Evolution of the CRS Performance Charge
Date of latest update
Type
Change
ID
R0210
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
R0025 established a new performance charge for DCC, which linked its performance against its Service Definition with financial incentives. During the R0025 PAB members noted the need to further develop the methodology, including reviewing it periodically. The RPA has worked with the PAB to develop proposals to enhance the performance charge.
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
28 February 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0168 | Clarify & Strengthen CRS Providers Requirements |
|
| R0208 | Adding the DIP Rules to the Cross Code Steering Group Terms of Reference | |
| R0210 | Evolution of the CRS Performance Charge | |
| R0239 | Housekeeping February 2025 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Proposed Solution - Draft Schedule 6 - Performance Assurance
Upload document
R0210 Solution - Draft Schedule 6 V2.4 - 24.09.24.docx
Archive
Off
Document title
R0210 - Legal text for consultation 17.10.24
Upload document
R0210 - Legal text for consultation (1).pdf
Archive
Off
Document title
R0210 - Legal Text - Post-Consultation 18.11.24
Upload document
R0210 Legal Text - 07.11 Amendments Post DCC.pdf
Archive
Off
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
RECPAB_24_0625_05 - Evolution of CRS Performance Charge.docx
CP form
R0210 Change Report V1.0 01.10.24
R0210 Consolidated Consultation Responses
R0210 Change Report (for Consultation)
R0210 Change Report (Pre-Vote) V1.0 18.11.24
R0210 Change Report (Post-Vote) V1.0 26.11.24
Company Name
REC Code Manager
Review status
Review required
Adding the DIP Rules to the Cross Code Steering Group Terms of Reference
Date of latest update
Type
Change
ID
R0208
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
The Data Integration Platform (DIP) will take on a key role within the electricity industry so the DIP Manager, as the Code Manager equivalent organisation responsible for the DIP and associated DIP Rules, needs to be recognised as a Cross Code Steering Group (CCSG) member.
Change Plan
Proposal Plan approved
Completed
Start:
29 Aug 2024Due:
01 Oct 2024Completion:
01 Oct 2024Consultation published
Completed
Start:
01 Oct 2024Due:
04 Oct 2024Completion:
01 Oct 2024Change Report - Final Recommendation
Completed
Start:
04 Oct 2024Due:
21 Nov 2024Completion:
22 Nov 2024Status
Implementation Date
28 February 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0168 | Clarify & Strengthen CRS Providers Requirements |
|
| R0208 | Adding the DIP Rules to the Cross Code Steering Group Terms of Reference | |
| R0210 | Evolution of the CRS Performance Charge | |
| R0239 | Housekeeping February 2025 |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Draft CCSG - Terms of Reference
Upload document
Draft CCSG - Terms of Reference v1.1.pdf
Archive
Off
Problem Statement
The current CCSG Terms of Reference (ToR) do not recognise the role of the DIP Manager introduced as part of the MHHS Programme.
Stages Selection
Change Proposal Form
R0208 - Change Report 1.0 (Consultation) 01.10.2024
R0208 Consolidated Consultation Responses
R0208 - Change Report 1.0 (Post Vote)
Company Name
Gemserv
Review status
Review required
Cross code change to align with BSC CP1598
Date of latest update
Type
Change
ID
R0206
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This Change Proposal has been raised to align with BSC CP1598, which states that six Scenario Variants of Market Messages specified within the early drafting of P375 were not progressed to the final solution of P375 and REC CP R0008.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
R0206 Solution Document v1.0
Upload document
R0206 Solution Document v1.0 (1).pdf
Archive
Off
Problem Statement
As these Scenario Variants are not captured in the Data Specification, the relevant Market Participants won’t be able to use the Data Transfer Network (DTN) to exchange the relevant data, which would result in them having to use a less secure mechanism to send and receive data. This means the original intent of Elexon Modification P375 has yet to be achieved as not all Market Message changes have been implemented.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0206 - Change Proposal Form
CP1598-Proposal-Form-A-Amending-the-EMDS-to-add-missing-Scenario-Variants-for-P375-v1.0.pdf
CP1598-Attachment B-EMDS changes_v1.0 (1).docx
CP1598_CPC-CP-Consultation-Responses-v1.0.pdf
CP1598 CP Consultation v1.0.pdf
R0206 Change Report (Proposal Plan) V1.0
R0206 Change Report (For Consultation) V1.0
R0206 Consolidated Consultation Responses
R0206 Change Report (Final Recommendation - Approved) V2.0 15.10.2024
Company Name
REC Code Manager
Review status
Review required
Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches
Date of latest update
Type
Change
ID
R0205
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
As part of the MHHS REC code change activity, a change has been made to REC Schedule 30 to remove the half hourly meter exemption from the Erroneous Transfer provisions. Whilst this is necessary from an MHHS perspective with all sites becoming half hourly settled, the application of ET obligations in the Advanced Meter segment creates some additional challenges. To be able to accurately bill an Advanced Meter site, following repatriation of that customer to their correct supplier after an ET has been raised / agreed, the supplier needs to have access to half hourly consumption data for the ET period when they were not the registered supplier. With ETs potentially taking up to 2 years to be identified and resolved, the only place that the supplier could reliably source that HH consumption data would be from the other (losing) supplier.
Change Plan
Change Proposal Plan to REC Change Panel
Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches > Change Plan
Start:
22 Aug 2024Due:
01 Apr 2025Completion:
01 Apr 2025Discussion at REC Change Issues Group
Not Started
Start:
01 Apr 2025Due:
05 Jun 2025Completion:
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- An approval of this Issue/Change Proposal would see an obligation placed upon the Losing Supplier, following a successful Erroneous Switch repatriation, to provide the Gaining Supplier with the Half-Hourly consumption data for the period in which they were erroneously supplying the meter.
- Half-Hourly consumption data would be providing to the Gaining Supplier, from the Losing Supplier, via SDEP using an Excel template within 5 Working Days of the Erroneous Switch repatriation switch date. The Gaining Supplier would be required to provide 48 Half-Hourly consumption intervals for each that the the Consumer was supplied by the erroneously Gaining Supplier.
Proposed Solution Document
Document title
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025
Upload document
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025.docx
Archive
Off
Document title
I0205 - Draft Reporting Templates
Upload document
I0205 - Draft Reporting Templates.xlsx
Archive
Off
Document title
I0205 - Impact Assessment
Archive
Off
Document title
R0205 - Schedule 30 Legal Drafting 15.08.2025
Upload document
R0205 - Schedule 30 Legal Drafting (For Consultation) 15.08.2025.docx
Archive
Off
Document title
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template
Upload document
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template.xlsx
Archive
Off
Problem Statement
In the absence of having Half-Hourly consumption data for Erroneously Switched Consumers, Energy Suppliers are currently required to estimate consumption for billing purposes that can lead to inaccurate billing.
Stages Selection
I01205 - Change Proposal Form
I0205 - Change Report (Proposal Plan) V1.0 Approved (01.04.2025)
I0205 Consolidated Impact Assessment Responses V1.0 (Non-Confidential) 30.07.2025
R0205 - Consolidated Consultation Responses (09.09.2025)
R0205 Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
Company Name
Centrica
Review status
Review required
CSS Retry Strategy
Date of latest update
Type
Change
ID
R0203
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
There is currently a mismatch within the Central Switching Service (CSS) system functionality and the legal text within the REC Switching Data Management Schedule. Within the schedule the retry strategy is defined as “retry sending the Market Message at intervals of 10 seconds, 20 seconds and 30 seconds from each attempt to send the Market Message. If these retry Market Messages also fail, then the Market Message shall be retried at intervals of one hour up to a maximum of 12 hours; after which delivery of the Market Message shall be abandoned and a Switching Incident raised in accordance with the Switching Service Management Schedule”. However, in response to an incident in 2022, the CSS Provider updated the retry strategy. This change seeks to amend the legal text in Section 2.4 of the Switching Data Management Schedule to reflect the retry strategy which is currently in operation in the CSS system.
Change Plan
Change Proposal Plan
Completed
Start:
15 Aug 2024Due:
17 Sep 2024Completion:
17 Sep 2024Consultation to be issued
Completed
Start:
17 Sep 2024Due:
20 Sep 2024Completion:
20 Sep 2024Consultation to close
Completed
Start:
20 Sep 2024Due:
04 Oct 2024Completion:
04 Oct 2024Final Recommendation Vote
Completed
Start:
04 Oct 2024Due:
15 Oct 2024Completion:
15 Oct 2024Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- The Switching Data Management Schedule Section 2.4 should be updated to reflect the current retry strategy: 1. a short interval retry sequence of 3 attempts at 20 second intervals 2. a long interval retry sequence of 12 attempts at 1 hour intervals. The CSS Provider has confirmed that there is now a process in place that would prevent any future updates to the retry strategy without a change request being raised in the first instance.
Proposed Solution Document
Document title
CSS Retry Strategy Redlining
Upload document
Switching Data Management v1.2 CSS Retry Strategy Redlining.doc
Archive
Off
Problem Statement
The CSS system is currently out of sync with the REC legal drafting for the retry strategy.
Stages Selection
Switching Data Management v1.2 CSS Retry Strategy Redlining.doc
R0203 - Change Proposal Form
R0203 - Change Report (Consultation) 17.09.2024
R0203 - Non-Confidential Consolidated Consultation Responses V1.0 (03.10.2024)
R0203 - Change Report (Final Recommendation - Approved) 15.10.2024
Company Name
REC Technical Services
Review status
Review required
Performance Assurance Report Catalogue Updates (MHHS)
Date of latest update
Type
Change
ID
R0202
Change Category
Change Path
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
This change seeks to update the Performance Assurance Reporting Catalogue (PARC) to capture data items required to continue to appropriately monitor Retail Risks under Market-wide Half Hourly Settlement (MHHS) industry arrangements. Some housekeeping changes, for the PARC, have also been included in this change.
Change Plan
Proposal Plan approved
Completed
Start:
08 Aug 2024Due:
03 Sep 2024Completion:
03 Sep 2024Party impact assessment completed
Completed
Start:
03 Sep 2024Due:
04 Oct 2024Completion:
04 Oct 2024Change Report approved for Consultation
Completed
Start:
04 Oct 2024Due:
25 Mar 2025Completion:
25 Mar 2025Consultation completed
Completed
Start:
25 Mar 2025Due:
15 Apr 2025Completion:
15 Apr 2025RECPAB Voting
In Progress
Start:
15 Apr 2025Due:
29 Apr 2025Completion:
Impacted REC Parties and Market Participants
Status
Implementation Date
28 June 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0155 | Change of Occupier: Evidentiary Standards and Timescales |
|
| R0193 | Add Enumeration Values to the DI51035 - Communications Provider Data Item |
|
| R0202 | Performance Assurance Report Catalogue Updates (MHHS) | |
| R0225 | Clarification on TDIS portfolio transfers on sale |
|
| R0233 | Introduction of an Energy Theft Unit (ETU) under the REC | |
| R0234 | Introduction of an energy theft Referral Assessment Service under the REC | |
| R0236 | REC Party Auto de-accession proposal |
|
| R0238 | Performance Assurance Reporting Catalogue - Annual Review | |
| R0249 | Correction to Change Management Schedule regarding sub-committee voting |
|
| R0258 | Housekeeping June 2025 | |
| R0080 | Improvements to ‘Failed to Deliver’ CSS Messages |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS (27.08.2024)
Upload document
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS.xlsx
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only (18.03.2025)
Upload document
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only 18.03.2025.xlsx
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025
Upload document
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025.xlsx
Archive
Off
Problem Statement
The PARC currently does not capture all the data items required to support the monitoring of Retail Risks following Market-wide Half Hourly Settlement go-live. An update to the PARC is required to include the data items that will ensure the Code Manager can provide the assurance the industry requires during transition and under the new MHHS arrangements.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
RECPAB_23_Performance Assurance Report Catalogue V5.2 - REDLINE.xlsx
R0202 - PARC Updates (MHHS) (CP Form)
R0202 Change Proposal Re-Plan v1.0 31.10.24
R0202 Change Report (Proposal Plan) v2.0 (Approved) 03.09.2024
R0202 Change Proposal Re-Plan V2.0 (Approved) 20.03.2025
R0202 Change Report (Consultation) v1.0 (Approved) 25.03.2025
R0202 Consolidated Consultation Responses V1.1 (22.04.2025)
R0202 Change Report (Final Recommendation) (Post-Vote) v2.0
Company Name
Code Manager
Review status
Review required
Creation of a Tool to Manually Correct ERDS / CSS Discrepancies
Date of latest update
Type
Change
ID
R0201
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 27 March 2026.
Summary
There is currently a tool utilised by DNOs to manually correct registration data to align the Registered Supplier in ERDS with the data held in CSS. The Market-Wide Half Hourly Settlement (MHHS) Design does not allow for retrospective amendment of Supplier Registration i.e. there is no equivalent tool for manual correction post MHHS go live (M10). Therefore, post MHHS implementation, any issues which prevent CSS data being reflected in ERDS cannot be corrected. This will prevent the Supplier from appointing agents and will lead to errors in settlement data under the BSC. A change is required to address this.
Change Plan
Change Issue Group
Completed
Start:
01 Aug 2024Due:
01 Aug 2024Completion:
01 Aug 2024Proposal Plan Approval
Completed
Start:
01 Aug 2024Due:
03 Sep 2024Completion:
03 Sep 2024Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
27 March 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0201 | Creation of a Tool to Manually Correct ERDS / CSS Discrepancies |
|
| R0298 | Annual Review of the Performance Assurance Report Catalogue (2025-26) |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed Solution Document
Document title
Indicative PARC extract for R0201
Upload document
Indicative PARC extract for R0201 270824 .xlsx
Archive
Off
Document title
Solution Development Report published for Impact Assessment
Upload document
R0201 - Solution Development Report for IA 2.0.pdf
Archive
Off
Document title
Legal Text published for Impact Assessment
Upload document
Legal Text Published for IA.zip
Archive
Off
Document title
R0201 - Solution Development Report 270824
Upload document
R0201 - Solution Development Report 270824.pdf
Archive
Off
Problem Statement
There are instances where ERDS (and SMRS under BSC governance) can be misaligned with the CSS and under the MHHS arrangements there is no mechanism for manual correction which there is in place today. From MHHS go live the Supplier will not be able to appoint their preferred agents. This issue only applies to MHHS Migrated Metering Points as the existing mechanism for manually correcting data would be used if the issue related to a non-migrated Metering Point. In the event that the Supplier cannot appoint its agents, this may prevent the Supplier from accurately billing the Consumer. The potential impact will increase as MHHS Migration continues, with more MHHS Metering Points potentially impacted by any CSS / ERDS discrepancy.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
CP Form - CSS ERDS Discrepancy
R0201 Change Proposal Re-Plan V2.0 Approved
Change Proposal Re-Plan V3.0 Approved
Change Report for Impact Assessment
RECCo Overview Slides - CSS and ERDS Discrepancies
R0201 Change Report Proposal Plan V2.0 (Approved) 03.09.2024
R0201 - Change Proposal Re-Plan v1.0 (Approved) 15.10.2024
R0201 Consolidated Impact Assessment Responses (Public)
R0201 Change Report (Consultation) v1.0 12.08.2025
R0201 Consolidated Consultation Responses V1.0
R0201 Change Proposal Re-plan V4.0
Company Name
RECCo
Review status
Review required
Review of the REC's Address Management Service
Date of latest update
Type
Issue
ID
I0200
Change Category
Change Path
Priority
Urgent
No
Latest Update
The Change Report (Update to Plan) has been published and is now open for comments until 23:59, 16 November 2026.
Summary
Having the incorrect address can lead to a range of Consumer issues, including switching, billing and meter reading problems. The Meter Point Location (MPL) and Retail Energy Location (REL) have been added to the Code to resolve this issue. Whilst there had been progress resolving address data issues, there is not currently a mechanism to establish Code level targets for address improvement, resulting in around 2.8 million unmatched addresses.
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
There has been progress resolving address data issues, but there is no mechanism to clearly establish Code level targets for address improvement, or overall market performance.
Stages Selection
Stages Selection
Workgroup
I0200 - Improving Address Management Targets (Issue Form)
I0200 - Change Issues Group paper
I0200 - Change Report (Proposal Plan) V1.1 (Approved) 18.02.2025
I0200 - Update to Plan (Pre Approval) 14.04.2026
I0200 Change Report (Update to Plan) V1.0 Approved 17.11.26
Company Name
REC Code Manager
Review status
Review required
A process for resolution of gas unregistered sites
Date of latest update
Type
Issue
ID
I0199
Other Industry Codes impacted
Change Path
Urgent
No
Latest Update
09/10/2024 - This Issue has been withdrawn as it will be progressed as part of I0172 and any Issues not related to the REC will be handed off to UNC & IGTUNC.
Summary
Issue raised by RECCo at RIG. Healthy discussions have led to a recommendation that RIG refer this to ChIG for further discussion. GTs have reported to RECCo that there are approx 85,000 unregistered sites on the networks with no process for resolution between GTs and Suppliers
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Solution Development
Stages Selection
Stages Selection
I0199 - Gas Unregistered Sites (PDF)
Company Name
REC Code Manager
Review status
Review required
Review of Metering Asset data transferred from MAMs to the CDSP
Date of latest update
Type
Issue
ID
I0196
Change Path
Priority
Urgent
No
Latest Update
10/09/2026 - The Metering Expert Panel approved the extension to plan for I0196. This REC Issue is now placed on hold.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
I0196 Change Re-Plan V2.1 (Approved) 09.09.26
Company Name
-
Review status
Review required