Central provision of DCC Technical Contacts for requesting test certificates

Date of latest update
Type
Change
ID
R0103
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
19.09.2023 - approved for implementation in February 2024 Release
Summary
In order for central systems testing (including maintenance and emergency testing) to be undertaken by the Switching Operator, certificates from the SDSPs and CSS User communities are required to interact with CSS in the testing environments. The Switching Operator was able to issue certs to the simulator provider during the Switching Programme, but the replacement process via Service Now no longer allows this – instead placing onerous activity on Parties to collaborate with the Switching Operator to give them the ability to request certificates on their behalf. This change has been raised to ensure that test certificates are held at all times for enough parties to enable changes to be tested with enough simulation to replicate live operational scenarios. The solution proposed is that the Switching Operator can nominate Technical Contacts (TC) for all CSS Users, in order that certificates can be requested for simulators in the test environments. CSS Users would continue to be able to nominate / remove their own TCs as now (and be able to remove the Switching Operator-nominated Technical Contact), and would see all TCs listed on the Switching Portal.
Proposer
Beth Brown
Change Plan

Impact Assessment period - start date

Completed

Start:

23 Mar 2023

Due:

19 May 2023

Completion:

19 May 2023

Impact Assessment period - end date

Completed

Start:

19 May 2023

Due:

28 Jul 2023

Completion:

28 Jul 2023

Preliminary Change Report issued and consultation started

Completed

Start:

28 Jul 2023

Due:

11 Aug 2023

Completion:

11 Aug 2023

Consultation end date

Completed

Start:

11 Aug 2023

Due:

04 Sep 2023

Completion:

04 Sep 2023

Final Change Report issued

Completed

Start:

04 Sep 2023

Due:

15 Sep 2023

Completion:

08 Sep 2023

Responsible Committee decision

Completed

Start:

15 Sep 2023

Due:

22 Sep 2023

Completion:

19 Sep 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.8.0
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 26 - Switching Service Management
R0156 Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification
R0071 DCC access to EES and GES
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)

Documents

Name Version Last updated Actions
176.62 KB
Version 1.0 - 02 Nov 2026 PDF - 176.62 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As the SO, I want sufficient simulators to be available in the test environments, so that I can test changes to CSS systems for all necessary scenarios
  2. As a CSS User, I want changes to the CSS systems to be robustly tested, so that implemented changes align to their design and deliver the planned benefits
  3. As a CSS User, I want to be able to manage my Technical Contacts, so that I am in control of my responsibilities under the REC
Proposed Solution Document
Document title
R0103 legal text changes for Party IA 22.06.2023
Upload document
R0103 legal text for Party IA 22.06.2023.pdf
Archive
Off
Document title
R0103 legal text for PCR v1.0 11.08.2023
Upload document
R0103 legal text for PCR v1.0 11.08.2023.pdf
Archive
Off
Document title
R0103 - Legal text for FCR v1.0 08.09.2023
Upload document
R0103 legal text for FCR v1.0 08..09.2023.pdf
Archive
Off
Problem Statement
Due to certificate expiry, there are not currently sufficient test security certificates for connecting to CSS test environments and emulating CSS Users (simulators). The current process for CSS Users to request certificates is inefficient and is reliant on the CSS Users obtaining new certificates in a timely manner. Without sufficient test certificates, the Switching Operator may not be able to fully test changes to the CSS system.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0103 Change Proposal Form (downloadable version) 23.03.2023
R0103 legal text for IAR v1.0 26.05.2023
R0103 - Change Proposal Plan v1.0 (Approved) 06.06.2023
R0103 - Initial Assessment Report v1.0 (Approved) 06.06.2023
R0103 Consolidated Impact Assessment Responses v1.0 11.08.2023
R0103 - Preliminary change Report Consultation Responses consolidated 08.09.23
R0103 - Preliminary Change Report v1.0 11.08.2023
R0103 Final Change Report (Approved for Implementation) 19.09.2023
Company Name
-
Review status
Review required

Clarify obligations on gas meter exchanges that occur close to CoS

Date of latest update
Type
Change
ID
R0094
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change has been raised to address an issue with the 'Switch with a Concurrent Change of MEM process.'. MEMs are obliged to issue ONJOBs to the CDSP as part of a meter exchange. However, this would not be issued if the MEM has received a de-Appointment flow as part of the Switch. This change proposes to obligate MEMs to issue ONJOBs for any completed meter exchanges, even after receiving a de-Appointment flow. This will ensure accurate Meter Technical Details are available to the gaining Supplier and MEM.
Proposer
David Morley
Change Plan

Solution Development & Analysis

Completed

Start:

17 Feb 2023

Due:

29 Mar 2024

Completion:

27 Mar 2024

Party Impact Assessment Due

Completed

Start:

29 Mar 2024

Due:

19 Apr 2024

Completion:

19 Apr 2024

Preliminary Change Report Issued

Completed

Start:

19 Apr 2024

Due:

26 Apr 2024

Completion:

26 Apr 2024

Responsible Committee Review

Completed

Start:

26 Apr 2024

Due:

08 May 2024

Completion:

08 May 2024

Consultation Closes

Completed

Start:

08 May 2024

Due:

31 May 2024

Completion:

31 May 2024

Final Change Report Issued

Completed

Start:

31 May 2024

Due:

05 Jun 2024

Completion:

05 Jun 2024

Responsible Committee Decision

Completed

Start:

05 Jun 2024

Due:

12 Jun 2024

Completion:

12 Jun 2024

Appeal Window Closure

Not Started

Start:

12 Jun 2024

Due:

26 Jun 2024

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Supplier to have accurate information about my meter, so that I do not experience billing problems following a Switch.
  2. As a MEM, I want to clearly understand my obligations relating to data transfer during a Switch, so that records of work I carry out are accurately recorded. 2 - As a Registered Supplier, I want metering data on my portfolio of Registrable Measurement Points to be accurate, so that Consumers do not experience billing problems or have a negative switch experience. 3 - As the CDSP, I want Change of Metering Asset data communicated with me to be timely and accurate, so that I am better able to fulfil my role and support REC Parties.
Proposed Solution Document
Document title
R0094 Draft Legal Text
Upload document
R0094 Draft Legal Text V1.0 25.04.24.pdf
Archive
Off
Document title
R0094 Solution - Draft Legal Text V1.1 05.06.24
Upload document
R0094 Solution - Draft Legal Text V1.1 05.06.24.pdf
Archive
Off
Problem Statement
When Metering Asset work is carried out concurrently with a Switch, details of the work undertaken may not be sent to industry by the MEM, resulting in inaccurate and out of date Metering Asset data being passed to the gaining Registered Gas Supplier.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
R0094 - Change Proposal Form downloadable version 17.02.2023
R0094 Change Proposal Plan v1.0 (Approved) 04-10-2023
R0094 Change Proposal Plan v2.0 (Approved) 01-03-2024
R0094 Initial Assessment Report v1.0 (Approved) 04-10-2023
R0094 Change Proposal Re-Plan (Approved) V1.0 01.03.24
R0094 Consolidated Impact Assessment Responses
R0094 Preliminary Change Report (Approved) V1.0 08.05.24
R0094 Consolidated Consultation Responses V1.0 05.06.24
R0094 Final Change Report (Post-Vote) V1.0 12.06.24
Company Name
OVO Energy
Review status
Review required

Clarifications to the Theft Detection Incentive Scheme

Date of latest update
Type
Change
ID
R0091
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
The Energy Theft Detection Incentive Scheme (TDIS) seeks to encourage Suppliers to undertake theft investigations. Following the completion of the first scheme year operated wholly under the REC, there have been several areas of the Code identified where additional clarity would benefit the administration of the TDIS.
Proposer
andrew.waghorn
Change Plan

Initial Assessment Report Issued

Completed

Start:

23 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Change Proposal Plan Issued

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Issued

Completed

Start:

07 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Consultation Issued

Completed

Start:

17 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Responsible Committee Decision

Completed

Start:

17 Feb 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

IAR and CPP Approval

Completed

Start:

27 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an Energy Supplier, I need my TDIS obligations to be clear to ensure I can meet the requirements appropriately.
  2. As the Code Manager, I want all Suppliers to be clear on the required Energy Theft reporting so that the scheme can be effectively administered.
  3. As RECCo, I want to ensure that all Suppliers have clear obligations to ensure the effective administration of TDIS to support the Theft Reduction Strategy.
Proposed Solution Document
Document title
R0091 - Legal Text (as at IAR/CPP)
Upload document
R0091 Legal Text (1).zip
Archive
Off
Document title
R0091 - Legal Text at FCR 21.03.2023
Upload document
R0091 - Legal Text at FCR.zip
Archive
Off
Document title
R0091 - Legal Text FINAL
Upload document
R0091 - Legal Text FINAL.zip
Archive
Off
Document title
EMAR Link
Archive
Off
Problem Statement
To enable REC Parties and their agents to successfully meet the obligations of the TDIS, the REC needs to accurately reflect the intention of the requirements and current processes.
R0091 - Change Proposal Form
R0091 - Change Proposal Plan (Approved) 07.02.2023
R0091 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0091 - Preliminary Change Report v1.0 17.02.2023
R0091 - Consolidated Consultation Responses
R0091 - Final Change Report v1.0 (Pre-Vote) 21.03.2023
R0091 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Formalising the Submission of PPMIP Unallocated Transaction Report (UTR) Files

Date of latest update
Type
Change
ID
R0082
Change Category
Change Path
Priority
Urgent
No
Latest Update
09/04/2024 - Due to the MHHS impact on Service Providers, the technical code freeze and any MHHS impacts on the proposed solution, the Code Manager has reconsidered the priority of R0082 and believes that should be progressed following MHHS go-live. This Change Proposal has been withdrawn, and the Code Manager will consider raising a new change at the appropriate time following MHHS with consideration of the Codes Roadmap.
Summary
This CP seeks to address the following issues regarding the Unallocated Transaction Report (UTR) files provided by PPMIPs to the Code Manager each month: 1. There is no REC requirement for PPMIPs to submit a monthly file to the Code Manager 2. PPMIPs are currently submitting files in two different file formats 3. C&C is only able to load one of the two file formats The CP has been raised to introduce a requirement in the REC for PPMIPs to provide monthly Unallocated Transaction Report (UTR) files to the Code Manager in a single file format, set out in the REC Data Specification. With this format being one that can be loaded by C&C.
Proposer
Rosalind Timperley
Change Plan

Solution analysis and development

Completed

Start:

28 Nov 2022

Due:

12 Jan 2024

Completion:

11 Jan 2024

Service Provider Impact Assessment start date

Completed

Start:

12 Jan 2024

Due:

15 Jan 2024

Completion:

15 Jan 2024

Service Provider Impact Assessment close

Completed

Start:

15 Jan 2024

Due:

11 Mar 2024

Completion:

11 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a PPMIP, I want to have clear guidance on how and when I should submit my Unallocated Transaction Report files.
  2. As a Supplier, I want to receive accurate Unallocated Transactions in relation to prepayment meters that are not smart meters.
  3. As the Code Manager, I want visibility of the Unallocated Transaction Report.
  4. As the EES Provider, I want to be able to efficiently upload the Unallocated Transaction Reports.
Problem Statement
PPMIPs aren’t submitting UTR files in the same format, and one of these formats cannot be loaded by the EES Provider. There is also no obligation in the REC for these reports to be provided.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0082 - Change Proposal Form
R0082 - Change Proposal Plan (Approved) 17.10.2023
R0082 Initial Assessment Report (Approved) 17.10.2023
Company Name
REC Code Manager
Review status
Review required

Improvements to ‘Failed to Deliver’ CSS Messages

Date of latest update
Type
Change
ID
R0080
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
Since CSS Go-Live a large number of messages have not been successfully delivered due to failures of CSS User's gateways, resulting in CSS exhausting the 12-hour retry period. This Change Proposal has been raised to explore and address this issue
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment close

Completed

Start:

09 Nov 2022

Due:

25 Jan 2024

Completion:

25 Jan 2024

Party Impact Assessment trigger

Completed

Start:

25 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Party Impact Assessment close

Completed

Start:

02 Feb 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Preliminary Change Report and Consultation issued

Completed

Start:

23 Feb 2024

Due:

10 May 2024

Completion:

10 May 2024

Consultation close

Completed

Start:

10 May 2024

Due:

03 Jun 2024

Completion:

03 Jun 2024

Responsible Committee Decision

Completed

Start:

24 Jul 2024

Due:

31 Jul 2024

Completion:

31 Jul 2024

Final Change Report Issued

Completed

Start:

03 Jun 2024

Due:

24 Jul 2024

Completion:

19 Jul 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to CSS Users to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
  3. As the CSS User I want to receive CSS messages in a timely manner following any outage of my own gateway or systems, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
Proposed Solution Document
Document title
R0080 - Solution Development Report 11.01.2024
Upload document
R0080 - Solution Development Report 11.01.2024.pdf
Archive
Off
Document title
CSS Interface Design Specification v8.9.0 R0080 - REDLINE
Upload document
CSS Interface Design Specification v8.9.0 R0080 - TRACKED.docx
Archive
Off
Document title
CSS Failed To Deliver Detailed Design (R0080) v1.3 (19.06.2024)
Upload document
CSS Failed To Deliver Detailed Design (R0080) v1.3.docx
Archive
Off
Document title
Business Data Validation Rules v1.5.0 R0080 - REDLINE
Upload document
Copy of Business Data Validation Rules v1.5.0 R0080 - REDLINE.xlsx
Archive
Off
Document title
Schedule 24_Switching Data Management v1.2_R0080 Draft (19.06.2024)
Upload document
Schedule 24_Switching Data Management v1.2_R0080 Draft.doc
Archive
Off
Problem Statement
Following an unexpected or extended period of gateway outage for a CSS User, there is currently no automated process to resend any CSS messages from the CSS Provider that were triggered during the period of outage. This results in the CSS Provider needing to manually correct any issues, which is time consuming and may affect Consumer Switches due to delays in messages being processed.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
R0080 - Change Proposal form
R0080 Onboarding document
R0080 - Change Proposal Plan (Approved) 16.01.2024
R0080 - Rebaselined Change Plan (26.04.2024)
R0080 - Initial Assessment Report (Approved) 16.01.2024
R0080 Consolidated Party IA Responses v1.0 (10.05.2024)
R0080 - Preliminary Change Report v1.0 (Published for Consultation) 10.05.2024
R0080 Consolidated Consultation Responses (19.06.2024)
R0080 - Final Change Report v2.0 (Approved) 31.07.2024
Company Name
-
Review status
Review required

Introduction of a Housekeeping Change Proposal Process

Date of latest update
Type
Change
ID
R0073
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented 01 April 2023
Summary
Introduction of a proportionate change process for the implementation of housekeeping changes to the REC. This change will also implemented other non-material housekeeping changes to Schedule 5 - Change Management. These are being progressed alongside the introduction of a housekeeping change process to enable an efficient delivery.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report

Completed

Start:

27 Sep 2022

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Consultation Start (due to end 10/02/23)

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

10 Feb 2023

Final Change Report

Completed

Start:

27 Jan 2023

Due:

28 Feb 2023

Completion:

24 Feb 2023

Responsible Committee Decision

Completed

Start:

28 Feb 2023

Due:

07 Mar 2023

Completion:

07 Mar 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As the Code Manager I want to be able to progress change to the REC in the most efficient way possible. Where minor, non-material changes are needed to correct typographical or consistency errors, or to update out of date reference, I want a simpler and more accelerated change process to manage these housekeeping activities.
  2. As a REC Party, I want the Code Manager to use a more efficient process for housekeeping changes, that reduces the burden of managing industry changes through the standard change process.
  3. As RECCo I want the Code Manager to use the most efficient and simplest process to manage housekeeping changes in order to free up Code Manager resources to progress higher priority changes.
Proposed Solution Document
Document title
R0073 - Final Legal Text v1.0 24.02.23
Upload document
R0073 - Final Legal Text 24.02.23 - v1.0.zip
Archive
Off
Document title
Draft Legal Text Schedules 1 and 5 Changes V1.0
Upload document
R0073 - Draft Legal Text Schedule 5 Change Management- GWLG - v1.0.zip
Archive
Off
Document title
R0073 - Process Flow diagram
Upload document
R0073 - Housekeeping Change Proposal Process v1.0.pdf
Archive
Off
Problem Statement
Typographical errors, formatting, and consistency errors (such as Paragraph numbering), out-of-date references to documents and updating addresses (including email) all have to go through the standard change process. In these cases, the changes are not material and do not need a solution to be developed nor do they need to demonstrate that they meet a business case and could therefore be progressed more quickly.
Housekeeping Change Process Document v1.0
R0073- Housekeeping Change Proposal Process Change Form
R0073 - Change Proposal Plan R0073 v1.0 (Approved)
R0073 Initial Assessment Report v1.0 (Approved)
R0073 - Consolidated Consultation Responses v1.0 24.02.23
R0073 - Preliminary Change Report - v1.0 (Published for consultation) - 27/01/2023
R0073 - Final Change Report V2.0 (Post Vote) - 09/03/2023
Company Name
REC Code Manager
Review status
Review required

DCC access to EES and GES

Date of latest update
Type
Change
ID
R0071
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2023 - R0071 is approved by Change Panel for implementation in February release.
Summary
This Change seeks to create a new User Category in REC Schedule 12 – Data Access, to allow the Switching Service Desk to access the Gas and Electricity Enquiry Services (GES and EES). This would result in more expeditious Service Desk ticket resolution and a positive indirect impact on consumer outcomes.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

25 Sep 2022

Due:

21 Sep 2023

Completion:

Preliminary Change Report Issued

Completed

Start:

21 Sep 2023

Due:

06 Oct 2023

Completion:

Responsible Committee Review

Completed

Start:

06 Oct 2023

Due:

17 Oct 2023

Completion:

17 Oct 2023

Consultation Issued

Completed

Start:

17 Oct 2023

Due:

20 Oct 2023

Completion:

20 Oct 2023

Final Change Report Issued

Completed

Start:

20 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Responsible Committee Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.8.0
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 26 - Switching Service Management
R0156 Updates to the CSS Message Business Data Validation Rules and Physical Interface Design Specification
R0071 DCC access to EES and GES
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)

Documents

Name Version Last updated Actions
176.62 KB
Version 1.0 - 02 Nov 2026 PDF - 176.62 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be handled appropriately, so that I can have a consistent and faultless switching experience.
  2. As the Switching Service Desk, I want to be able to access market data that lets me resolve tickets first time, so that I can provide a more efficient service to users. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible. As the EES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0071 Proposed Legal Text
Upload document
R0071 Legal Text - Gas Data Access Matrix v3.2.2 - Published with FCR - 10.11.23.zip
Archive
Off
Problem Statement
The Switching Service Desk generates and resolves tickets relating to Switching Incidents and Switching Data queries for Market Participants. GES and EES data is currently unavailable to the Switching Service Desk and access would allow them to resolve tickets more effectively, resulting in a more efficient service and better SLA performance.
SME
SME Role
Lead Technical Analyst
R0071 - Change Proposal Form
R0071 Change Proposal Plan v2.0 (Approved) - 05.09.2023
R0071 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0071 Preliminary Change Report v1.0 (Approved) - 17.10.23
R0071 Consolidated Consultation Responses v1.0 - 10.11.23
R0071 Final Change Report V1.0 (Post-Vote) 21.11.23
Company Name
-
Review status
Review required

REC Data Protection Changes

Date of latest update
Type
Change
ID
R0068
Change Category
Change Path
Priority
Urgent
No
Latest Update
19/03/2024 - Following further analysis and engagement with the REC Change Panel at its meeting on 19 March 2024, the Code Manager has revisited its consideration of this Change Proposal. Despite earlier acceptance of the Change Proposal, the Code Manager, and the Change Panel, believes that the proposal has no reasonable prospect of being approved in its current format, and have determined that the Change Proposal should not progress any further. Consequently, Change Proposal R0068 has been rejected. The Code Manager has offered their assistance to the proposer should they need any support in raising a new Change Proposal to resolve any remaining issues.
Summary
A number of additional data protection related changes were identified during the progression of Change Proposal R0046A ‘Governance of Data under the REC (Alternative)’. The intent of this Proposal is to collate all remaining proposed changes, to assess and progress them independently of R0046A, to allow for more thorough industry consultation and with longer lead-times to implementation.
Proposer
Bradley Baker
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Stages Selection
CP Form.pdf
Company Name
DCC
Review status
Review required

Creating a Meter Operator Agent and MOCoP Installer

Date of latest update
Type
Change
ID
R0064
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change Proposal seeks to clarify the obligations of each type of metering provider by reintroducing the distinction between Meter Operator Agents and MOCOPA Meter Installers which was removed by Retail Code Consolidation. At Retail Code Consolidation these organisations were merged into a new category, Metering Equipment Managers, which also included gas metering providers. Whilst both types of organisation can provide metering services, not all MEM obligations in the REC apply to both organisations.
Proposer
Anton Moden
Change Plan

Solution analysis and development

Completed

Start:

22 Aug 2022

Due:

14 Jul 2023

Completion:

13 Jul 2023

Service Impact assessment commenced

Completed

Start:

14 Jul 2023

Due:

14 Jul 2023

Completion:

14 Jul 2023

Impact Assessment Period Ended

Completed

Start:

09 Oct 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023

Preliminary Change Report issued

Completed

Start:

03 Nov 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Consultation issued

Completed

Start:

24 Nov 2023

Due:

07 Dec 2023

Completion:

07 Dec 2023

Final Change report issued

Completed

Start:

07 Dec 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024

REC Change Panel decision

Completed

Start:

26 Jan 2024

Due:

06 Feb 2024

Completion:

06 Feb 2024

Appeal Window closed

Completed

Start:

06 Feb 2024

Due:

20 Feb 2024

Completion:

20 Feb 2024

Draft Legal Text Changes (Including Legal Review)

Completed

Start:

11 Aug 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Service Provider Impact Assessment Completed

Completed

Start:

14 Jul 2023

Due:

11 Aug 2023

Completion:

11 Aug 2023

Impact Assessment Period Started

Completed

Start:

15 Sep 2023

Due:

09 Oct 2023

Completion:

06 Oct 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an electricity MEM, I want to be clear on the obligations I need to meet, based on the type of metering activity I complete. I want to meet my obligations efficiently and effectively and without the need to seek additional input/advice from the Code Manager.
  2. As the Code Manager, I want to be able to differentiate between electricity MEMs based on the type of activity they are responsible for and their interaction with central systems, so that I can engage appropriately. I need to be clear on the obligations that each MEM should be meeting and the performance reporting that should be provided.
Proposed Solution Document
Document title
R0064 - DRAFT legal text 24.11.2023
Upload document
R0064 - Draft Legal Text for Consultation.zip
Archive
Off
Document title
R0064 - Roles Version F for Impact Assessment 4.10.2023
Upload document
R0064 - Roles Version F for Impact Assessment 4.10.2023 (2).pptx
Archive
Off
Problem Statement
The REC currently groups all electricity metering providers within the MEM category. Previously, under the Master Registration Agreement (MRA) they were either classified as Meter Operator Agent or MOCOPA Meter Installers. Not all MEM obligations in the REC are intended to apply to both types of organisations. This can result in ambiguity on the obligations set out in the REC that need to be met by the different types of electricity MEM, not being able to target information to REC Parties appropriately and MEMs not being clear on their new entrant or Maintenance of Qualification obligations.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0064 - Change Proposal Form
R0064 - Change Proposal Plan v1.0 (Approved)
R0064 - Initial Assessment Report v1.0 (Approved)
R0064 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0064 - Change Proposal Plan v3.0 (Approved) 23.6.2023
R0064 - Change Proposal Plan v4.0 (Approved) 14.8.2023
R0064 - Change Proposal Plan v5.0 (Approved) 14.09.2023
R0064 - Change Proposal Plan v6.0 (Approved) 10.11.2023
Consolidated Impact Assessment Responses 29.11.2023
R0064 - Preliminary Change Report - V1.1 (Approved) 05.12.2023
R0064 - Consolidated Consultation Responses
R0064 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required

Addition of key information to all Service Now tickets

Date of latest update
Type
Change
ID
R0063
Change Category
Change Path
Priority
Urgent
No
Latest Update
The code elements of this change were implemented on the 12 April 2024. The technical solution will be delivered as part of the June 2024 REC Release.
Summary
This Change seeks to improve the key business information, required by the DNOs, included in the SNOW tickets produced by CSS Service Desk for CSS Asynchronously rejected messages
Proposer
Chris Price
Change Plan

Solution Analysis and Development

Completed

Start:

22 Aug 2022

Due:

07 Feb 2023

Completion:

07 Feb 2023

Service Provider Impact Assessment - Preliminary

Completed

Start:

07 Feb 2023

Due:

20 Mar 2023

Completion:

20 Mar 2023

Service Provider Detailed Impact Assessments

Completed

Start:

20 Mar 2023

Due:

10 Jul 2023

Completion:

27 Jun 2023

Preliminary Change Report issued

Completed

Start:

10 Jul 2023

Due:

14 Jul 2023

Completion:

14 Jul 2023

Responsible Committee review

Completed

Start:

14 Jul 2023

Due:

26 Jul 2023

Completion:

26 Jul 2023

Consultation trigger

Completed

Start:

26 Jul 2023

Due:

28 Jul 2023

Completion:

28 Jul 2023

Consultation close

Completed

Start:

28 Jul 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Final Change Report issued

Completed

Start:

18 Aug 2023

Due:

15 Sep 2023

Completion:

14 Sep 2023

Responsible Committee decision

Completed

Start:

15 Sep 2023

Due:

27 Sep 2023

Completion:

27 Sep 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.10.0_Superseded
Included changes Affected REC Items
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
  • Schedule 27 - RMP Lifecycle
R0063 Addition of key information to all Service Now tickets
R0093 Uplift to CSS Maximum Demand Volumes during MHHS Migration Period
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
172.63 KB
Version 1.0 - 16 Nov 2026 PDF - 172.63 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer I want the Switch process to work efficiently and effectively, so that I can switch Energy Supplier without unnecessary delay or issues.
  2. As an ERDS and GRDS, I want to receive SNOW tickets that contain all of the relevant data to enable me to triage and resolve issues efficiently, so that Consumers do not experience unnecessary switching delays and I am able to meet my service level obligations.
  3. As the CSS Provider, I want the ERDS related SNOW tickets to contain all of the relevant data to enable the efficient resolution of issues without the need for a manual workaround to be utilised, so that Consumers do not experience unnecessary switching delays.
Proposed Solution Document
Document title
Schedule 26 - Switching Service Management_R0063_FCR 15.09.2023
Upload document
Schedule 26 - Switching Service Management_R0063_FCR 15.09.2023.pdf
Archive
Off
Problem Statement
The SNOW tickets received by ERDS and GRDS for messages that CSS has asynchronously rejected (e.g., for business rule reasons) currently do not contain the relevant data for the SDSPs to triage and take any necessary action to resolve the underlying issue(s).This may delay the resolution of the SNOW tickets, potentially having an impact on aConsumers Switch.
SME
SME Role
Lead Technical Analyst
R0063 - Change Proposal Form
R0063 - Change Proposal Plan v1.0 (Approved)
R0063 - Initial Assessment Report v1.0 (Approved)
R0063 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0063 - Extension to Change Plan 2.0 (Approved) 04.04.2023
R0063 - Preliminary Change Report v1.0 (Approved) 26.07.2023
R0063 - Consolidated Consultation Responses
R0063 - Final Change Report v2.0 (Approved) 27.09.2023
Company Name
St Clements Ltd (on behalf of DNOs)
Review status
Review required