Performance Assurance Board Terms of Reference

Date of latest update
Type
Change
ID
R0042
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
Performance Assurance
Change Plan

Solution Walkthrough

Completed

Start:

14 Apr 2022

Due:

17 May 2022

Completion:

17 May 2022

Change Proposal Plan Approval

Completed

Start:

17 May 2022

Due:

17 May 2022

Completion:

17 May 2022

Preliminary Change Report Published

Completed

Start:

17 May 2022

Due:

20 May 2022

Completion:

20 May 2022

Consultation Start

Completed

Start:

20 May 2022

Due:

20 May 2022

Completion:

20 May 2022

Consultation End

Completed

Start:

20 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Responsible Committee Decision

Completed

Start:

07 Jun 2022

Due:

05 Jul 2022

Completion:

05 Jul 2022

Appeals Window Closes

Not Started

Start:

05 Jul 2022

Due:

19 Jul 2022

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.0.0_Superseded
Included changes Affected REC Items
R0038 Performance Assurance Report Catalogue Changes as a consequence of REC V3.0
R0041 REC V3.0
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 5 - Change Management
  • Schedule 27 - RMP Lifecycle
  • ASPCoP (since removed)
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0042 Performance Assurance Board Terms of Reference
  • Performance Assurance Board - Terms of Reference
R0045 Changes to SDEP Messages and Schedule numbering for REC V3.0
  • Market Message Catalogue

Documents

Name Version Last updated Actions
258.97 KB
Version 1.0 - 02 Nov 2026 PDF - 258.97 KB
1.0 02 Nov 2026
257.76 KB
Version 1.0 - 02 Nov 2026 DOCX - 257.76 KB
1.0 02 Nov 2026
219.4 KB
Version 1.0 - 16 Nov 2026 PDF - 219.4 KB
1.0 16 Nov 2026
1.65 MB
Version 1.0 - 02 Nov 2026 PPTX - 1.65 MB
1.0 02 Nov 2026
6.74 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.74 MB
1.0 02 Nov 2026
9.01 MB
Version 1.0 - 02 Nov 2026 PPTX - 9.01 MB
1.0 02 Nov 2026
3.89 MB
Version 1.0 - 02 Nov 2026 PPTX - 3.89 MB
1.0 02 Nov 2026
1.0 02 Nov 2026
16.78 KB
Version 1.0 - 02 Nov 2026 XLSX - 16.78 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As a REC Service Provider, I need the REC PAB to be able to make decisions on emergency operational change appeals and derogation requests in a timely manner, to ensure the Switching Service remains operational and effective.
  2. As a REC PAB member, I need to be able to make decisions on emergency operational change appeals and derogation requests in a timely manner, to ensure the Switching Service remains operational and effective.
  3. As a member of the Switching CAB, I need the REC PAB to make decisions on emergency operational change appeals and derogation requests in a timely manner, to ensure the Switching Service remains operational and effective. As a REC PAB Member, I need the quoracy requirements to be effective, so that meetings can go ahead and make decisions without the need to support additional ex-committee processes.
Proposed Solution Document
Document title
REC PAB - ToR - REC v3.0 Draft
Upload document
REC PAB - ToR - REC v3.0 Draft.pdf
Archive
Off
Problem Statement
Following the implementation of REC V3.0, the current REC PAB ToR will not support extraordinary meetings and quoracy arrangements driven by the Switching CAB or the appeals route from the Switching CAB to the REC PAB. This change seeks to update the REC PAB ToR to fully represent the changes being implemented as part of REC V3.0, and to also address lessons learnt during the REC PAB’s first year of operation.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0042 - CP Form (Downloadable version)
R0042 - Change Proposal Plan v1.0 (Approved)
R0042 - Preliminary Change Report v1.0 (Approved)
R0042 - Initial Assessment Report v1.0 (Approved)
R0042 - Final Change Report v2.0 (Approved)
R0042 - Consolidated Consultation Responses
Company Name
REC Code Manager - Performance Assurance
Review status
Review required

Revised Implementation Date for R0011

Date of latest update
Type
Change
ID
R0039
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
-
Summary
-
Proposer
patrick.bibby
Change Plan

Party Impact Assessment Issued

Completed

Start:

25 Mar 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022

Preliminary Change Report Issued

Completed

Start:

08 Apr 2022

Due:

29 Apr 2022

Completion:

29 Apr 2022

Consultation Issued

Completed

Start:

29 Apr 2022

Due:

29 Apr 2022

Completion:

29 Apr 2022

Final Change Report Issued

Completed

Start:

29 Apr 2022

Due:

13 May 2022

Completion:

13 May 2022

Responsible Committee Decision

Completed

Start:

13 May 2022

Due:

17 May 2022

Completion:

17 May 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 01.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need the industry Market Message/Data Specification to be implemented by all Parties at the same time so that I am able to validate EMRS invoices and credits without having to request additional supporting data or without my Market Messages failing.
  2. As LCCC I need to delay the implementation of R0011 so that changes to industry Market Message/Data Specification can be implemented by all Parties at the same time so that industry Market Messages don’t fail validation between Parties.
Problem Statement
Following a review of its delivery pipeline, the LCCC has determined it is unable to deploy the changes required in time for the current approved implementation date of 04 November 2022. In order to communicate a revised date and to limit the impacts to industry parties and delivery partners, this change needs to be assessed as a matter of urgency.
R0039 Change Proposal Form
R0039 - Change Proposal Plan v1.0 (Approved)
R0039 Initial Assessment Report v1.0
R0039 Preliminary Change Report v1.0
R0039 - Final Change Report v2.0
Company Name
Low Carbon Contracts Company
Review status
Review required

Performance Assurance Report Catalogue Changes as a consequence of REC V3.0

Date of latest update
Type
Change
ID
R0038
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Performance Assurance
Change Plan

Impact Assessments completed

Completed

Start:

23 Mar 2022

Due:

16 May 2022

Completion:

16 May 2022

Preliminary Change Report published

Completed

Start:

16 May 2022

Due:

31 May 2022

Completion:

31 May 2022

Consultation started

Completed

Start:

31 May 2022

Due:

31 May 2022

Completion:

31 May 2022

Consultation completed

Completed

Start:

31 May 2022

Due:

16 Jun 2022

Completion:

16 Jun 2022

Final Change Report published

Completed

Start:

16 Jun 2022

Due:

21 Jun 2022

Completion:

21 Jun 2022

Responsible Committee decision

Completed

Start:

21 Jun 2022

Due:

28 Jun 2022

Completion:

28 Jun 2022
Status
Implementation Date
Status Superseded
EMAR Version 3.0.0_Superseded
Included changes Affected REC Items
R0038 Performance Assurance Report Catalogue Changes as a consequence of REC V3.0
R0041 REC V3.0
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 5 - Change Management
  • Schedule 27 - RMP Lifecycle
  • ASPCoP (since removed)
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Standards Definition Document
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue
R0042 Performance Assurance Board Terms of Reference
  • Performance Assurance Board - Terms of Reference
R0045 Changes to SDEP Messages and Schedule numbering for REC V3.0
  • Market Message Catalogue

Documents

Name Version Last updated Actions
258.97 KB
Version 1.0 - 02 Nov 2026 PDF - 258.97 KB
1.0 02 Nov 2026
257.76 KB
Version 1.0 - 02 Nov 2026 DOCX - 257.76 KB
1.0 02 Nov 2026
219.4 KB
Version 1.0 - 16 Nov 2026 PDF - 219.4 KB
1.0 16 Nov 2026
1.65 MB
Version 1.0 - 02 Nov 2026 PPTX - 1.65 MB
1.0 02 Nov 2026
6.74 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.74 MB
1.0 02 Nov 2026
9.01 MB
Version 1.0 - 02 Nov 2026 PPTX - 9.01 MB
1.0 02 Nov 2026
3.89 MB
Version 1.0 - 02 Nov 2026 PPTX - 3.89 MB
1.0 02 Nov 2026
1.0 02 Nov 2026
16.78 KB
Version 1.0 - 02 Nov 2026 XLSX - 16.78 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the Code Manager I need to receive the necessary data to complete the required Performance Assurance activities post REC V3.0
  2. As a REC Service Provider, I need to understand all the data that I am required to share and from when, with the Code Manager required for Performance Assurance activities post REC V3.0
  3. As a Supplier I need to understand all the data that I am required to share and from when, with the Code Manager required for Performance Assurance activities post REC V3.0. As a MEM I need to understand all the data that I am required to share and from when, with the Code Manager required for Performance Assurance activities post REC V3.0.
Proposed Solution Document
Document title
Updated Proposed changes required to the PARC
Upload document
R0038 - REC Performance_Assurance_Report_Catalogue_V5.0 DRAFT.xlsx
Archive
Off
Problem Statement
Following the implementation of REC V3.0, the Code Manager (Performance Assurance) will need to receive the data necessary for them to complete their Performance Assurance activities post REC V3.0 The Performance Assurance Report Catalogue requires a change to include the new and updated Data Items. These are required to support the monitoring of Retail Risks included in the revised Performance Assurance Risk Register and give REC Parties clarity on the data they are required to provide.
Change Proposal Form
R0038 Change Proposal Plan v2.0 (Approved)
R0038 Initial Assessment Report
R0038 - Consolidated Impact Assessment Responses
R0038 Preliminary Assessment Report
R0038 - Consolidated Consultation Responses
R0038 - Final Change Report V2.0
Company Name
-
Review status
Review required

Service Provider Performance Charges (DCC)

Date of latest update
Type
Change
ID
R0025
Change Category
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented 01 April 2023
Summary
This Change Proposal seeks to introduce an economic incentive scheme for the Centralised Registration Service (CRS) Provider through the introduction of Service Provider Performance Charges linked to performance against service levels defined in the REC.
Proposer
Performance Assurance
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

04 Jan 2022

Due:

15 Nov 2022

Completion:

15 Nov 2022

Final Change Report Issued

Completed

Start:

15 Nov 2022

Due:

09 Dec 2022

Completion:

09 Dec 2022

Responsible Committee Decision

Completed

Start:

09 Dec 2022

Due:

20 Dec 2022

Completion:

20 Dec 2022

Send to Authority for Decision

Completed

Start:

20 Dec 2022

Due:

21 Dec 2022

Completion:

21 Dec 2022
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As the REC Code Manager, I want to ensure that REC Service Providers achieve their Service Level Agreements (SLAs) defined in REC Service Definitions, so that impacts to the REC Code Manager, REC Parties and other Service Providers, as a consequence of Service Provider underperformance, are minimised and the change process delivers to time and cost.
  2. As a Service Provider, I want clarity on when and how Performance Charges will be used as part of the Performance Assurance Techniques, so that I’m clear on what service levels I need to meet and the consequences of not delivering against these.
Proposed Solution Document
Document title
R0025 Final Legal Text
Upload document
R0025 Final Legal Text.zip
Archive
Off
Document title
R0025 - Final Solution
Archive
Off
Problem Statement
Service Provider performance measures and charges do not currently exist for services that are not procured by the Retail Energy Code Company but are provided by other Parties. The performance of Service Providers is essential to the proper functioning of the market, without appropriate performance measure or Performance Charges there is little incentive for these providers to maintain service performance or improve poor performance in a timely manner.
R0025 Change Proposal Plan V1.0 (Approved)
R0025 Initial Assessment Report V1.0 (Approved)
R0025 - Preliminary Change Report v1.0 (Issued for Consultation)
R0025 Consolidated Consultation Responses v1.0
R0025 - Final Change Report v2.0 (Post-Vote)
R0025 - Ofgem Decision
Company Name
REC Code Manager
Review status
Review required

EAC information in the EES API

Date of latest update
Type
Change
ID
R0024
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
Andrew Long
Change Plan

Solution Development and Party Engagement

Completed

Start:

29 Aug 2022

Due:

07 Sep 2022

Completion:

29 Aug 2022

Change Proposal Withdrawal

Completed

Start:

20 Dec 2021

Due:

29 Aug 2022

Completion:

29 Aug 2022
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Solution Development
Proposed solution summary
  1. As a domestic Electricity Consumer, I want to be quoted accurately for my electricity usage based on my electricity consumption, so that I can make an informed decision to accept/reject the quotation offered.
  2. As an Electricity Supplier, I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
  3. As a Third-Party Intermediary (TPI), I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
Problem Statement
Where an Electricity Supplier provides a quotation, or Third-Party Intermediary (TPI) completes a comparison, for an Electricity Consumer they must rely on the information provided by the Consumer about their electricity usage. In some cases, consumers may not have access to or knowledge of their annual electricity usage. Consequently, this would be estimated leading to potential inaccurate quotations being provided. Having access to the Metering Point level Estimated Annual Consumption (EAC) via the Electricity Enquiry Service (EES) would enable the provision of more accurate electricity quotations, enabling the Consumer to make an informed choice about their Electricity Supplier, tariff and product.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0024 - Change Proposal Plan v2.0 (Approved)
R0024 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Amendment to REC Data Access Matrix

Date of latest update
Type
Change
ID
R0022
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/04/2023 - The changes to the Data Access Matrix were implemented on 04 November 2022, with the technical EES changes implemented 03 April 2023
Summary
This change seeks to standardise Electricity Enquiry Service (EES) data access permissions across EES User Categories via a review and to update to the Data Access Matrix (DAM).
Proposer
Harriet Truss
Change Plan

Solution Development

Completed

Start:

15 Dec 2021

Due:

28 Mar 2022

Completion:

28 Mar 2022

Party Impact Assessment Issued

Completed

Start:

28 Mar 2022

Due:

01 Apr 2022

Completion:

01 Apr 2022

Service Provider Impact Assessment Issued

Completed

Start:

01 Apr 2022

Due:

12 May 2022

Completion:

12 May 2022

Service Provider Preliminary Impact Assessment Complete

Completed

Start:

12 May 2022

Due:

31 May 2022

Completion:

31 May 2022

Service Provider Detailed Impact Assessment initiated

Completed

Start:

31 May 2022

Due:

27 Jun 2022

Completion:

01 Jul 2022

Technical Expert Panel solution review

Completed

Start:

27 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022

Preliminary Change Report published

Completed

Start:

29 Jun 2022

Due:

08 Jul 2022

Completion:

07 Jul 2022

Service Provider Detailed Impact Assessment completed

Completed

Start:

08 Jul 2022

Due:

18 Jul 2022

Completion:

22 Jul 2022

Consultation 1 initiated

Completed

Start:

18 Jul 2022

Due:

22 Jul 2022

Completion:

21 Jul 2022

Consultation 1 completed

Completed

Start:

22 Jul 2022

Due:

12 Aug 2022

Completion:

12 Aug 2022

Change Panel review of updated Preliminary Change Report

Completed

Start:

12 Aug 2022

Due:

16 Aug 2022

Completion:

16 Aug 2022

Consultation 2 initiated

Completed

Start:

16 Aug 2022

Due:

18 Aug 2022

Completion:

18 Aug 2022

Consultation 2 completed

Completed

Start:

18 Aug 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Final Change Report published

Completed

Start:

02 Sep 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Change Panel decision

Completed

Start:

23 Sep 2022

Due:

04 Oct 2022

Completion:

04 Oct 2022
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.2.0_Superseded
Included changes Affected REC Items
R0018 Complex Sites process improvements
  • Schedule 14 - Metering Operations
R0022 Amendment to REC Data Access Matrix
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
R0054 EES Access for Virtual Lead Parties
  • Schedule 1 - Interpretations and Definitions
R0031 Altering the Trigger Points for CT Commissioning
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue
R0033 Micro-business Smart Meter Installation Reports
  • Smart Meter Installation Schedule (since removed)
R0036 Extensive Housekeeping Amendments
  • MOCoPA (since removed)
  • Schedule 15 - Metering Accreditation
  • REC Main Body
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 11 - Prepayment Arrangements
  • Schedule 6 - Performance Assurance
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 7 - Energy Theft Reduction
  • Schedule 5 - Change Management
  • Schedule 8 - Unbilled Energy Code of Practice
  • Schedule 4 - Company Governance
  • Schedule 17 - Secure Data Exchange
  • Schedule 28 - Related Metering Points
  • Schedule 3 - Accession Agreement
  • Schedule 18 - Green Deal Arrangements
  • Schedule 29 - Address Management
  • Schedule 13 - Transfer of Consumer Data
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
  • Schedule 9 - Qualification and Maintenance
  • Schedule 2 - REC Transition Schedule
  • Schedule 26 - Switching Service Management
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 10 - Charging Methodology
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Schedule 25 - Central Switching Service
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As an Electricity Consumer, I want data associated with my electricity supply to be made consistently available to Market Participants relevant organisations, so that they have equal access to the data they use to supply my electricity or look after my meter.
  2. As an EES User, I want to have access to all the data items appropriate to my EES User Category so that I can operate processes without disruption, to provide a good service to my customers and meet my performance targets. As the EES Provider I want to have clarity on the data items that I should provide to EES Users appropriate to their role. As the Code Manager I want Market Participants to have access to appropriate data in EES so they can complete business processes and meet performance targets, while ensuring access to data is subject to appropriate security and controls.
Proposed Solution Document
Document title
R0022 - Draft Legal Text
Upload document
R0022 - Draft Legal Text v1.0.zip
Archive
Off
Document title
R0022 - Draft Data Access Matrix Electricity v2.0
Upload document
R0022 Draft Data Access Matrix Electricity v2.0.xlsx
Archive
Off
Document title
REC Release Information
Archive
Off
Problem Statement
There is currently a lack of clarity regarding the data items that should be accessible by each EES User Category and there are potentially instances where data restrictions have been placed on EES Users which cannot be justified. The Data Access Matrix does not currently provide a single standardised role-based framework for EES Users’ access to data. This means that the Code Manager and the EES Provider cannot grant and provide EES Users with standardised access for a particular role. This may also result in operational issues for new entrants or can create a situation whereby EES Users in the same role have different access arrangements.
SME
SME Role
Lead Technical Analyst
R0022 - Change Proposal Plan v5.0 (Approved)
R0022 - Initial Assessment Report v1.0 (Approved)
R0022 - Consolidated IA Responses
R0022 - Preliminary Change Report 3.0 (Approved)
R0022 - Consolidated Consultation responses - PUBLIC
R0022 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier

Date of latest update
Type
Change
ID
R0021
Change Category
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Currently only the Registered Supplier can instruct a Metering Equipment Manager (MEM) to work on their metering asset. There is no ability to request that a single MEM completes work on multiple properties that may have different Electricity Suppliers. This creates barriers to developing solutions for local authorities, private and social housing landlords who are refurbishing premises or to help any premise owner (whether domestic or non-domestic) install new equipment to facilitate Low & Zero Carbon Technology (LZCT) installation such as the retro-fit of Electric Vehicle Charging (EVC) Points to homes and business premises. This Change Proposal will introduce a new role for existing accredited MEMs that will enable them to accept instructions to undertake a limited set of activities at the request of the premise owners without the need to use the Registered Suppliers’ MEMs.
Proposer
Colette Baldwin
Change Plan

Solution Development

Completed

Start:

09 Dec 2021

Due:

03 Feb 2022

Completion:

19 Apr 2022

Party Impact Assessment Issued

Completed

Start:

03 Feb 2022

Due:

22 Apr 2022

Completion:

22 Apr 2022

Deadline for Alternative Change Proposal Submission

Completed

Start:

22 Apr 2022

Due:

27 May 2022

Completion:

27 May 2022

Preliminary Change Report Issued Interim

Completed

Start:

27 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation Issued

Completed

Start:

27 May 2022

Due:

12 Jul 2022

Completion:

12 Jul 2022

Final Change Report Issued

Completed

Start:

16 Aug 2022

Due:

26 Aug 2022

Completion:

26 Aug 2022

Responsible Committee Decision

Completed

Start:

26 Aug 2022

Due:

14 Sep 2022

Completion:

14 Sep 2022

Preliminary Change Report (Updated) Issued

Completed

Start:

12 Jul 2022

Due:

12 Jul 2022

Completion:

12 Jul 2022

Consultation closure (extended deadline)

Completed

Start:

12 Jul 2022

Due:

16 Aug 2022

Completion:

16 Aug 2022
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As a property owner or occupier I want to be to arrange for the installation of equipment for the use of the occupier, such as fitting an isolator, installing on-site generation equipment or electric vehicle charging points. I want the installer to use a Safe Isolator Provider (SIP) who is authorised to undertake the work at my instruction rather than arrange for this work to be completed through the premises’ Registered Suppliers.
  2. As a REC Accredited Metering Equipment Manager, I want to be able to work as a SIP and de-energise and re-energise a site on the instruction of the homeowner/landlord, so that equipment – such as an isolator, on-site generation or electric vehicle charging points can be fitted without the need to co-ordinate the work with the Registered Suppliers’ MEMs. As a Distribution Network Operator, I want to be assured that the work is only completed by a SIP that has the necessary skills and REC accreditation and has the appropriate permissions to de-energise and re-energise the supply and doesn’t introduce any additional risk to the Distribution Network.
  3. As the Registered Supplier, I want to know what steps the SIP who attends the site and finds the site in an unsafe situation to re-energise, will take so that my customer is not left off-supply unnecessarily. As the Registered Supplier, I want to be alerted if the SIP finds any evidence of meter tampering at the premises.
Proposed Solution Document
Document title
R0021 - Final Approved legal text
Upload document
R0021 - Approved legal text.zip
Archive
Off
Document title
R0021 - Proposed new Market Message v1.0
Upload document
R0021 - Proposed new market message v1.0.docx (2).pdf
Archive
Off
Document title
R0021 - Draft Legal Text
Upload document
R0021 - Draft Legal Text.zip
Archive
Off
Document title
R0021 - Webinar 2 March 2023 - Draft Q & A Responses v0.3
Upload document
R0021 Implementation Webinar Q & A 2 March 2023.docx
Archive
Off
Problem Statement
It is difficult for landlords of local authority, social housing developments or private landlords of homes and businesses to co-ordinate the refurbishment of properties where they need the electricity supply to be de-energised to allow work being completed and the supply re-energised. Currently the landlord needs to liaise with the Electricity Supplier of each premise independently to arrange for the appointed MEM to attend and de-energise each supply point and then re-energise the site when the work is completed, as currently only the Registered Supplier’s appointed MEM or the DNO is permitted to undertake the work.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0021 - Change Proposal Plan v2.0 (Approved)
R0021 - Party IA Consolidated Responses
R0021 - Initial Assessment Report v1.0 (Approved)
R0021 - FAQs following Impact Assessment
R0021 - Preliminary Change Report v2.0 (Approved)
NAPIT Survey Results
R0021 - Consultation Non-confidential Consolidated Responses
R0021 - Final Change Report (Post-Vote)
R0021 Authority Decision
Company Name
-
Review status
Review required

Invalid Requests for Site Technical Details

Date of latest update
Type
Change
ID
R0017
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This Change Proposal seeks to provide clarity to Distribution Network Operators (DNOs) and Metering Equipment Managers (MEMs) on the process for requesting and sending Site Technical Details as part of Meter Asset Installation, Switch or Change of Agent processes.
Proposer
Elaine Carr
Change Plan

ANALYSIS AND ENGAGEMENT WITH BSC

Completed

Start:

01 Nov 2022

Due:

30 Nov 2022

Completion:

30 Nov 2022

PRESENT UPDATED CHANGE PROPOSAL PLAN TO CHANGE PANEL

Completed

Start:

22 Nov 2021

Due:

01 Nov 2022

Completion:

01 Nov 2022

Part Impact Assessment Issued

Completed

Start:

30 Nov 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Party Impact Assessment Closes

Completed

Start:

13 Jan 2023

Due:

03 Feb 2023

Completion:

03 Feb 2023

Present Updated Plan to Change Panel

Completed

Start:

03 Feb 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023

Preliminary Change Report issued

Completed

Start:

07 Feb 2023

Due:

31 Mar 2023

Completion:

31 Mar 2023

Metering Expert Panel approval of PCR

Completed

Start:

31 Mar 2023

Due:

12 Apr 2023

Completion:

12 Apr 2023

Consultation start date (aligned with BSC)

Completed

Start:

12 Apr 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Consultation end date (aligned with BSC)

Completed

Start:

14 Apr 2023

Due:

08 May 2023

Completion:

08 May 2023

Final Change Report issued

Completed

Start:

08 May 2023

Due:

26 May 2023

Completion:

26 May 2023

Metering Expert Panel decision

Completed

Start:

26 May 2023

Due:

07 Jun 2023

Completion:

07 Jun 2023
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer I want my existing or new meter to be read regularly to ensure I receive accurate bills.
  2. As a Distribution Network Operator I want to receive appropriate Requests for Site Technical Details. As a Distribution Network Operator I want the difference between my obligations and best practice to be clear in relation to provision of Site Technical Details for sites with and without Measurement Transformers.
  3. As a Metering Equipment Manager I want to be provided with Site Technical Details for all relevant sites so I can correctly install, commission and maintain the Metering Equipment.
Proposed Solution Document
Document title
R0017 - Schedule 14 - Metering Operations (Final Approved) v1.0 08.06.2023
Upload document
R0017 - Schedule 14 - Metering Operations (Final Approved) v1.0 08.06.2023.pdf
Archive
Off
Document title
R0017 - Schedule 14 - Metering Operations (For FCR) v1.0 26.05.2023
Upload document
R0017 - Schedule 14 - Metering Operations (For FCR) v1.0 26.05.2023 (1).docx
Archive
Off
Document title
R0017 - Schedule 14 - Metering Operations (For PCR) - 31.03.2023
Upload document
R0017 - Schedule 14 - Metering Operations (For PCR) v1.0 - 31.03.2023.docx
Archive
Off
Document title
R0017 Draft Legal Text (for Party IA) 13.01.23
Upload document
Schedule 14 - Metering Operations - R0017 v5 REDLINED.docx
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
Distribution Network Operators (DNOs) have reported that they are receiving a high volume of requests for Site Technical Details for Domestic and Microbusiness sites following a Switch or Change of Agent, resulting in increased workload for DNOs to validate and process these requests. It is not clear if these requests are all necessary or required by the MEMs and justify the effort required by the DNO to process these requests.
SME
SME Role
Lead Technical Analyst
R0017 - Initial Assessment Report v1.0 (Approved)
R0017 - Change Proposal Plan v7.0 (Approved) 09.03.2023
R0017 - Consolidated Impact Assessment Responses v1.0 - 23.02.2023
R0017 - Preliminary Change Report v2.0 (Approved) 14.04.2023
R0017 - NON-CONFIDENTIAL Consolidated consultation responses v1.0 26.05.2023
R0017 - Final Change Report v2.0 (Post-Vote) 08.06.2023
Company Name
SPEN
Review status
Review required

Cable Colour Identification

Date of latest update
Type
Change
ID
R0014
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
colette.baldwin
Change Plan

Initial Assessment Report published

Completed

Start:

01 Nov 2021

Due:

26 Nov 2021

Completion:

26 Nov 2021

Change Panel review

Completed

Start:

26 Nov 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

04 Jan 2022

Completion:

31 Dec 2021

Metering Expert Panel review

Completed

Start:

04 Jan 2022

Due:

12 Jan 2022

Completion:

12 Jan 2022

Consultation starts

Completed

Start:

12 Jan 2022

Due:

17 Jan 2022

Completion:

25 Jan 2022

Consultation ends

Completed

Start:

17 Jan 2022

Due:

15 Feb 2022

Completion:

15 Feb 2022

Final Change Report issued

Completed

Start:

15 Feb 2022

Due:

25 Feb 2022

Completion:

25 Feb 2022

Metering Expert Panel decision

Completed

Start:

25 Feb 2022

Due:

09 Mar 2022

Completion:

09 Mar 2022
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 2.3.0_Live
Included changes Affected REC Items
R0014 Cable Colour Identification
  • MOCoPA (since removed)
R0019 Consequential REC changes for BSC CP1532
  • Schedule 14 - Metering Operations
R0008 Consequential New and Amended Market Messages for BSC Modification P375
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0023 Prepayment Unallocatable Transactions
  • Schedule 11 - Prepayment Arrangements
R0035 Market Stabilisation Charge – Administration
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
156.64 KB
Version 1.0 - 02 Nov 2026 PDF - 156.64 KB
1.0 02 Nov 2026
256.28 KB
Version 1.0 - 02 Nov 2026 DOCX - 256.28 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Solution Development
Proposed solution summary
  1. As an electricity Consumer, I want requested meter work to take place safely and efficiently at the time and date agreed, so that I have a safe and working meter.
  2. As a MEM or a DNO I want clarity on how to deal with cable labelling during periods of coloured cable supply chain shortages, so that I can continue to install or maintain consumer metering.
  3. As a Metering Scheme Auditor, I want there to be clarity on the permitted labelling of non-standard colour coded cables used when connecting meters, so that audits can be appropriately completed.
Proposed Solution Document
Document title
R0014 legal text (tracked changes)
Upload document
R0014 MOCoP Tracked Change Legal Text v2.0.pdf
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
During times of sustained supply chain shortages, some colour coded cables may not generally be available. Where this is the case, Metering Equipment Managers (MEMs) and Distribution Network Operators (DNOs) need to be able to source a suitable alternative cable so that they can continue to install and maintain meters. Although the labelling of cables with different out sheath colours from the inner insulation is covered by the IET Wiring Regulations, this is not set out within the REC Electricity MOCoP.
IET Wiring Regulation BS7671 - 2018 - Table 51 Identification of Conductors
R0014 - Change Proposal Plan v1.0 (Approved)
R0014 - Initial Assessment Report v1.0 (Approved)
R0014 - Preliminary Change Report v2.0 (Approved)
R0014 - Final Change Report V2.0 (Post-Vote)
Company Name
-
Review status
Review required

Electricity Enquiry Service API Service Status

Date of latest update
Type
Change
ID
R0013
Change Category
Change Path
Priority
Urgent
No
Latest Update
-
Summary
-
Proposer
admin
Change Plan

Initial Assessment Report published

Completed

Start:

11 Oct 2021

Due:

05 Nov 2021

Completion:

05 Nov 2021

Analysis and Solution development activity

In Progress

Start:

05 Nov 2021

Due:

13 Jan 2022

Completion:

Service Provider Impact Assessment completion

Not Started

Start:

13 Jan 2022

Due:

15 Feb 2022

Completion:

REC Party Impact Assessment completion

Not Started

Start:

15 Feb 2022

Due:

23 Mar 2022

Completion:

Preliminary Change Report issued

Not Started

Start:

23 Mar 2022

Due:

20 Apr 2022

Completion:

Technical Expert Panel review

Not Started

Start:

20 Apr 2022

Due:

27 Apr 2022

Completion:

Consultation starts

Not Started

Start:

27 Apr 2022

Due:

05 May 2022

Completion:

Consultation ends

Not Started

Start:

05 May 2022

Due:

26 May 2022

Completion:

Final Change Report issued

Not Started

Start:

26 May 2022

Due:

21 Jun 2022

Completion:

Technical Expert Panel decision

Not Started

Start:

21 Jun 2022

Due:

29 Jun 2022

Completion:

Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As an EES User (organisation), I want a method of integrating the service status of the EES API with my systems, so that in the event of EES API outage or disruption I do not trigger unnecessary internal diagnostic activity of my IT systems and processes, and I can initiate appropriate mitigation activity to reduce impacts to my systems and/or the services I provide.
Problem Statement
EES Users do not have a method of integrating the service status of the EES API with their systems. EES Users could experience disruption in their systems/services, caused by EES API disruption or outage. EES Users are not able to automatically identify the root cause of API outages/disruption and may initiate unnecessary internal diagnostic activity after seeing disruption in their systems/services
Stages Selection
SME
SME Role
Lead Technical Analyst
R0013 - Initial Assessment Report v1.0 (Approved)
R0013 - Change Proposal Plan v1.0 (Approved)
Company Name
Switchcraft
Review status
Review required