D0303 flow following MHHS design changes

Date of latest update
Type
Issue
ID
I0230
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Proposer
Beth Tatton
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

04 Nov 2025
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
Calisen Asset Management Limited
Review status
Review required

ECOES API for Export MPAN Creation at Scale

Date of latest update
Type
Issue
ID
I0228
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/11/2026 - the Proposer has elected to withdraw this Issue as the business case has been covered by R0321, which has been approved by Change Panel for implementation. If you wish to adopt this Issue, please contact the Code Manager by COB 20 November 2026.
Summary
Electricity Suppliers believe there is a significant bottleneck to Export Metering Point creation, which is resulting in them feeling unable to offer Export smart products to a wider audience of Consumer and scale low-carbon technology. The most effective solution is an API within the Electricity Enquiry Service (EES) that allows the Electricity Supplier to request the creation of an Export Metering Point. This could work for both Electricity Suppliers and Distribution Network Operators (DNOs) ensuring that scalable solutions are applied at both sides of the process.
Proposer
Ben Atkinson
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025

Presented at REC Change Panel

Completed

Start:

Due:

Completion:

21 Apr 2026
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
A restriction of 50 Export Metering Points per DNO per day, with no two DNOs operating the bulk request process in the same way, is overly burdensome to Electricity Suppliers and creating a barrier for Consumers getting an Export Metering Point assigned to their Premise. This is ultimately harming the effort the reach Net Zero.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Change Issues Group paper - presented March 2025
I0228 Change Report (Proposal Plan) V1.0 approved 21.04.26
I0228 Consolidated Information Request Responses V1.0 PUBLIC
I0228 Update to Plan V1.0 on hold, approved 04.06.26
Company Name
Octopus Energy
Review status
Review required

Domestic Elective HH Switching

Date of latest update
Type
Change
ID
R0227
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change aims to remove unnecessary blocks to Consumer Switching, where a Domestic Consumer is registered as elective Half Hourly (HH) with the Losing Supplier, but the Gaining Supplier does not offer this.
Proposer
Angela Joyce
Change Plan

Proposal plan approved at Change Panel

Completed

Start:

Due:

Completion:

04 Feb 2025

Extension to Plan approved by Change Panel

Completed

Start:

Due:

Completion:

15 Apr 2025

Change Report (Final Recommendation) approved by Change Panel

Completed

Start:

Due:

Completion:

17 Jun 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
I0227 - Proposed Legal Text (IA) - Schedule 23 - Registration Services.doc
Upload document
I0227 - Schedule 23 Registration Services - Paragraph 11 Mark up - 28 February 2025(114145004).docx
Archive
Off
Document title
I0227 Schedule 23 pre MHHS version
Upload document
I0227 Schedule 23 pre MHHS version.pdf
Archive
Off
Document title
I0227 Schedule 23 post MHHS version
Upload document
I0227 Schedule 23 post MHHS version.pdf
Archive
Off
Problem Statement
There are issues when a Domestic Consumer intends to Switch Suppliers, but their MPAN is registered as elective HH with their current Supplier, and this is not offered by the Gaining Supplier. This can cause delays with Switching for Consumers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Issues Proposal Form - Attachment 1. Electralink Post.docx
Issue Proposal form
I0227 - Change Report (Proposal Plan - Approved) v1.0 04.02.2025
I0227 - Consolidated Party Impact Assessment Responses (Non-Confidential) 11.04.2025
I0227 Extension to Plan V1.0 Approved 15.04.2025
R0227 Change Report (For Consultation) V1.0
R0227 Consolidated Consultation Responses v1.0
R0227 Change Report (Final Recommendation) V1.0 Approved 17.06.25
Company Name
octopus energy
Review status
Review required

ESME ID Update Rejections

Date of latest update
Type
Change
ID
R0222
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The Electricity Smart Meter Equipment (ESME) ID is a unique identifier that provides a designation for a Smart Meter. Electricity Retail Data Agent (ERDA) systems were updated as per the requirements in R0033 to not allow for multiple incidences of an individual ESME ID to be registered, and reject the update, even when a second incidence of an ESME ID would be legitimate, for example in the case of a re-use of Metering Asset or a crossed meter. This Issue seeks to resolve this feature of the ESME ID validation while maintain data accuracy.
Proposer
Carl Dennis
Status
Implementation Date
Status Superseded
EMAR Version 4.0.0_Superseded
Included changes Affected REC Items
R0044 MHHS Programme Changes required to Central Switching Service
  • Schedule 1 - Interpretations and Definitions
  • Schedule 27 - RMP Lifecycle
R0173 Improvements to the Theft Detection Incentive Scheme (TDIS)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction
R0209 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0222 ESME ID Update Rejections
R0223 Reconciliation of Unallocatable Transactions Review
  • Schedule 11 - Prepayment Arrangements
R0241 MHHS Incremental Changes for go live
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0259 Update to R0173 Implementation Date
R0264 Data Specification Housekeeping
R0083 Changes to Supply Number Format for MHHS
R0097 Consequential Change for CSS Smart Meter Data Retriever Appointments
  • Data Item Catalogue
  • Market Message Catalogue
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Lydia Bentley
Solution Development
Proposed Solution Document
Document title
R0222 Data Spec DI51544 V1.0
Upload document
I0222 Data Spec DI51544 V1.0.pdf
Archive
Off
Problem Statement
ERDA data validation on the ESME ID Data Item in the D0312(MM00256) Market Message is imperfect, and can result in invalid rejections. This occurs when more than one incidence of an ESME ID is passed through individual ERDA system, as it only allows for a single occurrence, even if historic ones have been end-dated. In situations where a Metering Asset has been re-used, thus re-using the ESME ID, a rejection will occur, in an example of an unintended functionality of the validation system.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
I0222 Change Report (Plan) (Approved) V1.0 04.02.25
I0222 Change Report (IA) (Pre-Approval) V1.0 23.04.25
R0222 Change Report (Consultation) V1.0 01.05.25
R0222 Consolidated Consultation Responses V1.0
R0222 Change Report (Post-Vote) V1.0 25.06.25
Company Name
REC Code Manager
Review status
Review required

Housekeeping Change for R0206

Date of latest update
Type
Change
ID
R0220
Change Path
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard Change Process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical, grammatical or consistency errors, and provides an opportunity to introduce necessary clarifications. This change proposal is looking to fix an error identified with R0206 Cross code change to align with BSC CP1598. BSC CP1598 was raised to add six scenario variants to four Market Messages that have been identified as missing. The REC Energy Market Data Specification contains a number of Market Message scenario variants used in BSC processes. This REC Change Proposal has been raised to align with CP1598 and ensure these scenario variants are added to the REC Data Specification. The legal text for R0206 approved at Change Panel on 15 October 2024, had a change to one of the scenario variants (SV00474) that was not clear as it was not red lined. The change was to the owner of the scenario variant from the Retail Energy Code Company (RECCo) to the Balancing and Settlement Code Company (BSCCo). The red lining for SVcccc was also incorrect as it deleted RECCo as the owner when in fact it is a new scenario variant so no previous owner. The owner as BSCCo that was approved, is correct.
Proposer
Holly Law
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
R220_R0206 HK Solution Document v1.0.pdf
Upload document
R220_R0206 HK Solution Document v1.0.pdf
Archive
Off
R0220 - Housekeeping Change Report
Company Name
-
Review status
Review required

Amending contractual obligations for SIPs at Non-Domestic Premises

Date of latest update
Type
Change
ID
R0217
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 1 April Extraordinary REC Release.
Summary
The contractual obligations in section 21 of Schedule 14 are too restrictive or not relevant to Non-Domestic Premises making delivering isolators to Non-Domestic Premises more complex than it needs to be.
Proposer
Andy Knowles
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025

Change approved by Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.17.0_Superseded
Included changes Affected REC Items
R0217 Amending contractual obligations for SIPs at Non-Domestic Premises
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Problem Statement
Non-Domestic Consumers who occupy (but do not own) a Premises with relevant permissions allowing metering work to occur are unable to contract with SIPs due to the restrictions in section 21 of Schedule 14 Metering Operations.
SIP Non-Domestic contracting red lining.docx
R0217 Change Proposal form
R0217 Change Report (Proposal Plan) V1.0 Approved 21.01.25
R0217 Change Report (For Consultation) V1.0
R0217 Consolidated Consultation Responses PUBLIC V1.0
R0217 Change Report (Final Recommendation) V1.0 Post Vote
Company Name
-
Review status
Review required

REC Changes to tie in with DCP419

Date of latest update
Type
Change
ID
R0216
Change Category
Priority
Urgent
No
Latest Update
19/01/2026 - on 19 January 2026, the Authority published their decision to reject R0216, in line with the recommendation from both the Metering Expert Panel and the Code Manager.
Summary
DCP419 is looking to place obligations on any Party or agent to update the DNO before any planned de-energisation or comms interruptions on sites with a smart meter. This is to allow DNOs to be able to manage any off supply notifications (via AD1 alerts).
Proposer
Lorna Mallon
Change Plan

Discussed at Change Issues Group

Completed

Start:

Due:

Completion:

07 Nov 2024

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

18 Feb 2025

Change Report (For Consultation) approved by MEP

Completed

Start:

Due:

Completion:

09 Jul 2025

Change Report (Final Recommendation) presented at Metering Expert Panel

Completed

Start:

Due:

Completion:

10 Sep 2025
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0216 - Schedule 14 - Metering Operations (MHHS) - v0.2 (02.07.2025)
Upload document
R0216 - Schedule 14 - Metering Operations (MHHS) - v0.2 (1).docx
Archive
Off
Problem Statement
DNOs may be unnecessarily contacting Consumers where an AD1 notification is generated but the Consumer is having planned works involving their Electricity Smart Meter or Communications Hub replacements for their Electricity Smart Meter. This may create a poor Consumer experience.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
DCP 419 Market Message Specification.docx
Issue Form
I0216 Change Report (Proposal Plan) v1.0 Approved 18.02.25
I0216 Solution Development Report V1.0
I0216 Consolidated Impact Assessment Responses PUBLIC v1.0
I0216 Extension to Plan V1.0 Approved 06.05.25
R0216 Extension to Plan V2.0 Approved 27.06.25
R0216 Change Report (For Consultation) V1.0 approved 09.07.25
R0216 Consolidated Consultation Responses PUBLIC V1.0
R0216 Change Report (Final Recommendation) V1.1 post vote
Ofgem decision to reject R0216
Company Name
-
Review status
Review required

Import / Export MOA Charging Clarification

Date of latest update
Type
Change
ID
R0207
Change Category
Priority
Urgent
No
Latest Update
06/11/26 - This Change Proposal has been implemented as part of the 6 November 2026 REC Release.
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Proposer
Jon Hawkins
Change Report - Draft Change Report

Comments deadline
Change report - Final Change Report
Change Plan

Final recommendation to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025

Sent to Authority for determination

Completed

Start:

Due:

Completion:

13 Mar 2025
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 4.4.0
Included changes Affected REC Items
R0180 Clarity on use of on hold for switching issues, including the obligations of CSS Users
  • Schedule 26 - Switching Service Management
R0207 Import / Export MOA Charging Clarification
  • Schedule 14 - Metering Operations
R0253 Theft - DNO/Networks not providing photos
  • Schedule 8 - Unbilled Energy Code of Practice
R0261 Addition of Export flag in D0303 flows
R0266 REC Data Specification Clarifications
  • Schedule 14 - Metering Operations
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0317 Number of Displayed Register Digits Data Item linkage
R0328 Removal of D0383 & D0384 requirements from Sharing MTDs process
  • Schedule 14 - Metering Operations
R0336 Legal text to support REC Change R0180
  • Schedule 26 - Switching Service Management
R0343 MSC - Amending Statement Production Timescales
R0345 Housekeeping November 2026

Documents

Name Version Last updated Actions
331.85 KB
Version 1.0 - 11 Nov 2026 PDF - 331.85 KB
1.0 11 Nov 2026
1.0 11 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
Schedule 14 - Metering Operations R0207 v0.1
Upload document
Schedule 14 - Metering Operations R0207 draft.docx
Archive
Off
Document title
Schedule 14 - Metering Operations R0207 v0.2
Upload document
Schedule 14 - Metering Operations R0207 v0.2.docx
Archive
Off
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Change Proposal Form
R0207 - Change Report (Proposal Plan - Approved) V2.0 15.10.2024
R0207 Consolidated Impact Assessment Responses PUBLIC V1.0
R0207 Extension to Plan v1.0
R0207 Change Report (For Consultation) v1.0
R0207 Consolidated Consultation Responses PUBLIC V1.0
R0207 Change Report (Final Recommendation) V1.0 Post Vote
Authority Decision Letter - Ofgem Decision to Send Back R0207 (30.05.2025)
R0207 Revised Solution - Legal Text
R0207 Change Report (Impact Assessment) Revised Solution V2.0
Legal Drafting Revised Solution March 2026
Non Confidential consolidated impact assessment responses
R0207 Consolidated Consultation Responses (revised solution)
Authority decision to approve R0207
Company Name
Gemserv
Review status
Review required

Cross code change to align with BSC CP1598

Date of latest update
Type
Change
ID
R0206
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This Change Proposal has been raised to align with BSC CP1598, which states that six Scenario Variants of Market Messages specified within the early drafting of P375 were not progressed to the final solution of P375 and REC CP R0008.
Proposer
Lorna Mallon
Impacted REC Documents
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0206 Solution Document v1.0
Upload document
R0206 Solution Document v1.0 (1).pdf
Archive
Off
Problem Statement
As these Scenario Variants are not captured in the Data Specification, the relevant Market Participants won’t be able to use the Data Transfer Network (DTN) to exchange the relevant data, which would result in them having to use a less secure mechanism to send and receive data. This means the original intent of Elexon Modification P375 has yet to be achieved as not all Market Message changes have been implemented.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0206 - Change Proposal Form
CP1598-Proposal-Form-A-Amending-the-EMDS-to-add-missing-Scenario-Variants-for-P375-v1.0.pdf
CP1598-Attachment B-EMDS changes_v1.0 (1).docx
CP1598_CPC-CP-Consultation-Responses-v1.0.pdf
CP1598 CP Consultation v1.0.pdf
R0206 Change Report (Proposal Plan) V1.0
R0206 Change Report (For Consultation) V1.0
R0206 Consolidated Consultation Responses
R0206 Change Report (Final Recommendation - Approved) V2.0 15.10.2024
Company Name
REC Code Manager
Review status
Review required

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches

Date of latest update
Type
Change
ID
R0205
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
As part of the MHHS REC code change activity, a change has been made to REC Schedule 30 to remove the half hourly meter exemption from the Erroneous Transfer provisions. Whilst this is necessary from an MHHS perspective with all sites becoming half hourly settled, the application of ET obligations in the Advanced Meter segment creates some additional challenges. To be able to accurately bill an Advanced Meter site, following repatriation of that customer to their correct supplier after an ET has been raised / agreed, the supplier needs to have access to half hourly consumption data for the ET period when they were not the registered supplier. With ETs potentially taking up to 2 years to be identified and resolved, the only place that the supplier could reliably source that HH consumption data would be from the other (losing) supplier.
Proposer
Ben Atkinson
Change Report - Draft Change Report
Change report - Final Change Report
Change Plan

Change Proposal Plan to REC Change Panel

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches > Change Plan

Start:

22 Aug 2024

Due:

01 Apr 2025

Completion:

01 Apr 2025

Discussion at REC Change Issues Group

Not Started

Start:

01 Apr 2025

Due:

05 Jun 2025

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. An approval of this Issue/Change Proposal would see an obligation placed upon the Losing Supplier, following a successful Erroneous Switch repatriation, to provide the Gaining Supplier with the Half-Hourly consumption data for the period in which they were erroneously supplying the meter.
  2. Half-Hourly consumption data would be providing to the Gaining Supplier, from the Losing Supplier, via SDEP using an Excel template within 5 Working Days of the Erroneous Switch repatriation switch date. The Gaining Supplier would be required to provide 48 Half-Hourly consumption intervals for each that the the Consumer was supplied by the erroneously Gaining Supplier.
Proposed Solution Document
Document title
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025
Upload document
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025.docx
Archive
Off
Document title
I0205 - Draft Reporting Templates
Upload document
I0205 - Draft Reporting Templates.xlsx
Archive
Off
Document title
I0205 - Impact Assessment
Archive
Off
Document title
R0205 - Schedule 30 Legal Drafting 15.08.2025
Upload document
R0205 - Schedule 30 Legal Drafting (For Consultation) 15.08.2025.docx
Archive
Off
Document title
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template
Upload document
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template.xlsx
Archive
Off
Problem Statement
In the absence of having Half-Hourly consumption data for Erroneously Switched Consumers, Energy Suppliers are currently required to estimate consumption for billing purposes that can lead to inaccurate billing.
I01205 - Change Proposal Form
I0205 - Change Report (Proposal Plan) V1.0 Approved (01.04.2025)
I0205 Consolidated Impact Assessment Responses V1.0 (Non-Confidential) 30.07.2025
R0205 - Consolidated Consultation Responses (09.09.2025)
R0205 Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
Company Name
Centrica
Review status
Review required