Extending R0067 Refresh Functionality
Date of latest update
Type
Issue
ID
I0281
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/09/2026 - The update to plan has been approved by the Technical Expert Panel on 30 September 2026.
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSPs) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Issue originally aimed to extend the Refresh functionality, implemented for the Gas Retail Data Agent (GRDA).to the Electricity Retail Data Agent (ERDA). Following solution development for I0281, it was agreed that the Refresh functionality would be made available for all Market Participants in receipt of the in-scope messages.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0281_Proposed_Legal text_PIA_V1.0.
Upload document
I0281_Proposed_Legal text_PIA_V1.0.zip
Archive
Off
Problem Statement
CSS messages are not received by the SDSPs in the order in which they were originally sent, or after Gate Closure, so it can be difficult to detect and often requires significant manual effort to resolve. This issue can directly impact Consumer switching experiences, causing disruption and possible delays in a switch.
Stages Selection
Stages Selection
Workgroup
Workgroup(s)
I0281_Change Report (Update to Plan) v1.0 (Pre-approval)
I0281_Change Report (Update to Plan) v2.0 Approved
I0281_Change Report (Update to Plan) v2.0 (Pre-approval)
I0281_Change Report (Update to Plan) v1.0 Approved 20.05.2026
I0281_Change Report (Proposal Plan) v1.0_Approved 04.11.2025
Company Name
REC Technical Services
Review status
Review required
Data Latency SLA Alignment for Gas Enquiry Service
Date of latest update
Type
Change
ID
R0277
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The current performance level for the processing of Data from CDSP is no longer fit for purpose and does not reflect the operational capability of the service. The performance level was originally conceived as part of the CSS programme in 2022 and operational reality has shown it is not required by industry. A revision of the performance level will align service performance metrics with system performance and deliver economic benefit.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
07 Oct 2025Final Recommendation approved at TEP
Completed
Start:
Due:
Completion:
26 Nov 2025Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0277 Legal Text For Consultation
Upload document
R0277 Legal Text For Consultation.zip
Archive
Off
Problem Statement
The current performance levels for the processing of data from CDSP is no longer fit for purpose and does not align with system or service performance. The CSDP is also not meeting these performance levels on a monthly basis. While there are no known issues on data latency raised by users, this change to clarify performance levels is needed for the GES reinstated contract and to ensure ongoing service delivery.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0277 submission form
I0277 Change Report (Proposal Plan) approved 07/10/2025
R0277 Change Report (For Consultation) v1.0
R0277 Change Report (Final Recommendation) Approved 26.11.25 v1.0
Company Name
RECCo
Review status
Review required
SFIC to CMRM - missing Scenario Variant in D0126 / MM00016
Date of latest update
Type
Change
ID
R0276
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
It has been raised to the Code Manager by a Party that the Scenario Variant of Supply Fault Information Centre (SFIC) to Crowded Meter Room MEM (CMRM) is missing from the D0126 / MM00016 (Asset Condition Report Response / Clearance) Market Message. This should have been introduced as part of REC Change R0043 which introduced the role of the CMRM.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
16 Sep 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
SFIC to CMRM - missing Scenario Variant in D0126 red-lining (IA)
Upload document
SFIC to CMRM - missing Scenario Variant in D0126 MM00016 legal text.docx
Archive
Off
Document title
SFIC to CMRM - missing Scenario Variant in D0126 red-lining (consultation)
Upload document
SFIC to CMRM - missing Scenario Variant in D0126 V2.0.docx
Archive
Off
Problem Statement
CMRMs can send the D0135 / MM00023 Asset Condition Report Market Message to the SFIC, but the SFIC cannot send a response on the D0126 / MM00016 Asset Condition Report Response / Clearance Market Message to confirm the outcome of their investigation.
Stages Selection
R0276 submission form
R0276 Change Report (Proposal Plan) V1.0 approved 16.09.25
R0276 Consolidated Impact Assessment Responses PUBLIC v1.0
R0276 Change Report (For Consultation) V1.0
R0276 Consolidated Consultation Responses v1.0
R0276 Change Report (Final Recommendation) V1.0 approved 17.12.25
Company Name
REC Code Manager
Review status
Review required
Addition of Export flag in D0303 flows
Date of latest update
Type
Change
ID
R0261
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
The Market Message (D0303 / MM00240) responsible for informing Metering Asset Providers (MAPs) of Metering Equipment installation is generating a lot of queries and exceptions due to Export MPAN creation. This is requiring MAPs to manually investigate whether a D0303 showing a Metering Asset being installed against a second Metering Point is a correction or the creation of an Export MPAN that can be ignored. Due to the growing uptake of microgeneration this is a problem that is growing in volume.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
05 Feb 2026Change Report (For Consultation) approved at TEP
Completed
Start:
Due:
Completion:
25 Mar 2026Change Report (Final Recommendation) approved at TEP
Completed
Start:
Due:
Completion:
27 May 2026Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0180 | Clarity on use of on hold for switching issues, including the obligations of CSS Users |
|
| R0207 | Import / Export MOA Charging Clarification |
|
| R0253 | Theft - DNO/Networks not providing photos |
|
| R0261 | Addition of Export flag in D0303 flows | |
| R0266 | REC Data Specification Clarifications |
|
| R0317 | Number of Displayed Register Digits Data Item linkage | |
| R0328 | Removal of D0383 & D0384 requirements from Sharing MTDs process |
|
| R0336 | Legal text to support REC Change R0180 |
|
| R0343 | MSC - Amending Statement Production Timescales | |
| R0345 | Housekeeping November 2026 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 11 Nov 2026 | ||
| 1.0 | 11 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0261 solution V0.1
Upload document
I0261 solution.docx
Archive
Off
Document title
I0261 solution post IA V0.2
Upload document
I0261 solution post IA V0.2.docx
Archive
Off
Problem Statement
MAPs must manually check D0303 Market Messages received with duplicated Metering Equipment (e.g. duplicated Meter Serial Number) to ensure they hold the correct Metering Equipment against the correct Metering Point. For Export Metering Points using the same Metering Equipment as the Import Metering Point, this manual check results in no action needing to be taken.
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal form
I0261 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
I0261 Extension to Plan V1.0
I0261 Consolidated Impact Assessment Responses PUBLIC v1.0
R0261 Change Report (For Consultation) V1.0
R0261 Consolidated Consultation Responses v1.0
R0261 Change Report (Final Recommendation) V1.0 approved 27.05.26
Company Name
Centrica Smart Meter Assets
Review status
Review required
MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
Date of latest update
Type
Change
ID
R0256
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
REC Changes R0021 and R0101 introduced Scenario Variant SV00493 (Safe Isolation Provider (SIP) to Supply Fault Information Centre (SFIC)) to the Asset Condition Report Market Message (MM00023/D0135) which sets group 60H range to 0-*. It has been queried with the Code Manager if this was in error, as SIPs and Meter Operator Agents (MOAs) should act in the same manner when sending D0135 flows.
Change Plan
Proposal Plan approved by Change Panel
Completed
Start:
Due:
Completion:
01 Jul 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Red lined Data Specification for I0256
Upload document
I0256 solution for IA (1).docx
Archive
Off
Problem Statement
The differences between the Scenario Variants of the MOA, SIP, CMRM, Advanced Meter Service and Smart Meter Services in the D0135 flow could lead to confusion, as these Parties are meant to operate in the same manner in respect of sending the D0135 flow.
Stages Selection
Issue Form
I0256 Change Report (Proposal Plan) V1.0 approved 01.07.25
I0256 Consolidated Impact Assessment Responses PUBLIC V1.0
R0256 Change Report (For Consultation) V1.0
R0256 Consolidated Consultation Responses v1.0
R0256 Change Report (Final Recommendation) V1.0 approved 24.09.25
Company Name
RTS Code Manager
Review status
Review required
Update to R0060 Implementation Date
Date of latest update
Type
Change
ID
R0250
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/05/25 - On 28 May 2025 the Technical Expert Panel approved R0250, resulting in the implementation of R0060 being moved from 27 June 2025 to the ‘First available release after MHHS Milestone 8 – Code changes delivered’.
Summary
Without an update to the implementation of R0060 complexity is created for MHHS code drafting implementation as the MHHS design details in its operational choreography document that all timings are in clock time unless stated as otherwise.
Change Plan
Change Proposal approved by Technical Expert Panel
Completed
Start:
12 May 2025Due:
28 May 2025Completion:
28 May 2025Consultation completed
Completed
Start:
25 Mar 2025Due:
12 May 2025Completion:
12 May 2025Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
28 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Without an update to the implementation date of R0060, the intent of the original proposed implementation date cannot be achieved. If the implementation date remains as 27 June 2025 complexity will be created for the implementation of MHHS code drafting as the MHHS design details in its operational choreography document that all timings are in clock time unless stated as otherwise.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal form
R0250 Change Report (Proposal Plan) v2.0 (Approved) 15.04.2025
R0250 Change Report (Consultation) V1.0 16.04.2025
R0250 Consolidated Consultation Responses v1.0
R0250 Change Report (Final Recommendation) v2.0 (Post-Vote) 28.05.2025
Company Name
-
Review status
Review required
Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
Date of latest update
Type
Change
ID
R0243
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
From MHHS go live (M8), responsibility for maintaining the SSC and TPR valid set will transfer to the REC Code Manager. Without an associated change to ownership of the specific data items, cross governance issues will arise delaying the resolution of future changes to the use of SSC and TPR data in enduring retail processes.
Change Plan
Change Report (Proposal Plan) published
Completed
Start:
12 Feb 2025Due:
29 Jul 2025Completion:
29 Jul 2025Proposal Plan approved
Completed
Start:
29 Jul 2025Due:
05 Aug 2025Completion:
05 Aug 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0243 - Data Items REDLINED
Upload document
R0243 - Data Items REDLINED.zip
Archive
Off
Problem Statement
From MHHS Go Live at MHHS Milestone M8 ‘Code changes delivered’, responsibility for maintaining the SSC and TPR valid sets will transfer to the REC Code Manager. Without an associated change to ownership of the specific Data Items, cross governance issues will arise delaying the resolution of future changes to the use of SSC and TPR data in enduring retail processes.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal form
R0243 Change Report (Proposal Plan) v1.0 APPROVED 05.08.2025
R0243 Change Report (Consultation) v1.0 11.08.2025
R0243 Consolidated Consultation Responses PUBLIC v1.0
R0243 Change Report (Final Recommendation) v1.0 approved 24.09.25
Company Name
RECCo
Review status
Review required
Missing Scenario Variant from R0043
Date of latest update
Type
Change
ID
R0242
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
There is a missing scenario variant from the introduction of R0043 – Schedule 14 Metering Operations states the Crowded Meter Room MOA (CMRM) should send a D0139 to the Supplier and DNO but the scenario variant of CMRM to DNO is missing.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
18 Mar 2025Final vote at Technical Expert Panel
Completed
Start:
Due:
Completion:
25 Jun 2025Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0179 | Proposal for Limiting Queries in EES API Calls (Single Query per API Call) | |
| R0190 | Related Meter Point RMP status rules |
|
| R0198 | Metering Asset Manager (MAM) Communication Method Register | |
| R0242 | Missing Scenario Variant from R0043 |
|
| R0244 | C21 to be introduced into STIRG Document |
|
| R0235A | Missing Scenario Variants in D0179 Alternate Solution | |
| R0256 | MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101 |
|
| R0270 | Clarification of SIP Qualification Requirements |
|
| R0271 | Clarification of ASP, AMI, and EMO Accession Requirements |
|
| R0272 | Enabling transparency of the CRS Provider’s REC service level performance |
|
| R0277 | Data Latency SLA Alignment for Gas Enquiry Service |
|
| R0280 | CSS Certificate Authority audit clarification |
|
| R0283 | Annual Address Management Plan Updates |
|
| R0287 | Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations |
|
| R0293 | Housekeeping February 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
CMRMs currently cannot send all the Market Messages required of them in Schedule 14 Metering Operations.
Stages Selection
Change Proposal form
R0242 Change Report (Proposal Plan) V1.0 Approved 18.03.25
R0242 Consolidated Impact Assessment Responses
R0242 Change Report (For Consultation) V1.0
R0242 Consolidated Consultation Responses v1.0
R0242 Change Report (Final Recommendation) V1.0 approved 25.06.25
Company Name
-
Review status
Review required
Shared Sites in Electricity Enquiry Service (EES)
Date of latest update
Type
Issue
ID
I0231
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/03/2026 The Proposer has withdrawn this Issue following discussions with industry, where impacted Parties advised waiting for the completion of MHHS migration before progressing this Issue and solution development. The window to adopt this Issue has now closed.
Summary
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- A flag on EES that can help everyone clearly identify the shared site, the primary MPAN and all of the pseudo MPANs attached to it.
Problem Statement
There is a concern regarding shared sites (as defined by BSCP550) that have multiple suppliers linked to them. The investigation revealed a lack of visibility of these sites, and it appears that the industry is similarly uninformed. Elexon, the REC, and the wider industry do not have a consistent way of identifying these shared sites. Therefore, there is a good chance that agents are holding shared sites within their portfolio without knowing it. We would like to explore whether the EES Online Portal has any flags or mechanisms that could help identify these shared sites. If not, could these be added?
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Company Name
Elexon
Review status
Review required
D0303 flow following MHHS design changes
Date of latest update
Type
Issue
ID
I0230
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
Calisen Asset Management Limited
Review status
Review required