Schedule 26 - Switching Service Management 1.4 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory for CSS Users
Non-Party REC Service Users Mandatory for CSS Users
Loading...

Legal text to support REC Change R0180

Date of latest update
Type
Change
ID
R0336
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
REC Change R0180 “Clarity on use of on hold for switching issues, including the obligations of CSS Users” implements a technical solution for the closure of certain ticket raised to the Switching Operator when no response has been received. This Change Proposal contains the legal text to support R0180.
Proposer
Caroline Freimuller
Change Plan

Change Report (Proposal Plan) approved by Change Panel ex-committee

Completed

Start:

Due:

Completion:

19 Aug 2026

Solution presented at Technical Expert Panel

Completed

Start:

Due:

Completion:

26 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0336 Schedule 26 Switching Service Management - for consultation
Upload document
R0180 Schedule 26 Switching Service Management - for consultation.docx
Archive
Off
Document title
R0336 Switching Operator (SO) Service Definition - for consultation
Upload document
R0180 Switching Operator (SO) Service Definition - for consultation.docx
Archive
Off
Problem Statement
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Usersintroduces a technical solution for the closure of certain tickets raised to the Switching Operator when no response has been received. Without supporting legal text, these obligations and expectations are not documented within the REC.
SME
SME Role
Lead Technical Analyst
R0336 submission form
R0336 Change Report (Proposal Plan and Consultation) V1.0
R0336 Consolidated Consultation Responses v1.0
R0336 Change Report (Final Recommendation) v1.0 Approved 30.09.2026
Company Name
REC Code Manager
Review status
Review required

Regulatory Alliance Creation Rejections

Date of latest update
Type
Change
ID
R0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/10/2026 The Change Report (Update to Plan) was approved by the REC Change Panel on 20 October 2026, and the Issue progressed to a Change Proposal on 22 October 2026.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

18 Aug 2026

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Sep 2026

Update to plan approved by Change Panel

Completed

Start:

Due:

Completion:

20 Oct 2026
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Poppy Mullins
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Upload document
I0331 Schedule 24 Switching Data Management v0.6.docx
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Update to Plan) - Approved 20/10/26
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
I0331 Consolidated Impact Assessment Responses v2.0
I0331 Update to Plan Approved 20.10.2026
Company Name
SQE Energy
Review status
Review required

Enabling transparency of the CRS Provider’s REC service level performance

Date of latest update
Type
Change
ID
R0272
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
RECCo regularly reports on the performance of REC Service Providers in relation to their activities under the REC. However, there is currently no formal agreement to permit the publication of CRS performance measures between the CRS Provider and RECCo. Due to the multi-Party agreement, the REC does not specifically address the publication of this performance data. Instead, RECCo are operating under an informal understanding with the CRS Provider, which means there is a possibility that publication may be delayed or not agreed to in a given month. RECCo is dependent on the CRS Provider’s approval for each publication, which can cause delays. This approval could also be withheld at any point.
Proposer
Jenny Bridges
Change Report - Initial Assessment and Change Plan Report
Change report - Final Change Report

Comments deadline
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
Status Superseded
EMAR Version 4.2.0_Superseded
Included changes Affected REC Items
R0179 Proposal for Limiting Queries in EES API Calls (Single Query per API Call)
R0190 Related Meter Point RMP status rules
  • Schedule 28 - Related Metering Points
R0198 Metering Asset Manager (MAM) Communication Method Register
R0242 Missing Scenario Variant from R0043
  • Market Message Catalogue
R0244 C21 to be introduced into STIRG Document
  • Data Item Catalogue
R0235A Missing Scenario Variants in D0179 Alternate Solution
R0256 MM00023 /D0135 - Asset Condition Report clarification of intent on R0021/R0101
  • Market Message Catalogue
R0270 Clarification of SIP Qualification Requirements
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
R0271 Clarification of ASP, AMI, and EMO Accession Requirements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
R0272 Enabling transparency of the CRS Provider’s REC service level performance
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 26 - Switching Service Management
  • Schedule 24 - Switching Data Management
R0277 Data Latency SLA Alignment for Gas Enquiry Service
  • Schedule 1 - Interpretations and Definitions
R0280 CSS Certificate Authority audit clarification
  • Schedule 1 - Interpretations and Definitions
R0283 Annual Address Management Plan Updates
  • Schedule 1 - Interpretations and Definitions
  • Schedule 6 - Performance Assurance
  • Schedule 29 - Address Management
R0287 Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0293 Housekeeping February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. An update to the REC Schedule 6 – Performance Assurance.
Proposed Solution Document
Document title
R0272 Approved legal text (26.01.2026)
Upload document
I0272 draft legal text_v1.1.docx
Archive
Off
Problem Statement
Unlike REC Service Providers, there is currently no formal agreement in place between the CRS Provider and RECCo to publish details about the CRS Provider’s performance. RECCo is therefore dependent on the CRS Provider’s approval for each publication. Not only could there be delays in RECCo’s reporting, but the approval could also be withheld at any point, preventing RECCo’s reporting.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0272 Change Proposal Form
R0272 Consolidated Consultation responses V1.0
Company Name
Code Manager / RECCo
Review status
Review required
Schedule 26 - Switching Service Management 1.3 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory for CSS Users
Non-REC Service Users Mandatory for CSS Users
Loading...
Schedule 26 - Switching Service Management 1.2 – Implemented on
Market Participant Applicability
Market participant All Sections
Domestic Suppliers Mandatory
Non-Domestic Suppliers Mandatory
Gas Transporters Mandatory
Distribution Network Operators Mandatory
DCC Mandatory
Metering Equipment Managers Mandatory for CSS Users
Non-REC Service Users Mandatory for CSS Users
Loading...

Non dual-fuel Gas PSR Consumer

Date of latest update
Type
Issue
ID
I0186
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/09/2025 - the Change Panel approved placing this Issue on hold while the proposer progresses a sandbox trial
Summary
Non dual-fuel Consumers who register upon the PSR, will have their PSR data flow across energy industry data flows to mean that all parties are aware of any PSR Needs Codes, allowing us all to provide equal access to our services and support. This will be achieved via the utilisation of existing processes and systems. Initially a pilot will take place for a minimum of 3 months between participating companies before extending this to the whole industry”.
Proposer
Ben Atkinson
Change Report - Initial Assessment and Change Plan Report
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Problem Statement
The majority of domestic customers in the UK are what are called in the industry ‘dual-fuel’ - this means that with two types of energy (electricity & gas) a domestic dwelling has a single supplier ie they pay their bill to one organisation. This ‘dual-fuel’ position has supported the industry improvements to Priority Services Register (PSR) data flows by allowing previous divides to be overstepped in terms of data flows between energy types. There is however a problem which this RECC request aims to resolve. That is, where a customer who has both fuel types, also has two suppliers and they want to register upon the PSR. This was always a ‘known’ gap shared with our regulator when the many improvements were implemented across the PSR and considered to be something that would be addressed at a later date. This ‘gap’ means that without the dual-fuel link, currently data flows do not complete across energy types via the supplier data flow triggers.
Change Proposal Form - Non dual-fuel Gas PSR Customer
I0186 - Change Report (Proposal Plan) V1.0 (Approved) 18.02.2025
Company Name
British Gas
Review status
Review required

Clarify & Strengthen CRS Providers Requirements

Date of latest update
Type
Change
ID
R0168
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
The RECCo MSI review focused on the analysis and assessment of; Code compliance, performance, impacts and insights from lessons learned feedback from impacted stakeholders. These assessments thematically articulated changes and improvements identified to assure industry market participants that clear and appropriate action is, and will be, taken to prevent, detect and mitigate the risks and impacts of another event, and prepare for the right response to any future incidents. This Issue has been raised to address learnings from the P1 switching incident in July 2023.
Proposer
glenn.sheern
Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.16.0_Superseded

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. Root Cause Communication: That the DCC, in its role as Switching Operator, delivers, clear, accurate, timely information on the incident root cause, as soon as possible, once it has obtained a reasonable understanding. Both to offset the risks of uncertainty and limited information introduce, ensuring Switching parties (like Supplier, TPIs and Networks) have the right information to enable meaningful engagement, assist their end-consumers, and all impacted Market Participants can more proactively manage the incident impacts, including making appropriate plans in response to the incident and its resolution. Switching Operator's End-Consumer Communication: Introduce a requirement for the DCC, in its role as the Switching Operator, to provide end-consumer appropriate information for REC Parties and Non-REC Parties use to determine communication and action for their Consumers.
  2. Switching Operator, Switching Incident Impact Assessment: This change should clarify the existing Switching Operator’s broader obligation to assess an incidents impact on the wider Switching Arrangements (set out in REC Schedule 26, Switching Service Management Schedule (SSMS), section 1.7, or Major Switching Incidents starting at section 2.9), to ensure the Switching Operator facilitates the most effective, efficient (time, cost, resource) overall Switching industry solution is promoted and implemented. Incident Wider Switching Impact Assessment: Clarify that if a Major Switching Incident is not going to be resolved within defined Service levels (4 hours), then the DCC in its role as Switching Operator should determine the impact on compliance with the REC end-to-end Switching Arrangements, and work with Ofgem, and the Code Administrators for BSC, UNC and DCUSA, and RECCo, to identify the cross code impacts/impacts on other Codes when managing an incident and developing an appropriate solution for industry, with least negative impact to end-consumers.
  3. Refresh and testing of Switching Operator’s (SO) incident related policies, processes, and procedures, to ensure they remain fit for purpose.
  4. Refresh and testing of Switching Operator’s (SO) incident related policies, processes, and procedures, to ensure they remain fit for purpose.
Proposed Solution Document
Document title
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (02.08.2024)
Upload document
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (2).docx
Archive
Off
Document title
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 05.12.2024
Upload document
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
Switching Operator (SO) Service Definition (R0168 - Red-lining) 05.12.2024
Upload document
Switching Operator (SO) Service Definition (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 05.12.2024
Upload document
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 05.12.2024.pdf
Archive
Off
Document title
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024 (Word Version)
Upload document
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024.docx
Archive
Off
Document title
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024 (PDF Version)
Upload document
R0168 Draft Switching Operator Best Practice Document (V1.0 for Industry Consultation) 05.12.2024.pdf
Archive
Off
Document title
R0168 - Change Report (for Consultation) 12.12.2024
Upload document
R0168 - Change Report (for Consultation) 12.12.2024.pdf
Archive
Off
Document title
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 28.01.2025
Upload document
Schedule 26 - Switching Service Management Schedule (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 28.01.2025
Upload document
Central Switching Service (CSS) Service Definition (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Switching Operator (SO) Service Definition (R0168 - Red-lining) 28.01.2025
Upload document
Switching Operator (SO) Service Definition (R0168 - Red-lining) 28.01.2025.pdf
Archive
Off
Document title
Major Switching Incident: Switching Operator Best Practice Evaluation Form V1.0
Upload document
Major Switching Incident - Switching Operator Best Practice Evaluation Form V1.0.pdf
Archive
Off
Document title
Major Switching Incident: Switching Operator Best Practice Evaluation Form V1.0
Upload document
Major Switching Incident - Switching Operator Best Practice Evaluation Form V1.0.pdf
Archive
Off
Problem Statement
On 6th July 2023, a Major Switching Incident occurred with the Central Switching Service ((CSS) operated by the Switching Operator and CSS Service Provider, the Smart Data Communication Company (DCC)). It prevented the successful completion of that day’s planned electricity and gas, supply switches and new registrations. The CSS was stabilised post-incident and any new requests submitted after 9 a.m., 6th July were processed successfully. Through the collective action of the Switching Operator and industry parties, the CSS sent the missing industry messages to give effect to the intended switches and new registrations during the period of the 2nd to the 8th of August 2023. Priority 1 (P1) Major Switching Incidents of this nature are required to be resolved within 4 hours; however, DCC reported it took 1,605.6 hours in this instance. This incident had significant impacts on multiple industry parties and end consumers, demonstrating a clear need for improvement in the arrangements managing switching services and response to major incidents. The Retail Energy Code Company ((RECCo) with the assistance of its Code Manager) completed an end-to-end incident review; to identify the root cause, consider the efficiency and effectiveness of the incident management response, assess the improvements required, and identify appropriate actions for risk mitigation. With the overarching objective that by delivering the identified review recommendations, these actions should limit the possibility, or minimise the impact of, any future major switch incidents.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0168 - Issue Form
I0168 Switching Operator MSI Best Practice Document - for RFI and Industry Comments (02.08.2024)
I0168 - Change Report (Change Plan) (Approved) 17.09.2024
I0168 - Update to Proposal Plan (Approved 30.10.2024)
R0168 - Consolidated Consultation Responses (Non-Confidential) 20.01.2025
R0168 - Change Report (Final Reccomendation) 04.02.2025 (Approved) V2.0
Company Name
-
Review status
Review required

Introducing Third Party Intermediary (energy broker) assurance and accreditation

Date of latest update
Type
Change
ID
R0137
Change Category
Urgent
No
Latest Update
16/05/2025 - The Authority has published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Proposer
Jon Dixon
Change Plan

Service Provider Impact Assessment opens

Completed

Start:

20 Jul 2023

Due:

05 Jul 2024

Completion:

05 Jul 2024

Service Provider Impact Assessment closes

Completed

Start:

05 Jul 2024

Due:

09 Aug 2024

Completion:

06 Aug 2024

Party Impact Assessment opens

Completed

Start:

09 Aug 2024

Due:

16 Aug 2024

Completion:

15 Aug 2024

Party Impact Assessment closes

Completed

Start:

16 Aug 2024

Due:

09 Sep 2024

Completion:

09 Sep 2024

Preliminary Change Report Issued

Completed

Start:

09 Sep 2024

Due:

08 Oct 2024

Completion:

08 Oct 2024

Responsible Committee Review

Completed

Start:

08 Oct 2024

Due:

15 Oct 2024

Completion:

15 Oct 2024

Consultation opens

Completed

Start:

15 Oct 2024

Due:

18 Oct 2024

Completion:

17 Oct 2024

Consultation closes

Not Started

Start:

18 Oct 2024

Due:

08 Nov 2024

Completion:

Responsible Committee Decision

Not Started

Start:

10 Dec 2024

Due:

17 Dec 2024

Completion:

Final Change Report issued

Not Started

Start:

08 Nov 2024

Due:

10 Dec 2024

Completion:

Sent to Authority for Determination

Not Started

Start:

17 Dec 2024

Due:

18 Dec 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Non-Domestic Consumer, I want to work with TPIs who are demonstrating best practice standards within the market.
  2. As a Non-Domestic Energy Supplier, I want clear obligations around my use of TPIs so I can demonstrate best practice standards within the market and ensure my audit obligations are met.
  3. As RECCo, I want to provide an assurance and accreditation scheme to register TPIs to remove the burden of Suppliers having to individually audit TPIs.
  4. As a Third Party Intermediary, I want clear obligations so I can become accredited and assure that Suppliers and Non-Domestic Consumers are receiving best practice standards within the market.
Proposed Solution Document
Document title
Legal Text for Party IA.zip
Upload document
Legal Text for Party IA.zip
Archive
Off
Document title
R0137 Legal Text for Consultation
Upload document
R0137 Legal Text for Consultation.zip
Archive
Off
Document title
R0137 Legal Text - Final
Upload document
R0137 Final Legal Text (1).zip
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137 - Change Proposal Form External
R0137 Change Proposal Plan v1.0 (Approved)
R0137 Initial Assessment Report v1.1 (Approved)
R0137 Consolidated Impact Assessment Responses PUBLIC
R0137 and R0137A Change Report (For Consultation) V1.0
R0137 &R0137A Consolidated Consultation Responses PUBLIC v1.0
R0137 and R0137A Change Report (Post Vote) V1.0
Authority decision on REC modification proposal R0137 and R0137A
Company Name
RECCo
Review status
Review required