Removal of Facsimile as a Method of Code Communication

Date of latest update
Type
Change
ID
R0157
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
The Public Switched Telephone Networks (PSTN) will be switched off in December 2025 by all telecom companies and will be replaced with an Internet Protocol (IP) digital network. Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC. All communication methods referencing fax or facsimile will need to be removed and replaced with email (where this is not an existing option), unless an alternative form of communication is needed. Please note: The government have published preparatory guidance which includes migrating to IP-supported technology in advance of the planned decommissioning. UK transition from analogue to digital landlines - GOV.UK (www.gov.uk) Critical National Infrastructure (CNI) (“assets, facilities, systems, networks or processes and the essential workers that operate and facilitate them”) which is subdivided into 13 sectors including Energy, are advised to consider how they move to digital alternatives smoothly to avoid unnecessary interruption following the PSTN switch-off. Openreach's Energy Guidance Factsheet can be found in the CPs Accompanied Documents.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

03 Jan 2024

Due:

09 Feb 2024

Completion:

09 Feb 2024

Final Change Report Issued

Completed

Start:

23 Feb 2024

Due:

12 Mar 2024

Completion:

12 Mar 2024

Responsible Committee Decision

Completed

Start:

12 Mar 2024

Due:

19 Mar 2024

Completion:

19 Mar 2024

Appeal Window Closure

Not Started

Start:

19 Mar 2024

Due:

02 Apr 2024

Completion:

Consultation Close

Completed

Start:

09 Feb 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 4.1.0_Superseded
Included changes Affected REC Items
R0152 Revision to the Consolidated Metering Code of Practice (CoMCoP)
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0157 Removal of Facsimile as a Method of Code Communication
  • Schedule 14 - Metering Operations
  • Schedule 18 - Green Deal Arrangements
  • Standards Definition Document
  • Data Item Catalogue
R0191 Introduction of SLA for Supplier De-Registration on Disconnected Meters
  • Schedule 27 - RMP Lifecycle
R0205 Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
R0212 Protecting Crimestoppers and their Contacts
R0215 Schedule 30 Switch Meter Reading Problems - Rejections and Timings
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
R0060 ERDS Service Definition timezone correction
  • Schedule 1 - Interpretations and Definitions
R0232 Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)
R0243 Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
  • Data Item Catalogue
R0248 REC Changes to tie in with DCP451 - Suspending Registrations
  • Schedule 24 - Switching Data Management
R0254 Non-Domestic Change of Occupier Reporting (R0155 Solution)
R0255 Terms of Reference Updates
R0257 Change to REC for Data processing outside of EEA
R0263 Sharing Confirmed Energy Theft Data with the BSCCo
  • Schedule 7 - Energy Theft Reduction
R0269 Schedule 5 – Change Management: Clarity and Typographical Review
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0279 Housekeeping November 2025
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 7 - Energy Theft Reduction
  • Schedule 27 - RMP Lifecycle
  • Schedule 18 - Green Deal Arrangements
  • Schedule 24 - Switching Data Management
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Market Message Catalogue
R0227 Domestic Elective HH Switching
  • Schedule 23 - Registration Services
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. All communication methods referencing fax or facsimile will need to be removed and replaced with email
Proposed Solution Document
Document title
Existing References to Fax and "e-mail" in the REC (January 2024)
Upload document
Existing Fax References in the REC.pdf
Archive
Off
Document title
R00157 - Legal Text Changes (All Affected REC Products and Documents)
Upload document
R00157 - Draft Legal Text Changes.zip
Archive
Off
Problem Statement
Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC
CP Form - Removal of a Fax as a Code Communication method
R0157 - Change Proposal Plan V1.0 (Approved) 30.01.2024
R0157 - Initial Assessment Report V1.0 (Approved) 30.01.2024
R0157 - Consolidated Consultation Responses
R0157 - Preliminary Change Report V1.0 (For Consultation) 09.02.2024
R0157 - Final Change Report V2.0 (Post-Vote) 19.03.2024
Open Reach Energy Industry Factsheet
Company Name
REC Code Manager
Review status
Review required

Change of Occupier: Evidentiary Standards and Timescales

Date of latest update
Type
Change
ID
R0155
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025. The R0155 Guidance Document was updated on 05 November 2025 as a result of the implementation of R0232 and R0254 on 07 November 2025.
Summary
This Change Proposal seeks to address industry concerns with the Non-Domestic Change of Occupier (CoO) process identified by Non-Domestic Suppliers, Third Party Intermediaries (TPIs) and Consumers and bring improvements to the CoO process.
Proposer
Suchitra Hammond
Change Plan

Solution Development Completed

Completed

Start:

13 Dec 2023

Due:

28 Jun 2024

Completion:

28 Jun 2024

Party Impact Assessment Issued

Completed

Start:

28 Jun 2024

Due:

23 Aug 2024

Completion:

23 Aug 2024

Party Impact Assessment Closed

Completed

Start:

23 Aug 2024

Due:

27 Sep 2024

Completion:

27 Sep 2024
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. As a Consumer, when I become responsible for a new premise, I want to be supplied by the Energy Supplier and/or Tariff of my choice and for this to be completed in a timely manner. As a Consumer, when I become responsible for a new premise, I do not want to be billed for the previous occupier’s usage.
  2. As a TPI I want an efficient CoO process so that I can advise my client of the best Tariffs suitable to their needs. As an Energy Supplier, I want to easily identify genuine CoOs so that transfers are not unduly delayed, and my organisation can focus on genuine exceptions. As an Energy Supplier, I want to easily identify the validity of a CoO, so that the risk of misuse is reduced.
  3. As an Energy Supplier, I want to accurately invoice the correct occupant in the first instance. As REC Performance Assurance, we need a standardised and consistent process for CoO Switches, so that we can undertake performance reviews appropriately, highlighting areas of misuse and applying sanctions where appropriate.
Proposed Solution Document
Document title
R0155 - Draft Non-Domestic Change of Occupier Schedule (published for Party Impact Assessment) 13.08.2024
Upload document
R0155 - Draft Non-Domestic Change of Occupier Schedule (published for Party Impact Assessment) 13.08.2024.pdf
Archive
Off
Document title
R0155 - Draft Amendments to Schedule 23 - Registration Services (published for Party Impact Assessment) 13.08.24
Upload document
R0155 - Draft Amendments to Schedule 23 - Registration Services (published for Party Impact Assessment) 13.08.24.pdf
Archive
Off
Document title
R0155 - Performance Assurance Reporting Catalogue Extract (published for Party Impact Assessment) 13.08.2024.xlsx
Upload document
R0155 - Performance Assurance Reporting Catalogue Extract (published for Party Impact Assessment) 13.08.2024.xlsx
Archive
Off
Document title
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) 28.10.2024
Upload document
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) 28.10.2024.pdf
Archive
Off
Document title
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) (red-lined) 28.10.2024
Upload document
R0155 - Draft Non-Domestic Change of Occupier Schedule v0.2 (for consultation) (red-lined) 28.10.2024.pdf
Archive
Off
Document title
R0155 - Draft Amendments to Schedule 23 - Registration Services v0.2 (for consultation) 28.10.2024
Upload document
R0155 - Draft Amendments to Schedule 23 - Registration Services v0.2 (for consultation) 28.10.2024.pdf
Archive
Off
Document title
Performance Assurance Report Catalogue - R0155 Extract (for consultation) 28.10.2024
Upload document
Performance Assurance Report Catalogue - R0155 Extract (for consultation) 28.10.2024.xlsx
Archive
Off
Document title
R0155 - Change Report (for Consultation) V1.0 (29.10.2024)
Upload document
R0155 - Change Report (for Consultation) V1.0 (2).pdf
Archive
Off
Document title
R0155 - Change Report (Final Recommendation) V2.1 Post-Vote (24.01.2025)
Upload document
R0155 - Change Report (Final Recommendation) Post-Vote V2.1 (1).pdf
Archive
Off
Document title
R0155 - Non-Domestic Change of Occupier Schedule (10.12.2024)
Upload document
R0155 - Non-Domestic Change of Occupier Schedule.pdf
Archive
Off
Document title
R0155 - Schedule 23 - Registration Services (10.12.2024)
Upload document
R0155 - Schedule 23 - Registration Services.pdf
Archive
Off
Document title
R0155 - Schedule 23 - Registration Services (10.12.2024) (Red-Lined)
Upload document
R0155 - Schedule 23 - Registration Services (10.12.2024).pdf
Archive
Off
Document title
R0155 Non-Confidential Consultation Consolidated Responses V1.0 (09.12.2024)
Upload document
R0155 Non-Confidential Consultation Consolidated Responses V1.0 (1).pdf
Archive
Off
Document title
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Guidance Document V3.0
Upload document
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Guidance Document V3.pdf
Archive
Off
Document title
Updates on the Performance Assurance of R0155 V2.0
Upload document
Updates on the Performance Assurance of R0155 V2.0.pdf
Archive
Off
Document title
SDEP User Training Deck V2.0
Upload document
SDEP User Training Deck v2.0.pptx
Archive
Off
Document title
Information Request for R0155 Implementation (06.03.2025)
Upload document
Information Request for R0155 Implementation.docx
Archive
Off
Problem Statement
Non-Domestic Consumers may struggle to quickly and easily update a supplier when they become the new owner/occupier or responsible bill payer for a property. This can include: Inconsistent requests from suppliers for proof they are the new owner/occupier or responsible bill payer; inconsistent time taken to have new billing account set up or new contract agreed with the supplier; inconsistent treatment of request to change supplier (CoO flagged or not flagged, loss request objected to or not objected to); risk of being held responsible for previous owner/occupier or responsible bill payers debt and contract; risk of being put on deemed prices (on assumption these are more expensive than contract terms). Suppliers may struggle to quickly and easily update their billing and contractual records for non-domestic properties. This can include: inconsistent updates from consumer leaving a property; inconsistent updates from consumers taking over a property; inconsistent quality of evidence provided; risk of invalid/fraudulent requests to avoid debt or leave contracts before expiry date. Third Party Intermediaries (TPIs) may struggle to provide non-domestic consumers and suppliers with a service. This can include: different processes for each supplier; different evidence available from each consumer; being stuck in the middle.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Guidance Document V3 (05.11.2025)
R0155 - Change of Occupier - Evidentiary Standards and Timescales - Authority Approval 04.02.2025
R0155 - Change Proposal Form
R0155 - Change Proposal Plan v1.0 (Approved 19.12.2023)
R0155 - Change of Tenancy - Change Proposal Extension (Approved) 16.04.2024
Initial Assessment Report (Approved 19.12.2023)
R0155 - Change Report (Impact Assessment) 20.08.2024
R0155 - Consolidated Impact Assessment Responses (Non-Confidential) 28.10.2024
R0155 Non-Confidential Consultation Consolidated Responses V1.0 (09.12.2024)
Updates on the Performance Assurance of R0155 V1.0 (Supplementary document)
R0155 - Change Report (Final Recommendation) Post-Vote V2.1
Company Name
REC Code Manager
Review status
Review required

Implementation of Online Certificate Standard Protocol (OCSP) in addition to Certificate Revocation List (CRL).

Date of latest update
Type
Change
ID
R0151
Change Category
Change Path
Priority
Urgent
No
Latest Update
14/05/2024 - At the request of the proposer, this Change Proposal has now been withdrawn. The rationale for withdrawing the proposal was that the benefits afforded by this change will not be fully realised until 2026 (renew of digital certificates), and the risk profile around revoked certificates remains unchanged during this period. DCC recommend this change is revisited in 12 months, to allow sufficient time for review and resubmission ahead of any certificate renewal activities.
Summary
This Change seeks to make improvements to the Microsoft Azure Application Gateway module. A defect has been identified which requires the implementation of a manual/ customer workaround when checking the Certificate Revocation Lists (CRLs) systems within the Central Switching Service (CSS) to ensure certificates are revoked. This change seeks to remove the need to complete a manual workaround and implement a real-time certification validation capability.
Proposer
Stuart Pitcher
Change Plan

Solution Analysis and Development

Completed

Start:

30 Oct 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. The proposed solution is to roll out support for Online Certificate Standard Protocol (OCSP) in addition to Certificate Revocation List (CRL). The scope of the change will be: - Implementation of a central OCSP server and the update of the associated PKI processes to manage the Certificate Revocation. This will cover the TLS and JWS Certificate Revocation. - CSS implementation of Application Gateway will be reconfigured to include the OCSP functionality and server. - CSS change to implement the OCSP checking for the JWS certificates. - All new certificates that are issued will include the detail of the OCSP Server, as part of the migration approach all new certificates will have this information embedded. - All parties connecting to CSS have the relevant information for them to exploit the advanced features that OCSP introduces. The CRL checking functionality will be maintained so this change is an optional upgrade for any Systems that operate using Switching Key Infrastructure.
Problem Statement
There is currently a Microsoft Azure Application Gateway module defect against the checking of Certificate Revocation Lists (CRLs), with Microsoft stating that the CRL related defect will not be fixed. Consequently, any system within the CSS ecosystem, systems that use Switching Key Infrastructure (SWIKI), that have incorporated the Azure Application Gateway module to manage the TLS connection will have been required to implement a manual/custom workaround to ensure that certificates that are revoked are not allowed to establish a connection.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0151 - Implementation of OCSP in addition to CRL
R0151 - Initial Assessment Report V2.0 (Approved) 06.02.2024
Company Name
Smart DCC
Review status
Review required

Introduction of classification-based access model

Date of latest update
Type
Change
ID
R0148
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2025 - Following a review of the impact assessments received for the technical solution required to deliver R0148, taking into account the timelines, costs and the pending decision on the Evolution of the Enquiry Services, a positive business case cannot be demonstrated at this time. RECCo have, therefore, made the decision to withdraw R0148 and look at how the technical objectives can be met through the Evolution of the Enquiry Services. The adoption window has closed.
Summary
Currently Enquiry Services Data is only available to users whose roles and purposes for access are detailed within the Data Access Matrix (DAM). RECCo has undertaken a project to look at REC controlled data sources and created a Metadata Catalogue based on a Data Classification Model. This details the data items along with descriptions, identification of the associated data, roles, responsibilities, and classification. The output of this work will be utilised to improve access to Enquiry Services Data by making certain data items (defined as Always Open) easily available to everyone and simplifying the approval process for data items which can be made available if certain conditions have been met.
Proposer
Tracy Hardy
Change Plan

Service Provider Impact Assessment

In Progress

Start:

13 Oct 2023

Due:

31 Dec 2024

Completion:

Party Impact Assessment

Not Started

Start:

31 Dec 2024

Due:

31 Dec 2024

Completion:

Consultation

Not Started

Start:

31 Dec 2024

Due:

28 Feb 2025

Completion:

Responsible Committee Decision

Not Started

Start:

28 Feb 2025

Due:

04 Mar 2025

Completion:

Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want Market Participants to have appropriate data access so that I can benefit from improved product and service offerings.
  2. As a Market Participant, I want the processes that grant data access to be simplified and adaptable so that valid data use cases are addressed quickly.
Proposed Solution Document
Document title
Wiki Article - R0148 and the Metadata Catalogue
Archive
Off
Problem Statement
Currently the REC has a focus on role-based access to data items within the Enquiry Services as detailed in Schedule 12 – Data Access. However, a system and process where data items are released by virtue of the data item is needed.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0148 - Open Data Change Proposal Form V1.0.docx
Rebaseline of Change Proposal Plan v2.0
Metadata Catalogue V2.2 Published - EES GES Sources.
R0148 - Change Proposal Plan V1.0 (Approved)
R0148 - Initial Assessment Report v1.0 (Approved)
R0148 - Rebaseline of Change Proposal Plan (20.09.2024)
Company Name
Code Manager
Review status
Review required

Prepayment Levelisation

Date of latest update
Type
Change
ID
R0147
Change Category
Urgent
Yes
Latest Update
This change was implemented as part of the the Extraordinary release on 28 March 2024. *This Change Proposal has no impacts on Market-wide Half Hourly Settlement
Summary
This Change Proposal seeks to introduce the necessary governance and charging arrangements into the Retail Energy Code, to reconcile the impact on Domestic Energy Suppliers of levelling the cost of standing charges to Domestic Consumers paying by means of a Prepayment Meter with those paying by Direct Debit. This proposal is being raised on a contingent basis pending the decision of the Authority on whether to modify the standard conditions of the Gas and Electricity Supply Licences to levelise standing charges. That decision is expected in January 2024. This Change Proposal is being progressed in anticipation of the reconciliation of levelisation costs being administered by the Retail Energy Code Company.
Proposer
Jon Dixon
Change Plan

Solution development completed

Completed

Start:

22 Sep 2023

Due:

12 Oct 2023

Completion:

12 Oct 2023

Impact assessment period started

Completed

Start:

12 Oct 2023

Due:

13 Oct 2023

Completion:

13 Oct 2023

Impact assessment completed

Completed

Start:

13 Oct 2023

Due:

08 Nov 2023

Completion:

08 Nov 2023

Preliminary Change Report issued

Completed

Start:

08 Nov 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Responsible Committee review of Preliminary Change Report

Completed

Start:

17 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023

Consultation started

Completed

Start:

21 Nov 2023

Due:

22 Nov 2023

Completion:

22 Nov 2023

Consultation closed

Completed

Start:

22 Nov 2023

Due:

13 Dec 2023

Completion:

13 Dec 2023

Final Change Report issued

Completed

Start:

13 Dec 2023

Due:

12 Jan 2024

Completion:

11 Jan 2024

Responsible Committee decision

Completed

Start:

12 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Authority Determination requested

Completed

Start:

16 Jan 2024

Due:

17 Jan 2024

Completion:

17 Jan 2024
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.9.0
Included changes Affected REC Items
R0147 Prepayment Levelisation
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
184.95 KB
Version 1.0 - 16 Nov 2026 PDF - 184.95 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As a Domestic Consumer, I want to be charged the same standing charges regardless of whether I pay by DD or have a Prepayment Meter.
  2. As an Energy Supplier, I want my obligations regarding data provision to be clear so that I can provide accurate data. As an Energy Supplier, I want there to be a fair reconciliation mechanism calculates, reports, invoices and credits my organisation with the outcome of applying the payment levelisation methodology. As an Energy Supplier, I want the arrangements for the payment mechanism and terms, charging arrangements and invoicing to be clearly set out in the REC, so I can meet my obligations and have confidence in how the scheme operates.
  3. As RECCo, I want my responsibilities in relation to the development and administration of the levelisation scheme to be clearly set out in the REC so that I can successfully deliver the scheme for the industry. As the REC Code Manager, I want the levelisation scheme arrangements to be clearly set out in the REC, so that I can fulfil my role in administering and assuring the scheme.
Proposed Solution Document
Document title
Prepayment Levelisation - High level Solution Overview 05.10.2023
Upload document
PPM Levelisation - High level Solution Overview v1.2 05.10.2023.pdf
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v2.0 13.10.2023
Upload document
PPM Levelisation - High level Solution Overview v2.0 13.10.2023.pdf
Archive
Off
Document title
R0147 Draft Legal Text 05.10.2023
Upload document
R0147 Draft Legal Text 05.10.2023.zip
Archive
Off
Document title
R0147 Legal Text for PCR 17.11.2023
Upload document
R0147 Legal Text for PCR 17.11.2023.zip
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v3.0 (17.11.2023)
Upload document
PPM Levelisation - High level Solution Overview v3.0.pdf
Archive
Off
Document title
Payment Method Levelisation Solution Requirements (17.11.2023)
Upload document
Payment Method Levelisation Solution Requirements_13112023.xlsx
Archive
Off
Document title
Schedule XX Appendix - Supplier Data Reporting Specification v1.0
Upload document
Schedule XX Appendix - Supplier Data Reporting Specification v1.0.pdf
Archive
Off
Document title
R0147 Legal Text For Consultation 22.11.23
Upload document
R0147 Legal Text For Consultation 22.11.23.zip
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023
Upload document
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023.pdf
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v5.0 11.01.2024
Upload document
PPM Levelisation - High level Solution Overview v5.0 11.01.2024.pdf
Archive
Off
Document title
Payment Method Levelisation Solution Requirements_11.01.2024
Upload document
Payment Method Levelisation Solution Requirements_11.01.2024.xlsx
Archive
Off
Document title
R0147 Legal Text for FCR 11.01.2024
Upload document
R0147 Legal Text for FCR 11.01.2024.zip
Archive
Off
Document title
Ofgem Letter Levelisation - Alignment of legal text and license conditions 20.12.2023
Upload document
20231220 Ofgem Letter Levelisation - Alignment of legal text and license conditions (2).pdf
Archive
Off
Document title
R0147 Legal text - Consultation to FCR comparison
Upload document
R0147 Legal text - Consultation to FCR comparison.zip
Archive
Off
Document title
Levelisation - Alignment of legal text and licence modifications REC Response 17.01.2024
Upload document
20240117 Levelisation - Alignment of legal text and licence modifications REC Response.pdf
Archive
Off
Document title
R0147 Additional data specification guidance 23.02.2024
Upload document
R0147 Additional data specification guidance 23.02.2024.pdf
Archive
Off
Problem Statement
Ofgem are working towards and consulting on the design and implementation of a levelisation scheme to align the standing charges of Domestic Consumers who pay through a Prepayment Meter with those who pay via DD. RECCo will be the delivery partner for this scheme, however, the requirements and arrangements for the scheme need to be established in the REC.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0147 - Change Proposal Form.docx
R0147 Change Proposal Plan v2.0 (Approved) 14.11.2023
R0147 - Change Proposal Re-Plan (Approved) 19.12.2023
R0147 Initial Assessment Report v2.0 (Approved) 03.10.2023
R0147 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0147 Preliminary Change Report v2.0 (Approved) 22.11.2023
R0147 Consolidated Consultation Responses v1.0 PUBLIC
R0147 Final Change Report v2.0 (Post-Vote) 16.01.2024
Authority decision on REC modification proposal R0147 - Prepayment Levelisation 23.02.24
Company Name
RECCo
Review status
Review required

Housekeeping amendments

Date of latest update
Type
Change
ID
R0140
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal. Schedule 27 – RMP Lifecycle Schedule 1 – Interpretations and Definitions Schedule 5 – Change Management Schedule 9 – Qualification and Maintenance
Proposer
Holly Law
Change Plan

Publish House Keeping Change Report

Completed

Start:

11 Aug 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

Responsible Committee decision

Completed

Start:

08 Sep 2023

Due:

19 Sep 2023

Completion:

19 Sep 2023

Implemented

Completed

Start:

19 Sep 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023
Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Solution Development
Proposed Solution Document
Document title
R0140 Final Draft Legal text
Upload document
R0140 Final Draft Legal text.zip
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
R0140 - Housekeeping Change Report v1.0 (Approved) 19.09.23
Company Name
Gemserv
Review status
Review required

Combined progression of Change Proposals R0058, R0104 and R0129

Date of latest update
Type
Change
ID
R0138
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This change seeks to efficiently address the issues raised under the following Change Proposals. R0058 – REC Services Procurement Clarification R0104 – Clarifying Requirement for Continuous Billing Following an Erroneous Switch R0129 – Clarifying Event of Default Requirements These Change Proposals have been identified by the Code Manager as requiring non-contentious, clarificatory and non-material alterations to the REC Legal Text only.
Proposer
Elise Handy
Change Plan

Preliminary Change Report published

Completed

Start:

04 Aug 2023

Due:

01 Sep 2023

Completion:

01 Sep 2023

Consultation close

Completed

Start:

01 Sep 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Final Change Report published

Completed

Start:

15 Sep 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Responsible Committee decision

Not Started

Start:

22 Sep 2023

Due:

03 Oct 2023

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.6.0_Superseded
Included changes Affected REC Items
R0110 A review of Supplier access to data on GES
R0138 Combined progression of Change Proposals R0058, R0104 and R0129
R0140 Housekeeping amendments
R0059 Maintenance of Qualification Schedule Change
  • Schedule 1 - Interpretations and Definitions
  • Schedule 9 - Qualification and Maintenance
R0088 Make Shipper NExA values available on the GES portal
R0017 Invalid Requests for Site Technical Details
  • Schedule 14 - Metering Operations
  • Data Item Catalogue
  • Market Message Catalogue

Documents

Name Version Last updated Actions
222.91 KB
Version 1.0 - 02 Nov 2026 PDF - 222.91 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant, I need the REC drafting to be accurate, so I can rely on it to ensure my processes and procedures correctly reflect my obligations. If there are mistakes or omissions, then it could cause issues with the effective operation and assurance of the retail energy market.
Proposed Solution Document
Document title
R0138 - Draft Legal Text
Upload document
R0138 - Draft Legal Text.zip
Archive
Off
Problem Statement
Three Change Proposals have been placed on hold due to having a low priority status. These proposals have been identified as having fully formed solutions, which are non-contentious and can be quickly implemented. This change seeks to address these Change Proposals so that they can be addressed, and their benefits realised.
DRAFT Change Proposal Form - Umbrella 2 CP.docx
R0138 - Initial Assessment Report (Approved) 15.08.2023
R0138 - Change Proposal Plan (Approved) 15.08.2023
R0138 - Consolidated Consultation Responses
R0138 - Preliminary Change Report v1.0 (01.09.2023) published for Consultation
R0138 - Final Change Report (Post-Vote) 03.10.2023
Company Name
REC Code Manager
Review status
Review required

Introducing Third Party Intermediary (energy broker) assurance and accreditation

Date of latest update
Type
Change
ID
R0137
Change Category
Urgent
No
Latest Update
16/05/2025 - The Authority has published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Proposer
Jon Dixon
Change Plan

Service Provider Impact Assessment opens

Completed

Start:

20 Jul 2023

Due:

05 Jul 2024

Completion:

05 Jul 2024

Service Provider Impact Assessment closes

Completed

Start:

05 Jul 2024

Due:

09 Aug 2024

Completion:

06 Aug 2024

Party Impact Assessment opens

Completed

Start:

09 Aug 2024

Due:

16 Aug 2024

Completion:

15 Aug 2024

Party Impact Assessment closes

Completed

Start:

16 Aug 2024

Due:

09 Sep 2024

Completion:

09 Sep 2024

Preliminary Change Report Issued

Completed

Start:

09 Sep 2024

Due:

08 Oct 2024

Completion:

08 Oct 2024

Responsible Committee Review

Completed

Start:

08 Oct 2024

Due:

15 Oct 2024

Completion:

15 Oct 2024

Consultation opens

Completed

Start:

15 Oct 2024

Due:

18 Oct 2024

Completion:

17 Oct 2024

Consultation closes

Not Started

Start:

18 Oct 2024

Due:

08 Nov 2024

Completion:

Responsible Committee Decision

Not Started

Start:

10 Dec 2024

Due:

17 Dec 2024

Completion:

Final Change Report issued

Not Started

Start:

08 Nov 2024

Due:

10 Dec 2024

Completion:

Sent to Authority for Determination

Not Started

Start:

17 Dec 2024

Due:

18 Dec 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Non-Domestic Consumer, I want to work with TPIs who are demonstrating best practice standards within the market.
  2. As a Non-Domestic Energy Supplier, I want clear obligations around my use of TPIs so I can demonstrate best practice standards within the market and ensure my audit obligations are met.
  3. As RECCo, I want to provide an assurance and accreditation scheme to register TPIs to remove the burden of Suppliers having to individually audit TPIs.
  4. As a Third Party Intermediary, I want clear obligations so I can become accredited and assure that Suppliers and Non-Domestic Consumers are receiving best practice standards within the market.
Proposed Solution Document
Document title
Legal Text for Party IA.zip
Upload document
Legal Text for Party IA.zip
Archive
Off
Document title
R0137 Legal Text for Consultation
Upload document
R0137 Legal Text for Consultation.zip
Archive
Off
Document title
R0137 Legal Text - Final
Upload document
R0137 Final Legal Text (1).zip
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137 - Change Proposal Form External
R0137 Change Proposal Plan v1.0 (Approved)
R0137 Initial Assessment Report v1.1 (Approved)
R0137 Consolidated Impact Assessment Responses PUBLIC
R0137 and R0137A Change Report (For Consultation) V1.0
R0137 &R0137A Consolidated Consultation Responses PUBLIC v1.0
R0137 and R0137A Change Report (Post Vote) V1.0
Authority decision on REC modification proposal R0137 and R0137A
Company Name
RECCo
Review status
Review required

Change to REC Schedule 22 Market Stabilisation Charge (MSC)

Date of latest update
Type
Change
ID
R0136
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
This Change Proposal seeks to deliver two changes to REC Schedule 22 – Market Stabilisation Charge. The first change will update the statement timescales in Schedule 22 to ensure that this is appropriately aligned with the statement Schedule. The second change seeks to update the disputes Section (section 7) of Schedule 22 to include reference to Credit Advice Notes.
Proposer
Lynne Fallon
Change Plan

Impact Assessment and Change Proposal Plan Published

Completed

Start:

17 Jul 2023

Due:

25 Aug 2023

Completion:

25 Aug 2023

Preliminary Change Report Issued

Completed

Start:

25 Aug 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Review of PCR by Change Panel

Completed

Start:

22 Sep 2023

Due:

03 Oct 2023

Completion:

03 Oct 2023

Consultation Started

Completed

Start:

03 Oct 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Consultation Closes

Completed

Start:

06 Oct 2023

Due:

26 Oct 2023

Completion:

26 Oct 2023

Final Change Report Issued

Completed

Start:

26 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Change Panel Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.7.0_Live

Documents

Name Version Last updated Actions
160.82 KB
Version 1.0 - 02 Nov 2026 PDF - 160.82 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Samantha Briggs
Solution Development
Proposed solution summary
  1. As RECCo, I want the Retail Energy Code to specify my obligations, governance and charging mechanisms, so that I can effectively discharge obligations imposed by the Authority through the Licence Condition modification.
  2. As a Domestic Supplier, I want to understand how RECCo will calculate my credits and liabilities and when they will send statements, so that I can plan to review my invoices/credit notes prior to the receipt of monies owed or payments I need to make to RECCo or at an appropriate time for my organisation.
  3. As a Domestic Supplier, I want to understand how I can dispute a Credit Advice which I do not believe is accurate, so that I am able to raise a dispute/challenge compliantly.
Proposed Solution Document
Document title
R0136 - Draft Legal Text (10.11.2023)
Upload document
R0136 - Draft Legal Text v1.0 (1).doc
Archive
Off
Problem Statement
Schedule 22 says that within 10 Working Days after the end of each MSC-4-Week Cycle, RECCo shall send each Energy Supplier a statement in respect of that MSC-4-Week Cycle. This contradicts the 15 days set out in the Process Maps shared with Parties during the development of the administration arrangements of the Market Stabilisation Charge. Additionally, suppliers are querying how they may raise a dispute when they believe they are not entitled to the monies stated on Credit Advice Notices as this process is not set out in the Schedule.
R0136 - Change Proposal Form
R0136 - Changes to Sche 22 - CPP v1.0 (Approved) 05.09.2023
R0136 - Changes to Sch 22 MSC IAR (Approved) v1.0 05.09.2023
R0136 - Preliminary Change Report - (Approved) 03.10.23
R0136 - Consolidated Consultation Response 10/11/2023
R0136 - Final Change Report v2.0 (Post-Vote) 21.11.2023
Company Name
RECCo
Review status
Review required

Annulment Definition

Date of latest update
Type
Change
ID
R0119
Change Category
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Annulments are defined in the interpretations schedule as: Annulled means that a Registration has been annulled by the Losing Supplier pursuant to an Annulment Request. “Annulment” and similar expressions shall be interpreted accordingly. Annulment Request means the Registration Service Request from the Losing Supplier to terminate the progress of a Registration in accordance with Paragraph 10 of the Registration Services Schedule. The Registration Services Schedule does not define an annulment but sets out in para 10: A Losing Supplier must only submit an Annulment Request in respect of a Registration where the Losing Supplier is permitted to do so in accordance with its Energy Supply Licence. Unfortunately the Energy Supply Licence does not refer to annulments, making this term not clearly defined. REC Performance Assurance (RPA) have identified Parties using annulments when they should use other processes. The lack of a clear definition of what an annulment is could be a contributing factor to this.
Proposer
Anton Moden
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

17 May 2023

Due:

31 May 2024

Completion:

31 May 2024

Final Change Report Issued

Completed

Start:

31 May 2024

Due:

05 Jul 2024

Completion:

05 Jul 2024

Responsible Committee Decision

Not Started

Start:

05 Jul 2024

Due:

16 Jul 2024

Completion:

Authority Determination Requested

Not Started

Start:

16 Jul 2024

Due:

17 Jul 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.14.0_Superseded
Included changes Affected REC Items
R0108 Enabling Electricity Enquiry Service searches using a Unique Property Reference Number
R0113 Data Specification updates and clarifications
R0115 Frequency and content of CSS reports on switching via the DCC portal
R0119 Annulment Definition
  • Schedule 1 - Interpretations and Definitions
  • Schedule 23 - Registration Services
R0150 On-site Aggregation as a method to facilitate Third Party Access - BSC P455
  • Schedule 1 - Interpretations and Definitions
  • Schedule 25 - Central Switching Service
R0049 Intellectual Property Rights and Services Data Main Body changes
R0092A DCC Service Level Agreements for the Switching Incentive Regime (Alternative)
R0203 CSS Retry Strategy
  • Schedule 24 - Switching Data Management
R0206 Cross code change to align with BSC CP1598
  • Market Message Catalogue
R0211 November 2024 House Keeping Change
R0069 Amendments to Sample Access Agreement
  • Schedule 9 - Qualification and Maintenance
R0094 Clarify obligations on gas meter exchanges that occur close to CoS
  • Schedule 14 - Metering Operations
  • Market Message Catalogue
R0098 Optional fuzzy searching in EES

Documents

Name Version Last updated Actions
199.57 KB
Version 1.0 - 02 Nov 2026 PDF - 199.57 KB
1.0 02 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed Solution Document
Document title
Extract: Schedule 23 - Registration Services (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Upload document
Registration Services - R0119 (Draft Legal Text).docx
Archive
Off
Document title
Schedule 23 - Registration Services (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Upload document
Registration Services - R0119 (1).docx
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Upload document
Schedule 1 - Interpretations and Definitions - R0119.docx
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions - R0119 (updated draft amendments at FCR) 05.07.2024
Upload document
Schedule 1 - Interpretations and Definitions - R0119 (1).docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (updated draft amendments at FCR) 05.07.2024
Upload document
Registration Services - R0119 (2).docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (updated draft amendments at FCR) (Extract) 05.07.2024
Upload document
Registration Services - R0119 (Draft Legal Text post-Consultation).docx
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions - R0119 (Recommended for Authority Approval) 16.07.2024
Upload document
Schedule 1 - Interpretations and Definitions - R0119 (Recommended for Authority Approval) 16.07.2024.docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (Recommended for Authority approval) 16.07.2024
Upload document
Registration Services - R0119 (Recommended for Authority approval) 16.07.2024.docx
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (Recommended for Authority approval) (Extract) 16.07.2024.docx
Upload document
Registration Services - R0119 (Recommended for Authority approval) (Extract) 16.07.2024.docx
Archive
Off
Problem Statement
Parties are using annulments when they should use other processes, in particular the objection process. The lack of a clear definition of what an annulment is could be a contributing factor to this.
SME
SME Role
Lead Assurance Analyst
R0119 - Change Proposal Form 17.05.2023
R0119 - Change Proposal Plan V1.0 (Approved)
R0119 - Initial Assessment Report V1.0 (Approved)
R0119 - Preliminary Change Report V1.0 (Published for Consultation) 31.05.2024
R0119 - Consolidated Consultation Responses V1.0 (25.06.2024)
R0119 - Final Change Report V2.0 (Post-Vote) 16.07.2024
R0119 - Authority Decision (10.09.2024)
Company Name
REC Code Manager
Review status
Review required