO first becomes aware that a fused supply is now Energised. This may be several days/weeks/months after DNO commissioning, and it is proving difficult for the DNO to meet their BSC obligations.
R0031 - CP form (Downloadable version)
R0031 - PCR Altering the Trigger Point for CT Commissioning
R0031 - Final Change Report (Post Vote - Approved)
R0031 - IAR Altering the Trigger Point for CT Commissioning V1.0 (Approved)
R0031 - CPP Altering the Trigger Point for CT Commissioning v1.0 (Approved)
R0031 - Consolidated Consultation Responses v1.0
Company Name
-
Review status
Review required

Minimum identification requirements in the Meter Operation Code of Practice

Date of latest update
Type
Change
ID
R0027
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
courtney.campbellwood
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want to be able to verify the attending agent’s identity so I can feel safe at my Premises whilst work is completed and trust the Energy industry to care about my safety.
  2. As an electricity Consumer I want to be able to verify the attending agent’s identity so that work can be completed efficiently, without delay or confusion.
  3. As an Electricity Supplier I want my Appointed Metering Equipment Manager to be identifiable when attending Consumer Sites to retain Consumer confidence, trust and for works to be completed without delay.
  4. As a Metering Equipment Manager, I want clarity around the requirements regarding identity cards to be clear so that I can assure compliance and easily identify myself to consumers at site.
  5. As a Metering Scheme Auditor, I want clarity on appropriate identity requirements so I can confidently validate a Metering Equipment Manager’s identity during a site audit.
Problem Statement
Identify card inconsistencies can result in Metering Scheme Auditors and Consumers not being able to reliably verify a Meter Operative’s identity. If Consumers and Metering Scheme Auditors are unable to verify the Competent Person’s identity there could be delays to audits being completed, on-site work being carried out, safety risks or a reduction in consumer trust and confidence.
Stages Selection
R0027 - Change Proposal Plan V1.0 (Approved)
R0027 Initial Assessment Report
Company Name
-
Review status
Review required

Whole current (WC)/Current Transformer (CT) certificates

Date of latest update
Type
Change
ID
R0026
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/01/2024 - Change Proposal has been withdrawn.
Summary
Metering Equipment Managers (MEMs) can currently work on Whole Current (WC) or Current Transformer (CT) meters without having been previously assessed on that metering category. This Change Proposal seeks to develop and implement a solution to address this area of risk.
Proposer
Elise Handy
Change Plan

Solution Analysis and Development Start

Completed

Start:

07 Jan 2022

Due:

31 Oct 2022

Completion:

Impact Assessment Period start

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Solution Development completed

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Impact Assessment period ends

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Electricity Consumer I want to be confident that the Meter Operative that completes work on my Metering Equipment is competent to ensure my supply is safe, secure and uninterrupted.
  2. As a MEM, I want to be confident that my processes and Meter Operatives are compliant with the MOCoP, to ensure minimal disruption to my clients and the safety of my employees.
  3. As an Electricity Supplier, I want to be confident that my Appointed agents are compliant with the MOCoP to ensure my consumers safety.
Problem Statement
Current metering accreditation arrangements allow MEMs to work on whole current or Current Transformer (CT) meters regardless of whether they have previously or recently been assessed on that metering category. This poses potential risks for the safety of Consumers and Meter Operatives as the MEMs may not have appropriate processes or training in place to ensure compliance with the MOCoP.
Stages Selection
R0026 - Initial Assessment Report v1.0 (Approved)
R0026 - Change Proposal Plan - V3.0 (Approved)
Company Name
-
Review status
Review required

Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier

Date of latest update
Type
Change
ID
R0021
Change Category
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Currently only the Registered Supplier can instruct a Metering Equipment Manager (MEM) to work on their metering asset. There is no ability to request that a single MEM completes work on multiple properties that may have different Electricity Suppliers. This creates barriers to developing solutions for local authorities, private and social housing landlords who are refurbishing premises or to help any premise owner (whether domestic or non-domestic) install new equipment to facilitate Low & Zero Carbon Technology (LZCT) installation such as the retro-fit of Electric Vehicle Charging (EVC) Points to homes and business premises. This Change Proposal will introduce a new role for existing accredited MEMs that will enable them to accept instructions to undertake a limited set of activities at the request of the premise owners without the need to use the Registered Suppliers’ MEMs.
Proposer
Colette Baldwin
Change Plan

Solution Development

Completed

Start:

09 Dec 2021

Due:

03 Feb 2022

Completion:

19 Apr 2022

Party Impact Assessment Issued

Completed

Start:

03 Feb 2022

Due:

22 Apr 2022

Completion:

22 Apr 2022

Deadline for Alternative Change Proposal Submission

Completed

Start:

22 Apr 2022

Due:

27 May 2022

Completion:

27 May 2022

Preliminary Change Report Issued Interim

Completed

Start:

27 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation Issued

Completed

Start:

27 May 2022

Due:

12 Jul 2022

Completion:

12 Jul 2022

Final Change Report Issued

Completed

Start:

16 Aug 2022

Due:

26 Aug 2022

Completion:

26 Aug 2022

Responsible Committee Decision

Completed

Start:

26 Aug 2022

Due:

14 Sep 2022

Completion:

14 Sep 2022

Preliminary Change Report (Updated) Issued

Completed

Start:

12 Jul 2022

Due:

12 Jul 2022

Completion:

12 Jul 2022

Consultation closure (extended deadline)

Completed

Start:

12 Jul 2022

Due:

16 Aug 2022

Completion:

16 Aug 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As a property owner or occupier I want to be to arrange for the installation of equipment for the use of the occupier, such as fitting an isolator, installing on-site generation equipment or electric vehicle charging points. I want the installer to use a Safe Isolator Provider (SIP) who is authorised to undertake the work at my instruction rather than arrange for this work to be completed through the premises’ Registered Suppliers.
  2. As a REC Accredited Metering Equipment Manager, I want to be able to work as a SIP and de-energise and re-energise a site on the instruction of the homeowner/landlord, so that equipment – such as an isolator, on-site generation or electric vehicle charging points can be fitted without the need to co-ordinate the work with the Registered Suppliers’ MEMs. As a Distribution Network Operator, I want to be assured that the work is only completed by a SIP that has the necessary skills and REC accreditation and has the appropriate permissions to de-energise and re-energise the supply and doesn’t introduce any additional risk to the Distribution Network.
  3. As the Registered Supplier, I want to know what steps the SIP who attends the site and finds the site in an unsafe situation to re-energise, will take so that my customer is not left off-supply unnecessarily. As the Registered Supplier, I want to be alerted if the SIP finds any evidence of meter tampering at the premises.
Proposed Solution Document
Document title
R0021 - Final Approved legal text
Upload document
R0021 - Approved legal text.zip
Archive
Off
Document title
R0021 - Proposed new Market Message v1.0
Upload document
R0021 - Proposed new market message v1.0.docx (2).pdf
Archive
Off
Document title
R0021 - Draft Legal Text
Upload document
R0021 - Draft Legal Text.zip
Archive
Off
Document title
R0021 - Webinar 2 March 2023 - Draft Q & A Responses v0.3
Upload document
R0021 Implementation Webinar Q & A 2 March 2023.docx
Archive
Off
Problem Statement
It is difficult for landlords of local authority, social housing developments or private landlords of homes and businesses to co-ordinate the refurbishment of properties where they need the electricity supply to be de-energised to allow work being completed and the supply re-energised. Currently the landlord needs to liaise with the Electricity Supplier of each premise independently to arrange for the appointed MEM to attend and de-energise each supply point and then re-energise the site when the work is completed, as currently only the Registered Supplier’s appointed MEM or the DNO is permitted to undertake the work.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0021 - Change Proposal Plan v2.0 (Approved)
R0021 - Party IA Consolidated Responses
R0021 - Initial Assessment Report v1.0 (Approved)
R0021 - FAQs following Impact Assessment
R0021 - Preliminary Change Report v2.0 (Approved)
NAPIT Survey Results
R0021 - Consultation Non-confidential Consolidated Responses
R0021 - Final Change Report (Post-Vote)
R0021 Authority Decision
Company Name
-
Review status
Review required

Consequential REC changes for BSC CP1532

Date of latest update
Type
Change
ID
R0019
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Ann Perry
Change Plan

Initial Assessment Report and Change Proposal Plan approved

Completed

Start:

26 Nov 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Preliminary Change Report issued

Completed

Start:

21 Dec 2021

Due:

28 Jan 2022

Completion:

28 Jan 2022

Preliminary Change Report approval

Completed

Start:

28 Jan 2022

Due:

09 Feb 2022

Completion:

09 Feb 2022

Consultation starts

Completed

Start:

09 Feb 2022

Due:

14 Feb 2022

Completion:

11 Feb 2022

Consultation ends

Completed

Start:

14 Feb 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Final Change Report Issued

Completed

Start:

04 Mar 2022

Due:

11 Mar 2022

Completion:

11 Mar 2022

Responsible Committee decision (ex-Committee)

Completed

Start:

11 Mar 2022

Due:

23 Mar 2022

Completion:

22 Mar 2022
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want my new Energy Supplier to set up my account and appoint their agents appropriately, so I receive timely and accurate bills.
  2. As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Energy Supplier, I want to be able to Appoint and De-appoint Agents more quickly, to minimise risks to my settlement performance and ability to produce accurate and timely consumer bills when the new switching arrangements go-live.
Proposed Solution Document
Document title
Legal text (tracked changes)
Upload document
R0019 Legal text changes 1.0.doc
Archive
Off
Document title
Change Set
Archive
Off
Problem Statement
BSC CP1532 proposed updates to the Change of Supply (CoS) timescales within BSC Procedures BSCP502, BSCP504 and BSCP514, to align the Half-Hourly and Non-Half Hourly Supplier Agent Appointment and de-Appointment timescales and to facilitate the achievement of the Faster Switching programme objectives. BSC CP1532 was approved on 01 September 2021 by the Supplier Volume Allocation Group (SVG). Following the SVG’s decision to approve, BSCP514 moved to the Retail Energy Code (REC) following the implementation of P420 ‘Retail Code Consolidation Significant Code Review’. A REC Change Proposal is therefore required to deliver the full solution.
CP1532 Final CP Report.pdf
R0019 - Change Proposal Plan v1.0 (Approved)
R0019 - Initial Assessment Report v1.0 (Approved)
R0019 - Preliminary Change Report v1.0 (Approved)
R0019 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Complex Sites process improvements

Date of latest update
Type
Change
ID
R0018
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Ann Perry
Change Plan

Party Impact Assessment Issued

Completed

Start:

25 Nov 2021

Due:

20 Jan 2022

Completion:

10 Feb 2022

Preliminary Change Report Issued

Completed

Start:

20 Jan 2022

Due:

21 Feb 2022

Completion:

18 Feb 2022

Responsible Committee Decision – Ex-Committee

Completed

Start:

21 Feb 2022

Due:

03 Mar 2022

Completion:

03 Mar 2022

Consultation Started

Completed

Start:

03 Mar 2022

Due:

07 Mar 2022

Completion:

07 Mar 2022

Consultation End

Completed

Start:

07 Mar 2022

Due:

01 Apr 2022

Completion:

01 Apr 2022

Final Change Report Issued

Completed

Start:

01 Apr 2022

Due:

29 Apr 2022

Completion:

29 Apr 2022

Responsible Committee Decision

Completed

Start:

29 Apr 2022

Due:

11 May 2022

Completion:

11 May 2022

Appeal Window Open

Completed

Start:

11 May 2022

Due:

13 May 2022

Completion:

13 May 2022

Appeal Window Closed

Completed

Start:

13 May 2022

Due:

27 May 2022

Completion:

27 May 2022
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 3.2.0_Superseded
Included changes Affected REC Items
R0018 Complex Sites process improvements
  • Schedule 14 - Metering Operations
R0022 Amendment to REC Data Access Matrix
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
R0054 EES Access for Virtual Lead Parties
  • Schedule 1 - Interpretations and Definitions
R0031 Altering the Trigger Points for CT Commissioning
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue
R0033 Micro-business Smart Meter Installation Reports
  • Smart Meter Installation Schedule (since removed)
R0036 Extensive Housekeeping Amendments
  • MOCoPA (since removed)
  • Schedule 15 - Metering Accreditation
  • REC Main Body
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 11 - Prepayment Arrangements
  • Schedule 6 - Performance Assurance
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 7 - Energy Theft Reduction
  • Schedule 5 - Change Management
  • Schedule 8 - Unbilled Energy Code of Practice
  • Schedule 4 - Company Governance
  • Schedule 17 - Secure Data Exchange
  • Schedule 28 - Related Metering Points
  • Schedule 3 - Accession Agreement
  • Schedule 18 - Green Deal Arrangements
  • Schedule 29 - Address Management
  • Schedule 13 - Transfer of Consumer Data
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As an electricity Consumer, I want my metering data to be accurate, to ensure my account is set up correctly and I receive accurate and timely invoices.
  2. As a Metering Equipment Manager, I want to have clarity on my obligations to provide data - specifically what data I need to send, who the recipients are and when I need to send it to ensure I provide accurate data to other Market Participants. As an Electricity Supplier and as an Electricity Distribution Network Operator (DNO), I want to receive accurate and complete Meter Technical Details (MTD) to enable me to take appropriate action following a change of metering equipment, a switch, a change of HHDC, a new connection a meter configuration or MEM.
  3. As a Half Hourly Data Collector, I want to receive accurate and complete Meter Technical Details to enable me to take appropriate action following a change of metering equipment, change of supplier, change of HHDC, new connections, meter configuration or MEM.
Proposed Solution Document
Document title
R0018 - Draft Legal Text
Upload document
R0018 - Draft Legal Text.zip
Archive
Off
Document title
Link to Change Set (EMAR)
Archive
Off
Problem Statement
There is not a consistent understanding around the Complex Site process which can lead to the Complex Site Supplementary Information Form (CSSIF) being populated or interpreted differently by different parties. This may lead to incorrect data being used for consumer billing and Settlement, which can result in BSC Trading Disputes.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Issue-88-Issue-Report.zip
R0018 - Preliminary Change Report v1.0 (Approved)
R0018 - Final Change Report v1.0
R0018 - Change Proposal Plan v1.0 (Approved)
R0018 - Consolidated Consultation Responses v1.0
R0018 - Consolidated Impact Assessment Responses v0.1
R0018 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Invalid Requests for Site Technical Details

Date of latest update
Type
Change
ID
R0017
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This Change Proposal seeks to provide clarity to Distribution Network Operators (DNOs) and Metering Equipment Managers (MEMs) on the process for requesting and sending Site Technical Details as part of Meter Asset Installation, Switch or Change of Agent processes.
Proposer
Elaine Carr
Change Plan

ANALYSIS AND ENGAGEMENT WITH BSC

Completed

Start:

01 Nov 2022

Due:

30 Nov 2022

Completion:

30 Nov 2022

PRESENT UPDATED CHANGE PROPOSAL PLAN TO CHANGE PANEL

Completed

Start:

22 Nov 2021

Due:

01 Nov 2022

Completion:

01 Nov 2022

Part Impact Assessment Issued

Completed

Start:

30 Nov 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Party Impact Assessment Closes

Completed

Start:

13 Jan 2023

Due:

03 Feb 2023

Completion:

03 Feb 2023

Present Updated Plan to Change Panel

Completed

Start:

03 Feb 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023

Preliminary Change Report issued

Completed

Start:

07 Feb 2023

Due:

31 Mar 2023

Completion:

31 Mar 2023

Metering Expert Panel approval of PCR

Completed

Start:

31 Mar 2023

Due:

12 Apr 2023

Completion:

12 Apr 2023

Consultation start date (aligned with BSC)

Completed

Start:

12 Apr 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Consultation end date (aligned with BSC)

Completed

Start:

14 Apr 2023

Due:

08 May 2023

Completion:

08 May 2023

Final Change Report issued

Completed

Start:

08 May 2023

Due:

26 May 2023

Completion:

26 May 2023

Metering Expert Panel decision

Completed

Start:

26 May 2023

Due:

07 Jun 2023

Completion:

07 Jun 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer I want my existing or new meter to be read regularly to ensure I receive accurate bills.
  2. As a Distribution Network Operator I want to receive appropriate Requests for Site Technical Details. As a Distribution Network Operator I want the difference between my obligations and best practice to be clear in relation to provision of Site Technical Details for sites with and without Measurement Transformers.
  3. As a Metering Equipment Manager I want to be provided with Site Technical Details for all relevant sites so I can correctly install, commission and maintain the Metering Equipment.
Proposed Solution Document
Document title
R0017 - Schedule 14 - Metering Operations (Final Approved) v1.0 08.06.2023
Upload document
R0017 - Schedule 14 - Metering Operations (Final Approved) v1.0 08.06.2023.pdf
Archive
Off
Document title
R0017 - Schedule 14 - Metering Operations (For FCR) v1.0 26.05.2023
Upload document
R0017 - Schedule 14 - Metering Operations (For FCR) v1.0 26.05.2023 (1).docx
Archive
Off
Document title
R0017 - Schedule 14 - Metering Operations (For PCR) - 31.03.2023
Upload document
R0017 - Schedule 14 - Metering Operations (For PCR) v1.0 - 31.03.2023.docx
Archive
Off
Document title
R0017 Draft Legal Text (for Party IA) 13.01.23
Upload document
Schedule 14 - Metering Operations - R0017 v5 REDLINED.docx
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
Distribution Network Operators (DNOs) have reported that they are receiving a high volume of requests for Site Technical Details for Domestic and Microbusiness sites following a Switch or Change of Agent, resulting in increased workload for DNOs to validate and process these requests. It is not clear if these requests are all necessary or required by the MEMs and justify the effort required by the DNO to process these requests.
SME
SME Role
Lead Technical Analyst
R0017 - Initial Assessment Report v1.0 (Approved)
R0017 - Change Proposal Plan v7.0 (Approved) 09.03.2023
R0017 - Consolidated Impact Assessment Responses v1.0 - 23.02.2023
R0017 - Preliminary Change Report v2.0 (Approved) 14.04.2023
R0017 - NON-CONFIDENTIAL Consolidated consultation responses v1.0 26.05.2023
R0017 - Final Change Report v2.0 (Post-Vote) 08.06.2023
Company Name
SPEN
Review status
Review required

Cable Colour Identification

Date of latest update
Type
Change
ID
R0014
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
colette.baldwin
Change Plan

Initial Assessment Report published

Completed

Start:

01 Nov 2021

Due:

26 Nov 2021

Completion:

26 Nov 2021

Change Panel review

Completed

Start:

26 Nov 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

04 Jan 2022

Completion:

31 Dec 2021

Metering Expert Panel review

Completed

Start:

04 Jan 2022

Due:

12 Jan 2022

Completion:

12 Jan 2022

Consultation starts

Completed

Start:

12 Jan 2022

Due:

17 Jan 2022

Completion:

25 Jan 2022

Consultation ends

Completed

Start:

17 Jan 2022

Due:

15 Feb 2022

Completion:

15 Feb 2022

Final Change Report issued

Completed

Start:

15 Feb 2022

Due:

25 Feb 2022

Completion:

25 Feb 2022

Metering Expert Panel decision

Completed

Start:

25 Feb 2022

Due:

09 Mar 2022

Completion:

09 Mar 2022
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As an electricity Consumer, I want requested meter work to take place safely and efficiently at the time and date agreed, so that I have a safe and working meter.
  2. As a MEM or a DNO I want clarity on how to deal with cable labelling during periods of coloured cable supply chain shortages, so that I can continue to install or maintain consumer metering.
  3. As a Metering Scheme Auditor, I want there to be clarity on the permitted labelling of non-standard colour coded cables used when connecting meters, so that audits can be appropriately completed.
Proposed Solution Document
Document title
R0014 legal text (tracked changes)
Upload document
R0014 MOCoP Tracked Change Legal Text v2.0.pdf
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
During times of sustained supply chain shortages, some colour coded cables may not generally be available. Where this is the case, Metering Equipment Managers (MEMs) and Distribution Network Operators (DNOs) need to be able to source a suitable alternative cable so that they can continue to install and maintain meters. Although the labelling of cables with different out sheath colours from the inner insulation is covered by the IET Wiring Regulations, this is not set out within the REC Electricity MOCoP.
IET Wiring Regulation BS7671 - 2018 - Table 51 Identification of Conductors
R0014 - Change Proposal Plan v1.0 (Approved)
R0014 - Initial Assessment Report v1.0 (Approved)
R0014 - Preliminary Change Report v2.0 (Approved)
R0014 - Final Change Report V2.0 (Post-Vote)