Changes to allow DNOs to reinstate disconnected MPANs

Date of latest update
Type
Change
ID
R0095
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
The Code Manager have taken R0095 off of hold and published an Information Request for R0095 on 22 October 2026, this is open to responses until 13 November 2026.
Summary
When Meter Point Administration Numbers (MPANs) are erroneously disconnected, they cannot be reinstated. As a result, Consumers suffer billing issues and Registered Suppliers cannot settle against the disconnected MPAN. This change seeks to introduce a mechanism to restore erroneously disconnected MPANs.
Proposer
Leanne Yates
Change Plan

Solution Development

Completed

Start:

17 Feb 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024
Impacted Consumers
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I do not want the erroneous disconnection of my MPAN to affect the continuity of my supply contract and billing arrangements.
  2. As a DNO, I want to be able to reverse erroneous disconnections with no lasting effect so that I don’t need to create a new MPAN to resolve the issue, thereby avoiding DUoS payment collection issues. 2 - As a Supplier, I want to be able to reverse erroneous disconnections with no lasting effect so that I can correctly bill my consumers. 3 - As the CSS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate. 4 - As MPRS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate.
Problem Statement
When MPANs are incorrectly identified and targeted for disconnection, the RMP will be erroneously terminated following receipt of Termination Market Messages by the CSS. This process is irreversible once triggered, meaning that there is no mechanism to restore the MPAN as it was previously. This results in a poor Consumer experience, and settlement misbalancing for Registered Suppliers. Currently, there is no mechanism to mitigate the negative impact on Registered Suppliers/DNO and Consumers.
SME
SME Role
Lead Technical Analyst
R0095 - Change Proposal form downloadable version 17.02.2023
R0095 Change Proposal Plan v1.0 (Approved) - 20.09.23
R0095 Initial Assessment Report v1.0 (Approved) - 20.09.2023
R0095 - Change Proposal Re-Plan (Approved) v1.0-13.12.23
Company Name
-
Review status
Review required

Uplift to CSS Maximum Demand Volumes during MHHS Migration Period

Date of latest update
Type
Change
ID
R0093
Change Category
Change Path
Priority
Urgent
No
Latest Update
This change was implemented as part of the the Extraordinary release on 28 March 2024. * This Change Proposal supports the transition to Market-wide Half Hourly Settlement.
Summary
This Change Proposal seeks to make the necessary updates to the REC, primarily to the Central Switching Service (CSS) Service Definition, to ensure that the Switching Operator is appropriately prepared for the increase in message volumes that will be created during the Market Wide Half-Hourly Settlement (MHHS) programme migration period.
Proposer
Jon Hawkins
Change Plan

Solution Analysis and Development completed

Completed

Start:

08 Feb 2023

Due:

06 Apr 2023

Completion:

04 Apr 2023

Service Provider Preliminary Impact Assessment period started

Completed

Start:

06 Apr 2023

Due:

06 Apr 2023

Completion:

04 Apr 2023

Service Provider impact assessment period completed

Completed

Start:

06 Apr 2023

Due:

23 Oct 2023

Completion:

23 Oct 2023

Preliminary Change Report issued

Completed

Start:

23 Oct 2023

Due:

17 Nov 2023

Completion:

17 Nov 2023

Responsible Committee review

Completed

Start:

17 Nov 2023

Due:

29 Nov 2023

Completion:

29 Nov 2023

Consultation issued

Completed

Start:

29 Nov 2023

Due:

01 Dec 2023

Completion:

01 Dec 2023

Consultation closed

Completed

Start:

01 Dec 2023

Due:

15 Dec 2023

Completion:

15 Dec 2023

Final Change Report issued

Completed

Start:

15 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Responsible Committee decision

Completed

Start:

12 Jan 2024

Due:

24 Jan 2024

Completion:

24 Jan 2024

Appeal Window closure

Completed

Start:

24 Jan 2024

Due:

08 Feb 2024

Completion:

08 Feb 2024
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 3.9.0
Included changes Affected REC Items
R0147 Prepayment Levelisation
  • Schedule 1 - Interpretations and Definitions

Documents

Name Version Last updated Actions
184.95 KB
Version 1.0 - 16 Nov 2026 PDF - 184.95 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As an Electricity Consumer, I want the migration of my MPAN to the new HH Settlement arrangements to be as smooth as possible, so that the service I receive from my Electricity Supplier or it’s appointed agents is not interrupted As an Electricity Consumer, I want my ability to switch to be impacted as little as possible by MHHS migration activities
  2. As the Switching Operator, I want to be prepared for the increased volumes expected during the MHHS Migration Period. As the ERDS Provider, I want the CSS to be able to manage the volume of messages being sent so that I can provide the service I am required to during the MHHS Migration Period
  3. As an Electricity Supplier, I want the MPANs I select to the new HH Settlement arrangements to complete their migration without undue delay, so that the service I provide to Consumers is impacted as little as possible and so that I can meet my migration obligations As a MEM, as part of migration I want my new appointment and my legacy de-appointment to occur within the planned timescales so that the services I provide are impacted as little as possible As a Data Service, as part of migration, I want my new appointment to occur within the planned timescales so that the services I provide can commence in a timely manner As a Data Collector, I want my legacy de-appointment to occur within the planned timescales so that I have a clear understanding and smooth ending to the service I provide
Proposed Solution Document
Document title
R0093 Solution Development Report v2.0 13.11.2023
Upload document
R0093 Solution Development Report v2.0 13.11.2023.pdf
Archive
Off
Document title
R0093 - Legal text for Consultation 30.11.2023
Upload document
R0093 - Legal text for Consultation 30.11.2023.zip
Archive
Off
Document title
R0093 - Legal text for PCR 17.11.2023
Upload document
R0093 - Legal text for PCR 17.11.2023.zip
Archive
Off
Problem Statement
As part of the MHHS programme, it is necessary to migrate approximately 31 million MPANs from the existing settlement arrangements to those under the MHHS Target Operating Model. This will create a significantly increased volume of messages, whether for Switches or changes to Supplier Agents, for the CSS during the MHHS Migration Period. The CSS Service Definition does not currently require the Switching Operator to be capable of processing these additional volumes.
SME
SME Role
Lead Technical Analyst
Uplift to CSS NFRs for MHHS Migration Period - Interpretations.docx
Uplift to CSS NFRs for MHHS Migration Period - CSS Definition .docx
R0093 Change Proposal Form
R0093 - Change Proposal Plan v3.0 (Approved) 15.09.2023
R0093 - Initial Assessment Report v1.0 (Approved) 04.04.2023
R0093 - Preliminary Change Report v2.0 (Approved) 30.11.2023
R0093 Consolidated Consultation Responses v1.0 PUBLIC
R0093 - Final Change Report v2.0 (Post-Vote) 24.01.2024
R0093 - Authority Decision to Reject Appeal 21.03.2024
R0093 - Final Change Report v3.0 (Revised implementation date) 25.03.2024
Company Name
RECCo
Review status
Review required

DCC Service Level Agreements for the Switching Incentive Regime

Date of latest update
Type
Change
ID
R0092
Change Category
Priority
Urgent
No
Latest Update
22/07/2024 - The Authority rejected R0092 and approved R0092A for implementation 08/11/2024. R0092A Change Proposal page link: https://recportal.co.uk/group/guest/-/dcc-service-level-agreements-for-the-switching-incentive-regime-1
Summary
Requirements for the Central Switching Service (CSS) were identified during the Design, Build and Test Phase of the Ofgem-led Switching Programme as a basis for the procurement of Switching systems. These requirements were later baselined in the REC Service Definitions as Service Level Agreements (SLAs). Following the successful go-live of the CSS, these SLAs merit a review, in order to ensure that they are realistic, given the physical systems design and the actual behaviours of users, compared to the assumptions that were made in the early design phase of the Switching Programme. This Change Proposal has been raised as the vehicle to complete the review and take forward any identified changes.
Proposer
Cordelia Grey
Change Plan

Solution Development

Completed

Start:

01 Feb 2023

Due:

05 Oct 2023

Completion:

05 Oct 2023

Service Provider Impact Assessment

Completed

Start:

05 Oct 2023

Due:

20 Nov 2023

Completion:

13 Nov 2023

Party Impact Assessment

Completed

Start:

20 Nov 2023

Due:

03 Jan 2024

Completion:

10 Nov 2023

Preliminary Change Report issued

Completed

Start:

03 Jan 2024

Due:

20 Feb 2024

Completion:

16 Feb 2024

Preliminary Change Report - Committee Review

Completed

Start:

20 Feb 2024

Due:

27 Feb 2024

Completion:

27 Feb 2024

Consultation close

Completed

Start:

01 Mar 2024

Due:

04 Apr 2024

Completion:

04 Apr 2024

Final Change Report issued

Completed

Start:

04 Apr 2024

Due:

23 Apr 2024

Completion:

19 Apr 2024

Responsible Committee Decision

Completed

Start:

23 Apr 2024

Due:

30 Apr 2024

Completion:

30 Apr 2024

Sent to Authority for Determination

Not Started

Start:

30 Apr 2024

Due:

01 May 2024

Completion:

Consultation published

Completed

Start:

27 Feb 2024

Due:

01 Mar 2024

Completion:

01 Mar 2024
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want the CRS Provider to provide an effective service so that my Switch is not delayed.
  2. As the REC Code Manager, I want to ensure the CRS Provider has appropriate SLAs set, which incentivises the effective functioning of the Switching Service.
  3. As the CRS Provider, I want to ensure that the appropriate SLAs are in place to incentivise the effective functioning of the Switching Service and if these SLAs are not met by the CRS Provider, the commercial impact is proportionate to the detriment experienced by CSS Users and Consumers.
Proposed Solution Document
Document title
R0092 DCC Red line Proposal (26.01.2024)
Upload document
R0092 DCC Red line Proposal.pptx
Archive
Off
Document title
R0092_Legal Text at FCR (19.04.2024)
Upload document
R0092_Legal Text at FCR.zip
Archive
Off
Problem Statement
Following the introduction of Performance Charges, on 01 April 2023, charges will apply based on the CRS Provider's performance against the defined SLAs. The SLAs were developed based on assumptions made in the early phases of the Switching Programme. The DCC has proposed that these are reviewed, to ensure they are fit for purpose and any Performance Charges applied are proportionate to CSS User detriment and Consumer impact.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Switching Performance Measures - DCC's proposed changes.pdf
DCC Service Level Agreements for the Switching Incentive Regime - Change Proposal Form
Switching Performance Regime PMEL Candidates v2.0
R0092 - Change Proposal Plan (Approved) 06.06.2023
R0092 Extension to Change Plan 1.0 (Approved) 15.08.2023
R0092 - Initial Assessment Report (Approved) 06.06.2023
R0092 - Rebaselined Change Plan (Approved 12.01.2024)
R0092_Consolidated Impact Assessment Responses_NON-CONFIDENTIAL (16.02.2024)
R0092 and R0092A - Preliminary Change Report v1.1 (Approved) 28.02.2024
R0092 and R0092A - Consolidated Consultation Responses (19.04.2024)
R0092 and R0092A - Final Change Report v2.0 (Post-Vote) 30.04.2024
R0092A_Authority_Decision (22.07.2024)
Company Name
DCC
Review status
Review required

Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Date of latest update
Type
Change
ID
R0090
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Change Proposal seeks to address inconsistencies in the REC Data Specification to reflect pre-REC Data Transfer Catalogue (DTC) standards. This will also address consequential updates applied to the R0011 legal text.
Proposer
Rosalind Timperley
Change Plan

Solution Development

Completed

Start:

23 Jan 2023

Due:

23 Feb 2023

Completion:

23 Feb 2023

Party Impact Assessment Issued

Completed

Start:

23 Feb 2023

Due:

24 Feb 2023

Completion:

24 Feb 2023

Preliminary Change Report Issued

Completed

Start:

24 Feb 2023

Due:

27 Mar 2023

Completion:

24 Mar 2023

Consultation Issued

Completed

Start:

27 Mar 2023

Due:

27 Mar 2023

Completion:

24 Mar 2023

Final Change Report Issued

Completed

Start:

27 Mar 2023

Due:

19 Apr 2023

Completion:

19 Apr 2023

Responsible Committee Decision

Not Started

Start:

19 Apr 2023

Due:

26 Apr 2023

Completion:

Status
Implementation Date
Status Superseded
EMAR Version 3.5.0_Superseded
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0102 Revision of the approved solution for R0032
  • Data Item Catalogue
  • Market Message Catalogue
R0114 Housekeeping amendments
  • REC Main Body
  • Schedule 1 - Interpretations and Definitions
  • Schedule 2 - REC Transition Schedule
  • Data Access Matrix (Electricity)
  • Data Access Matrix (Gas)
R0015 Remote communication obligations for electricity Advanced Meters
  • Schedule 14 - Metering Operations
R0010 New Meter Types for Auxiliary Proportional Controllers (APCs)
  • Data Item Catalogue
  • Market Message Catalogue
R0011 Reporting of Additional EMR Backing Data to Suppliers
  • Data Item Catalogue
  • Market Message Catalogue
R0021 Allowing REC accredited MEMs to de-energise and re-energise supply points independent of the Supplier
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
R0030 Erroneous Transfer Cancellations
  • Schedule 1 - Interpretations and Definitions
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Data Item Catalogue
  • Market Message Catalogue
R0066 Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)
R0032 New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)
  • Data Item Catalogue
  • Market Message Catalogue
R0090 Alignment of Data Specification with Pre-REC Rules and Consequential Impacts on R0011 Legal Text

Documents

Name Version Last updated Actions
1.0 02 Nov 2026
4.64 MB
Version 1.0 - 02 Nov 2026 PPTX - 4.64 MB
1.0 02 Nov 2026
199.58 KB
Version 1.0 - 02 Nov 2026 PDF - 199.58 KB
1.0 02 Nov 2026
124.69 KB
Version 1.0 - 02 Nov 2026 PDF - 124.69 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Market Participant I want to have clarity on the format of Data Items within the Data Specification, so that my internal systems can be correctly configured to send and receive Data Items within Market Messages.
Proposed Solution Document
Document title
Final Legal Text.zip
Upload document
Final Legal Text.zip
Archive
Off
Problem Statement
The R0011 legal text contains inconsistencies with other Data Items that were last amended before the REC Data Specification came into effect. Such inconsistencies have potential to cause confusion to Parties implementing the R0011 legal text.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
Summary of R0011 Impacted Data Specification
R0090 Change Proposal Plan v1.0 (Approved) 21.02.2023
R0090 Initial Assessment Report v1.0 (Approved) 21.02.2023
R0090 Preliminary Change Report v1.0 (Issued for Consultation) 24.03.2023
Summary of amendments to R0011 Legal Text 19.04.2023
R0090 Final Change Report v2.0 (Post-Vote) 26.04.2023
Company Name
REC Code Manager
Review status
Review required

MAP GES data access

Date of latest update
Type
Change
ID
R0087
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/01/25 - Change Proposal withdrawn at proposers request.
Summary
As a MAP I want to be able to track my daily position of my portfolio. As a MAP I want to be able to track changes in my portfolio over time. As a MAP I want to understand who are using my assets and identify where assets are not being used
Proposer
David Newman
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
holly.law
Solution Development
Stages Selection
Company Name
Correla
Review status
Review required

Housekeeping changes to the approved legal text for R0047

Date of latest update
Type
Change
ID
R0084
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
Change Proposal R0047 - Metering Code of Practice Consolidation Review, has been approved for implementation on 01 April 2023. Since approval of the Change Proposal the Code Manager has identified a number of omissions, clarifications, typographical errors and changes needed to the approved legal text. This CP has been raised to make the changes to the legal text and ensure accurate text is introduced into the REC.
Proposer
Ann Perry
Change Plan

Preliminary Change Report published and issued for Consultation

Completed

Start:

16 Dec 2022

Due:

24 Feb 2023

Completion:

24 Feb 2023

Consultation ends

Completed

Start:

24 Feb 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Final Change Report published

Completed

Start:

10 Mar 2023

Due:

21 Mar 2023

Completion:

21 Mar 2023

Responsible Committee decision (Ex-Committee)

Completed

Start:

21 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Appeal window closure

In Progress

Start:

24 Mar 2023

Due:

07 Apr 2023

Completion:

Impacted Consumers
Status
Implementation Date
Status Superseded
EMAR Version 3.4.0_Superseded
Included changes Affected REC Items
R0047 Metering Code of Practice Consolidation Review
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Smart Meter Installation Schedule (since removed)
  • Gas Metering Code of Practice (since removed)
R0025 Service Provider Performance Charges (DCC)
  • Schedule 6 - Performance Assurance
R0073 Introduction of a Housekeeping Change Proposal Process
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
R0084 Housekeeping changes to the approved legal text for R0047
  • MOCoPA (since removed)
  • ASPCoP (since removed)
  • REC Change Panel - Terms of Reference
  • Schedule 17 - Secure Data Exchange
R0091 Clarifications to the Theft Detection Incentive Scheme
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction

Documents

Name Version Last updated Actions
1.0 16 Nov 2026
6.08 MB
Version 1.0 - 02 Nov 2026 PPTX - 6.08 MB
1.0 02 Nov 2026
163.13 KB
Version 1.0 - 02 Nov 2026 PDF - 163.13 KB
1.0 02 Nov 2026
140.07 KB
Version 1.0 - 02 Nov 2026 PDF - 140.07 KB
1.0 02 Nov 2026
128.82 KB
Version 1.0 - 02 Nov 2026 PDF - 128.82 KB
1.0 02 Nov 2026
62.46 KB
Version 1.0 - 02 Nov 2026 XLSX - 62.46 KB
1.0 02 Nov 2026
113.76 KB
Version 1.0 - 02 Nov 2026 PDF - 113.76 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
  2. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
  3. As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
  4. As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Proposed Solution Document
Document title
R0084 Legal text changes - CoMCoP - (For Final Change Report) 21.03.2023
Upload document
R0084 - CoMCoP v2.1 (redlined for Final Change Report) 21.03.2023 (3).docx
Archive
Off
Document title
R0084 Legal text changes - CoMCoP - (For consultation) 24.02.2023
Upload document
R0084 - CoMCoP v2.1 (redined for Consultation) 24.02.2023.docx
Archive
Off
Problem Statement
To enable REC Parties to successfully meet the obligations of the CoMCoP, when it is implemented via Change Proposal R0047 on 01 April 2023, the CoMCoP needs to accurately reflect the intention of R0047 and current processes.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0084 - CP Form (Downloadable version)
R0084 - Legal text changes identified pre IAR/CPP - uploaded 12.02.23
R0084 - Change Proposal Plan v1.0 (Approved) 23.02.2023
R0084 - Initial Assessment Report v1.0 (Approved) 23.02.2023
R0084 - Preliminary Change Report v1.0 (Published for Consultation) 24.02.2023
R0084 - Consolidated consultation responses v1.0 21.03.2023
R0084 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Changes to Supply Number Format for MHHS

Date of latest update
Type
Change
ID
R0083
Change Category
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The Electricity Supply License requires Suppliers to provide the Supply Number to each Consumer on every bill, or at least once per year where no bill has been sent. The Supply Number format is prescribed by the REC and is detailed in the Energy Market Data Specification. The MHHS design is changing the data associated with each individual metering point, including those data items currently displayed within the Supply Number top line. To support Electricity Supplier implementation of the MHHS arrangements, a clearly defined solution is required setting out a revised approach to populating the Supply Number on Consumer’s bills and statements.
Proposer
Jon Hawkins
Change Plan

Solution development completed

Completed

Start:

05 Dec 2022

Due:

31 Mar 2023

Completion:

31 Mar 2023

Party Impact Assessment issued

Completed

Start:

31 Mar 2023

Due:

06 Apr 2023

Completion:

06 Apr 2023

Party Impact Assessment closed

Completed

Start:

06 Apr 2023

Due:

02 May 2023

Completion:

02 May 2023

Preliminary Change Report issued

Completed

Start:

02 May 2023

Due:

25 May 2023

Completion:

26 May 2023

REC Change Panel review of PCR

Completed

Start:

25 May 2023

Due:

06 Jun 2023

Completion:

06 Jun 2023

Consultation issued

Completed

Start:

06 Jun 2023

Due:

09 Jun 2023

Completion:

09 Jun 2023

Consultation closed

Completed

Start:

09 Jun 2023

Due:

30 Jun 2023

Completion:

30 Jun 2023

Final Change Report issued

Completed

Start:

30 Jun 2023

Due:

21 Jul 2023

Completion:

20 Jul 2023

REC Change Panel decision

Completed

Start:

21 Jul 2023

Due:

01 Aug 2023

Completion:

01 Aug 2023

Authority Determination requested

Completed

Start:

01 Aug 2023

Due:

03 Aug 2023

Completion:

02 Aug 2023
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Superseded
EMAR Version 4.0.0_Superseded
Included changes Affected REC Items
R0044 MHHS Programme Changes required to Central Switching Service
  • Schedule 1 - Interpretations and Definitions
  • Schedule 27 - RMP Lifecycle
R0173 Improvements to the Theft Detection Incentive Scheme (TDIS)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 7 - Energy Theft Reduction
R0209 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 12 - Data Access
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0222 ESME ID Update Rejections
R0223 Reconciliation of Unallocatable Transactions Review
  • Schedule 11 - Prepayment Arrangements
R0241 MHHS Incremental Changes for go live
  • Schedule 15 - Metering Accreditation
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 19 - Market Exit and Supplier of Last Resort
  • Schedule 27 - RMP Lifecycle
  • Schedule 28 - Related Metering Points
  • Schedule 29 - Address Management
  • Schedule 9 - Qualification and Maintenance
  • Schedule 24 - Switching Data Management
  • Schedule 23 - Registration Services
  • Schedule 30 - Resolution of Consumer Facing Switching and Billing Issues
  • Standards Definition Document
  • Data Item Catalogue
  • Market Message Catalogue
R0259 Update to R0173 Implementation Date
R0264 Data Specification Housekeeping
R0083 Changes to Supply Number Format for MHHS
R0097 Consequential Change for CSS Smart Meter Data Retriever Appointments
  • Data Item Catalogue
  • Market Message Catalogue
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want to be able to provide my prospective Energy Supplier with the necessary information for them to provide a suitable tariff. As a Non-Domestic Consumer, I want to have the necessary information that will allow me to access tariff information, specific to my business, to help me manage my energy. As an electricity Consumer, I want to have access to the data that will help me appoint my own Metering Equipment Manager (MEM) where permitted.
  2. As a Supplier, I want to know how to populate and format the Supply Number, so that I can meet my obligations to include it in Consumer bills or statements. As a Third Party Intermediary (TPI), I want Consumers to be able to provide me with the right information to provide appropriate quotes.
  3. As an independent Distribution Network Operator, I want to be able to identify and use the DUoS Tariff Id so that I can provide transparency on charging that is being applied to my customers. As the Electricity Enquiry Service (EES) Provider, I want to know how to populate the Supply Number so that I can make it available on the EES
Proposed Solution Document
Document title
Approved Solution for R0083 v1.0 26.05.2023
Upload document
Approved Solution for R0083 v1.0 26.05.2023.pdf
Archive
Off
Document title
Approved Legal Text R0083 Supply Number Format redlining v2.0
Upload document
Approved Legal Text R0083 Supply Number Format redlining v2.0.pdf
Archive
Off
Document title
R0083 - Guidance for Supply Number population v2.0
Upload document
R0083- Changes to Supply Number Format for MHHS Guidance V2.0.pdf
Archive
Off
Document title
All Solution documents and legal text 06.06.2023 (For PCR)
Upload document
All Solution documents and legal text for PCR 06.06.2023.zip
Archive
Off
Document title
Proposed Solution for R0083 v1.0 26.05.2023 (For PCR)
Upload document
Proposed Solution for R0083 v1.0 26.05.2023.pdf
Archive
Off
Document title
Legal text - Option 1 (R0083) Supply Number Format redlining v2.0 26.05.2023 (For PCR)
Upload document
Legal text - Option 1 (R0083) Supply Number Format redlining v2.0.pdf
Archive
Off
Document title
Proposed Solution for R0083A v2.0 06.06.2023 (For PCR)
Upload document
Proposed Solution for R0083A v2.0 06.06.2023.pdf
Archive
Off
Document title
Legal text - Option 3 (R0083A) Supply Number Format redlining v1.0 26.05.2023 (For PCR)
Upload document
Legal text - Option 3 (R0083A) Supply Number Format redlining v1.0.pdf
Archive
Off
Document title
R0083 and R0083A Solution Options Draft Legal Text (IA) 06.04.2023
Upload document
R0083 and R0083A Solution Options Draft Legal Text IA 06.04.2023.zip
Archive
Off
Document title
R0083 and 83A - Solution Options v1.0 (Impact Assessment) 06.04.2023
Upload document
R0083 and 83A - Solution Options v1.0 Impact Assessment 06.04.2023.pdf
Archive
Off
Problem Statement
The Market-wide Half Hourly Settlement design is impacting the Data Items that are used in the top line of the Supply Number, which Energy Suppliers are obliged to provide to Consumers at least once a year under their Licence. A revised definition of the Supply Number format is required so that Electricity Suppliers have a clear understanding of the approach to populating the Supply Number for metering points that have migrated to the new MHHS arrangements.
SME
SME Role
Lead Technical Analyst
MHHS Supply Number Consultation Response Summary Anon 08.11.2022
MHHS Supply Number Consultation 14.10.22
R0083 - Change Proposal Form
R0083 and R0083A Initial Assessment Report v2.0 (Approved) 22.02.2023
R0083 and 83A Change Proposal Plan v2.0 (Approved) 22.02.2023
R0083 and 83A Consolidated Party Impact Assessment Responses v2.0 PUBLIC 07.06.2023
R0083 and R0083A Preliminary Change Report v1.0 (Pre-Approval) 26.05.2023
R0083 and R0083A Preliminary Change Report v2.0 (Approved) 07.06.2023
R0083 and R0083A Consolidated Consultation Responses v1.0 PUBLIC 20.07.2023
R0083 and R0083A Final Change Report v2.0 (Post-Vote) 02.08.2023
Decision to approve REC Change Proposal R0083 Changes to Supply Number Format
Company Name
RECCo
Review status
Review required

Addition of Previous MEM to the EES API

Date of latest update
Type
Change
ID
R0079
Change Category
Change Path
Priority
Urgent
No
Latest Update
14/05/2024 - As this Change Proposal is affected by the MHHS Code Freeze, the Proposer has withdrawn this CP and may reraise it post M10.
Summary
This change aims to add the previously appointed MEM as a data item viewable in the EES API
Proposer
Adrian Salter
Status
Implementation Status
Date Raised
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Addition of Previous MEM to the EES API.docx
Company Name
EDF
Review status
Review required

Release of Community View Data Items to MEMs in GES

Date of latest update
Type
Change
ID
R0074
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/06/2023 The system changes associated with this change were successfully implemented as planned on Friday 02 June 2023.
Summary
This Change Proposal will enable MEMs to ‘Community View’ access to a limited set of data in the GES, for sites where they are not the appointed MEM.
Proposer
David Addison
Change Plan

Service Provider Impact Assessment

Completed

Start:

05 Oct 2022

Due:

21 Nov 2022

Completion:

16 Dec 2022

Party Impact Assessment

Completed

Start:

21 Nov 2022

Due:

21 Nov 2022

Completion:

18 Dec 2022

Preliminary Change Report Issued

Completed

Start:

21 Nov 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation closure

Completed

Start:

13 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Responsible Committee Decision

Completed

Start:

27 Jan 2023

Due:

22 Feb 2023

Completion:

22 Feb 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.3.0_Superseded

Documents

Name Version Last updated Actions
203.39 KB
Version 1.0 - 02 Nov 2026 PDF - 203.39 KB
1.0 02 Nov 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
  1. As a Consumer, I want a Metering Equipment Manager to be able to access and validate my site details, ahead of their arrival on site for planned or emergency metering work, so that I do not experience any delays in work being completed and can have continuity of supply.
  2. As a MEM, I want access to sufficient data for sites where I am not the Appointed MEM, to enable me to complete pre-metering works validations of the site details, so I can undertake these works correctly and safely.
  3. As a MEM, I want access to data for sites where I am not the Appointed MEM, so I can confirm de-appointments and answer invoice validation queries.
Proposed Solution Document
Document title
GES Data Access Matrix for R0074
Upload document
R0074 - REC V3.0 GES Data Access Matrix v1.0.xlsx
Archive
Off
Problem Statement
At go-live for REC v3.0 the ‘Community View’ access to data in the GES, previously available via the DES under the UNC, was inadvertently removed. MEMs used this data in a number of processes, including validation of site details prior to metering works – particularly for emergency work, and the resolution of invoice queries from Suppliers. Without access to this Enquiry Service Data, MEMs are unable to complete activities that are central to their operations, including checking site details prior to attending emergency metering works. This has the potential to have a direct negative impact on the experience of metering works for Consumers, and in in some cases, continuity of supply and safety could be at risk.
Change Proposal Form
R0074 - Change Proposal Plan v1.0
R0074 - Initial Assessment Report v1.0 (Approved)
R0074 - Consultation Responses_NON CONFIDENTIAL
R0074 - Preliminary Change Report v1.0 (Published for Consultation)
R0074 - Final Change Report v2.0 (Post-Vote) 22.02.2023
Company Name
Xoserve
Review status
Review required

Provision of Enduring Test Environments

Date of latest update
Type
Change
ID
R0070
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Currently the REC does not require the Central Switching Service (CSS) and Switching Operator (SO) to provide the enduring test environments and test data for use by REC Parties when making necessary system changes for REC Change Proposals or internal system updates. This Change Proposal has been raised to introduce these obligations in to the REC.
Proposer
Beth Brown
Change Plan

Solution Analysis and Development

Completed

Start:

09 Sep 2022

Due:

06 Jun 2023

Completion:

06 Jun 2023

Service Provider Impact Assessment Period

Completed

Start:

06 Jun 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Service Provider Impact Assessment

Completed

Start:

24 Nov 2023

Due:

03 Jan 2024

Completion:

03 Jan 2024

Party Impact Assessment Issued

Completed

Start:

06 Oct 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Issued

Completed

Start:

03 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Responsible Committee Review

Completed

Start:

16 Jan 2024

Due:

23 Jan 2024

Completion:

23 Jan 2024

Consultation Issued

Completed

Start:

23 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Final Change Report Issued

Completed

Start:

26 Jan 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Responsible Committee Decision

Completed

Start:

23 Feb 2024

Due:

05 Mar 2024

Completion:

05 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Superseded
EMAR Version 3.11.0_Superseded
Included changes Affected REC Items
R0043 Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms
  • MOCoPA (since removed)
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 12 - Data Access
  • Data Access Matrix (Electricity)
  • Data Item Catalogue
  • Market Message Catalogue
R0158 Amendment to the ‘Supplier Registration Report (MAP)’ report methodology
R0160 Electricity Supply to Hydrogen Electrolysers
  • Schedule 1 - Interpretations and Definitions
R0064 Creating a Meter Operator Agent and MOCoP Installer
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 9 - Qualification and Maintenance
R0070 Provision of Enduring Test Environments
  • Schedule 1 - Interpretations and Definitions
  • Schedule 5 - Change Management
  • Schedule 26 - Switching Service Management
  • Schedule 25 - Central Switching Service

Documents

Name Version Last updated Actions
159.49 KB
Version 1.0 - 16 Nov 2026 PDF - 159.49 KB
1.0 16 Nov 2026
1.0 02 Nov 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Solution Development
Proposed solution summary
  1. As a CSS User I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues prior to go-live.
  2. As the SO, I want clarity on the obligations placed on me regarding the provision and maintenance of CSS Test Environments and data, so that I can meet my obligations and provide CSS Users and Service Providers with access to appropriate Test Environments.
  3. As a Switching Data Service Provider (SDSP), I want clarity on the obligations placed on me regarding the provision and maintenance of Test Environments and data, so that I can meet my obligations to test CSS changes. As a Switching Data Service Provider (SDSP), I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues and address prior to go-live.
Proposed Solution Document
Document title
R0070 legal text v1.0 - Published with Impact Assessment
Upload document
R0070 legal text v1.0 - Published with Impact Assessment.docx
Archive
Off
Document title
R0070 Legal Text v2.0 - Published with Preliminary Change Report
Upload document
R0070 legal text v2.0.pdf
Archive
Off
Document title
R0070 - Legal Text v3.0 - Approved for Implementation
Upload document
R0070 legal text v3.0.pdf
Archive
Off
Document title
REC Category 3 - Environment Management Plan
Upload document
REC Cat 3 Environment Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Document title
REC Category 3 Test Data Management Plan
Upload document
REC Cat 3 Test Data Management Plan v0.6 - Published with Impact Assessment.docx
Archive
Off
Problem Statement
For specific types of changes, industry system testing will be required to ensure the end-to-end Switching processes will work as expected following implementation. If Test Environments and Test Data are not available, CSS Users will not be able to complete testing to confirm their systems will operate correctly in the live environment. The REC currently doesn’t define specific obligations on Service Providers regarding enduring test systems and Test Data for Switching processes. The lack of specific obligations may impact the availability of appropriate Test Environments. This could impact the progression of improvements to Switching processes that require a technical change.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0070 Initial Assessment Report v1.0 (Approved)
R0070 - Preliminary Change Report (Approved 23.01.2024)
R0070 - Change Proposal Plan v2.0 (Approved)
R0070 - Change Proposal Form
R0070 - Consolidated Impact Assessment Responses
R0070 - Consolidated Consultation Responses
R0070 - Final Change Report V2.0 (Post-Vote) 05.03.2024
Company Name
-
Review status
Review required