Performance Assurance Report Catalogue V5.1
Date of latest update
Type
Change
ID
R0154
Change Category
Change Path
Priority
Urgent
No
Latest Update
This change was implemented as part of the the Extraordinary release on 28 March 2024. 24/04/24 - A new version of the Final Change Report(V1.1) has been published. The table in Appendix 2 has been amended to make clear that both reports 100 & 101 have been removed as part of the solution for this change.
Summary
Following their annual review, the REC Performance Assurance Board (PAB) have suggested updates to the Performance Assurance Report Catalogue (PARC). This change seeks to implement those updates, thereby introducing the newest version of the PARC.
Change Plan
PRELIMINARY CHANGE REPORT AND CONSULTATION ISSUED
Completed
Start:
24 Nov 2023Due:
05 Jan 2024Completion:
05 Jan 2024CONSULTATION CLOSES
Completed
Start:
05 Jan 2024Due:
26 Jan 2024Completion:
26 Jan 2024FINAL CHANGE REPORT ISSUED
Completed
Start:
26 Jan 2024Due:
16 Feb 2024Completion:
16 Feb 2024RESPONSIBLE COMMITTEE DECISION
Not Started
Start:
16 Feb 2024Due:
27 Feb 2024Completion:
Status
Implementation Date
28 March 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0147 | Prepayment Levelisation |
|
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 16 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want parties who handle my energy account information to be held to high standards, so that I have confidence in their management of my information.
- As a REC Party and/or Service Provider, I want the performance assurances standards to which I am held to be regularly reviewed, so that I have confidence in monitoring activities.
Proposed Solution Document
Document title
RECPAB_23_Performance Assurance Report Catalogue V5.1 - REDLINE (003) - 22.12.23 Fina
Upload document
RECPAB_23_Performance Assurance Report Catalogue V5.1 - REDLINE (003) - 22.12.23 Final (1).xlsx
Archive
Off
Document title
RECPAB_23_Performance Assurance Report Catalogue V5.1 (Post-Consultation) 16.02.24
Upload document
RECPAB_23_Performance Assurance Report Catalogue V5.1 (Post-Consultation) 16.02.24.xlsx
Archive
Off
Document title
RECPAB_23_Performance Assurance Report Catalogue V5.1 (Post-Consultation) REDLINED - 16.02.24
Upload document
RECPAB_23_Performance Assurance Report Catalogue V5.1 - (Post Consultation) REDLINE.xlsx
Archive
Off
Problem Statement
The REC Performance Assurance Board has reviewed the Performance Assurance report catalogue (PARC) and proposed changes to update the PARC to version 5.1. As the PARC is a Category two document, implementation of the proposed PARC changes must therefore follow the change process.
Stages Selection
SME
SME Role
Lead Technical Analyst
RECPAB_23_Performance Assurance Report Catalogue V5.1 - REDLINE (2).xlsx
R0154 Change Proposal Form
R0154 Change Proposal Plan (Approved) v1.0 19.12.23
R0154 Initial Assessment Report (Approved) v1.0 19.12.23
R0154 Preliminary Change Report (Published for Consultation) v1.0 - 05.01.24
R0154 Consolidated Consultation Responses v1.0 - 16.02.24
R0154 Final Change Report (Post-Vote) V1.1 - 24.04.24
Company Name
REC Code Manager
Review status
Review required
Catering for Registration Events where the Incumbent Supplier deactivates prior to a Switch becoming effective
Date of latest update
Type
Change
ID
R0153
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/06/24 - This change has been withdrawn by the proposer and is being incorporated as part of R0178 - Improvements to CSS Business Process Logic. 03/05/2024 - An investigation was held into the requirements of this change and into other issues identified with the CSS Business Process and Logic. Landmark have provided data relating to the number of incidents for three different scenarios which had been identified. A discussion as held between the Code Manager, DCC and Landmark, and agreed that they will look to combine all identified issues into a new REC Change Proposal.
Summary
This change looks to resolve the issue for Registration Events where the incumbent Supplier deactivates prior to a Switch becoming effective. In some instances, the incumbent Supplier is withdrawing prior to the ‘Supply Effective from Date’ which causes the accepted Switch to fail at Gate Closure (17:00hrs) . An effective solution is to allow the consumer to Switch with the original effective date. There are a number of solution options to enable this to happen.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
Solution Development
Problem Statement
In some instances, the incumbent Supplier is withdrawing prior to the ‘Supply Effective from Date’ which causes the accepted Switch to fail at Gate Closure (17:00hrs).
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
Catering for Registration of Events CP Form 24.11.2023
Company Name
Xoserve
Review status
Review required
Revision to the Consolidated Metering Code of Practice (CoMCoP)
Date of latest update
Type
Change
ID
R0152
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Following the implementation of the Consolidated Metering Code of Practice (CoMCoP) a number of issues have been identified by RECCo, The Code Manager and REC Parties, stating that REC Parties are unable to meet their obligations as currently presented in the CoMCoP. The Code Manager has reviewed these and determined changes are required.
Change Plan
Extension to Plan V2.0 approved at Change Panel
Completed
Start:
Due:
Completion:
04 Feb 2025Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0152 | Revision to the Consolidated Metering Code of Practice (CoMCoP) |
|
| R0157 | Removal of Facsimile as a Method of Code Communication |
|
| R0191 | Introduction of SLA for Supplier De-Registration on Disconnected Meters |
|
| R0205 | Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches | |
| R0212 | Protecting Crimestoppers and their Contacts | |
| R0215 | Schedule 30 Switch Meter Reading Problems - Rejections and Timings |
|
| R0060 | ERDS Service Definition timezone correction |
|
| R0232 | Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) | |
| R0243 | Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership |
|
| R0248 | REC Changes to tie in with DCP451 - Suspending Registrations |
|
| R0254 | Non-Domestic Change of Occupier Reporting (R0155 Solution) | |
| R0255 | Terms of Reference Updates | |
| R0257 | Change to REC for Data processing outside of EEA | |
| R0263 | Sharing Confirmed Energy Theft Data with the BSCCo |
|
| R0269 | Schedule 5 – Change Management: Clarity and Typographical Review |
|
| R0279 | Housekeeping November 2025 |
|
| R0227 | Domestic Elective HH Switching |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I trust my Energy Supplier and their associated agents to have a robust metering framework to ensure the safety and accuracy of my meter.
- As an Energy Supplier, MEM or DNO, I need clear and correct documentation so I can identify the obligations I need to meet within my role and satisfy my audit criteria.
- As an Energy Supplier, I need to know that any MEM or DNO I work with is compliant to ensure the best practice for my customers.
- As the Metering Scheme Auditor, I need clear and correct documentation to ensure I can fulfil my role and provide confidence that REC Parties are meeting their obligations.
Proposed Solution Document
Document title
Draft legal text for Party Impact Assessment
Upload document
Legal text for Party IA (1).zip
Archive
Off
Document title
R0152 Solution Documents Guidance v1.0
Upload document
R0152 Solution Documents Guidance v1.0.pdf
Archive
Off
Document title
R0152 Party IA Solution Documents Guidance Video
Archive
Off
Document title
R0152 Legal text for Consultation
Upload document
R0152 Legal text for Consultation.zip
Archive
Off
Document title
R0152 legal text for final recommendation
Upload document
R0152 legal text for final recommendation.zip
Archive
Off
Problem Statement
MEMs are struggling to successfully pass their CoMCoP audits and be compliant, due to inconsistencies and lack of clarity in the document. There has been concern expressed by MEMs, that when contracting with Energy Suppliers, they are proclaiming themselves compliant with the CoMCoP when this may or may not be true.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
SME User
daniel.rodgers@retailenergycode.co.uk
REC Analysis CoMCoP.xlsx
R0152 - Change Proposal Form (downloadable version) 16.11.2023
R0152 Change Proposal Plan v1.0 (Approved) 19.12.23
R0152 Initial Assessment Report v1.0 (Approved) 19.12.23
R0152 Extension to Plan v1.0 (Approved) 31.10.2024
R0152 Extension to Plan v2.0 (Approved) 04.02.2025
R0152 Consolidated Party Impact Assessment Responses PUBLIC V1.0
R0152 Change Report (For Consultation) V1.0
R0152 - Consolidated Consultation Responses (Public) v1.0
R0152 Change Report (Final Recommendation) V1.1 approved
R0152 Change Report (Final Recommendation) V1.1 approved
Company Name
REC
Review status
Review required
On-site Aggregation as a method to facilitate Third Party Access - BSC P455
Date of latest update
Type
Change
ID
R0150
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Following a modification proposal to the Balancing and Settlement Code (BSC) to allow on-site aggregation as a method for third party access on private networks, the Code Manager is required to amend the REC to place a requirement on the Meter Equipment Managers (MEMs) appointed by the boundary points Electricity Supplier, to rectify any faults found with the submeters used in the on-site aggregation methodology.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
15 Jan 2024Due:
22 Mar 2024Completion:
22 Mar 2024Party Impact Assessment
Completed
Start:
30 Oct 2023Due:
15 Jan 2024Completion:
15 Jan 2024Final Change Report Issued
Completed
Start:
22 Mar 2024Due:
26 Apr 2024Completion:
25 Apr 2024Responsible Committee Decision
Completed
Start:
26 Apr 2024Due:
08 May 2024Completion:
08 May 2024Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- The BSC Modification P455 Modification proposes to place a requirement on the SVA MOA (MEMs) appointed by the Boundary Point Supplier to rectify any faults found with the sub meters used in the On-Site Aggregation methodology; and to produce and submit the On-Site Aggregation Form to the HHDC. As MEMs (SVA MOAs) are governed under the Retail Energy Code (REC), R0150 is the REC's subsequent change to propose this.
Proposed Solution Document
Document title
Metering Operations - R0150 Legal Drafting (Published with Consultation 22.03.2024)
Upload document
Metering Operations - R0150 Legal Drafting (1).docx
Archive
Off
Document title
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Extract: R0150 - Schedule 14 Legal Drafting (Published with Final Change Report) 25.04.2024
Upload document
R0150 - Schedule 14 Legal Drafting (Extract) (Published with Final Change Report) 25.04.2024.docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14 Extract)
Upload document
R0150 Legal Drafting (Schedule 14 Extract).docx
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14).
Upload document
Approved for Implementation - R0150 Schedule 14 Legal Solution.docx
Archive
Off
Document title
Ofgem - BSC Modification P455 Decision
Archive
Off
Problem Statement
Under the proposed solution for BSC Modification P455, Consumers will require a Market Participant to oversee the maintenance of their sub-meter, including installations and rectification of metering faults. To ensure this, the REC will need to place a requirement on the MEMs appointed by the boundary point Electricity Supplier to rectify any faults found with the sub-meters used in the On-Site Aggregation.
Stages Selection
R0150 - On-site Aggregation as a method to facilitate Third Party Access - BSC P455
R0150 Change Proposal Plan V1.0 (Approved 19.12.2023)
R0150 - Change Proposal Re-Plan (Approved) 08.02.2024
R0150 Initial Assessment Report V1.0 (Approved) 19.12.2023
R0150 - Preliminary Change Report V1.0 (Published for Consultation 22.03.2024)
R0150 - Consolidated Consultation Responses (17.04.2024)
R0150 - Final Change Report V2.0 (Approved) 08.05.2024
Company Name
Gemserv
Review status
Review required
Implementation of Online Certificate Standard Protocol (OCSP) in addition to Certificate Revocation List (CRL).
Date of latest update
Type
Change
ID
R0151
Change Category
Change Path
Priority
Urgent
No
Latest Update
14/05/2024 - At the request of the proposer, this Change Proposal has now been withdrawn. The rationale for withdrawing the proposal was that the benefits afforded by this change will not be fully realised until 2026 (renew of digital certificates), and the risk profile around revoked certificates remains unchanged during this period. DCC recommend this change is revisited in 12 months, to allow sufficient time for review and resubmission ahead of any certificate renewal activities.
Summary
This Change seeks to make improvements to the Microsoft Azure Application Gateway module. A defect has been identified which requires the implementation of a manual/ customer workaround when checking the Certificate Revocation Lists (CRLs) systems within the Central Switching Service (CSS) to ensure certificates are revoked. This change seeks to remove the need to complete a manual workaround and implement a real-time certification validation capability.
Change Plan
Solution Analysis and Development
Completed
Start:
30 Oct 2023Due:
26 Jan 2024Completion:
26 Jan 2024Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- The proposed solution is to roll out support for Online Certificate Standard Protocol (OCSP) in addition to Certificate Revocation List (CRL). The scope of the change will be: - Implementation of a central OCSP server and the update of the associated PKI processes to manage the Certificate Revocation. This will cover the TLS and JWS Certificate Revocation. - CSS implementation of Application Gateway will be reconfigured to include the OCSP functionality and server. - CSS change to implement the OCSP checking for the JWS certificates. - All new certificates that are issued will include the detail of the OCSP Server, as part of the migration approach all new certificates will have this information embedded. - All parties connecting to CSS have the relevant information for them to exploit the advanced features that OCSP introduces. The CRL checking functionality will be maintained so this change is an optional upgrade for any Systems that operate using Switching Key Infrastructure.
Problem Statement
There is currently a Microsoft Azure Application Gateway module defect against the checking of Certificate Revocation Lists (CRLs), with Microsoft stating that the CRL related defect will not be fixed. Consequently, any system within the CSS ecosystem, systems that use Switching Key Infrastructure (SWIKI), that have incorporated the Azure Application Gateway module to manage the TLS connection will have been required to implement a manual/custom workaround to ensure that certificates that are revoked are not allowed to establish a connection.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0151 - Implementation of OCSP in addition to CRL
R0151 - Initial Assessment Report V2.0 (Approved) 06.02.2024
Company Name
Smart DCC
Review status
Review required
Updates to the EES API Interface Specification
Date of latest update
Type
Change
ID
R0149
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
The EES Provider has made some alterations to the EES API Interface Specification to incorporate new data items that support MHHS Stage 0 as well as some housekeeping changes and clarifications to the methods within the API.
Change Plan
Preliminary Change Report and Consultation published
Completed
Start:
20 Oct 2023Due:
03 Nov 2023Completion:
03 Nov 2023Consultation close
Completed
Start:
03 Nov 2023Due:
17 Nov 2023Completion:
17 Nov 2023Final Change Report issued
Completed
Start:
17 Nov 2023Due:
22 Nov 2023Completion:
22 Nov 2023Responsible Committee Decision
Completed
Start:
22 Nov 2023Due:
29 Nov 2023Completion:
29 Nov 2023Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
06 December 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0118 | Review of Schedule 12 and processes to manage access to data |
|
| R0128 | Removal of CSS Business Rule 1177 to reflect OFAF optionality | |
| R0136 | Change to REC Schedule 22 Market Stabilisation Charge (MSC) | |
| R0149 | Updates to the EES API Interface Specification | |
| R0067 | Introduction of CSS refresh functionality |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As an EES API User, I want to ensure that I have the most up to date technical information so that I can use the API in the most effective way.
- As the EES Provider, I want to ensure that the most up to date technical information is available to Users.
Proposed Solution Document
Document title
EES API Interface Specification v3.1.5. Redline (30.10.2023)
Upload document
EES API Interface Specification v3.1.5. Redline (1).docx
Archive
Off
Problem Statement
The current version of the EES API Technical Specification (V3.1.4) does not contain the latest updates from the EES Provider. Without these updates, API users will not be able to utlilise the new data items or have further detail on the data items returned within SearchUtilityAddress and GetTechnicalDetailsByMpan.
Stages Selection
R0149 - Change Proposal Form.docx
R0149 - Change Proposal Plan (Approved) 07.11.2023
R0149 - Preliminary Change Report (Published for Consultation) 03.11.2023
R0149 Initial Assessment Report (Approved) 07.11.2023
R0149 - Consolidated Consultation Responses (22.11.2023)
R0149 - Final Change Report v2.0 (Approved) 29.11.2023
Company Name
Code Manager
Review status
Review required
Introduction of classification-based access model
Date of latest update
Type
Change
ID
R0148
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
21/11/2025 - Following a review of the impact assessments received for the technical solution required to deliver R0148, taking into account the timelines, costs and the pending decision on the Evolution of the Enquiry Services, a positive business case cannot be demonstrated at this time. RECCo have, therefore, made the decision to withdraw R0148 and look at how the technical objectives can be met through the Evolution of the Enquiry Services. The adoption window has closed.
Summary
Currently Enquiry Services Data is only available to users whose roles and purposes for access are detailed within the Data Access Matrix (DAM). RECCo has undertaken a project to look at REC controlled data sources and created a Metadata Catalogue based on a Data Classification Model. This details the data items along with descriptions, identification of the associated data, roles, responsibilities, and classification. The output of this work will be utilised to improve access to Enquiry Services Data by making certain data items (defined as Always Open) easily available to everyone and simplifying the approval process for data items which can be made available if certain conditions have been met.
Change Plan
Service Provider Impact Assessment
In Progress
Start:
13 Oct 2023Due:
31 Dec 2024Completion:
Party Impact Assessment
Not Started
Start:
31 Dec 2024Due:
31 Dec 2024Completion:
Consultation
Not Started
Start:
31 Dec 2024Due:
28 Feb 2025Completion:
Responsible Committee Decision
Not Started
Start:
28 Feb 2025Due:
04 Mar 2025Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I want Market Participants to have appropriate data access so that I can benefit from improved product and service offerings.
- As a Market Participant, I want the processes that grant data access to be simplified and adaptable so that valid data use cases are addressed quickly.
Proposed Solution Document
Document title
Wiki Article - R0148 and the Metadata Catalogue
Archive
Off
Problem Statement
Currently the REC has a focus on role-based access to data items within the Enquiry Services as detailed in Schedule 12 – Data Access. However, a system and process where data items are released by virtue of the data item is needed.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0148 - Open Data Change Proposal Form V1.0.docx
Rebaseline of Change Proposal Plan v2.0
Metadata Catalogue V2.2 Published - EES GES Sources.
R0148 - Change Proposal Plan V1.0 (Approved)
R0148 - Initial Assessment Report v1.0 (Approved)
R0148 - Rebaseline of Change Proposal Plan (20.09.2024)
Company Name
Code Manager
Review status
Review required
Data Specification Update for Refresh Functionality
Date of latest update
Type
Change
ID
R0146
Change Category
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
This change has been raised to update the Data Specification and to align it with the changes made during implementation of change proposal ‘R0067 – Introduction of CSS Refresh Functionality’.
Change Plan
Preliminary Change Report Published
Completed
Start:
21 Aug 2023Due:
16 May 2024Completion:
16 May 2024Consultation Issued
Completed
Start:
16 May 2024Due:
16 May 2024Completion:
16 May 2024Final Change Report Issued
Data Specification Update for Refresh Functionality > Change Plan
Start:
16 May 2024Due:
19 Jun 2024Completion:
Responsible Committee Decision
Data Specification Update for Refresh Functionality > Change Plan
Start:
19 Jun 2024Due:
26 Jun 2024Completion:
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
23 August 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0121 | SDEP Review Improvements (1) - Process Types |
|
| R0146 | Data Specification Update for Refresh Functionality | |
| R0164 | Removing the Enumerations from Communications Method Data Item (J0386) to align with BSC CP 1594 | |
| R0166 | Removal of the Green Deal Panel | |
| R0181 | Schedule 14 - Metering Operations Footnote Review |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 02 Nov 2026 | ||
| 1.0 | 02 Nov 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
Proposed Solution Document
Document title
R0146 Solution Development Report
Upload document
R0146 Solution Development Report v1.0.docx
Archive
Off
Document title
R0146 Attachment A - Proposed Data Specification Changes
Upload document
Attachment A R0146 Proposed Data Specification Changes v1.0.docx
Archive
Off
Problem Statement
Following implementation of R0067, a small number of Market Messages and Data Items need to be appropriately reflected within the Data Specification.
Stages Selection
R0146 - Change Proposal Form
R0146 - Change Proposal Plan v1.0 (Approved)
R0146 - Initial Assessment Report v1.0 (Approved)
R0146 - Preliminary Change Report v1.0
R0146 Final Change Report (Post-Vote) v1.0 26.06.2024
Company Name
Code Manager
Review status
Review required
Service Termination Issue Reporting (Change to Category 2 document)
Date of latest update
Type
Change
ID
R0145
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
22/02/2024 At the Metering Expert Panel meeting on 14 February 2024, the Panel voted to reject the Code Manager's recommendation to approve R0145 - Service Termination Issue Reporting (Change to Category 2 Document). Under REC Schedule 5 - Change Management, when a Responsible Committee rejects the recommendation of the Code Manager with respect to a Self-Governance Change Proposal, the Change Proposal is automatically referred to Ofgem (as the Authority) for its determination, unless the Code Manager changes its recommendation based on the reasons provided by the relevant sub committee. Following consideration of the decision made by the Metering Expert Panel and the reasons for its rejection, the Code Manager has decided to amend its recommendation, and is now recommending the rejection of R0145. The Code Manager maintains that the business case for R0145 was made, and the solution does address the identified problem statement, and this was reflected in the comments of a majority of group members as the R0145 was progressed and during the vote. However, it is clear that some RECMEP members are supportive of a change to the governance of this document that would remove it from the REC completely. Although this was outside of the scope of the original change, it was a consistent theme throughout the development of R0145. Consequently, R0145 has been rejected for implementation and the decision will not be referred to Ofgem.
Summary
This Change Proposal updates the Categorisation of this REC document to a Category 2 document. It is currently classified as a Category 3 document – which are used for guidance documents that have no material impacts on REC Parties. The REC obligates compliance with this document through Schedule 14 – Meter Operations and the Consolidated Metering Codes of Practice
Change Plan
Impact Assessment
Completed
Start:
21 Aug 2023Due:
25 Aug 2023Completion:
25 Aug 2023Preliminary Change Report Issued
Completed
Start:
25 Aug 2023Due:
08 Sep 2023Completion:
08 Sep 2023Preliminary Change Report Review by Metering Expert Panel (ex-committee)
Completed
Start:
08 Sep 2023Due:
15 Sep 2023Completion:
15 Sep 2023Consultation - 15 Working Days
Completed
Start:
15 Sep 2023Due:
22 Sep 2023Completion:
13 Oct 2023Final Change Report Issued
Completed
Start:
08 Dec 2023Due:
22 Dec 2023Completion:
06 Feb 2024Metering Export Panel Decision
Completed
Start:
10 Nov 2023Due:
24 Nov 2023Completion:
24 Nov 2023Second Preliminary Change Report
Completed
Start:
22 Sep 2023Due:
10 Nov 2023Completion:
10 Nov 2023Consultation on 2nd Preliminary Change Report
Completed
Start:
24 Nov 2023Due:
27 Nov 2023Completion:
24 Nov 2023Preliminary Change Report Consultation Closes
Completed
Start:
27 Nov 2023Due:
08 Dec 2023Completion:
08 Dec 2023Final Decision of Metering Expert Panel
Not Started
Start:
22 Dec 2023Due:
12 Jan 2024Completion:
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a DNO I want to ensure that the MEMs who work on my network have the requisite skills and experience and that they will follow the instructions relating to reporting incidents of danger, damage, or interference with the DNO Equipment, as set out in the Service Termination Issue Reporting document.
- As a Supplier I want any MEM I employ to have clear instructions on how to report incidents of danger, damage, or interference with the DNO Equipment.
- As a MEM I want information on what actions I need to take where there is danger, damage, or interference with the DNO Equipment at site, so that issues can be safely addressed in the appropriate timescales.
- As the Code Manager, I want clarity on the governance and for change processes of the document to be appropriate, for the subject matter and relevant affected parties.
Problem Statement
Compliance with the CoMCoP and the Metering Operations Schedule includes obligations on the MEMs to report incidents of danger, damage, or interference with the DNO Equipment in accordance with the requirements set out in the document. Failure to comply with these requirements will leave the MEM subject to permission to work on the DNO’s equipment being revoked, which will have consequences on their ability to work as a REC MEM more widely.
Stages Selection
R0145 - Downloadable Change Proposal Form
R0145 - Service Termination Issue Reporting CPP v1.0 Approved 05.09.2023
R0145 IAR - Service Termination Issue Reporting Approved by Change Panel 05.09.2023
08.09.2023 - R0145 REC Service Termination Issue Reporting v1.0 Draft Legal Text for PCR
R0145 - Preliminary Change Report (Approved by Panel) 15.09.23
R0145 - Change Proposal Re-Plan v2.0 20/11/2023
R0145 - Consolidated Consultation Responses v1.1 Public
R0145 FCR -STIR Document (Change to Cat 2) (Post-Vote) V1.0 14.02.2024
Company Name
Gemserv
Review status
Review required
New value for Site Visit Check Code (J0024)
Date of latest update
Type
Change
ID
R0143
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
12/10/2023 - Change Proposal has been rejected, as the change needs to be raised under the Balancing & Settlement Code - as the impacted Data Item is a BSC owned Data Item, and is not able to be amended by a REC Change.
Summary
The Change introduces a change to the MM00036/(D0139), to introduce a new Site Visit Check Code to reflect site specific capacity charges being levied by the Distribution Network Operators (DNOs) on Suppliers for their Consumers.
Change Plan
Impact Assessment Report Published
Completed
Start:
14 Aug 2023Due:
25 Aug 2023Completion:
25 Aug 2023Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Solution Development
Proposed solution summary
- As a Consumer, I need my Supplier to be aware of any charges that will be applied by the DNO for the provision of the connection while the site is De-energised.
- As a Supplier I need to know if charges are expected to be levied by the DNO for retained capacity for De-energised Metering Points, so that I can pass the costs on to my Consumer.
Problem Statement
DNOs need to be able to communicate to Suppliers that they will charge site-specific DUoS for de-energised sites where there is an ongoing need for the connection to be maintained.
Stages Selection
R0143 - Change Proposal Form
R0143 - Change Proposal Plan v1.0 2 Approved by Change Panel 05.09.2023
R0143 - IAR - New Site Visit Check Code v1.0 Approved by Change Panel 25.09.2023
Company Name
UK Power Networks
Review status
Review required