On-site Aggregation as a method to facilitate Third Party Access - BSC P455

Date of latest update
Type
Change
ID
R0150
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Following a modification proposal to the Balancing and Settlement Code (BSC) to allow on-site aggregation as a method for third party access on private networks, the Code Manager is required to amend the REC to place a requirement on the Meter Equipment Managers (MEMs) appointed by the boundary points Electricity Supplier, to rectify any faults found with the submeters used in the on-site aggregation methodology.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

15 Jan 2024

Due:

22 Mar 2024

Completion:

22 Mar 2024

Party Impact Assessment

Completed

Start:

30 Oct 2023

Due:

15 Jan 2024

Completion:

15 Jan 2024

Final Change Report Issued

Completed

Start:

22 Mar 2024

Due:

26 Apr 2024

Completion:

25 Apr 2024

Responsible Committee Decision

Completed

Start:

26 Apr 2024

Due:

08 May 2024

Completion:

08 May 2024
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. The BSC Modification P455 Modification proposes to place a requirement on the SVA MOA (MEMs) appointed by the Boundary Point Supplier to rectify any faults found with the sub meters used in the On-Site Aggregation methodology; and to produce and submit the On-Site Aggregation Form to the HHDC. As MEMs (SVA MOAs) are governed under the Retail Energy Code (REC), R0150 is the REC's subsequent change to propose this.
Proposed Solution Document
Document title
Metering Operations - R0150 Legal Drafting (Published with Consultation 22.03.2024)
Upload document
Metering Operations - R0150 Legal Drafting (1).docx
Archive
Off
Document title
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Extract: R0150 - Schedule 14 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
R0150 - Schedule 14 Legal Drafting (Extract) (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14 Extract)
Upload document
R0150 Legal Drafting (Schedule 14 Extract).docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14).
Upload document
Approved for Implementation - R0150 Schedule 14 Legal Solution.docx
Archive
Off
Document title
Ofgem - BSC Modification P455 Decision
Archive
Off
Problem Statement
Under the proposed solution for BSC Modification P455, Consumers will require a Market Participant to oversee the maintenance of their sub-meter, including installations and rectification of metering faults. To ensure this, the REC will need to place a requirement on the MEMs appointed by the boundary point Electricity Supplier to rectify any faults found with the sub-meters used in the On-Site Aggregation.
R0150 - On-site Aggregation as a method to facilitate Third Party Access - BSC P455
R0150 Change Proposal Plan V1.0 (Approved 19.12.2023)
R0150 - Change Proposal Re-Plan (Approved) 08.02.2024
R0150 Initial Assessment Report V1.0 (Approved) 19.12.2023
R0150 - Preliminary Change Report V1.0 (Published for Consultation 22.03.2024)
R0150 - Consolidated Consultation Responses (17.04.2024)
R0150 - Final Change Report V2.0 (Approved) 08.05.2024
Company Name
Gemserv
Review status
Review required

Introduction of classification-based access model

Date of latest update
Type
Change
ID
R0148
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2025 - Following a review of the impact assessments received for the technical solution required to deliver R0148, taking into account the timelines, costs and the pending decision on the Evolution of the Enquiry Services, a positive business case cannot be demonstrated at this time. RECCo have, therefore, made the decision to withdraw R0148 and look at how the technical objectives can be met through the Evolution of the Enquiry Services. The adoption window has closed.
Summary
Currently Enquiry Services Data is only available to users whose roles and purposes for access are detailed within the Data Access Matrix (DAM). RECCo has undertaken a project to look at REC controlled data sources and created a Metadata Catalogue based on a Data Classification Model. This details the data items along with descriptions, identification of the associated data, roles, responsibilities, and classification. The output of this work will be utilised to improve access to Enquiry Services Data by making certain data items (defined as Always Open) easily available to everyone and simplifying the approval process for data items which can be made available if certain conditions have been met.
Proposer
Tracy Hardy
Change Plan

Service Provider Impact Assessment

In Progress

Start:

13 Oct 2023

Due:

31 Dec 2024

Completion:

Party Impact Assessment

Not Started

Start:

31 Dec 2024

Due:

31 Dec 2024

Completion:

Consultation

Not Started

Start:

31 Dec 2024

Due:

28 Feb 2025

Completion:

Responsible Committee Decision

Not Started

Start:

28 Feb 2025

Due:

04 Mar 2025

Completion:

Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want Market Participants to have appropriate data access so that I can benefit from improved product and service offerings.
  2. As a Market Participant, I want the processes that grant data access to be simplified and adaptable so that valid data use cases are addressed quickly.
Proposed Solution Document
Document title
Wiki Article - R0148 and the Metadata Catalogue
Archive
Off
Problem Statement
Currently the REC has a focus on role-based access to data items within the Enquiry Services as detailed in Schedule 12 – Data Access. However, a system and process where data items are released by virtue of the data item is needed.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0148 - Open Data Change Proposal Form V1.0.docx
Rebaseline of Change Proposal Plan v2.0
Metadata Catalogue V2.2 Published - EES GES Sources.
R0148 - Change Proposal Plan V1.0 (Approved)
R0148 - Initial Assessment Report v1.0 (Approved)
R0148 - Rebaseline of Change Proposal Plan (20.09.2024)
Company Name
Code Manager
Review status
Review required

Prepayment Levelisation

Date of latest update
Type
Change
ID
R0147
Change Category
Urgent
Yes
Latest Update
This change was implemented as part of the the Extraordinary release on 28 March 2024. *This Change Proposal has no impacts on Market-wide Half Hourly Settlement
Summary
This Change Proposal seeks to introduce the necessary governance and charging arrangements into the Retail Energy Code, to reconcile the impact on Domestic Energy Suppliers of levelling the cost of standing charges to Domestic Consumers paying by means of a Prepayment Meter with those paying by Direct Debit. This proposal is being raised on a contingent basis pending the decision of the Authority on whether to modify the standard conditions of the Gas and Electricity Supply Licences to levelise standing charges. That decision is expected in January 2024. This Change Proposal is being progressed in anticipation of the reconciliation of levelisation costs being administered by the Retail Energy Code Company.
Proposer
Jon Dixon
Change Plan

Solution development completed

Completed

Start:

22 Sep 2023

Due:

12 Oct 2023

Completion:

12 Oct 2023

Impact assessment period started

Completed

Start:

12 Oct 2023

Due:

13 Oct 2023

Completion:

13 Oct 2023

Impact assessment completed

Completed

Start:

13 Oct 2023

Due:

08 Nov 2023

Completion:

08 Nov 2023

Preliminary Change Report issued

Completed

Start:

08 Nov 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Responsible Committee review of Preliminary Change Report

Completed

Start:

17 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023

Consultation started

Completed

Start:

21 Nov 2023

Due:

22 Nov 2023

Completion:

22 Nov 2023

Consultation closed

Completed

Start:

22 Nov 2023

Due:

13 Dec 2023

Completion:

13 Dec 2023

Final Change Report issued

Completed

Start:

13 Dec 2023

Due:

12 Jan 2024

Completion:

11 Jan 2024

Responsible Committee decision

Completed

Start:

12 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Authority Determination requested

Completed

Start:

16 Jan 2024

Due:

17 Jan 2024

Completion:

17 Jan 2024
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.9.0
Included changes Affected REC Items
R0147 Prepayment Levelisation
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
184.95 KB
Version 1.0 - 16 Nov 2026 PDF - 184.95 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As a Domestic Consumer, I want to be charged the same standing charges regardless of whether I pay by DD or have a Prepayment Meter.
  2. As an Energy Supplier, I want my obligations regarding data provision to be clear so that I can provide accurate data. As an Energy Supplier, I want there to be a fair reconciliation mechanism calculates, reports, invoices and credits my organisation with the outcome of applying the payment levelisation methodology. As an Energy Supplier, I want the arrangements for the payment mechanism and terms, charging arrangements and invoicing to be clearly set out in the REC, so I can meet my obligations and have confidence in how the scheme operates.
  3. As RECCo, I want my responsibilities in relation to the development and administration of the levelisation scheme to be clearly set out in the REC so that I can successfully deliver the scheme for the industry. As the REC Code Manager, I want the levelisation scheme arrangements to be clearly set out in the REC, so that I can fulfil my role in administering and assuring the scheme.
Proposed Solution Document
Document title
Prepayment Levelisation - High level Solution Overview 05.10.2023
Upload document
PPM Levelisation - High level Solution Overview v1.2 05.10.2023.pdf
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v2.0 13.10.2023
Upload document
PPM Levelisation - High level Solution Overview v2.0 13.10.2023.pdf
Archive
Off
Document title
R0147 Draft Legal Text 05.10.2023
Upload document
R0147 Draft Legal Text 05.10.2023.zip
Archive
Off
Document title
R0147 Legal Text for PCR 17.11.2023
Upload document
R0147 Legal Text for PCR 17.11.2023.zip
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v3.0 (17.11.2023)
Upload document
PPM Levelisation - High level Solution Overview v3.0.pdf
Archive
Off
Document title
Payment Method Levelisation Solution Requirements (17.11.2023)
Upload document
Payment Method Levelisation Solution Requirements_13112023.xlsx
Archive
Off
Document title
Schedule XX Appendix - Supplier Data Reporting Specification v1.0
Upload document
Schedule XX Appendix - Supplier Data Reporting Specification v1.0.pdf
Archive
Off
Document title
R0147 Legal Text For Consultation 22.11.23
Upload document
R0147 Legal Text For Consultation 22.11.23.zip
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023
Upload document
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023.pdf
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v5.0 11.01.2024
Upload document
PPM Levelisation - High level Solution Overview v5.0 11.01.2024.pdf
Archive
Off
Document title
Payment Method Levelisation Solution Requirements_11.01.2024
Upload document
Payment Method Levelisation Solution Requirements_11.01.2024.xlsx
Archive
Off
Document title
R0147 Legal Text for FCR 11.01.2024
Upload document
R0147 Legal Text for FCR 11.01.2024.zip
Archive
Off
Document title
Ofgem Letter Levelisation - Alignment of legal text and license conditions 20.12.2023
Upload document
20231220 Ofgem Letter Levelisation - Alignment of legal text and license conditions (2).pdf
Archive
Off
Document title
R0147 Legal text - Consultation to FCR comparison
Upload document
R0147 Legal text - Consultation to FCR comparison.zip
Archive
Off
Document title
Levelisation - Alignment of legal text and licence modifications REC Response 17.01.2024
Upload document
20240117 Levelisation - Alignment of legal text and licence modifications REC Response.pdf
Archive
Off
Document title
R0147 Additional data specification guidance 23.02.2024
Upload document
R0147 Additional data specification guidance 23.02.2024.pdf
Archive
Off
Problem Statement
Ofgem are working towards and consulting on the design and implementation of a levelisation scheme to align the standing charges of Domestic Consumers who pay through a Prepayment Meter with those who pay via DD. RECCo will be the delivery partner for this scheme, however, the requirements and arrangements for the scheme need to be established in the REC.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0147 - Change Proposal Form.docx
R0147 Change Proposal Plan v2.0 (Approved) 14.11.2023
R0147 - Change Proposal Re-Plan (Approved) 19.12.2023
R0147 Initial Assessment Report v2.0 (Approved) 03.10.2023
R0147 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0147 Preliminary Change Report v2.0 (Approved) 22.11.2023
R0147 Consolidated Consultation Responses v1.0 PUBLIC
R0147 Final Change Report v2.0 (Post-Vote) 16.01.2024
Authority decision on REC modification proposal R0147 - Prepayment Levelisation 23.02.24
Company Name
RECCo
Review status
Review required

Allowing different Metering Equipment Managers (MEMs) to be appointed to Import and Export Metering Points

Date of latest update
Type
Change
ID
R0144
Change Category
Priority
Urgent
No
Latest Update
17/02/2025 - R0144 has been withdrawn by the Proposer, alongside it's joint BSC Change P459, as they cannot be progressed prior to MHHS. The Proposer will look to re-raise both changes in the future. The adoption window for this withdrawal has closed.
Summary
The Export Supplier needs to be able to appoint different MEMs to that of the Import Supplier
Proposer
Kit Dixon
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want a competitive Export market so I can get the best rates for the energy I generate. I want clear metering equipment ownership so I can be confident my meter is functional and safe. I want accurate billing from my Export Supplier.
  2. As an Export Supplier, I want to be able to appoint the MEM that ties in with my commercial strategy.
  3. As a MEM, I want clear guidance on the responsibilities I have for any metering equipment I am appointed to.
Problem Statement
Export Suppliers may become non-compliant with industry regulations if they are unable to appoint the same MEM as the Import Supplier, for example when the Consumer switches Import Supplier or when the Import Supplier changes the appointed MEM.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Change Proposal Form
R0144 Change Proposal Plan Withdrawal v1.0 (Pre Approval)
R0144 Change Proposal Plan v1.0 (16.04.2024) Approved
R0144 Initial Assessment Report v1.0 (16.04.2024) Approved
Company Name
REC Code Manager
Review status
Review required

Housekeeping amendments

Date of latest update
Type
Change
ID
R0140
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal. Schedule 27 – RMP Lifecycle Schedule 1 – Interpretations and Definitions Schedule 5 – Change Management Schedule 9 – Qualification and Maintenance
Proposer
Holly Law
Change Plan

Publish House Keeping Change Report

Completed

Start:

11 Aug 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

Responsible Committee decision

Completed

Start:

08 Sep 2023

Due:

19 Sep 2023

Completion:

19 Sep 2023

Implemented

Completed

Start:

19 Sep 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
R0140 Final Draft Legal text
Upload document
R0140 Final Draft Legal text.zip
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
R0140 - Housekeeping Change Report v1.0 (Approved) 19.09.23
Company Name
Gemserv
Review status
Review required

Combined progression of Change Proposals R0058, R0104 and R0129

Date of latest update
Type
Change
ID
R0138
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This change seeks to efficiently address the issues raised under the following Change Proposals. R0058 – REC Services Procurement Clarification R0104 – Clarifying Requirement for Continuous Billing Following an Erroneous Switch R0129 – Clarifying Event of Default Requirements These Change Proposals have been identified by the Code Manager as requiring non-contentious, clarificatory and non-material alterations to the REC Legal Text only.
Proposer
Elise Handy
Change Plan

Preliminary Change Report published

Completed

Start:

04 Aug 2023

Due:

01 Sep 2023

Completion:

01 Sep 2023

Consultation close

Completed

Start:

01 Sep 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Final Change Report published

Completed

Start:

15 Sep 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Responsible Committee decision

Not Started

Start:

22 Sep 2023

Due:

03 Oct 2023

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need the REC drafting to be accurate, so I can rely on it to ensure my processes and procedures correctly reflect my obligations. If there are mistakes or omissions, then it could cause issues with the effective operation and assurance of the retail energy market.
Proposed Solution Document
Document title
R0138 - Draft Legal Text
Upload document
R0138 - Draft Legal Text.zip
Archive
Off
Problem Statement
Three Change Proposals have been placed on hold due to having a low priority status. These proposals have been identified as having fully formed solutions, which are non-contentious and can be quickly implemented. This change seeks to address these Change Proposals so that they can be addressed, and their benefits realised.
DRAFT Change Proposal Form - Umbrella 2 CP.docx
R0138 - Initial Assessment Report (Approved) 15.08.2023
R0138 - Change Proposal Plan (Approved) 15.08.2023
R0138 - Consolidated Consultation Responses
R0138 - Preliminary Change Report v1.0 (01.09.2023) published for Consultation
R0138 - Final Change Report (Post-Vote) 03.10.2023
Company Name
REC Code Manager
Review status
Review required

Introducing Third Party Intermediary (energy broker) assurance and accreditation

Date of latest update
Type
Change
ID
R0137
Change Category
Urgent
No
Latest Update
16/05/2025 - The Authority has published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Proposer
Jon Dixon
Change Plan

Service Provider Impact Assessment opens

Completed

Start:

20 Jul 2023

Due:

05 Jul 2024

Completion:

05 Jul 2024

Service Provider Impact Assessment closes

Completed

Start:

05 Jul 2024

Due:

09 Aug 2024

Completion:

06 Aug 2024

Party Impact Assessment opens

Completed

Start:

09 Aug 2024

Due:

16 Aug 2024

Completion:

15 Aug 2024

Party Impact Assessment closes

Completed

Start:

16 Aug 2024

Due:

09 Sep 2024

Completion:

09 Sep 2024

Preliminary Change Report Issued

Completed

Start:

09 Sep 2024

Due:

08 Oct 2024

Completion:

08 Oct 2024

Responsible Committee Review

Completed

Start:

08 Oct 2024

Due:

15 Oct 2024

Completion:

15 Oct 2024

Consultation opens

Completed

Start:

15 Oct 2024

Due:

18 Oct 2024

Completion:

17 Oct 2024

Consultation closes

Not Started

Start:

18 Oct 2024

Due:

08 Nov 2024

Completion:

Responsible Committee Decision

Not Started

Start:

10 Dec 2024

Due:

17 Dec 2024

Completion:

Final Change Report issued

Not Started

Start:

08 Nov 2024

Due:

10 Dec 2024

Completion:

Sent to Authority for Determination

Not Started

Start:

17 Dec 2024

Due:

18 Dec 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Non-Domestic Consumer, I want to work with TPIs who are demonstrating best practice standards within the market.
  2. As a Non-Domestic Energy Supplier, I want clear obligations around my use of TPIs so I can demonstrate best practice standards within the market and ensure my audit obligations are met.
  3. As RECCo, I want to provide an assurance and accreditation scheme to register TPIs to remove the burden of Suppliers having to individually audit TPIs.
  4. As a Third Party Intermediary, I want clear obligations so I can become accredited and assure that Suppliers and Non-Domestic Consumers are receiving best practice standards within the market.
Proposed Solution Document
Document title
Legal Text for Party IA.zip
Upload document
Legal Text for Party IA.zip
Archive
Off
Document title
R0137 Legal Text for Consultation
Upload document
R0137 Legal Text for Consultation.zip
Archive
Off
Document title
R0137 Legal Text - Final
Upload document
R0137 Final Legal Text (1).zip
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137 - Change Proposal Form External
R0137 Change Proposal Plan v1.0 (Approved)
R0137 Initial Assessment Report v1.1 (Approved)
R0137 Consolidated Impact Assessment Responses PUBLIC
R0137 and R0137A Change Report (For Consultation) V1.0
R0137 &R0137A Consolidated Consultation Responses PUBLIC v1.0
R0137 and R0137A Change Report (Post Vote) V1.0
Authority decision on REC modification proposal R0137 and R0137A
Company Name
RECCo
Review status
Review required

Change to REC Schedule 22 Market Stabilisation Charge (MSC)

Date of latest update
Type
Change
ID
R0136
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
This Change Proposal seeks to deliver two changes to REC Schedule 22 – Market Stabilisation Charge. The first change will update the statement timescales in Schedule 22 to ensure that this is appropriately aligned with the statement Schedule. The second change seeks to update the disputes Section (section 7) of Schedule 22 to include reference to Credit Advice Notes.
Proposer
Lynne Fallon
Change Plan

Impact Assessment and Change Proposal Plan Published

Completed

Start:

17 Jul 2023

Due:

25 Aug 2023

Completion:

25 Aug 2023

Preliminary Change Report Issued

Completed

Start:

25 Aug 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Review of PCR by Change Panel

Completed

Start:

22 Sep 2023

Due:

03 Oct 2023

Completion:

03 Oct 2023

Consultation Started

Completed

Start:

03 Oct 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Consultation Closes

Completed

Start:

06 Oct 2023

Due:

26 Oct 2023

Completion:

26 Oct 2023

Final Change Report Issued

Completed

Start:

26 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Change Panel Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Samantha Briggs
Solution Development
Proposed solution summary
  1. As RECCo, I want the Retail Energy Code to specify my obligations, governance and charging mechanisms, so that I can effectively discharge obligations imposed by the Authority through the Licence Condition modification.
  2. As a Domestic Supplier, I want to understand how RECCo will calculate my credits and liabilities and when they will send statements, so that I can plan to review my invoices/credit notes prior to the receipt of monies owed or payments I need to make to RECCo or at an appropriate time for my organisation.
  3. As a Domestic Supplier, I want to understand how I can dispute a Credit Advice which I do not believe is accurate, so that I am able to raise a dispute/challenge compliantly.
Proposed Solution Document
Document title
R0136 - Draft Legal Text (10.11.2023)
Upload document
R0136 - Draft Legal Text v1.0 (1).doc
Archive
Off
Problem Statement
Schedule 22 says that within 10 Working Days after the end of each MSC-4-Week Cycle, RECCo shall send each Energy Supplier a statement in respect of that MSC-4-Week Cycle. This contradicts the 15 days set out in the Process Maps shared with Parties during the development of the administration arrangements of the Market Stabilisation Charge. Additionally, suppliers are querying how they may raise a dispute when they believe they are not entitled to the monies stated on Credit Advice Notices as this process is not set out in the Schedule.
R0136 - Change Proposal Form
R0136 - Changes to Sche 22 - CPP v1.0 (Approved) 05.09.2023
R0136 - Changes to Sch 22 MSC IAR (Approved) v1.0 05.09.2023
R0136 - Preliminary Change Report - (Approved) 03.10.23
R0136 - Consolidated Consultation Response 10/11/2023
R0136 - Final Change Report v2.0 (Post-Vote) 21.11.2023
Company Name
RECCo
Review status
Review required

Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation

Date of latest update
Type
Change
ID
R0133
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
A Balancing & Settlement Code (BSC) Modification P441 is looking to introduce additional Complex Site classes which would categorise the types of Complex Site, with each having clearly defined criteria within the BSC, whilst also facilitating a new "type" of Complex Site (referred to as a Class 6 Complex Site) to allow approval of "non-standard" complex sites. It will also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.
Proposer
Elise Handy
Change Plan

Solution Development

Completed

Start:

04 Jul 2023

Due:

14 Aug 2023

Completion:

14 Aug 2023

Party Impact Assessment

Completed

Start:

14 Aug 2023

Due:

14 Aug 2023

Completion:

04 Sep 2023

Preliminary change report

Completed

Start:

14 Aug 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a consumer, I want more choice to take up low-carbon technology and more flexible energy solutions through local energy schemes, such as the Ofgem BEIS Smart System Flexibility Plan and any other future flexibility service provisions that may be developed.
  2. For MEMs, l want to remove ambiguity around the current Complex Site arrangements and will facilitate the advancement of community energy schemes.
  3. For Suppliers, I want to encourage more innovation that will lead to the better use of local energy schemes.
Problem Statement
The introduction of new Complex Site classes is needed into the REC to make the solutions under P441 and DCP 424 work. Meter Equipment Managers (MEMs) will need to understand what their new obligations are in respect of metering requirements, as well as impacts on any of the metering processes associated with a Complex Site.
Stages Selection
Change Proposal Form 04.07.2023
R0133 - Change Proposal Plan v1.0 approved 18/07/2023
R0133 Initial Assessment Report v1.0 Approved 18/07/2023
R0133 - Change Proposal Plan v2.0 (Approved) 13/09/2023
R1033 - Draft Legal Text Schedule 14 - Metering Operations for PCR 22.09.23
R0133 - Consolidated Impact Assessment Responses
R0133 Preliminary Change Report V1.0
Company Name
Code Manager
Review status
Review required

Change the Logical Format of the J0001 (DI50001) ‘Market Participant Role Code’ data item to Char(2)

Date of latest update
Type
Change
ID
R0132
Change Category
Change Path
Urgent
Yes
Latest Update
20/10/2023 - Change Proposal Withdrawn. This change will be progressed through the BSC.
Summary
This Change Proposal looks to implement changes to REC Market Messages impacted by the change in the logical format of the J0001 (DI50001) ‘Market Participant Role Code’ from a character length of one to a character length of two.
Proposer
admin
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a new Market Participant, I want to be able to implement Electricity industry solutions and initiatives utilising industry systems that require me to be assigned a MPRC
  2. As an existing Market Participant, I want to be able to define my interactions with other Market Participants using unique Market Role code identifiers As the BSC, I want to be able to assign new MPRCs so that we can fulfil requests as part of new market solutions
  3. As a new or existing Market Participant, I want to be able to continue sending and receiving Market Messages which include the MPRC within the file
Problem Statement
Under the current logical format there are only 36 possible MPRCs available for the Electricity industry, and they have all been allocated. The BSC are therefore currently unable to allocate new MPRCs and propose to update the logical format of the J0001 (DI50001) ‘Market Participant Role Code’. REC owned Market Messages will need to be updated to accommodate the new logical format.
Stages Selection
REC Change Proposal for J0001 Logical Format_Attachment 1_proposed amendment.docx
R0132 Change Proposal Form
R0132 Change Proposal Plan v1.0 (Approved) 19.09.2023
R0132 Initial Assessment Report v1.0 (Approved) 19.09.2023
Company Name
BSCCo
Review status
Review required