Theft Detection Incentive Scheme (TDIS) Reporting Periods
Date of latest update
Type
Change
ID
R0163
Change Category
Change Path
Priority
Urgent
No
Latest Update
29/01/2028 - Adoption Window closed. Change withdrawn
Summary
This Change Proposal seeks to alter the Theft Detection Incentive Scheme (TDIS) reporting cycle from annual to a quarterly cycle. This alteration is limited the administration of the scheme and will have no impact on how Suppliers submit their reports.
Change Plan
Responsible Committee decision
Not Started
Start:
09 Apr 2024Due:
21 Jan 2025Completion:
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As an Energy Supplier, I want the ability to effectively monitor my TDIS performance so that I can optimise my theft detection operations.
- As the Code Manager, I want the TDIS to continually evolve so that performance against the scheme can be improved.
- As RECCo, I want the TDIS to continually evolve to support the Theft Reduction Strategy.
Proposed Solution Document
Document title
R0163 Draft Legal Text (10.04.2024)
Upload document
R0163 Draft Legal Text.zip
Archive
Off
Problem Statement
The current annual TDIS Reporting Cycle does not support the effective cost recovery for Suppliers in year, enable Suppliers to monitor their TDIS performance or enable the Code Manager to flexibly adopt improvements to the scheme.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
2023.11 Ofgem - Open letter on Energy Theft.pdf
RECCo TTM cover letter 15.01.2024.pdf
R0163 - Change Proposal Form
R0163 - Initial Assessment Report v1.1 (16.04.2024) Approved
R0163 - Change Proposal Plan V1.1 (16.04.2024) Approved
R0163 - Preliminary Change Report v1.0 (12.04.2024) Published for consultation
R0163 Consolidated Consultation Responses_Non-Confidential 09.05.2024
R0163 - Rebaseline of Change Proposal Plan (13.05.2024)
R0163 - Rebaseline of Change Proposal Plan v2.0 (06.09.2024)
R0163 Consolidated Consultation Responses (Non-confidential)
Company Name
RECCo
Review status
Review required
Access to SDES for Gas Networks
Date of latest update
Type
Change
ID
R0162
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/10/2025 - the REC Change Panel approved the withdrawal of the proposal plan for R0162 and that this Change would be placed on hold while I0285 progresses.
Summary
Raising on behalf of the Gas Networks, who currently struggle to find who to email queries to within suppliers organisation. Suppliers and Electricity DNO's moved to SDES to ensure all communications were in a secure portal, with SLA's and for GDPR reasons, but Gas Networks do not have access to this portal, and not considered during the implementation of the system. They also obtain photo's when out on site to help resolve queries and would like somewhere to upload them to send to suppliers.
Change Plan
Proposal Plan approved by Change Panel
Completed
Start:
Due:
Completion:
15 Apr 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
01 May 2025Change approved to go on hold at Change Panel
Completed
Start:
Due:
Completion:
21 Oct 2025Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0162 Solution Development Report V1.0
Upload document
R0162 Solution Development Report V1.0.pdf
Archive
Off
Problem Statement
Energy Suppliers and Distribution Network Operators (DNOs) moved to SDES to ensure all communications were in a secure portal, with SLAs and for GDPR reasons. Gas Transporters do not have access to this portal, and were not considered during the implementation of the system. As such, communications are not being sent as securely as possible.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
CP Form Access to SDES for Gas Networks
R0162 Change Report (Proposal Plan) V1.0 Approved 15.04.2025
R0162 Consolidated Impact Assessment Responses v1.0
R0162 Extension to Plan V1.0 approved 27.08.25
R0162 Rebaseline Plan (withdrawal) V2.0 approved 21.10.25
Company Name
Octopus Energy
Review status
Review required
Enabling Robotics for SDEP
Date of latest update
Type
Change
ID
R0161
Change Category
Change Path
Priority
Urgent
No
Latest Update
24/03/26 - This Change is on hold pending the outcome of R0122 - SDEP Review Improvements
Summary
The Secure Data Exchange Portal (SDEP) is a mailbox that enables the transfer of sensitive customer related data in a way that ensures data is safe and secure. Suppliers are obliged to send and receive queries and escalations via the SDEP. Unfortunately, the SDEP has issues in bulk resolving processes which could be solved by the removal of the prohibition of the use of robotics. For example, there is no function to be able to retrieve cases specific to each team, work these and then automatically issue a response. Currently, to get the same kind of functionality, an agent or team lead would need to manually process. In another scenario, under REC schedule 30, as part of each of the processes, we are obliged to issue an escalation where there has been no response within set timeframes. Prior to SDEP implementation, we would be able to issue email escalations automatically where there was an absence of a response flow. With the SDEP this process is now manual: an agent will need to sign in to ECOES, navigate to the appropriate module, and input the data.
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Stages Selection
CP Form Enabling Robotics for SDEP
Company Name
OVO Energy
Review status
Review required
Electricity Supply to Hydrogen Electrolysers
Date of latest update
Type
Change
ID
R0160
Change Category
Priority
Urgent
Yes
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change to the Retail Energy Code is proposing to facilitate efficient and robust procedures between Licensed Suppliers and LCCC as part of the regulatory solution to prove that electricity supplied to the hydrogen producer is LCHS-compliant.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
20 Mar 2024Due:
02 May 2024Completion:
25 Apr 2024Consultation Close
Completed
Start:
02 May 2024Due:
24 May 2024Completion:
20 May 2024Final Change Report Issued
Completed
Start:
24 May 2024Due:
07 Jun 2024Completion:
23 May 2024Responsible Committee Decision
Completed
Start:
07 Jun 2024Due:
18 Jun 2024Completion:
04 Jun 2024Authority Determination Requested
Completed
Start:
18 Jun 2024Due:
19 Jun 2024Completion:
05 Jun 2024Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
28 June 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0043 | Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms |
|
| R0158 | Amendment to the ‘Supplier Registration Report (MAP)’ report methodology | |
| R0160 | Electricity Supply to Hydrogen Electrolysers |
|
| R0064 | Creating a Meter Operator Agent and MOCoP Installer |
|
| R0070 | Provision of Enduring Test Environments |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- A modification to the Retail Energy Code to facilitate efficient and robust procedures between Licensed Suppliers and LCCC as part of the regulatory solution to prove that electricity supplied to the hydrogen producer is LCHS-compliant.
Proposed Solution Document
Document title
Electricity Supply to Hydrogen Electrolysers Schedule (Draft)
Upload document
REC Mod 140324 - Draft Legal Text (New Schedule).docx
Archive
Off
Document title
R0160 - Draft Schedule - Electricity Supply to Hydrogen Electrolysers (Published for FCR) 23.05.2024)
Upload document
R0160 - Draft Schedule - Electricity Supply to Hydrogen Electrolysers.pdf
Archive
Off
Document title
R0160 - Schedule 1 - Interpretations & Definitions at FCR (23.05.2024)
Upload document
R0160 - Schedule 1 - Interpretations & Definitions at FCR.pdf
Archive
Off
Problem Statement
Primary legislation for hydrogen production does not mention the role of Licensed Suppliers. Consequently, the LCCC does not have the power needed to compel Licensed Suppliers to disclose the information needed by the LCCC to carry out its duties with regards the Hydrogen Production Business Model (HPBM) and Low Carbon Hydrogen Agreement (LCHA) to prove that the electricity is compliant with the Low Carbon Hydrogen Standard (LCHS) .
Stages Selection
R0160 - CP Form Electricity Supply to Hydrogen Electrolysers
R0160 - Draft Legal Text (Submitted by proposer)
R0160 - Change Proposal Plan V1.0 (Approved) 18.04.2024
R0160 - Initial Assessment Report v1.0 (Approved) 18.04.2024
R0160 - Preliminary Change Report (Published for Consultation) 25.04.2024
R0160 - Consolidated Consultation Responses (21.05.2024)
R0160 - Final Change Report V2.0 (Post-vote) 04.06.2024
R0160 Authority Decision
Company Name
Hydrogen UK
Review status
Review required
Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
Date of latest update
Type
Change
ID
R0158
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Meter Asset Providers (MAPs) can query the Gas Enquiry Service (GES) as part of their billing process to establish the Registered Gas Suppliers of their portfolio of Metering Assets. The reports via which MAPs can query the GES are not currently working exactly as intended due to incorrect wording in the GES Definition; this change seeks to rectify that.
Change Plan
Preliminary Change Report Issued
Completed
Start:
08 Feb 2024Due:
15 Mar 2024Completion:
15 Mar 2024Consultation Issued
Completed
Start:
15 Mar 2024Due:
15 Mar 2024Completion:
15 Mar 2024Final Change Report Issued
Completed
Start:
15 Mar 2024Due:
12 Apr 2024Completion:
12 Apr 2024Responsible Committee Decision
Completed
Start:
12 Apr 2024Due:
24 Apr 2024Completion:
24 Apr 2024Appeal Window Closure
Not Started
Start:
24 Apr 2024Due:
08 May 2024Completion:
Status
Implementation Date
28 June 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0043 | Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms |
|
| R0158 | Amendment to the ‘Supplier Registration Report (MAP)’ report methodology | |
| R0160 | Electricity Supply to Hydrogen Electrolysers |
|
| R0064 | Creating a Meter Operator Agent and MOCoP Installer |
|
| R0070 | Provision of Enduring Test Environments |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Registered Gas Supplier, I want to receive accurate invoices from MAPs for use of their Metering Assets, so that I am not over or under charged. 2 - As a MAP, I want to be able to access accurate information about my portfolio so that I can be correctly remunerated by Suppliers. 3 - As the GES Provider, I want the reports that I am obligated to provide to be correctly defined, so that I am able to provide accurate data to MAPs regarding their portfolios.
Proposed Solution Document
Document title
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3 (Draft) 15.03.24
Upload document
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3 (Draft) 15.03.24.pdf
Archive
Off
Document title
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3.1 (Draft) 11.04.24
Upload document
R0158 Solution - Gas Enquiry Service (GES) Service Definition v1.3.1 (Draft) 11.04.24.pdf
Archive
Off
Problem Statement
The GES Service Definition defines two reports that MAPs can use to query the CDSP to find out which Registered Gas Suppliers supply Metering Assets in their portfolio, so that they can bill them. Due to a drafting error in the GES Service Definition, this report is not working as intended, and MAPs are not able to ascertain the Registered Gas Supplier for their entire portfolio. This change seeks to rectify the drafting error and restore the intended functionality of the two reports.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0158 Change Proposal Form - Supporting Documents
R0158 Change Proposal Form
R0158 Change Proposal Form (PDF)
R0158 Initial Assessment Report (Approved) V1.0 06.03.24
R0158 Change Proposal Plan (Approved) V1.0 06.03.24
R0158 Preliminary Change Report (Published for Consultation) V1.0 15.03.24
R0158 Consolidated Consultation Responses V1.0 12.04.24
R0158 Final Change Report (Post-Vote) V1.0
Company Name
Xoserve
Review status
Review required
DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
Date of latest update
Type
Change
ID
R0092A
Change Category
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Requirements for the Central Switching Service (CSS) were identified during the Design, Build and Test Phase of the Ofgem-led Switching Programme as a basis for the procurement of Switching systems. These requirements were later baselined in the REC Service Definitions as Service Level Agreements (SLAs). Following the successful go-live of the CSS, these SLAs merit a review, in order to ensure that they are realistic, given the physical systems design and the actual behaviours of users, compared to the assumptions that were made in the early design phase of the Switching Programme. This Change Proposal has been raised as the vehicle to complete the review and take forward any identified changes
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want the CRS Provider to provide an effective service so that my Switch is not delayed.
- As the REC Code Manager, I want to ensure the CRS Provider has appropriate SLAs set, which incentivises the effective functioning of the Switching Service.
- As the CRS Provider, I want to ensure that the appropriate SLAs are in place to incentivise the effective functioning of the Switching Service and if these SLAs are not met by the CRS Provider, the commercial impact is proportionate to the detriment experienced by CSS Users and Consumers.
Proposed Solution Document
Document title
R0092A_Legal Text at FCR (19.04.2024)
Upload document
R0092A_Legal Text at FCR.zip
Archive
Off
Problem Statement
Following the introduction of Performance Charges, on 01 April 2023, charges will apply based on the CRS Provider's performance against the defined SLAs. The SLAs were developed based on assumptions made in the early phases of the Switching Programme. The DCC has proposed that these are reviewed, to ensure they are fit for purpose and any Performance Charges applied are proportionate to CSS User detriment and Consumer impact.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0092A - Change Proposal Form.docx
R0092A_Authority_Decision (22.07.2024)
Company Name
REC Code Manager
Review status
Review required
Removal of Facsimile as a Method of Code Communication
Date of latest update
Type
Change
ID
R0157
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
The Public Switched Telephone Networks (PSTN) will be switched off in December 2025 by all telecom companies and will be replaced with an Internet Protocol (IP) digital network. Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC. All communication methods referencing fax or facsimile will need to be removed and replaced with email (where this is not an existing option), unless an alternative form of communication is needed. Please note: The government have published preparatory guidance which includes migrating to IP-supported technology in advance of the planned decommissioning. UK transition from analogue to digital landlines - GOV.UK (www.gov.uk) Critical National Infrastructure (CNI) (“assets, facilities, systems, networks or processes and the essential workers that operate and facilitate them”) which is subdivided into 13 sectors including Energy, are advised to consider how they move to digital alternatives smoothly to avoid unnecessary interruption following the PSTN switch-off. Openreach's Energy Guidance Factsheet can be found in the CPs Accompanied Documents.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
03 Jan 2024Due:
09 Feb 2024Completion:
09 Feb 2024Final Change Report Issued
Completed
Start:
23 Feb 2024Due:
12 Mar 2024Completion:
12 Mar 2024Responsible Committee Decision
Completed
Start:
12 Mar 2024Due:
19 Mar 2024Completion:
19 Mar 2024Appeal Window Closure
Not Started
Start:
19 Mar 2024Due:
02 Apr 2024Completion:
Consultation Close
Completed
Start:
09 Feb 2024Due:
23 Feb 2024Completion:
23 Feb 2024Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- All communication methods referencing fax or facsimile will need to be removed and replaced with email
Proposed Solution Document
Document title
Existing References to Fax and "e-mail" in the REC (January 2024)
Upload document
Existing Fax References in the REC.pdf
Archive
Off
Document title
R00157 - Legal Text Changes (All Affected REC Products and Documents)
Upload document
R00157 - Draft Legal Text Changes.zip
Archive
Off
Problem Statement
Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC
Stages Selection
CP Form - Removal of a Fax as a Code Communication method
R0157 - Change Proposal Plan V1.0 (Approved) 30.01.2024
R0157 - Initial Assessment Report V1.0 (Approved) 30.01.2024
R0157 - Consolidated Consultation Responses
R0157 - Preliminary Change Report V1.0 (For Consultation) 09.02.2024
R0157 - Final Change Report V2.0 (Post-Vote) 19.03.2024
Open Reach Energy Industry Factsheet
Company Name
REC Code Manager
Review status
Review required
Change of Occupier: Evidentiary Standards and Timescales
Date of latest update
Type
Change
ID
R0155
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025. The R0155 Guidance Document was updated on 05 November 2025 as a result of the implementation of R0232 and R0254 on 07 November 2025.
Summary
This Change Proposal seeks to address industry concerns with the Non-Domestic Change of Occupier (CoO) process identified by Non-Domestic Suppliers, Third Party Intermediaries (TPIs) and Consumers and bring improvements to the CoO process.
Change Plan
Solution Development Completed
Completed
Start:
13 Dec 2023Due:
28 Jun 2024Completion:
28 Jun 2024Party Impact Assessment Issued
Completed
Start:
28 Jun 2024Due:
23 Aug 2024Completion:
23 Aug 2024Party Impact Assessment Closed
Completed
Start:
23 Aug 2024Due:
27 Sep 2024Completion:
27 Sep 2024Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
28 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, when I become responsible for a new premise, I want to be supplied by the Energy Supplier and/or Tariff of my choice and for this to be completed in a timely manner. As a Consumer, when I become responsible for a new premise, I do not want to be billed for the previous occupier’s usage.
- As a TPI I want an efficient CoO process so that I can advise my client of the best Tariffs suitable to their needs. As an Energy Supplier, I want to easily identify genuine CoOs so that transfers are not unduly delayed, and my organisation can focus on genuine exceptions. As an Energy Supplier, I want to easily identify the validity of a CoO, so that the risk of misuse is reduced.
- As an Energy Supplier, I want to accurately invoice the correct occupant in the first instance. As REC Performance Assurance, we need a standardised and consistent process for CoO Switches, so that we can undertake performance reviews appropriately, highlighting areas of misuse and applying sanctions where appropriate.
Proposed Solution Document
Document title
R0155 - Draft Non-Domestic Change of Occupier Schedule (published for Party Impact Assessment) 13.08.2024
Upload document
R0155 - Draft Non-Domestic Change of Occupier Schedule (published for Party Impact Assessment) 13.08.2024.pdf
Archive
Off
Document title
R0155 - Draft Amendments to Schedule 23 - Registration Services (published for Party Impact Assessment) 13.08.24
Upload document
R0155 - Draft Amendments to Schedule 23 - Registration Services (published for Party Impact Assessment) 13.08.24.pdf
Archive
Off
Document title
R0155 - Performance Assurance Reporting Catalogue Extract (published for Party Impact Assessment) 13.08.2024.xlsx
Upload document
R0155 - Performance Assurance Reporting Catalogue Extract (published for Party Impact Assessment) 13.08.2024.xlsx
Archive
Off
Document title
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) 28.10.2024
Upload document
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) 28.10.2024.pdf
Archive
Off
Document title
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) (red-lined) 28.10.2024
Upload document
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) (red-lined) 28.10.2024.pdf
Archive
Off
Document title
R0155 - Draft Amendments to Schedule 23 - Registration Services v0.2 (for consultation) 28.10.2024
Upload document
R0155 - Draft Amendments to Schedule 23 - Registration Services v0.2 (for consultation) 28.10.2024.pdf
Archive
Off
Document title
Performance Assurance Report Catalogue - R0155 Extract (for consultation) 28.10.2024
Upload document
Performance Assurance Report Catalogue - R0155 Extract (for consultation) 28.10.2024.xlsx
Archive
Off
Document title
R0155 - Change Report (for Consultation) V1.0 (29.10.2024)
Upload document
R0155 - Change Report (for Consultation) V1.0 (2).pdf
Archive
Off
Document title
R0155 - Change Report (Final Recommendation) V2.1 Post-Vote (24.01.2025)
Upload document
R0155 - Change Report (Final Recommendation) Post-Vote V2.1 (1).pdf
Archive
Off
Document title
R0155 - Non-Domestic Change of Occupier Schedule (10.12.2024)
Upload document
R0155 - Non-Domestic Change of Occupier Schedule.pdf
Archive
Off
Document title
R0155 - Schedule 23 - Registration Services (10.12.2024)
Upload document
R0155 - Schedule 23 - Registration Services.pdf
Archive
Off
Document title
R0155 - Schedule 23 - Registration Services (10.12.2024) (Red-Lined)
Upload document
R0155 - Schedule 23 - Registration Services (10.12.2024).pdf
Archive
Off
Document title
R0155 Non-Confidential Consultation Consolidated Responses V1.0 (09.12.2024)
Upload document
R0155 Non-Confidential Consultation Consolidated Responses V1.0 (1).pdf
Archive
Off
Document title
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Guidance Document V3.0
Upload document
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Guidance Document V3.pdf
Archive
Off
Document title
Updates on the Performance Assurance of R0155 V2.0
Upload document
Updates on the Performance Assurance of R0155 V2.0.pdf
Archive
Off
Document title
SDEP User Training Deck V2.0
Upload document
SDEP User Training Deck v2.0.pptx
Archive
Off
Document title
Information Request for R0155 Implementation (06.03.2025)
Upload document
Information Request for R0155 Implementation.docx
Archive
Off
Problem Statement
Non-Domestic Consumers may struggle to quickly and easily update a supplier when they become the new owner/occupier or responsible bill payer for a property. This can include: Inconsistent requests from suppliers for proof they are the new owner/occupier or responsible bill payer; inconsistent time taken to have new billing account set up or new contract agreed with the supplier; inconsistent treatment of request to change supplier (CoO flagged or not flagged, loss request objected to or not objected to); risk of being held responsible for previous owner/occupier or responsible bill payers debt and contract; risk of being put on deemed prices (on assumption these are more expensive than contract terms). Suppliers may struggle to quickly and easily update their billing and contractual records for non-domestic properties. This can include: inconsistent updates from consumer leaving a property; inconsistent updates from consumers taking over a property; inconsistent quality of evidence provided; risk of invalid/fraudulent requests to avoid debt or leave contracts before expiry date. Third Party Intermediaries (TPIs) may struggle to provide non-domestic consumers and suppliers with a service. This can include: different processes for each supplier; different evidence available from each consumer; being stuck in the middle.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Guidance Document V3 (05.11.2025)
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Authority Approval 04.02.2025
R0155 - Change Proposal Form
R0155 - Change Proposal Plan v1.0 (Approved 19.12.2023)
R0155 - Change of Tenancy - Change Proposal Extension (Approved) 16.04.2024
Initial Assessment Report (Approved 19.12.2023)
R0155 - Change Report (Impact Assessment) 20.08.2024
R0155 - Consolidated Impact Assessment Responses (Non-Confidential) 28.10.2024
R0155 Non-Confidential Consultation Consolidated Responses V1.0 (09.12.2024)
Updates on the Performance Assurance of R0155 V1.0 (Supplementary document)
R0155 - Change Report (Final Recommendation) Post-Vote V2.1
Company Name
REC Code Manager
Review status
Review required
Catering for Registration Events where the Incumbent Supplier deactivates prior to a Switch becoming effective
Date of latest update
Type
Change
ID
R0153
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/06/24 - This change has been withdrawn by the proposer and is being incorporated as part of R0178 - Improvements to CSS Business Process Logic. 03/05/2024 - An investigation was held into the requirements of this change and into other issues identified with the CSS Business Process and Logic. Landmark have provided data relating to the number of incidents for three different scenarios which had been identified. A discussion as held between the Code Manager, DCC and Landmark, and agreed that they will look to combine all identified issues into a new REC Change Proposal.
Summary
This change looks to resolve the issue for Registration Events where the incumbent Supplier deactivates prior to a Switch becoming effective. In some instances, the incumbent Supplier is withdrawing prior to the ‘Supply Effective from Date’ which causes the accepted Switch to fail at Gate Closure (17:00hrs) . An effective solution is to allow the consumer to Switch with the original effective date. There are a number of solution options to enable this to happen.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
In some instances, the incumbent Supplier is withdrawing prior to the ‘Supply Effective from Date’ which causes the accepted Switch to fail at Gate Closure (17:00hrs).
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
Catering for Registration of Events CP Form 24.11.2023
Company Name
Xoserve
Review status
Review required
Revision to the Consolidated Metering Code of Practice (CoMCoP)
Date of latest update
Type
Change
ID
R0152
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Following the implementation of the Consolidated Metering Code of Practice (CoMCoP) a number of issues have been identified by RECCo, The Code Manager and REC Parties, stating that REC Parties are unable to meet their obligations as currently presented in the CoMCoP. The Code Manager has reviewed these and determined changes are required.
Change Plan
Extension to Plan V2.0 approved at Change Panel
Completed
Start:
Due:
Completion:
04 Feb 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I trust my Energy Supplier and their associated agents to have a robust metering framework to ensure the safety and accuracy of my meter.
- As an Energy Supplier, MEM or DNO, I need clear and correct documentation so I can identify the obligations I need to meet within my role and satisfy my audit criteria.
- As an Energy Supplier, I need to know that any MEM or DNO I work with is compliant to ensure the best practice for my customers.
- As the Metering Scheme Auditor, I need clear and correct documentation to ensure I can fulfil my role and provide confidence that REC Parties are meeting their obligations.
Proposed Solution Document
Document title
Draft legal text for Party Impact Assessment
Upload document
Legal text for Party IA (1).zip
Archive
Off
Document title
R0152 Solution Documents Guidance v1.0
Upload document
R0152 Solution Documents Guidance v1.0.pdf
Archive
Off
Document title
R0152 Party IA Solution Documents Guidance Video
Archive
Off
Document title
R0152 Legal text for Consultation
Upload document
R0152 Legal text for Consultation.zip
Archive
Off
Document title
R0152 legal text for final recommendation
Upload document
R0152 legal text for final recommendation.zip
Archive
Off
Problem Statement
MEMs are struggling to successfully pass their CoMCoP audits and be compliant, due to inconsistencies and lack of clarity in the document. There has been concern expressed by MEMs, that when contracting with Energy Suppliers, they are proclaiming themselves compliant with the CoMCoP when this may or may not be true.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
SME User
daniel.rodgers@retailenergycode.co.uk
REC Analysis CoMCoP.xlsx
R0152 - Change Proposal Form (downloadable version) 16.11.2023
R0152 Change Proposal Plan v1.0 (Approved) 19.12.23
R0152 Initial Assessment Report v1.0 (Approved) 19.12.23
R0152 Extension to Plan v1.0 (Approved) 31.10.2024
R0152 Extension to Plan v2.0 (Approved) 04.02.2025
R0152 Consolidated Party Impact Assessment Responses PUBLIC V1.0
R0152 Change Report (For Consultation) V1.0
R0152 - Consolidated Consultation Responses (Public) v1.0
R0152 Change Report (Final Recommendation) V1.1 approved
R0152 Change Report (Final Recommendation) V1.1 approved
Company Name
REC
Review status
Review required